Page 1: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

FACILITIES MANAGEMENT101 TRAINING

WELCOME

Jacqueline GonzalezSpecialist CAD Operator

Kenneth KlindtAVP of Facilities Mgmt

John DunnuckVP of Operations

Sean DevaneyDistrict Director Facilities

College Wide Maintenance

Deborah CzubkowskiDistrict Director Facilities Design and

Construction

Mark GriffinDistrict Director Facilities

Planning amp Capital Budgets

Jean GriffinExecutive Assistant

Amanda WilliamsSenior Analyst

Construction amp Capital Accounts

Priscila FortCentral Campus

Senior Project Manager

Robert BellotSouth Campus

Senior Project Manager

Nelson GorisNorth Campus

Senior Project ManagerJonathan Iglesias

CAFM System Administrator Mike Coval

Electrical Manager

Yohannes AsgedomHVACMechanical Mgr

Mike McManigalFacility Mgr DTC

Kenneth HuntLocksmith Manager

Nathan Sade Facility Mgr SC

Chris TavaresFleet Manager

Janet SimilienAdmin Assistant III

Marcus WilsonFacility Mgr NC

Larry JonesFacility Mgr CC

Laura OzmentCW Landscape Mgr

Juanita B VegaExecutive Assistant

Tamaris AlvarezFacilities Planner

Ana OvallesDirector Facilities

Planning

Ellice MartinezSpecial Projects Manager

Aldrin D LakeAdmin Assistant III

Patsy LenoxExecutive Assistant

District DirectorEnvironmental Safety amp

Chief Fire Official

bull Dr Judy Schmelzer AVP Business Services and Resource Managementbull Zaida Riollano District Director Strategic Sourcingbull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officerbull Jose Hidalgo Contracting Officer

bull Joseph Carriker District Director Campus Safetybull Tim Andrasek Manager Physical Security Technology

bull Otto Letzelter MEP Structural Building Officialbull Sal Giorlando MEP Structural Inspectorbull Tom Giorlando MEP Structural Electrical Inspectorbull Barbara Camparscone MEP Structural Operations Managerbull Elizabeth Pardee MEP Structural Executive Coordinator

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautionsa All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksitea The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksitea Check in with your designated person that requested the Work

Orderb Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357i Provide contact person who requested work orderii Proper identification should be worn at all timesiii Provide length of time you will be on site

IV Parking on Campusa All contractors or vendors must have a company identified vehicleb The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reportinga 911 shall be called for any assistance that requires emergency

responseb 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipmenta All contractors and vendors shall provide their own equipment b Broward College equipment will not be lent out to contractors or

vendors

VII Hot Work Permita All contractors shall acquire the proper hot work permit from the

College Building Department agency

VIII Smokinga There is no smoking at Broward College It is a smoke free campus

(including no vaping)

IX Required Conducta Proper dress is required including proper safety attire and equipmentb Music and radios are prohibitedc Proper language is requiredd Interaction with students and staff shall be kept to a minimum

X Equipment Deliveriesa Deliveries of equipment and supplies will be coordinated with

campus schedule preferably at non peak times b Deliveries will be coordinated with the vendor not BC Central

receiving

XI Hazardous Materialsa Chemicals brought onto site must be handled in accordance with

OSHA and all other applicable lawsb MSDS Sheets will be available on site accompanying materials

XII Broward College Contacts a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 2: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Jacqueline GonzalezSpecialist CAD Operator

Kenneth KlindtAVP of Facilities Mgmt

John DunnuckVP of Operations

Sean DevaneyDistrict Director Facilities

College Wide Maintenance

Deborah CzubkowskiDistrict Director Facilities Design and

Construction

Mark GriffinDistrict Director Facilities

Planning amp Capital Budgets

Jean GriffinExecutive Assistant

Amanda WilliamsSenior Analyst

Construction amp Capital Accounts

Priscila FortCentral Campus

Senior Project Manager

Robert BellotSouth Campus

Senior Project Manager

Nelson GorisNorth Campus

Senior Project ManagerJonathan Iglesias

CAFM System Administrator Mike Coval

Electrical Manager

Yohannes AsgedomHVACMechanical Mgr

Mike McManigalFacility Mgr DTC

Kenneth HuntLocksmith Manager

Nathan Sade Facility Mgr SC

Chris TavaresFleet Manager

Janet SimilienAdmin Assistant III

Marcus WilsonFacility Mgr NC

Larry JonesFacility Mgr CC

Laura OzmentCW Landscape Mgr

Juanita B VegaExecutive Assistant

Tamaris AlvarezFacilities Planner

Ana OvallesDirector Facilities

Planning

Ellice MartinezSpecial Projects Manager

Aldrin D LakeAdmin Assistant III

Patsy LenoxExecutive Assistant

District DirectorEnvironmental Safety amp

Chief Fire Official

bull Dr Judy Schmelzer AVP Business Services and Resource Managementbull Zaida Riollano District Director Strategic Sourcingbull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officerbull Jose Hidalgo Contracting Officer

bull Joseph Carriker District Director Campus Safetybull Tim Andrasek Manager Physical Security Technology

bull Otto Letzelter MEP Structural Building Officialbull Sal Giorlando MEP Structural Inspectorbull Tom Giorlando MEP Structural Electrical Inspectorbull Barbara Camparscone MEP Structural Operations Managerbull Elizabeth Pardee MEP Structural Executive Coordinator

