Page 1: Welcome to Hazardous Materials Technician - Part 1

Welcometo Hazardous Materials

Technician - Part 1

Page 2: Welcome to Hazardous Materials Technician - Part 1

General

• Without reference determine general principles of the Hazardous Materials Technician with at least 80% accuracy.

Page 3: Welcome to Hazardous Materials Technician - Part 1

INTRODUCTION

• Hazardous materials technicians shall be trained to meet all competencies at the first responder awareness and operational levels and the competencies of this chapter. Hazardous materials technicians also shall receive any additional training to meet applicable … appropriate state, local, or provincial occupational health and safety regulatory requirements.

Page 4: Welcome to Hazardous Materials Technician - Part 1

DEFINITIONS

• Hazardous materials technicians are those persons who respond to releases or potential releases of hazardous materials for the purpose of controlling the release.

• Hazardous materials technicians are expected to use specialized chemical protective clothing and specialized control equipment.

Page 5: Welcome to Hazardous Materials Technician - Part 1

GOAL

• The goal of this chapter shall be to provide the hazardous materials technician with the knowledge and skills to perform the following tasks safely. Therefore, in addition to being competent at both the first responder awareness and operational levels, the hazardous materials technician shall be able to:

Page 6: Welcome to Hazardous Materials Technician - Part 1

GOALS

– Analyze

– Plan

– Implement

– Evaluate

Page 7: Welcome to Hazardous Materials Technician - Part 1

Analyzing the Incident

• Given scenarios of facility and transportation hazardous materials incidents, identify the principles for analyzing a hazardous materials incident at the technician level with at least 80% accuracy.

Page 8: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

• Describe the following terms and explain their significance in the risk assessment process.– Acid, caustic– Air reactivity– Biological agents and toxins– Boiling point

Page 9: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Catalyst– Chemical interactions– Chemical reactivity– Compound, mixture– Concentration– Corrosivity– Critical temperature and pressure

Page 10: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Expansion ration – Flammable range (LEL & UEL)– Fire point– Flash point– Halogenated hydrocarbon– Ignition (auto-ignition) temperature– Inhibitor– Instability

Page 11: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Ionic and covalent compounds– Irritants (riot control agents)– Maximum safe storage temperature

(MSST)– Melting point/Freezing point– Miscibility– Nerve agents– Organic and inorganic

Page 12: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Oxidation potential– pH – Physical state – Polymerization– Radioactivity– Saturated, unsaturated, and aromatic

hydrocarbons– Self-accelerating decomposition temperature

Page 13: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Solution, slurry– Specific gravity– Strength– Sublimation– Temperature of product– Toxic products of combustion

Page 14: Welcome to Hazardous Materials Technician - Part 1

Chemical Terms & Their Significancein the Risk Assessment Process

– Vapor density– Vapor pressure– Vesicants (blister agents)– Viscosity– Volatility– Water reactivity– Water solubility

Page 15: Welcome to Hazardous Materials Technician - Part 1

Toxicological Terms & Exposure Values & Their Significance in the Risk

Assessment Process

• Describe the following toxicological terms and exposure values and explain their significance in the risk assessment process:– Parts per million (ppm)– Parts per billion (ppb)– Lethal dose (LD 50)– Lethal concentration (LC 50)

Page 16: Welcome to Hazardous Materials Technician - Part 1

Toxicological Terms & Exposure Values& Their Significance in the Risk

Assessment Process

– Permissible exposure limit (PEL)– Threshold limit value time weighted

average (TLV-TWA)– Threshold limit value short-term exposure

limit (TWA-STEL)– Threshold limit value ceiling (TLV-C)– Immediately dangerous to life and health

value (IDLH)

Page 17: Welcome to Hazardous Materials Technician - Part 1

Radiological Terms & Their Significance in the Risk Assessment Process

• Describe the following radiological terms and explain their significance in predicting the extent of health hazards and environmental impact in a hazardous materials incident:– Alpha– Beta– Gamma

Page 18: Welcome to Hazardous Materials Technician - Part 1

Radiological Terms & Their Significance in the Risk Assessment Process

– Activity– Quantity gamma– Absorbed dose– Half-life– Inverse square law– Time, Distance, and Shielding

Page 19: Welcome to Hazardous Materials Technician - Part 1

TECHNICIAN PERFORMANCE TEST

• Given examples of various hazardous materials facility and transportation containers, identify each container by type and identify at least one material and its hazard class within 60 minutes IAW DOD Instruction & DOD Manual 6055.6.

Page 20: Welcome to Hazardous Materials Technician - Part 1

TECHNICIAN PERFORMANCE TEST

• Given examples of various hazardous materials facility and transportation containers and the appropriate reference guide, identify the capacity and basic design and construction features, including closures, for each container within 60 minutes IAW DOD Instruction & DOD Manual 6055.6.

Page 21: Welcome to Hazardous Materials Technician - Part 1

Container Capacities

• Given three examples of facility and transportation containers, identify the approximate capacity of each container.

NOTE: This information may be presented when each container is taught.

Page 22: Welcome to Hazardous Materials Technician - Part 1

Container Capacities

• Using markings on the container, identify the capacity (by weight and/or volume) of the following examples of transportation vehicles.

NOTE: This information may be presented when each container is taught.

Page 23: Welcome to Hazardous Materials Technician - Part 1

Basic Design and Construction Features, Including Closures

• Identify the basic design and construction features, including closures, of the following bulk containers.

NOTE: This information may be presented when each container is taught.

Page 24: Welcome to Hazardous Materials Technician - Part 1

Non-bulk Container Materials & Hazard Classes

• Given examples of the following non-bulk containers, identify at least one material, and its hazard class, that is typically found in each container

NOTE: This information may be presented when each container is taught.

Page 25: Welcome to Hazardous Materials Technician - Part 1

Railroad Tank Car Identification

• Given examples of the following railroad cars, identify each car by type and identify at least one material, and its hazard class, that is typically found in each car.

