welded tube pros llc - quit your winding!weldedtubepros.com/od.pdf · 2012. 12. 11. · sweed ts450...
TRANSCRIPT
SWEED TS450 SCARF CHOPPER• Eliminate the #1 Safety Hazard in the Tube Mill Industry!• Eliminate O.D. Scarf scrap ball handling!• Produce valuable by-product!
16574 Old Chippewa Trail • Doylestown, OH 44230 • Phone: (330) 658-7070 • eFax: (312) 896-5696 • E-Mail: [email protected] Consultants, Div. Welded Tube Pros; Authorized Distributor
© 2
001 S
weed R
ecy
clin
g S
yst
em
s --
SR
S018A
Quit YQuit YQuit YQuit YQuit Your Winding!our Winding!our Winding!our Winding!our Winding!The TS450 Chopperfor OD Tube Scarf
The Model TS450 is designed to put an end to the dangerous business of repeatedly handling O.D. bead scarf.Thread the scarf into the tension controlled pinchroll only once per run. No more repeated scrap winder thread-ing and unloading. Chopping scarf greatly reduces risk of burns, cuts and back injury. Plus, by chopping thescarf instead of winding, no further handling is required and the value of the scrap is greatly increased.
Built in the USA
Scarf chopped in the Sweed TS450 is safelyand easily compacted—Approximately 2000linear feet of chopped scarf easily fits into a12” x 10” x 4” box.
Scarf from a winder is dangerous, bulky and noteasy to handle.
• 1 HP motor• 1 HP motor• 1 HP motor• 1 HP motor• 1 HP motor• Single Phase, 115/230 V• Single Phase, 115/230 V• Single Phase, 115/230 V• Single Phase, 115/230 V• Single Phase, 115/230 Voltoltoltoltolt
Three Phase, 230/460 VThree Phase, 230/460 VThree Phase, 230/460 VThree Phase, 230/460 VThree Phase, 230/460 Voltoltoltoltolt• W• W• W• W• Weight: 435 lbs.eight: 435 lbs.eight: 435 lbs.eight: 435 lbs.eight: 435 lbs.• Dimensions: 36“ x 26” x 13”• Dimensions: 36“ x 26” x 13”• Dimensions: 36“ x 26” x 13”• Dimensions: 36“ x 26” x 13”• Dimensions: 36“ x 26” x 13”• 5” Diameter heat dissipating feedrolls• 5” Diameter heat dissipating feedrolls• 5” Diameter heat dissipating feedrolls• 5” Diameter heat dissipating feedrolls• 5” Diameter heat dissipating feedrolls• 1 year warranty on parts and labor• 1 year warranty on parts and labor• 1 year warranty on parts and labor• 1 year warranty on parts and labor• 1 year warranty on parts and labor
TS450
WELDED TUBE PROS LLC
SINGLE SOURCE FOR WELDED TUBE TECHNOLOGY AND EQUIPMENT
IN-LINE GAU
For weAutom0.0005”incomiLine G0.250” limitatistrengt
I2S GAMMA TNon-cothickne0.010” 0.0001”
LAP LASER TNon-comateriaweld desame g1,200 F
LAP LASER VNon-cosensor FPM. Askiddin
HARRIS CAMCambestampeimprovfly to +
HARRIS CEN
Opticasensingand rel
SWEED SCRASlitter spec tuchop foincreas
Tel: 330-65
CONSULTING
Process Quality Tube / Pengineer
TUBE MILL A
Laser asmill from
MILL REBUILService facility.
OPERATOR T
In-plantpersonnand videprocess.
ROLL TOOL AToolingreducedquality.
JOB PLACE SAOperatoclaims.
ON SITE DRUG
In-PlantFree Wo
SUNPRO ENVISERVICES
Site andservicesdecontaDOT-PeTranspo
SUNPRO ELECUpgradenergizeequipme
PRODUCTS
GE CONTROL SYSTEMS lded tube or rollform processes. atic correction of thickness to of minimum gauge despite
ng strip thickness variation. In-auge mills for strip from 0.010 to thick X widths to 18”. No on on speed, material yield h or gauge.
HICKNESS GAUGE ntact Gamma Radiation ss gauges for material from to 0.250” thick. Accuracy to @ 2,500 FPM
HICKNESS GAUGES ntact laser thickness gauges for l from 0.005 to 1.00” thick. End tection AND thickness on the
auge. Accuracy to 0.0002” @ PM
ELOCITY GAUGES ntact laser Doppler velocity for line speeds from 10 to 3,950 ccuracy, without concern for g to 0.2% of actual line speed.
BER DETECTION SYSTEMS r detection in rollformed, d or welded sections for ed quality. Detect camber on the / - 0.015” per foot.
TER GUIDE SYSTEMS l detectors of edge or centerline for process lines, payoff, rewind ated strip handling systems.
P RECYCLING SYSTEMS side trim, OD / ID Weld bead, offbe or rollform section crush and r fast, easy disposal and ed profit.
8-7070 eFax: 312-896-5696 email: infoWebsite: www.weldedtubepros.
SERVICES
ENGINEERING Audits, Roll Tool Analysis, Audits, Project management, ipe Mill relocation or upgrade ing.
LINGMENT SERVICES. sisted alignment of the entire entry to exit.
DING performed in-plant or at our
RAINING training for setup and operation el. Company training manuals os developed to suit your
NALYSIS inspection and setup review for setup time and improved
FETY TRAINING r training to reduce injury
AND ALCOHOL TESTING testing programs for a Drug rk place.
RONMENTAL SITE
building decontamination ; PCB cleanup, Radiation mination, Wastewater treatment. rmitted Hazardous Waste rter.
TRICAL SERVICES e of electrical substation, d substation painting, PCB nt recirtification / replacement.
@weldedtubepros.comcom