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautionsa All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksitea The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksitea Check in with your designated person that requested the Work

Orderb Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357i Provide contact person who requested work orderii Proper identification should be worn at all timesiii Provide length of time you will be on site

IV Parking on Campusa All contractors or vendors must have a company identified vehicleb The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reportinga 911 shall be called for any assistance that requires emergency

responseb 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipmenta All contractors and vendors shall provide their own equipment b Broward College equipment will not be lent out to contractors or

vendors

VII Hot Work Permita All contractors shall acquire the proper hot work permit from the

College Building Department agency

VIII Smokinga There is no smoking at Broward College It is a smoke free campus

(including no vaping)

IX Required Conducta Proper dress is required including proper safety attire and equipmentb Music and radios are prohibitedc Proper language is requiredd Interaction with students and staff shall be kept to a minimum

X Equipment Deliveriesa Deliveries of equipment and supplies will be coordinated with

campus schedule preferably at non peak times b Deliveries will be coordinated with the vendor not BC Central

receiving

XI Hazardous Materialsa Chemicals brought onto site must be handled in accordance with

OSHA and all other applicable lawsb MSDS Sheets will be available on site accompanying materials

XII Broward College Contacts a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 3: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Dr Judy Schmelzer AVP Business Services and Resource Managementbull Zaida Riollano District Director Strategic Sourcingbull Peggy Howse District Director Auxiliary Services bull Anthea Pennant District Director Supplier Relations and Diversity bull Eileen Hunt Contracting Officerbull Jose Hidalgo Contracting Officer

bull Joseph Carriker District Director Campus Safetybull Tim Andrasek Manager Physical Security Technology

bull Otto Letzelter MEP Structural Building Officialbull Sal Giorlando MEP Structural Inspectorbull Tom Giorlando MEP Structural Electrical Inspectorbull Barbara Camparscone MEP Structural Operations Managerbull Elizabeth Pardee MEP Structural Executive Coordinator

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautionsa All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksitea The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksitea Check in with your designated person that requested the Work

Orderb Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357i Provide contact person who requested work orderii Proper identification should be worn at all timesiii Provide length of time you will be on site

IV Parking on Campusa All contractors or vendors must have a company identified vehicleb The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reportinga 911 shall be called for any assistance that requires emergency

responseb 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipmenta All contractors and vendors shall provide their own equipment b Broward College equipment will not be lent out to contractors or

vendors

VII Hot Work Permita All contractors shall acquire the proper hot work permit from the

College Building Department agency

VIII Smokinga There is no smoking at Broward College It is a smoke free campus

(including no vaping)

IX Required Conducta Proper dress is required including proper safety attire and equipmentb Music and radios are prohibitedc Proper language is requiredd Interaction with students and staff shall be kept to a minimum

X Equipment Deliveriesa Deliveries of equipment and supplies will be coordinated with

campus schedule preferably at non peak times b Deliveries will be coordinated with the vendor not BC Central

receiving

XI Hazardous Materialsa Chemicals brought onto site must be handled in accordance with

OSHA and all other applicable lawsb MSDS Sheets will be available on site accompanying materials

XII Broward College Contacts a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 4: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

I Safety Precautionsa All contractors and vendors shall be responsible for initiating

maintaining and supervising all safety precautions and programs in connection with performance of their contract with the College

II Construction Projects - Access to your Worksitea The CM superintendent or project manager will be responsible

to provide all sub-contractors and vendors access to the specific project work site

b Contractors should have company IDs State ID and Company Uniform

c The CM Superintendent or Project Manager should request badges from Broward College Project Manager or Facility Manager

III Maintenance and Repair Vendors ndash Access to your Worksitea Check in with your designated person that requested the Work

Orderb Regular vendors can get access badges from Broward College

Project Manager or Facility Manager Access badges will be programmed as needed

c Key set pickup scheduled ahead of time Vendor is liable for any lost key sets and core cost for replacement This should be scheduled with Broward College Project Manager or Facility Manager

d Check-in with Campus Safety by contacting 954-201-4357i Provide contact person who requested work orderii Proper identification should be worn at all timesiii Provide length of time you will be on site

IV Parking on Campusa All contractors or vendors must have a company identified vehicleb The college project manager is responsible to inform the contractor to

park in non-designated parking spaces

a Any contractor that needs to park in designated parking spaces must receive authorization from the appropriate Business Deans Office

b No parking on sidewalks grass fire lanes or roadways

V Incident Reportinga 911 shall be called for any assistance that requires emergency

responseb 954-201-HELP (4357) shall be called for Campus Safety assistance

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipmenta All contractors and vendors shall provide their own equipment b Broward College equipment will not be lent out to contractors or

vendors

VII Hot Work Permita All contractors shall acquire the proper hot work permit from the

College Building Department agency

VIII Smokinga There is no smoking at Broward College It is a smoke free campus

(including no vaping)

IX Required Conducta Proper dress is required including proper safety attire and equipmentb Music and radios are prohibitedc Proper language is requiredd Interaction with students and staff shall be kept to a minimum

X Equipment Deliveriesa Deliveries of equipment and supplies will be coordinated with

campus schedule preferably at non peak times b Deliveries will be coordinated with the vendor not BC Central

receiving

XI Hazardous Materialsa Chemicals brought onto site must be handled in accordance with

OSHA and all other applicable lawsb MSDS Sheets will be available on site accompanying materials