Page 26: Welcome to Hazardous Materials Technician - Part 1

• Cryogenic liquid tank cars– Type

– Material/Hazard Class

– Capacity & Markings

– Design/Construction

– Closures

Railroad Tank Car Identification

Page 27: Welcome to Hazardous Materials Technician - Part 1
Page 28: Welcome to Hazardous Materials Technician - Part 1
Page 29: Welcome to Hazardous Materials Technician - Part 1

• High-pressure tube cars– Type

– Material/Hazard Class

– Capacity & Markings

– Design/Construction

– Closures

Railroad Tank Car Identification

Page 30: Welcome to Hazardous Materials Technician - Part 1
Page 31: Welcome to Hazardous Materials Technician - Part 1

• Nonpressure tank cars– Type

– Material/Hazard Class

– Capacity & Markings

– Design/Construction

– Closures

Railroad Tank Car Identification

Page 32: Welcome to Hazardous Materials Technician - Part 1
Page 33: Welcome to Hazardous Materials Technician - Part 1

• Pneumatically unloaded hopper cars– Type

– Material/Hazard Class

– Capacity & Markings

– Design/Construction

– Closures

Railroad Tank Car Identification

Page 34: Welcome to Hazardous Materials Technician - Part 1

• Pressure tank cars– Type

– Material/Hazard Class

– Capacity & Markings

– Design/Construction

– Closures

Railroad Tank Car Identification

Page 35: Welcome to Hazardous Materials Technician - Part 1
Page 36: Welcome to Hazardous Materials Technician - Part 1

Intermodal Tank Identification

• Given examples of the following intermodal tanks, identify each intermodal tank by type and identify at least one material, and its hazard class, that is typically found in each tank.

Page 37: Welcome to Hazardous Materials Technician - Part 1

• Intermediate bulk containers– Type

– Material/Hazard class

– Design/Construction

– Closures

– Capacities & Markings

Intermodal Tank Identification

Page 38: Welcome to Hazardous Materials Technician - Part 1

Nonpressure Intermodal Tanks

• IM-101 (IMO Type 1 internationally) portable tank.– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Page 39: Welcome to Hazardous Materials Technician - Part 1

Non-Pressure intermodal tank

Page 40: Welcome to Hazardous Materials Technician - Part 1

Nonpressure Intermodal Tanks

• IM-102 (IMO Type 2 internationally) portable tank.– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Page 41: Welcome to Hazardous Materials Technician - Part 1
Page 42: Welcome to Hazardous Materials Technician - Part 1

Pressure Intermodal Tanks

• DOT 51 or IMO Type 5– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Page 43: Welcome to Hazardous Materials Technician - Part 1
Page 44: Welcome to Hazardous Materials Technician - Part 1

Specialized Intermodal Tanks

• Cryogenic intermodal tanks (IMO Type 7).– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Page 45: Welcome to Hazardous Materials Technician - Part 1
Page 46: Welcome to Hazardous Materials Technician - Part 1

Specialized Intermodal Tanks

• Tube module.– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Page 47: Welcome to Hazardous Materials Technician - Part 1
Page 48: Welcome to Hazardous Materials Technician - Part 1

Cargo Tank Identification

• Given examples of the following cargo tanks, identify at least one material, and its hazard class, that is typically found in each tank.

Page 49: Welcome to Hazardous Materials Technician - Part 1

• Dry bulk cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 50: Welcome to Hazardous Materials Technician - Part 1

Dry bulk cargo tank

Page 51: Welcome to Hazardous Materials Technician - Part 1
Page 52: Welcome to Hazardous Materials Technician - Part 1

• MC-306/DOT-406 cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 53: Welcome to Hazardous Materials Technician - Part 1

MC-306 cargo tank

Page 54: Welcome to Hazardous Materials Technician - Part 1

MC-406 cargo tank

Page 55: Welcome to Hazardous Materials Technician - Part 1
Page 56: Welcome to Hazardous Materials Technician - Part 1

• MC-307/DOT-407 cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 57: Welcome to Hazardous Materials Technician - Part 1

MC-307 cargo tank

Page 58: Welcome to Hazardous Materials Technician - Part 1

MC-407 cargo tank

Page 59: Welcome to Hazardous Materials Technician - Part 1

• MC-312/DOT-412 cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 60: Welcome to Hazardous Materials Technician - Part 1

MC-312 cargo tank

Page 61: Welcome to Hazardous Materials Technician - Part 1

MC-412 cargo tank

Page 62: Welcome to Hazardous Materials Technician - Part 1
Page 63: Welcome to Hazardous Materials Technician - Part 1

• MC-331 cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 64: Welcome to Hazardous Materials Technician - Part 1

MC-331 cargo tank

Page 65: Welcome to Hazardous Materials Technician - Part 1
Page 66: Welcome to Hazardous Materials Technician - Part 1

• MC-338 cargo tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/Construction

– Closures

Cargo Tank Identification

Page 67: Welcome to Hazardous Materials Technician - Part 1

MC-338 cargo tank

Page 68: Welcome to Hazardous Materials Technician - Part 1

Facility Tank Identification

• Given examples of the following facility tanks, identify at least one material, and its hazard class, that is typically found in each tank.

Page 69: Welcome to Hazardous Materials Technician - Part 1

Facility Tank Identification

• Non-pressure tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/construction

– Closures

Page 70: Welcome to Hazardous Materials Technician - Part 1

Non-pressure facility tanks

Page 71: Welcome to Hazardous Materials Technician - Part 1
Page 72: Welcome to Hazardous Materials Technician - Part 1
Page 73: Welcome to Hazardous Materials Technician - Part 1
Page 74: Welcome to Hazardous Materials Technician - Part 1
Page 75: Welcome to Hazardous Materials Technician - Part 1

Facility Tank Identification

• Pressure tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/construction

– Closures

Page 76: Welcome to Hazardous Materials Technician - Part 1

Low-pressure & pressure vessels

Page 77: Welcome to Hazardous Materials Technician - Part 1
Page 78: Welcome to Hazardous Materials Technician - Part 1
Page 79: Welcome to Hazardous Materials Technician - Part 1

