THE CITY OF NEW YORK July 16, 2012 CERTIFICATE 24511 RESOLVED That the Design Commission, having considered designs for the installation of louvers, 80 Centre Street, Manhattan, submitted by the Department of Citywide Administrative Services, represented by exhibits 353-JC, JD & JE of record in this matter, hereby gives to the same unanimous preliminary and final approval. Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs. A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012. Jackie Snyder Executive Director

Upload: others

Post on 23-Jan-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24511

RESOLVED That the Design Commission, having considered designs for the installation of louvers, 80 Centre Street, Manhattan, submitted by the Department of Citywide Administrative Services, represented by exhibits 353-JC, JD & JE of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 2: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24512

RESOLVED That the Design Commission, having considered designs for the rehabilitation of 970 DeKalb Avenue, Brooklyn, submitted by the Department of Design and Construction, represented by exhibits 7068-A, B, C & D of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the Department of Design and Construction will plant a tree in the empty tree pit in front of the building.

Preliminary approval is conditioned upon submission of this project for final review and approval before July 16, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 3: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

11\'CDESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24513

RESOLVED That the Design Commission, having considered designs for the installation of a rooftop photovoltaic panel, Engine Company 298, 153-11 Hillside Avenue, Queens, submitted by the Department of Design and Construction, represented by exhibits 3396-E, F, G, H & I of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 4: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24514

RESOLVED That the Design Commission, having considered designs for the rehabilitation of the Leonard Covello Senior Center, 312 East 1 ogth Street, Manhattan, submitted by the Department of Design and Construction, represented by exhibits 7069-A, B, C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 5: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

NIICDESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24515

RESOLVED That the Design Commission, having considered designs for the installation of a door and mechanical equipment, The Bronx High School of Science, 75 West 205th Street, Bronx, submitted by the Department of Education, represented by exhibits 3142-N, 0 & P of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 6: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N'ICOESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24516

RESOLVED That the Design Commission, having considered designs for the reconstruction of the Bryant Avenue Bridge over Amtrak rail lines, Bronx, submitted by the Department of Transportation, represented by exhibits 6395-C, D, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 7: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II¥CDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24517

RESOLVED That the Design Commission, having considered designs for the installation of six Bishop's Crook light poles with teardrop luminaires, Minetta Lane and Minetta Street between Sixth Avenue and MacDougal Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 5817-0, P & Q of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 8: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

NVCDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24518

RESOLVED That the Design Commission, having considered designs for the installation of security bollards as Phase I of the perimeter security master plan, United Nations, First Avenue from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 6084-R, S, T & U of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that the United Nations will submit designs for Phase II, including the public plaza between 45th Street and 471h Street, for review and approval within two years.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 9: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

IWCDESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24519

RESOLVED That the Design Commission, having considered designs for the installation of a flagpole, John D'Amato Field, New Dorp Lane, Cedar Grove Avenue, Great Kills Park, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 1952-AW, AX, A Y & AZ of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting

July 16,2012.

Jackie Snyder Executive Director

Page 10: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N'ICOESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24520

RESOLVED That the Design Commission, having considered designs for the rehabilitation of a comfort station and adjacent site work, Bill Brown Park, Avenue X, Bedford Avenue, Avenue Y and East 24th Street, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 1917 -K, L & M of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before July 16, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 11: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II¥CDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24521

RESOLVED That the Design Commission, having considered designs for the construction of an addition, Dairyland USA Chef's Warehouse, 200-240 Food Center Drive, Bronx, submitted by the Economic Development Corporation, represented by exhibits 3394-FN, FO, FP & FQ of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 12: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥COESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24522

RESOLVED That the Design Commission, having considered designs for the installation of exhaust and HVAC equipment, Engine Company 50, 1155 Washington Avenue, Bronx, submitted by the Fire Department, represented by exhibits 3996-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Snyder Executive Director