XII Broward College Contacts a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 5: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

ContractorVendor Check-In ProcedureJoseph (Joe) Carriker Captain ndash Campus Safety

VI Borrowing Campus Equipmenta All contractors and vendors shall provide their own equipment b Broward College equipment will not be lent out to contractors or

vendors

VII Hot Work Permita All contractors shall acquire the proper hot work permit from the

College Building Department agency

VIII Smokinga There is no smoking at Broward College It is a smoke free campus

(including no vaping)

IX Required Conducta Proper dress is required including proper safety attire and equipmentb Music and radios are prohibitedc Proper language is requiredd Interaction with students and staff shall be kept to a minimum

X Equipment Deliveriesa Deliveries of equipment and supplies will be coordinated with

campus schedule preferably at non peak times b Deliveries will be coordinated with the vendor not BC Central

receiving

XI Hazardous Materialsa Chemicals brought onto site must be handled in accordance with

OSHA and all other applicable lawsb MSDS Sheets will be available on site accompanying materials

XII Broward College Contacts a Facilities 954-201-6022 b Campus Safety 954-201-4357

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 6: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

HOUSEKEEPING

bull Break at 1010 AM

bull Snacks provided by Panera Bread

bull Cold beverages provided by Broward College Auxiliary Services

bull No food or drinks inside the auditorium

bull Restrooms and water fountains located behind the Auditorium

bull Cell phonersquos ringer offbull BC is a Tobacco Free Workplace

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 7: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

FACILITIES MANAGEMENT OVERVIEW

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 8: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Project Initiation Phase

Design Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 9: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Identify Need amp Funding

bull All projects must be on our internal Five Year Capital Plan and any project $2M or greater must be on the Capital Improvement Plan(CIP) submitted to FLDOE

bull Projects may be driven by condition assessment findings

bull Remodel or Renovation projects may be requested by Campus

bull Projects prioritized based availability of funding and review by Senior Administration

Mark Griffin District Director of Facilities Planning and Budget

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 10: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

FIRST 2 DIGIT CAMPUS SITE

00 ndash College Wide

10 ndash Central

11 ndash Downtown

12 ndash Weston

14 ndash Cypress

20 ndash North

30 ndash South

31 ndash Miramar West

34 ndash Tiger Tail

35 ndash Pines Center

37 ndash Miramar Town Center

ldquoCrdquo ConstructionldquoMrdquo Maintenance

ldquoPrdquo Planning

Ex 1003-C14-010Year Project was initiated

Building Number

Project assigned this year in that building

Sub-project

July 30th 2015

Project NumberingMark Griffin District Director of Facilities Planning and Budget

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 11: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Based onbull Availability of fundingbull Availability of College resourcesbull Availability of external resourcesbull Scheduled use of facility if RemodelRenovationbull Estimated durationbull Time lines will be developed based on input from all parties involved

Establish Initial ScheduleMark Griffin District Director of Facilities Planning and Budget

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 12: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Surveys

bull Infrastructure Topographical and Boundary Survey

bull Standards developed apply to all survey work

bull Master survey must be updated for all work performed

bull Data collected supports GIS mapping of infrastructure

bull Facilitates location of utilities and provides condition assessment data

North Campus ndash Keith and Associates

Central Campus ndash Stoner and Associates

South Campus ndash Craven Thompson and Associates

Mark Griffin District Director of Facilities Planning and Budget

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 13: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Required submittals to FDOE

httpwwwfldoeorgfinanceedual-facilitiesrequirements-for-plan-review-of-constrstml

A board which undertakes the construction remodeling renovation lease or lease-purchase of any educational plant or ancillary facility or day labor project regardless of cost or fund source shall develop policy and procedures for the review of contract and construction documents as outlined in Section 101338 FS permanent archival of plans and submission of project data as requested to the Department pursuant to sect 101350 FS

For all projects over $300000 the following forms shall be submitted to the Office of Educational Facilities for their files

bull OEF Form 110A - Project Implementation Informationbull OEF Form 110B - Certificate Of Occupancybull OEF Form 208 - Letter Of Transmittalbull OEF Form 208A - Facility Space ChartNet And Gross Square Footagebull OEF Form 209 - Certificate Of Final Inspectionbull OEF Form 220 - Building Permit Applicationbull Construction Documents (Phase III) bull Etchellip

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 14: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Required Forms httpspublic2fldoeorgEFISRegistrationRegisteraspx

You must have a Broward College email address (Contingent Worker)

Mark Griffin District Director of Facilities Planning and Budget

State Required Forms

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 15: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Project Planning Phase

Design

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 16: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Broward College end usersbull Involve upper-management for input of College-wide goalsbull Value end-user needs for particulars storage privacy needs and

future requestsbull Refer back to Interior and Design Standardsbull Request sign-off from Deans and Presidents involved

Scopebull Determine scope based on feedback from Facilities Teambull Always going back to what budget allows

BC Resourcesbull Coordination and plan review with the following BC personnel

Electrical HVAC Access Control CCTV Landscape Services AV Fire IT Locksmith and others BC PLANNING

Identify StakeholdersAna Ovalles Director of Facilities Planning

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 17: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Schematic Design according to approved budget

Schematic DesignAna Ovalles Director of Facilities Planning

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 18: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

BC Resources

Schematic Sign-off by Administration to minimize thishellip hellip Illegal use of storage room

Ana Ovalles Director of Facilities Planning

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 19: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