Facility Tank Identification

• Cryogenic tanks– Type

– Material/Hazard class

– Capacity & Markings

– Design/construction

– Closures

Page 80: Welcome to Hazardous Materials Technician - Part 1
Page 81: Welcome to Hazardous Materials Technician - Part 1

Non-bulk Tank Identification

• One ton containers– Type

– Material/Hazard class

– Capacity & Markings

– Design/construction

– Closures

Page 82: Welcome to Hazardous Materials Technician - Part 1
Page 83: Welcome to Hazardous Materials Technician - Part 1
Page 84: Welcome to Hazardous Materials Technician - Part 1

Pipelines

• Pipelines– Type

– Material/Hazard class

– Capacity & Markings

– Design/construction

– Closures

Page 85: Welcome to Hazardous Materials Technician - Part 1
Page 86: Welcome to Hazardous Materials Technician - Part 1

• Bags– Type

– Material/Hazard class

– Design/Construction

– Closures

– Capacities & Markings

Non-bulk Containers

Page 87: Welcome to Hazardous Materials Technician - Part 1

Bags (nonbulk)

Page 88: Welcome to Hazardous Materials Technician - Part 1
Page 89: Welcome to Hazardous Materials Technician - Part 1

• Carboys– Type

– Material/Hazard class

– Design/Construction

– Closures

– Capacities & Markings

Non-bulk Containers

Page 90: Welcome to Hazardous Materials Technician - Part 1

Carboys (non-bulk)

Page 91: Welcome to Hazardous Materials Technician - Part 1
Page 92: Welcome to Hazardous Materials Technician - Part 1

• Cylinders– Type

– Material/Hazard class

– Design/Construction

– Closures

– Capacities & Markings

Non-bulk Containers

Page 93: Welcome to Hazardous Materials Technician - Part 1

Cylinders

Page 94: Welcome to Hazardous Materials Technician - Part 1
Page 95: Welcome to Hazardous Materials Technician - Part 1

• Drums– Type

– Material/Hazard class

– Design/Construction

– Closures

– Capacities & Markings

Non-bulk Containers

Page 96: Welcome to Hazardous Materials Technician - Part 1

Drums

Page 97: Welcome to Hazardous Materials Technician - Part 1
Page 98: Welcome to Hazardous Materials Technician - Part 1

Container Capacities

• Given three examples of facility and transportation containers, identify the approximate capacity of each container.

NOTE: This information may have been presented when each container was taught.

Page 99: Welcome to Hazardous Materials Technician - Part 1

Container Capacities

• Given examples of transportation vehicles using the markings on the container, identify the capacity (by weight and/or volume).

NOTE: This information may have been presented when each container was taught.

Page 100: Welcome to Hazardous Materials Technician - Part 1

Basic Design and Construction Features, Including Closures

• Identify the basic design and construction features, including closures, for bulk containers.

NOTE: This information may have been presented when each container was taught.

Page 101: Welcome to Hazardous Materials Technician - Part 1

Non-bulk Container Material & Hazard Classes

• Given examples of the following non-bulk containers, identify at least one material, and its hazard class, that is typically found in each container

NOTE: This information may have been presented when each container was taught.

Page 102: Welcome to Hazardous Materials Technician - Part 1

Radioactive Material Packages

• Given examples of the following radioactive materials packages, identify each package by type and identify at least one typical material found in each package.

Page 103: Welcome to Hazardous Materials Technician - Part 1

Radioactive Material Packages

• Identify basic design and construction features of the following radioactive materials containers

Page 104: Welcome to Hazardous Materials Technician - Part 1

• Type A– Type

– Material/Hazard class

– Design/Construction

– Closures

Radioactive Material Packages

Page 105: Welcome to Hazardous Materials Technician - Part 1

• Type B– Type

– Material/Hazard class

– Design/Construction

– Closures

Radioactive Material Packages

Page 106: Welcome to Hazardous Materials Technician - Part 1
Page 107: Welcome to Hazardous Materials Technician - Part 1

Radioactive Labels

• Given a label for a radioactive material, identify vertical bars, contents, activity, and transport index, then describe the labeled item and its significance in surveying a radioactive materials incident.

Page 108: Welcome to Hazardous Materials Technician - Part 1

Detecting Weapons of Mass Destruction (WMD) Agents

• For each of the following, describe a method that can be used to detect them.– Nerve agents– Vesicants (Blister agents)– Biological agents and toxins– Irritants (riot control agents

Page 109: Welcome to Hazardous Materials Technician - Part 1

Classifying by Hazard(s) Unknown Materials

• Given at least three unknown materials, one of which is a solid, one a liquid, and one a gas, identify or classify by hazard each unknown material.

Page 110: Welcome to Hazardous Materials Technician - Part 1

Analysis Process Steps for Unknown Materials

• Identify the steps in an analysis process for identifying unknown solid and liquid materials.– Wear appropriate protective clothing– Approach cautiously from uphill and upwind– Measure in this order or simultaneously;

1 Radioactive 5 Hydrogen Sulfide2 Combustibility 6 Carbon Monoxide3 Oxygen Availability (deficiency) 7Organic Vapor4 pH

Page 111: Welcome to Hazardous Materials Technician - Part 1

Analysis Process Steps for Unknown Materials

• Identify the steps in an analysis process for identifying an unknown atmosphere.– Wear appropriate protective clothing– Approach cautiously from uphill and upwind– Measure in this order or simultaneously;

1 Radioactive 5 Hydrogen Sulfide2 Combustibility 6 Carbon Monoxide3 Oxygen Availability (deficiency) 7Organic Vapor4 pH

Page 112: Welcome to Hazardous Materials Technician - Part 1

Identifying Monitoring EquipmentUsed to Determine Hazards

• Identify the type(s) of monitoring equipment, test strips, and reagents used to determine the following hazards.