Page 13: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24523

RESOLVED That the Design Commission, having considered designs for the installation of exhaust equipment, Engine Company 216, 187 Union Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 3585-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16,2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 14: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24524

RESOLVED That the Design Commission, having considered designs for the installation of exhaust equipment, Engine Company 221, 161 South Second Street, Brooklyn, submitted by the Fire Department, represented by exhibits 1780-F, G, H & I of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

0 on

Page 15: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II'ICDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24525

RESOLVED That the Design Commission, having considered designs for the installation of exhaust equipment, Engine Company 231, 107 Watkins Street, Brooklyn, submitted by the Fire Department, represented by exhibits 3857 -C, D, E & F of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 16: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24526

RESOLVED That the Design Commission, having considered designs for the installation of exhaust equipment, Engine Company 233, 25 Rockaway Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 4642-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 17: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN

July 16, 2012

CERTIFICATE 24527

RESOLVED That the Design Commission, having considered designs for the installation of exhaust equipment, Engine Company 290, 480 Sheffield Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 623-M, N, 0 & P of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 18: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II'ICDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24528

RESOLVED That the Design Commission, having considered designs for the rehabilitation of Engine Company 331/Ladder 173, 158-57 Cross Bay Boulevard, Howard Beach, Queens, submitted by the Fire Department, represented by exhibits 3473-H, I & J of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 19: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

IWCOESIGN THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24529

RESOLVED That the Design Commission, having considered designs for the installation of prototypical signage, Howard Beach Community Library, 92-06 156th Avenue, Queens, submitted by the Queens Library, represented by exhibits 3985-C & D of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 20: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II¥CDESIGN

July 16, 2012

CERTIFICATE 24530

RESOLVED That the Design Commission, having considered designs for the installation of prototypical signage, Whitestone Community Library, 151-10 141

h Road, Queens, submitted by the Queens Library, represented by exhibits 3751-M & N of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

30% materiaL

Page 21: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN

July 16, 2012

CERTIFICATE 24532

RESOLVED That the Design Commission, having considered designs for the construction of the Hunter's Point Community Library, Queens West Development, Parcel 8, 4-56 4Jlh Road, Queens, submitted by the Department of Design and Construction, represented by exhibits 5663-K, L, M & N of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the signage will be larger and integrated into the perimeter wall.

Preliminary approval is conditioned upon submission of this project for final review and approval before July 16, 2014.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

Page 22: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

II¥COESIGN

July 16, 2012

CERTIFICATE 24533

RESOLVED That the Design Commission, having considered designs for the reconstruction of the plaza, including the fountains and the south garage entrance, Metropolitan Museum of Art, 1000 Fifth Avenue between 801

h Street and 841h Street, Manhattan, submitted by the

Department of Cultural Affairs and the Department of Parks & Recreation, represented by exhibits 179-LC, LD, LE, LF, LG, LH & Ll of record in this matter, hereby gives to the same unanimous final approval with the understanding that (1) the etched donor signage will only be inpainted if, upon review, it is determined that it is not sufficiently visible, and (2) a qualified arborist will be retained on a long-term contract in order to successfully maintain the pleached and pollarded trees.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director

on post *consumer materiaL

Page 23: Welcome to NYC.gov - THE CITY OF NEW YORK...2012/07/16  · from East 42nd Street to East 45th Street and East 4Jih to East 48th Street, Manhattan, submitted by the Department of Transportation,

N¥CDESIGN OF THE CITY OF NEW YORK

July 16, 2012

CERTIFICATE 24531

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 90-53 Sutphin Boulevard, southeast corner of Sutphin Boulevard and Jamaica Avenue, Queens, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7070-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval of a 5' x 1 0' newsstand subject to the submission of a revised plan reflecting this change.

Final approval is conditioned upon commencement of work before July 16, 2014 and submission of comprehensive photographic documentation of the completed project consisting of 8" x 1 0" archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on July 16, 2012.

Jackie Snyder Executive Director