FFampE INSTALLAutomotive-Marine

Relocation of existing equipment

bull Planning coordinates withinternal BC staff

bull Equipment layout based on approved equipment list

Building 98 Relocation of FFampE Building 98 Equipment

Develop FFampE plan

FFampE coordination

Tamaris Alvarez Facilities Planner

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 20: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Coordination of electrical components in furniture with Design Professional

bull ID Drawings provided by the design team are the official documents for FFampE placement

bull Design Team to follow-up all updating documents

Electrical amp network installation for furniture

Develop FFampE planTamaris Alvarez Facilities Planner

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 21: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Engineering Lab Installation of new Powered Workstationsbull Dimension of equipment (PC size Monitor size All in one)bull Future electrical needs from end usersbull Student stations per room ndash required per academic program Canrsquot

changed throughout the project ndash rooms waiting to be scheduled

Furniture Fixture amp Equipment Placement

bull No need for two shelvesbull Shelve will need to hold up to 75 lbsbull Depth for shelve = 18rsquorsquo minbull Distance between work-surface and

shelve = 15rsquorsquo minbull Power strip to be at least 3rsquorsquo- 4rsquorsquo

below the shelvebull Work-surface height = 34rsquorsquo (top)bull Strip 5 duplex + 1 data

Equipment ListTamaris Alvarez Facilities Planner

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 22: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Implement standard colors for College-wide renovations and new construction Minimize maintenance storage of paint and carpet

bull Coordination of furniture finishes with millwork and door laminatesfinishes

Tile Carpet

Laminate

Develop FFampE plan

Finishes selection

Tamaris Alvarez Facilities Planner

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 23: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Tamaris Alvarez Facilities Planner

Project Turnover

Project turnover to Facilities Design amp Construction

bull Project is funded

bull Project is reviewed by BC staff and end users

bull Once the schematic design is signed off by end user the project is turnover to the Design amp Construction team

bull Senior Project Manager begins by setting up a project in Procore

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 24: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Broward College Senior Project Managers set-up projects on the BC Procore site Each vendor will need to submit a contact list that will need access

bull It is the CMrsquos responsibility to add all sub-contractors to the project

bull All items needing approval need to be submitted through Procore (This includes RFIrsquos Submittals Payment Applications etc)

Ellice Martinez Special Projects Manager

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 25: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Procorersquos ResponsibilitiesBCrsquos responsibility update

bull Directory

bull Historic reference documents

( As-Builts)

bull Planning

bull Master schedule

bull Topographic

bull Underground utility survey

bull Meeting Minutes prior to

Precon Meeting

bull Review RFIrsquos

CMrsquos responsibility to update

bull Project Sub Directorybull Daily Logs

bull Initiate RFIrsquos and upload

bull Closeout documents

bull Building Code Official (Inspection

reports and permits)

bull Environmental reports

bull Geotechnical reports

bull Material testing results

bull Meeting Minutes after Precon Meeting

bull Schedule Updates

bull Submittals - (CCArsquos Pay apps change

orders Construction Submittals)

Architects responsibility to update

bull DesignConstruction Documents

bull RFIrsquos review

bull Specifications

Everyonersquos responsibility

bull Photos

bull Observations

bull Punchlist

Ellice Martinez Special Projects Manager

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 26: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Tips

If you would like to attend a special Procore training there is a sign in sheet

going around the room Please make sure you sign up before you leave

Ellice Martinez Special Projects Manager

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 27: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Project Design Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 28: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Contingent WorkerDeborah Czubkowski District Director of Design and Construction

Continuing Services Architectsbull District Director will submit request in behalf of the Architect representative

bull An email notification will be sent from Broward College to the Architect

bull You will be assigned a Broward College email address

bull You will be able to submit and manage FDOE forms in Broward Collegersquos behalf

bull You will be able to request a Broward College Badge

All other continuing services Vendorsbull District Director of Design and Construction will submit list of vendors and their

representatives to Safety and Security

bull Once Safety and Security receives the list you should be able to request a badge at their office

in Cypress Creek

CMrsquosSurveyorsRoofers

EngineersMechanical

ElectricalAV

Access ControlEtc

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 29: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

BC Design and Construction Standards

1 Go to Browardedu

2

3

4

COMMUNITY PUBLIC

FACILITIES MANAGEMENT

Deborah Czubkowski District Director of Design and Construction

STANDARDS

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 30: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Broward College Design and Construction Standards

Page 3Conformance Statement

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 31: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Design Professional Responsibilities Deborah Czubkowski District Director of Design and Construction

1 Design Documents

bull Detailed walkthrough of existing conditionsbull For construction projects under $200K ndash Submit

100 CDrsquos for review and then a permit set

bull For construction projects over $200K ndash Submit 30

60 90 and 100 CDrsquos to BC Building

Department and BC SPM for review

bull The college may choose to request fewer submittals

3 Construction Administration

bull Construction inspections

bull Coordinate finishes (carpet millwork etc)

bull Review and approvereject submittals

bull Review of Pay Applications CCArsquos and Change Orders

2 Pre-con

bull Prepare budget estimates

bull Evaluate Value Engineering Opportunities

bull Review GMP

4 Closeout

bull Punchlist

bull Review Closeout Documents including Asbuilts

bull Review Final Payment and Retainage payment

bull Complete FDOE Forms

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 32: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

AE Deliverables amp BC Disciplines Coordination Deborah Czubkowski District Director of Design and Construction