Page 113: Welcome to Hazardous Materials Technician - Part 1

Identifying Monitoring EquipmentUsed to Determine Hazards

– Corrosivity, pH

– Flammability

– Oxidation potential

– Oxygen deficiency

– Radioactivity

– Toxic levels

Page 114: Welcome to Hazardous Materials Technician - Part 1

Capabilities and Limiting Factors Associated With the Selection and Use of Monitoring

Equipment

• Identify the capabilities and limiting factors associated with the selection and use of the following monitoring equipment, test strips, and reagents.

Page 115: Welcome to Hazardous Materials Technician - Part 1

– Carbon monoxide meters

– Colorimetric tubes

– Combustible gas indicator

– Oxygen meters

– Passive dosimeters

Capabilities and Limiting Factors Associated With the Selection and Use of

Monitoring Equipment

Page 116: Welcome to Hazardous Materials Technician - Part 1

– Photo-ionization detectors

– pH indicators and/or pH meters

– Radiation detection instruments

– Reagents

– Test strips

Capabilities and Limiting Factors Associated With the Selection and Use

of Monitoring Equipment

Page 117: Welcome to Hazardous Materials Technician - Part 1

• Given monitoring equipment and three unknown materials demonstrate field maintenance and testing of the monitors, select the appropriate monitors, and classify, identify, and quantify three unknown materials within 60 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Monitoring & Detection Equipment

Page 118: Welcome to Hazardous Materials Technician - Part 1

• Given various hazardous materials scenarios and necessary materials, collect hazard, response, and exposure information not available from the North American Emergency Response Guidebook or MSDS within 60 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Collecting & Interpreting Hazard & Response Information

Page 119: Welcome to Hazardous Materials Technician - Part 1

Collecting & Interpreting Hazard & Response Information

• Identify and interpret the types of hazard and response information available from each of the following resources and explain the advantages and disadvantages of each resource.

Page 120: Welcome to Hazardous Materials Technician - Part 1

Collecting & Interpreting Hazard & Response Information

– Hazardous materials data bases

– Maps and diagrams

– Monitoring equipment

– Reference manuals

– Technical information centers

– Technical information specialists

Page 121: Welcome to Hazardous Materials Technician - Part 1

Heat Transfer Process with Cryogenic Liquids

• Describe the heat transfer processes that occur as a result of a cryogenic liquid spill.– Rapid Vaporization– Expansion Ratios

Page 122: Welcome to Hazardous Materials Technician - Part 1

Signs, Symptoms and Target Organ Effects of Exposure to Hazardous Materials

• Given five hazardous material scenarios and the appropriate reference materials, identify the signs and symptoms of exposure to each material and the target organ effects of exposure to that material.

Page 123: Welcome to Hazardous Materials Technician - Part 1

• Given examples of domestic gas line breaks and the locations of combustible gas indicator readings, plot the readings and work zones using EPA guidelines, within 30 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Domestic Gas Line Breaks/Leaks

Page 124: Welcome to Hazardous Materials Technician - Part 1

Domestic Gas Line Breaks/Leaks

• Given a scenario of a domestic gas line break and the readings from a combustible gas indicator, determine the area of evacuation.

Page 125: Welcome to Hazardous Materials Technician - Part 1

Determining Pressure in Bulk & Facility Containers

• Identify two methods for determining the pressure in bulk packaging or facility containers.– Pressure Gauges– Temperature of Contents– Pop-off or Safety Vent release pressures– Test or Maximum Allowable Working

Pressures (MAWP) printed on container

Page 126: Welcome to Hazardous Materials Technician - Part 1

Amount of Lading Remaining in Damaged Bulk Packaging of Facility Containers

• Identify one method for determining the amount of lading remaining in damaged bulk packaging of facility containers.– Shipping Papers– Container Specification markings– Gauging Devices– Frost line on container

Page 127: Welcome to Hazardous Materials Technician - Part 1

Sample Collection

• Demonstrate a method for collecting samples of the following:– Solid - brush, scrap, scoop, core, & forceps– Liquid - jars, coliwasas, bailers, dippers,

bombs, & drum thiefs– Gas - sample bags

Page 128: Welcome to Hazardous Materials Technician - Part 1

Multiple Products in Pipeline

• Describe how a liquid pipeline can carry different products.

Page 129: Welcome to Hazardous Materials Technician - Part 1

Pipeline Identification & Information

• Given an example of a pipeline, identify the following:– Ownership of the line

– Procedures for checking gas migration

– Procedures for shutting down the line or controlling the leak

– Type of product in the line

Page 130: Welcome to Hazardous Materials Technician - Part 1

Pressure Container Damage Terms & Definitions

• Identify the types of damage that a container including pressure containers could incur.– Cracks

– Scores

– Gouges

– Dents

Page 131: Welcome to Hazardous Materials Technician - Part 1

Identifying Tank Car Damage

• Given examples of tank damage, identify the type of damage in each example by name.– Cracks

– Scores

– Gouges

– Dents

Page 132: Welcome to Hazardous Materials Technician - Part 1

Mixed Chemical Incidents

• Identify at least three resources available that indicate the effects of mixing various hazardous materials.– Guide to Hazardous Chemical Reactions

NFPA 491– Handbook of Reactive Chemical Hazards -

Bretherick– Hazardous Chemicals Desk Reference -

Lewis

Page 133: Welcome to Hazardous Materials Technician - Part 1

Fire & Safety Features for Fixed Facility Storage Locations

• Identify the impact of the following fire and safety features on the behavior of the products during an incident at a bulk storage facility and explain their significance in the risk assessment process:

Page 134: Welcome to Hazardous Materials Technician - Part 1

Fire & Safety Features for Fixed Facility Storage Locations

– Fire protection systems

– Monitoring and detection systems

– Product spillage and control (impoundment and diking)

– Tank spacing

– Tank venting and flaring systems

– Transfer operations

Page 135: Welcome to Hazardous Materials Technician - Part 1

Dispersion Pattern Prediction Resources

• Identify local resources for dispersion pattern prediction and modeling including computers, monitoring equipment, or specialists in the field.– Weather Service– Computer Models (Cameo, Aloha, EIS)– Colleges & Universities– County, State, & Federal Agencies

Page 136: Welcome to Hazardous Materials Technician - Part 1

Determining Extent of Hazard within the Endangered Area

• Given the concentrations of the released material, identify the steps for determining the extent of the hazards (e.g., physical, safety, and health) within the endangered area of a hazardous materials incident.