30 Design Documents

1 Confirm Schematic Design2 Review BC Design and

Construction Standards3 Provide Conformance

Statement4 Coordination with BC

Resourcesa Information Technologyb Locksmithc Electrical and Plumbing d Mechanicale Landscapef Fire Protectiong Audio Visualh Access Controli Securityj Interior Design

5 Estimate of Probable Cost6 FDOE initial submittals

60 Design Documents

1 Coordination of Furniture and equipment

2 Demolition Plan3 SiteworkCivil Work4 Preliminary interior and

exterior color and finish schedule

5 3D Renderings at Ownerrsquos request

6 Review architectural floor plan and elevations

7 Written summary statement of all comments from BC in-house staff that were included in the 30 submittal

8 Coordination of the trades in one drawing (ie HVAC electrical data)

90 Design Documents

1 Written summary statement of comments included in the 60 submittal

2 One set of structural calculations

3 Written statement of BC Fire Marshal approval status

4 Two sets of required Energy Code forms Mechanical Load calculations Photometric calculations for normal and emergency power

100 Design Documents

1 Written summary statement of comments included in the 90 submittal

2 Final landscape material type quantity and spacing approval by BC Landscape Manager

3 Final drainage district approvals and SFWM approvals as applicable

4 Final Approval from BC Fire Marshal

5 Written statement from AE of record that the plans and specifications conform to the Broward College Construction and Design Standards

6 Pre filled OEF Forms for the project OEF 100A 110B CO and Final Inspection 209

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 33: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

BC Senior Project Manager (SPM) ResponsibilitiesDeborah Czubkowski District Director of Design and Construction

Your main point of contact for the projects

North Campus Sr PM Central Campus Sr PM South Campus Sr PM

All changes must be approved by Senior Project Manager

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 34: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 35: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Pre Construction CMs Responsibilities Nelson Goris Senior Project Manager

bull For Projects under $2M the CM is engaged at the same time as the AE Team

bull Value of CMrsquos participation at this phaseo Preliminary cost estimateso Review of Design Documentso Review Preliminary Scheduleso Preliminary Site Evaluations

bull Bid Processo Bid Advertisemento Bid Documentso Pre Bid Meetingso BC SPM to be present at Bid Opening

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 36: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Bid Advertisement

Per Florida Statue the legal notice shall include at least the following information

1 Project name and name of Board 2 Location of the project 3 Brief statement describing the work 4 Date time and place of bid opening 5 From whom and when contract documents are available including

deposit or charge 6 Other information for bidders prequalification of bidders notice of

pre-bid conference bid security insurance plan deposit and whether the Board intends to waive technicalities

Zaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Bidding Process

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 37: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Bidding RequirementsConstruction Projects Estimated to cost $300000 or more the bid advertisement shall be published a minimum of once a week for three consecutive weeks in a local newspaper with general circulation throughout the district The last such notice shall appear at least seven days prior to the date set for the bid opening

1 Procurement to approve advertisement

2 Facilities Representative must be present at the bid openings

3 Any correction or change in the advertisement shall be made at least seven days prior to the date set for bid opening

4 The original date set for bid opening may be changed and extended at any time within the final seven day period provided the notice to bidders is published again for one time at least seven days prior to the new bid date and each known prospective bidder is notified in writing of the change

5 Complete drawings and the project specification manual shall be available to contractors on the date of the first legal advertisement

Bidding ProcessZaida Riollano District Director Strategic Sourcing ProcurementDr Judy Schmelzer AVP Business Services amp Resource Management

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 38: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Restrictions amp Timelines

Coordination College BookstoresCafeacutersquos Food Service ndash Subway amp Dunkin DonutsVending ndash Snack and Beverage

Bookstores ndash Requires a contracted employee be present during any interior work in all campus Bookstore locations Security does not have a key or provide access Minimum of 5 day notice Cafeacutersquos and Food Service ndash Any service disruption or interior work needs to be coordinated to prevent food loss or contamination Contracted employee can be assigned to be present if required Minimum of 5 day noticeVending Machines 1 Service disruption (no power) need a minimum of 5 days notice for product to be removed 2 Relocation ndash Requires a minimum of 2 weeks notice to remove vending machines during project 3 Please do not move or remove vending machines if an urgent issuemdashplease contact your BC SPM

Peggy Howse District Director Auxiliary Services

Auxiliary Services

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 39: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

SDSB Program at BCProgram Goalsbull Constructionmdash34 percentbull Professional Servicesmdash7 percent bull Non-professional Servicesmdash17 percentbull Goods amp Suppliesmdash10 percent

Supplier Registration ndash Doing Business with BC ndash Link on left hand banner

SDSB Program application ndash application on the Supplier Diversity website Eligibility established through certification from the followingbull Broward County (Florida) ndash Small Business Divisionbull Florida State Minority Supplier Development Council (FSMSDC)bull Miami Dade County (Florida) ndash Department of Business Developmentbull Palm Beach County (Florida) ndash Office of Small Business Assistancebull School Board of Broward County (Florida) ndash Office of Supplier Diversity and Outreachbull State of Florida ndash Office of Supplier Diversity bull Woman Business Enterprise National Council (Florida affiliate of WBENC)

For list of registered vendors contact me Anthea at (954) 201-7307 or apennantBrowardedu

Supplier Diversity Small Business (SDSB) ProgramAnthea Pennant District Director Supplier Relations and Diversity