Page 137: Welcome to Hazardous Materials Technician - Part 1

Methods for Predicting Areas of Potential Harm

• Identify two methods for predicting the areas of potential harm within the endangered area of a hazardous materials incident.

– Computer Modeling– Monitoring Equipment– Technical Assistance

Page 138: Welcome to Hazardous Materials Technician - Part 1

Estimating the Outcomes within an Endangered Area

• Identify a method for estimating the outcomes within an endangered area of a hazardous materials incident.– Analyze the following incident data

• Physical • Cognitive • Technical

Page 139: Welcome to Hazardous Materials Technician - Part 1

Estimating the Outcomes within an Endangered Area

• Components– Product

– Container

– Environment

• Subgroups– Damage

– Hazard

– Vulnerability Risk

• Additional Elements to consider– Spill

– Leak

– Fire

Page 140: Welcome to Hazardous Materials Technician - Part 1

Response Objectives

• Given simulated facility and transportation problems, the hazardous materials technician shall describe the response objectives for each problem. The hazardous materials technician shall be able to describe the steps for determining response objectives (defensive, offensive, nonintervention) given an analysis of a hazardous materials incident.

Page 141: Welcome to Hazardous Materials Technician - Part 1

Action Options

• Given simulated facility and transportation hazardous materials incidents, the hazardous materials technician shall identify the possible action options (defensive, offensive, and nonintervention) by response objective for each problem. The hazardous materials technician shall be able to identify the possible action options to accomplish a given response objective.

Page 142: Welcome to Hazardous Materials Technician - Part 1

Administer CerTest

End Part I

Technician

Page 143: Welcome to Hazardous Materials Technician - Part 1

TECHNICIAN

PART II

Page 144: Welcome to Hazardous Materials Technician - Part 1

Personal Protective Equipment

• Identify the four levels of personal protective equipment (EPA/NIOSH or NFPA 471) and describe the equipment for each level and the condition under which each level is used.

Page 145: Welcome to Hazardous Materials Technician - Part 1

Level A - Vapor-Protective Suits

• Fully-Encapsulated Vapor Protective Suit selected based on chemical w/ positive pressure SCBA

• Worn in presence of incompletely ID’d vapors, or gases

• One-piece suit w/double glove & boot, hard hat

• Highest Level of protection

Page 146: Welcome to Hazardous Materials Technician - Part 1

Level B - Liquid Splash-Protective Suit

• Multi-piece or Fully-Encapsulated Liquid Protective Suit selected based on chemical w/ positive pressure SCBA

• Double glove & boot, hard hat

• Vapor or gases present will not affect exposed skin

• Lesser Level of skin protection

Page 147: Welcome to Hazardous Materials Technician - Part 1

Level C - Liquid Splash-Protective Suit

• Multi-piece Liquid Protective Suit selected based on chemical w/ positive pressure SCBA

• Atmospheric, liquid splashes or direct contact will not adversely effect the wearer

• Same clothing as Level B, Air-purifying Respirator

• Lesser Level of Respiratory Protection

Page 148: Welcome to Hazardous Materials Technician - Part 1

Level D - Normal Protective Clothing

• Normal work clothing

• Work exposures prohibit splashes, immersion, or the potential for unexpected inhalation or contact with hazardous levels of chemicals

• Coveralls, Safety Boots/Shoes, Safety Glasses/goggles, hard hat

• No Respiratory protection, Minimal Skin protection

Page 149: Welcome to Hazardous Materials Technician - Part 1

Factors in Choosing Respiratory Protection

• Identify the factors to be considered in selecting the proper respiratory protection for a specified action option.– Primary Key is the Hazard of the chemical

• Correlates to the level of PPE (i.e. Level A or C)

– Use highest level of Respiratory protection until level of concentration has been determined

Page 150: Welcome to Hazardous Materials Technician - Part 1

Advantages & Disadvantages of Various Styles of Respiratory Protection

• Describe the advantages, limitations, and proper use of the following types of respiratory protection at hazardous materials incidents.

– Positive pressure self-contained breathing apparatus

– Positive pressure air line respirators with required escape unit

– Air purifying respirators

Page 151: Welcome to Hazardous Materials Technician - Part 1

Selecting Proper Respiratory Protection

• Identify the process for selecting proper respiratory protection at hazardous materials incidents.– Identify the Name of Chemical– Concentration– Hazard of Chemical (i.e. inhalation, absorption,

etc.)– Expected Exposure– OSHA Requirements

Page 152: Welcome to Hazardous Materials Technician - Part 1

Components of Air-purifying and Air-line Respirators

• Identify the operational components of air purifying respirators and air line respirators by name and describe their functions.– Air-purifying Respirator – Supplied Air Respirator

• Mask • Mask• Filter Cartridge • Manifold w/Airline• Head Harness • Escape Unit

• Air Supply

Page 153: Welcome to Hazardous Materials Technician - Part 1

Factors in Selecting Proper Chemical-Protective Clothing

• Identify the factors to be considered in selecting the proper chemical-protective clothing for a specified action option.

Page 154: Welcome to Hazardous Materials Technician - Part 1

Factors in Selecting Proper Chemical-Protective Clothing

• Risk Assessment– Identify the Hazard Present

– Estimate the likelihood of exposure

– Understand the consequence of exposure

– Determine the risk

• Selection– Overall Suit Integrity – Design Features

– Materials Chemical Resistance – Service Life

– Materials Physical Properties – Cost

Page 155: Welcome to Hazardous Materials Technician - Part 1

Damage to Chemical Protective Clothing

• Describe the following terms and explain their impact and significance on the selection of chemical-protective clothing.– Degradation

– Penetration

– Permeation

Page 156: Welcome to Hazardous Materials Technician - Part 1

Indications of Degradation of Chemical Protective Clothing

• Identify at least three indications of material degradation of chemical-protective clothing.– Stiffness– Excess Pliability– Tears, Cuts or Abrasions– Damage to Zippers or Closures– Discoloration– Other Visible Suit Damage

Page 157: Welcome to Hazardous Materials Technician - Part 1

Types of Chemical Protective ClothingVapor & Splash

• Identify the three types of vapor-protective and splash-protective clothing and describe the advantages and disadvantages of each type.– Type I - Fully Encapsulated, SCBA inside suit– Type II - Non-Encapsulated, SCBA outside suit– Type III - Fully Encapsulated, SCBA inside suit

with Air-line supply hose passing through suit

Page 158: Welcome to Hazardous Materials Technician - Part 1

Chemical Protective Clothing Cooling Devices

• Identify the relative advantages and disadvantages of the following heat exchange units used for the cooling of personnel in chemical-protective clothing.

– Air cooled

– Ice cooled

– Water cooled

Page 159: Welcome to Hazardous Materials Technician - Part 1

Process for Selecting Proper Protective Clothing

• Identify the process for selecting the proper protective clothing at hazardous materials incidents.– Utilize EPA/OSHA Guidelines for Levels– Insure Compatibility– Observe Breakthrough times– Follow Manufacturers Recommendations

Page 160: Welcome to Hazardous Materials Technician - Part 1

Select Appropriate Protective Clothing

• Given three examples of various hazardous materials, determine the appropriate protective clothing construction materials for a given action option using chemical compatibility charts within 30 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 161: Welcome to Hazardous Materials Technician - Part 1

Physical & Psychological Stresses on Wearers of Specialized Protective Clothing

• Identify the physical and psychological stresses that can affect users of specialized protective clothing.– Low Dexterity & Mobility– Low Visibility– Poor Communications– Heat Stress– Physical Stress– Claustrophobia

Page 162: Welcome to Hazardous Materials Technician - Part 1

Decontamination Advantages/Disadvantages

• Identify the advantages and limitations and describe an example where each of the following decontamination methods would be used.

Page 163: Welcome to Hazardous Materials Technician - Part 1

Decontamination Advantages/Disadvantages

– Absorption - Tools & Equipment, Limited for personnel

– Adsorption - Tools & Equipment, flat surfaces

– Chemical degradation - Tools, Equipment & Personnel

– Dilution - Most Common, Tools, Equipment, & Personnel

– Disposal - Tools, Equipment, & Clothing when decontamination is not practical or cost effective

Page 164: Welcome to Hazardous Materials Technician - Part 1

Decontamination Advantages/Disadvantages

– Evaporation - Volatile or easily evaporative liquids

– Neutralization - Tools & Equipment (creates heat)

– Solidification - Hard, flat surfaces

– Vacuuming - Solids, water reactive materials

– Washing - Very commonly used with tools, equipment, & personnel

Page 165: Welcome to Hazardous Materials Technician - Part 1

Technical Information Sources on Decontamination

• Identify three sources of technical information for selecting appropriate decontamination procedures and identify how to contact those sources in an emergency.– CHEMTREC/CANUTEC/SETIQ– Manufacturers/MSDS’s– National Response Center– Local or Regional Poison Control Centers

Page 166: Welcome to Hazardous Materials Technician - Part 1

• Given a simulated hazardous materials incident, the local emergency response plan and standard operating procedures, develop a plan of action to include safety considerations within 60 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 167: Welcome to Hazardous Materials Technician - Part 1

Technician Level Offensive Control Techniques

• Describe the purpose of, procedures for, equipment required, and safety precautions used with the following techniques for hazardous materials control.

Page 168: Welcome to Hazardous Materials Technician - Part 1

Purpose of, Procedures for, Equipment Required, and Safety Precautions for:

– Absorption

– Neutralization

– Overpacking

– Patching

– Plugging

Page 169: Welcome to Hazardous Materials Technician - Part 1

Common Methods for Product Transfer

• Given MC-306/DOT-406, MC-307/DOT-407, MC-312/DOT-412, MC-331, and MC-338 cargo tanks, identify the common methods for product transfer from each type of cargo tank.

Page 170: Welcome to Hazardous Materials Technician - Part 1

Safety Considerations Includedin the Plan of Action

• Given a simulated hazardous materials, develop the safety considerations that must be included in the plan of action.

Page 171: Welcome to Hazardous Materials Technician - Part 1

Safety Considerations Includedin the Plan of Action

– The plan of action describes response objectives, action options, personnel, and equipment.

– The site safety plan develops from the plan of action.

– Needs to be consistent with the LERP and SOP’s.

Page 172: Welcome to Hazardous Materials Technician - Part 1

Plan of Action Safety Considerations

• List and describe the safety considerations to be included…in the plan of action.

Page 173: Welcome to Hazardous Materials Technician - Part 1

Safety Briefing

• Identify the points that should be made in a safety briefing prior to working at the scene.

Page 174: Welcome to Hazardous Materials Technician - Part 1

Confined Space Safety Hazards

• Identify the atmospheric and physical safety hazards associated with hazardous materials incidents involving confined spaces.

Page 175: Welcome to Hazardous Materials Technician - Part 1

Confined Space Safety Hazards

• Atmospheric Hazards– Oxygen-deficient

– Oxygen-enriched

– Flammable/explosive

– Toxic

Page 176: Welcome to Hazardous Materials Technician - Part 1

Confined Space Safety Hazards

• Physical Hazards– Engulfment

– Falls/slips

– Electrical

– Structural

– Mechanical

Page 177: Welcome to Hazardous Materials Technician - Part 1

Pre-Entry Activities

• Identify the pre-entry activities to be performed.

Page 178: Welcome to Hazardous Materials Technician - Part 1

Collecting Legal Evidence

• Identify the procedures, equipment, and safety precautions for collecting legal evidence at hazardous materials incidents.

Page 179: Welcome to Hazardous Materials Technician - Part 1

Implementing the Planned Response

• Given simulated hazardous materials incidents, describe the principles for implementing the planned response to a hazardous materials incident at the technician level with at least 80% accuracy.