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 40: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Project Preconstruction Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 41: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Evaluate Cost Value EngineeringNelson Goris Senior Project Manager

bull Sealed bids are to be open on the day and location as

advertised with SPM andor Procurement personnel

present

bull CM records all bids submitted

bull CM to review bids and provide Value Engineering options

bull CM formally presents GMP to SPM

bull CM provides hard copies of GMP to SPM

bull SPM distributes GMP to Design Team for additional review

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 42: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

GMP ndash Guarantee Maximum PriceNelson Goris North Campus SPM

bull Schedule of Value o Summary Sheeto Detail Sheeto CSI Formato CM to follow BC standard summary

list for overhead profit and insurances

bull Include Qualifications amp Assumptionsbull Acknowledgement of all submitted Design

Documents including Addendums and Revisions

bull Construction Schedule

Nelson Goris Senior Project Manager

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 43: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Purchase Order (PO)Nelson Goris North Campus SPM

bull SPM obtains approval of GMP from Design Team

and BC internal approval

bull SPM submits request for Purchase Order

bull Purchase Order is submitted

bull Notice to Proceed is issued

No work can commence without a Purchase Order

Nelson Goris Senior Project Manager

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 44: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Pre Construction MeetingNelson Goris North Campus SPM

bull Refer to Preconstruction Meeting Agenda Template (located in the Design and Construction Standards)o Staging Areao Hours of Operationo Other project related information

bull Attendanceo CMo Superintendento BC SPMo End Usero Building Officialo Other BC Resources as applicable

bull Meeting Minutes by BC SPM

bull After the preconstruction meeting CM will be responsible for Meeting Minutes

Nelson Goris Senior Project Manager

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 45: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Project Execute Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 46: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

PermitsOtto Letzelter Chief Building Official

bull Construction must NOT begin without a permit posted on the

jobsite Coordinate everything through the SPM

bull Obtain all subcontractor permits Electrical Mechanical

Plumbing Low voltage Roofing Fire Alarm Fire Sprinkler

Demolition Site Utilities which can be found at Browardedu

bull Temporary Service and Construction trailer require permits

and inspections

bull Permits are to be posted on jobsite with approved plans for

inspections

bull Obtain other agency permits as required SFWM SBDD

CBDD etc

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 47: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Plan Reviews and Inspections

bull Plan Reviews must contain the following Coordinate everything through the SPM and upload everything to Procore Provide a Complete Design incorporating all items of work

bull Photometrics for normal and emergency power Include lighting design basis and complete control system design with written sequencing

bull Proposed site civil work Written statement to include the status of the Drainage District permit modification submittal or approvals and SFWM approvals

bull Demolition Submit copy of asbestos report environmental survey for the proposed area of renovation

Otto Letzelter Chief Building Official

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 48: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Submit 1 copy of the Geotechnical Report and structural calculations

bull Provide a Statement of Sanitary Sewer capacity water service Fire Service and Chilled Water Service availability for the proposed project Include parking impacts per SREF

bull Provide complete project specifications If separate project specifications books are not provided then provide a summary specification on the plans for door hardware insulation lighting systems finishes ceiling treatments plumbing fixtures restroom partitions AV infrastructure and any special provisions included in the project such as bike racks lockers ADA lifts etc

bull When required CM to provide a copy of their Preconstruction Plan Review

Plan Reviews and InspectionsOtto Letzelter Chief Building Official

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 49: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Construction amp Inspections

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as approved submittals

bull Coordinate with BCPM for all items submittals requiring BC Approval

bull Review items of work prior to scheduling inspections Review quality of work Provide for all infrastructure within the walls and ceiling areas

bull Review BC standards with Subcontractors Review items such as MEP infrastructure valve and box identification Review functionality and access of items above ceiling and within access boxes or panels Review Manufacturing cut sheets and installation instructions Duct Detectors Fire dampers

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors

Otto Letzelter Chief Building Official

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 50: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Fire InspectionsOtto Letzelter Chief Building Official Broward College Acting Fire Marshal

bull Call in for all inspections Provide copy or access to Procore for items required during inspection such as FA and FS plans and approved submittals

bull Review items of work prior to scheduling inspections Review quality of work Provide onsite copies of all manufacturersquos installation instructions and approved testing requirements for all alarm devices

bull Provide all required equipment on site for testing Heat guns smoke magnets etc

bull Pre test all systems prior to scheduling inspections FA FS Building controls Lighting controls Fan and motor controls Stand alone HVAC units Duct detectors that are related to the FA FS systems 100 of all devices will be tested

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 51: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Amanda Williams Senior Analyst Construction and Capital Accounts

Overview

Payment window - begins when PM receives a complete and accurate payment application

Payment request - reviewed and approved by eight members of staff and administration

Progress Payments

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 52: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Schedule of Values (SOV)Example ndash Our Standard Template

Line Item Description Markup Dollar Amount Description Detail

a Direct Cost $100000000

Includes general conditions general requirements all the CSI divisions (as

applicable to the project)

b Contingency 10 $10000000At Owners discretion (usually about 10)

c Subtotal with contingency $110000000

d OHampP 500 $5500000

Automatically changes markup per the fee scale in the CM at Risk Contract based

on ce Subtotal with OHampP $115500000f Insurance 150 $1732500 Based on e

g Builders Risk 125 $1443750Based on e but included at Owners

discretion

Subtotal with Insurances $118676250h Bond 175 $2076834 Based on e + f + g

i TOTAL AMOUNT OF GMP $120753084Amount of the Purchase Order to be

issued e+f+g+h

Progress PaymentsAmanda Williams Senior Analyst Construction and Capital Accounts