Page 180: Welcome to Hazardous Materials Technician - Part 1

Duties of the Technician at a Hazardous Materials Incident

• Given the local emergency response plan or organization‘s standard operating procedures and a simulated hazardous materials incident, the hazardous materials technician shall demonstrate the duties of an assigned hazardous materials branch position within the local incident management system (IMS).

Page 181: Welcome to Hazardous Materials Technician - Part 1

Role of the Hazardous Materials Technician

• Identify the role of the hazardous materials technician during an incident involving hazardous material.

Page 182: Welcome to Hazardous Materials Technician - Part 1

Duties & Responsibilities of the Technician within Hazardous Materials Incident & IMS

• Identify the duties and responsibilities of the following hazardous materials branch functions within the incident management system.

Page 183: Welcome to Hazardous Materials Technician - Part 1

Duties & Responsibilities of the Technician within Hazardous Materials Incident & IMS

– Backup– Decontamination– Entry– Hazardous materials branch management– Hazardous materials branch safety– Information/research– Reconnaissance– Resources

Page 184: Welcome to Hazardous Materials Technician - Part 1

Duties & Responsibilities of the Technician within Hazardous Materials Incident & IMS

– Incident commander– Command staff– Planning– Logistics– Operations– Staging– Finance and administration

Page 185: Welcome to Hazardous Materials Technician - Part 1

• Given a simulated hazardous materials scenario, as a team, demonstrate the ability to set up a contamination reduction corridor and perform decontamination within 30 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 186: Welcome to Hazardous Materials Technician - Part 1

Setup of the Decontamination Corridor

• Demonstrate setup of the decontamination corridor as specified in the planned response.

Page 187: Welcome to Hazardous Materials Technician - Part 1
Page 188: Welcome to Hazardous Materials Technician - Part 1

The Decontamination Process

• Demonstrate the decontamination process specified in the planned response.

Page 189: Welcome to Hazardous Materials Technician - Part 1
Page 190: Welcome to Hazardous Materials Technician - Part 1

• Given specialized personal protective equipment and appropriate respiratory protection inspect, record, don, work in, and doff the clothing within 60 minutes DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 191: Welcome to Hazardous Materials Technician - Part 1

Safety Procedures for Personnel Wearing Vapor-protective Clothing

• Describe three safety procedures for personnel wearing vapor-protective clothing.

Page 192: Welcome to Hazardous Materials Technician - Part 1

Emergency Procedures for Personnel Wearing Vapor-protective Clothing

• Describe three emergency procedures for personnel wearing vapor-protective clothing.– Loss of air supply– Loss of suit integrity– Loss of verbal communication– Buddy down in hot zone

Page 193: Welcome to Hazardous Materials Technician - Part 1

Procedures for Donning, Working In, and Doffing Respiratory Protection

• Identify the procedures for donning, working in, and doffing the following types of respiratory protection:– Air line respirator with escape unit– Air purifying respirator

Page 194: Welcome to Hazardous Materials Technician - Part 1

Demonstrate Donning, Working In, and Doffing Chemical-protective Clothing

• Demonstrate donning, working in, and doffing chemical-protective clothing in addition to any other specialized protective equipment provided by the authority having jurisdiction.

Page 195: Welcome to Hazardous Materials Technician - Part 1

Record the Use, Repair, and Testing of Chemical-protective Clothing

• Demonstrate the ability to record the use, repair, and testing of chemical-protective clothing according to manufacturer’s specifications and recommendations.

Page 196: Welcome to Hazardous Materials Technician - Part 1

Maintenance, Testing, Inspection, and Storage Procedures for Personal Protective Equipment

• Describe the maintenance, testing, inspection, and storage procedures for personal protective equipment provided by the authority having jurisdiction according to the manufacturer‘s specifications and recommendations.

Page 197: Welcome to Hazardous Materials Technician - Part 1

• Given necessary materials, select, maintain, and inspect the appropriate tools, and demonstrate the ability to contain various leaks on a pressure vessel within 60 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 198: Welcome to Hazardous Materials Technician - Part 1

Containing Leaks in Pressure Vessels

• Given a pressure vessel, select the appropriate material or equipment and demonstrate a method(s) to contain leaks from the following locations.

Page 199: Welcome to Hazardous Materials Technician - Part 1

Containing Leaks in Pressure Vessels specifically:

– Fusible metal of plug– Fusible plug threads– Side wall of cylinder– Valve blowout– Valve gland– Valve inlet threads– Valve seat– Valve stem assembly blowout

Page 200: Welcome to Hazardous Materials Technician - Part 1
Page 201: Welcome to Hazardous Materials Technician - Part 1

Closing Valves, Replacing Plugs, Tightening Loose Plugs

• Given the fittings on a pressure container, demonstrate the ability to perform the following.– Close open valves

– Replace missing plugs

– Tighten loose plugs

Page 202: Welcome to Hazardous Materials Technician - Part 1

• Given a 55-gal drum and an 85-gallon overpack drum, necessary tools and equipment, as a team, contain various leaks on the drum, and demonstrate three methods of overpacking, within 30 DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 203: Welcome to Hazardous Materials Technician - Part 1

Drum Leak Control

• Given a 55-gal (208-L) drum, demonstrate the ability to contain the following types of leaks using appropriate tools and materials.– Bung leak– Chime– Forklift puncture– Nail puncture

Page 204: Welcome to Hazardous Materials Technician - Part 1
Page 205: Welcome to Hazardous Materials Technician - Part 1

Drum Overpacking

• Given a 55-gal (208-L) drum and an overpack drum, demonstrate the ability to place the 55-gal drum into the overpack drum using the following methods.– Rolling slide-in– Slide-in– Slip-over

Page 206: Welcome to Hazardous Materials Technician - Part 1
Page 207: Welcome to Hazardous Materials Technician - Part 1

Tool & Equipment Maintenance & Inspection

• Identify the maintenance and inspection procedures for the tools and equipment provided for the control of hazardous materials releases according to the manufacturer’s specifications and recommendations.