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 53: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Amanda Williams Senior Analyst Construction and Capital Accounts

Schedule of Values

First need authorization from the BCSPM or District Director

Change Orders (COrsquos) - must be fully executed in order for a payment to be processed

Contingency Change Authorizations (CCArsquos) Keep separate details of CCA activity

Owner Direct Purchase (ODPrsquos) Usually for items over $50K We execute the PO but Contractor manages

the process

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 54: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Contingency Change Authorizations Log (CCA)

IncludesOriginal Contingency BalanceDescriptionDate approved by BCSPMWhich payment application it was included inValue ndash decreases and increases to balanceRemaining Contingency Balance

Values should match to the G703

Amanda Williams Senior Analyst Construction and Capital Accounts

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 55: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Cost Details ndash AIA G703Amanda Williams Senior Analyst Construction and Capital Accounts

Provides line item details of project costs

Proof of project costs must be submitted with the payment application

Project cost documents may include invoices receipts subcontract payment applications time sheets

Records must be CLEAR and LEGIBLE and must match to the line items and totals on the AIA G703

Cost records must reference the project name project number and location

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 56: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Payment Applications

Cost Summary ndash AIA G702

The G702 is a summary of information that comes directly from the G703

Verify G702 information even if it directly ldquopopulatesrdquo from the G703

Submit a draft copy for review to the SPM at least 5 days prior to uploading to Procore

VERY IMPORTANT ndash the payment application should be certified by the ArchitectEngineer for the payment amount being requested

Exception ndash when an ArchitectEngineer is not involved in the project

Rejections of a submitted application will require recertification by the ArchitectEngineer

Amanda Williams Senior Analyst Construction and Capital Accounts

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 57: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Payment Applications

Waivers Materials Presently Stored

Waiver of Lien from the CM is required in the payment application Amount of expected payment Date of the work being billed

Materials Presently Stored Requirements for materials stored offsite

Bonded warehouse certificate Photos of project materials Bill of Lading for those project materials

Amanda Williams Senior Analyst Construction and Capital Accounts

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 58: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

RetainageAmanda Williams Senior Analyst Construction and Capital Accounts

FSS 255087 ndash 10 retainage

Reduction of retainage May be requested by the CM after 50

project completion Must be approved by the PMDistrict

Director

Requests for payment of retainage must be submitted separately from progress payment applications

Final retainage payment application should be submitted only after execution of Certificate of Occupancy and delivery of final documents

If you would like to attend a special Pay Application training there is a sign in sheet going around the room Please make sure you sign up before you leave

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 59: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Roofing ProjectsPriscila Fort Senior Project Manager

1 BC Senior PM will contact our consultant for Roof Assessment and scope of

work

2 BC Building Official will perform inspections as well as BC Roofing Consultant

3 For projects involving some roofing work it is highly encourage to contact the

roofing continuing services contractors for the respective campus

4 For projects involving roofing work the cost shall remain within the project and

to be process through the CM

Advanced Roofing ndash Central Campus South Campus Pembroke Pines Miramar Downtown Center

Hi-Tech Roofing ndash Cypress Creek and North Campus

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 60: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Occupancy Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 61: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Punch ListPriscila Fort Senior Project Manager

CMrsquos shall complete their own punchlist before requesting from Architect

amp Owner

CM will request Architect to schedule the punchlist walk-thru with Senior

PM near substantial completion

It helps CM meet deadline

Identify long lead items to repairreplace

Leverages subcontractorrsquos availability to make timely repairs before

moving on to the next project

Architect will upload complete punchlist to Procore for CM to distribute

Only one punchlist will be issued ndash It will combine AE BC and Building

Official

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 62: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

TCOCOPriscila Fort Senior Project Manager

TCO ndash Temporary Certificate of Occupancy

bull Expires in 30 days

bull All Life Safety items completed and inspected

bull Electrical inspection and Emergency light test

bull Exhaust and outside air verification on mechanical system

bull Test amp Balance completed

CO ndash Certificate of Occupancy

bull 30 days after TCO is issued

bull 100 of all contract items and final inspections and approval from AE and BC Senior PM

bull FDOE forms completed (this applies to projects over $300K)

bull Final payment (Retainage) shall be issued

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 63: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Coordinate Staff MovePriscila Fort Senior Project Manager

bull BC coordinates and executes all staff moves through the planning department

bull CM needs to include sufficient time in their schedule for the following

bull Computerstelephones installation

bull Furniture installation

bull IT and AV connections

bull Staff training

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 64: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Initiation Planning OccupancyExecute

Permits

Plan Reviews and

Inspections

Constructionand

Inspections

Fire Inspections

Progress Payments

Schedule of Values

Retainage

Roofing Projects

Punch List

Temporary Certificate of Occupancy

Certificate of Occupancy

Coordinate Staff Moves

Project Closeout Phase

Design

Contingent Worker

BC Design amp Construction

Standards

DesignProfessional

AE Deliverables

andBC

Disciplines Coordination

BC Senior PM

Identify Stakeholders

ampScope

SchematicDesign

BC Resources

Develop FFampE Plan

Equipment List

Project turnover to Design and

Construction

Procore

Pre-Con

PreconConstruction

Managers

Bid Process

Auxiliary Services

SDSB Program

GMP

Evaluate Cost and Value Engineer

Purchase Order

Pre-con Meeting

Closeout Process

As-built Drawings

Equipment transfer control

Consultant Evaluations

Lessons Learned

Closeout

Identify need amp Funding

(CIP amp Educational

Plant Survey)