Page 208: Welcome to Hazardous Materials Technician - Part 1

Assessing Leaks & Spills within Confined Spaces

• Identify three considerations for assessing a leak or spill inside a confined space without entering the area.

Page 209: Welcome to Hazardous Materials Technician - Part 1

• Given a MC-306/DOT-406 cargo tank and dome cover clamp, as a team, install the clamp on the dome and stop various leaks, within 30 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 210: Welcome to Hazardous Materials Technician - Part 1

Product Transfer Safety Consideration

• Identify three safety considerations for product transfer.– Bonding

– Grounding

– Elimination of ignition sources

– Shock hazards

Page 211: Welcome to Hazardous Materials Technician - Part 1

Install a Dome Cover Clamp

• Given a MC-306/DOT-406 cargo tank and a dome cover clamp, demonstrate the ability to install the clamp on the dome properly.

Page 212: Welcome to Hazardous Materials Technician - Part 1
Page 213: Welcome to Hazardous Materials Technician - Part 1

Fire Involving MC 306/DOT 406 Aluminum Shell Cargo Tanks

• Identify the methods and precautions used when controlling a fire involving an MC-306/DOT-406 aluminum shell cargo tank.

Page 214: Welcome to Hazardous Materials Technician - Part 1

Containing Leaksin Various Cargo Tank Trucks

• Describe at least one method for containing each of the following types of leaks in MC-306/DOT-406, MC-307/DOT-407, and MC-312/DOT- 412 cargo tanks:

Page 215: Welcome to Hazardous Materials Technician - Part 1

Containing Leaksin Various Cargo Tank Trucks

– Dome cover leak

– Irregular-shaped hole

– Puncture

– Split or tear

Page 216: Welcome to Hazardous Materials Technician - Part 1

Product Removal & Transferfrom Cargo Tank Trucks

• Describe three product removal and transfer considerations for overturned MC-306/DOT-406, MC-307/DOT-407, MC-312/DOT-412, MC-331, and MC-338 cargo tanks.– Inherent risk associated with such operations– Procedures and safety precautions– Equipment required

Page 217: Welcome to Hazardous Materials Technician - Part 1

• Given a copy of the local emergency response plan, identify the element of the plan necessary to implement the planned response within 60 minutes IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 218: Welcome to Hazardous Materials Technician - Part 1

Evaluating Progress

• Given a scenario and a plan of action, identify the effectiveness of control functions with at least 80% accuracy.

Page 219: Welcome to Hazardous Materials Technician - Part 1

Evaluating Effectiveness of Control Functions

• Given various simulated facility and transportation hazardous materials incidents involving nonbulk and bulk packaging and the plan of action, the hazardous materials technician shall evaluate the effectiveness of any control functions listed in the plan of action.

Page 220: Welcome to Hazardous Materials Technician - Part 1

Terminating the Incident

• Given various simulated hazardous materials incidents, identify the principles associated with terminating an incident at the technician level with at least 80% accuracy.

Page 221: Welcome to Hazardous Materials Technician - Part 1

Components of a Debriefing

• Describe three components of an effective debriefing.

Page 222: Welcome to Hazardous Materials Technician - Part 1

Key Topics of an Effective Debriefing

• Describe the key topics of an effective debriefing.

Page 223: Welcome to Hazardous Materials Technician - Part 1

When to Perform a Debriefing

• Describe when a debriefing should take place.

Page 224: Welcome to Hazardous Materials Technician - Part 1

Who Should attend the Debrief

• Describe who should be involved in a debriefing.

Page 225: Welcome to Hazardous Materials Technician - Part 1

Components of an Effective Critique

• Describe three components of an effective critique.

Page 226: Welcome to Hazardous Materials Technician - Part 1

Who Should Attend the Critique

• Describe who should be involved in a critique.

Page 227: Welcome to Hazardous Materials Technician - Part 1

Necessity of an Effective Critique

• Describe why an effective critique is necessary after a hazardous materials incident.

Page 228: Welcome to Hazardous Materials Technician - Part 1

Written Documents as a Result of the Critique

• Describe which written documents should be prepared as a result of the critique.

Page 229: Welcome to Hazardous Materials Technician - Part 1

Reports & Documentation Required to Conclude a Response

• Identify the reports and supporting documentation required by the local emergency response plan and the organization’s standard operating procedures.

Page 230: Welcome to Hazardous Materials Technician - Part 1

Complete Required Reports

• Demonstrate the proper completion of the reports required by the local emergency response plan and the organization’s standard operating procedures.

Page 231: Welcome to Hazardous Materials Technician - Part 1

Incident Reports

• Identify the steps to be taken in compiling incident reports that meet federal, state, local, and organizational requirements.

Page 232: Welcome to Hazardous Materials Technician - Part 1

Exposure Records

• Describe the importance of personnel exposure records.

Page 233: Welcome to Hazardous Materials Technician - Part 1

Debriefing Records

• Describe the importance of debriefing records.

Page 234: Welcome to Hazardous Materials Technician - Part 1

Critique Records

• Describe the importance of critique records.

Page 235: Welcome to Hazardous Materials Technician - Part 1

Activity Log & Exposure Records

• Identify the steps in keeping an activity log and exposure records for hazardous materials incidents.

Page 236: Welcome to Hazardous Materials Technician - Part 1

Entry & Exit Logs

• Identify the requirements for compiling hot zone entry and exit logs.

Page 237: Welcome to Hazardous Materials Technician - Part 1

PPE Logbooks

• Identify the requirements for compiling personal protective equipment logs.

Page 238: Welcome to Hazardous Materials Technician - Part 1

Filing Documents & Maintaining Records

• Identify the requirements for filing documents and maintaining records.

Page 239: Welcome to Hazardous Materials Technician - Part 1

• Given a scenario, as a team, demonstrate the ability to direct resources, terminate the incident, provide a debriefing, conduct a critique, and document the incident within 4 hours IAW DoD Instruction 6055.6 & DoD Manual 6055.6.

Page 240: Welcome to Hazardous Materials Technician - Part 1

Administer CerTest

End Part II

Technician