Project Number

Establish initial

schedule

Surveys

State Required

Forms

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 65: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Closeout Process

CONSTRUCTION MANAGER RESPONSIBILITIES

bull Review Broward College Facilities Design and Construction Standards

bull Review the Broward College Close Out Process and Check List

bull At each Construction Coordination Meeting provide an Agenda Item for

Project Close Out Items of discussion may include

bull Documentation of Equipment Finishes etc for Operation and

Maintenance Manuals and Warranties

bull As-built Documentation verification throughout the Construction

process

bull Verification of ldquoAttic Stockrdquo requirements as identified in the Project

Documents

Robert Bellot Senior Project Manager

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 66: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

At Final Completion of Project Schedule a meeting with Broward

College and Design Team to review Close Out Documentation

Provide Close Out Documents in both hard copy and electronic

format

Provide Site Survey of Utilities if applicable

Provide TCO and CO Documentation to verify approval Fire

Marshal and Building Officials

Closeout ProcessRobert Bellot Senior Project Manager

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 67: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

CHECKLIST DetailCheck for

CompletionCompletion

Date Notes1 All field issues are resolved2 Site and building clean per specifications

3All building systems tested and certified complete and operational per specifications

31 Electric32 Plumbing33 Mechanical34 Telecom35 Special systems36 Life safety systems

4 All field inspection reports issue signed by contractor and returned5 Test and Balance reports issued and submitted to AE for review6 All spare parts amp attic stock submitted per contract7 All Keys turned to owner8 All owner training completed9 All regulatory documents properly submitted

10All proposals change orders and contingency expenditures have been fully executed

11 All disputes claims RFIs etc are resolved12 All punch list items are certified by the owner and AE for completion13 Complete Construction Record Package as been submitted and approved

131 Operation and Maintenance Manual and Warranties132 As built Drawings133 Manufacturer Instructions

DetailCheck for

CompletionCompletion

Date Notes15 Final LEED Submittals are complete16 Substantial Completion form is complete and approved17 Certificate of Final Completion is complete and approved18 Application for final payment is complete and submitted19 Release of lien are submitted and approved20 Consent of Surety is submit and approved21 Certificate of Occupancy is complete and approved

22AE professional final close out certification has been submitted and approved

23 Final Certificate of occupancy has been submitted24 Board has approved project25 Final Payment is released

ProjectNTPFinal Completion date

Sheet1

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Project
NTP
Final Completion date
Detail Check for Completion Completion Date Notes
1 All field issues are resolved
2 Site and building clean per specifications
3 All building systems tested and certified complete and operational per specifications
31 Electric
32 Plumbing
33 Mechanical
34 Telecom
35 Special systems
36 Life safety systems
4 All field inspection reports issue signed by contractor and returned
5 Test and Balance reports issued and submitted to AE for review
6 All spare parts amp attic stock submitted per contract
7 All Keys turned to owner
8 All owner training completed
9 All regulatory documents properly submitted
10 All proposals change orders and contingency expenditures have been fully executed
11 All disputes claims RFIs etc are resolved
12 All punch list items are certified by the owner and AE for completion
13 Complete Construction Record Package as been submitted and approved
131 Operation and Maintenance Manual and Warranties
132 As built Drawings
133 Manufacturer Instructions
Detail Check for Completion Completion Date Notes
15 Final LEED Submittals are complete
16 Substantial Completion form is complete and approved
17 Certificate of Final Completion is complete and approved
18 Application for final payment is complete and submitted
19 Release of lien are submitted and approved
20 Consent of Surety is submit and approved
21 Certificate of Occupancy is complete and approved
22 AE professional final close out certification has been submitted and approved
23 Final Certificate of occupancy has been submitted
24 Board has approved project
25 Final Payment is released
Page 68: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

As-built drawings shall be kept current during the

duration of the work

Provide minimum two-point dimensions for items

The ArchitectEngineer will review the Contractorrsquos

as-built drawings each month

Contractor to coordinate with BC Senior Project

Manager for the selected surveyor vendor

selection per campus North Campus ndash Keith amp Associates Inc

Central Campus ndash Stoner amp Associates Inc

South Campus ndash Craven Thompson amp Associates Inc

Final payment will be withheld until ldquoas-built

surveysrdquo are furnished

As-BuiltRobert Bellot Senior Project Manager

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 69: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Review of as-built drawings before pay apps can be approved

bull Review of as-built drawings before covering work (Building Official)

As-BuiltRobert Bellot Senior Project Manager

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 70: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

bull Hard copy and electronic copy (Complete Set) ndash in color

bull Location of buildings

bull Sewer Systems ndash catch basins grease traps and their inverts fire hydrants etc

bull Electrical Systems ndash poles panels vaults and underground lines etc

bull HVAC ndash controls systems drains vent and ducting systems etc

bull Unexpected obstructions - any items found in the project area

bull ANY OTHER ITEMS that are necessary for continuing maintenance and upkeep of the structure

bull Per Contract (Article 126)

bull Scope existing lines before beginning the project (ie Restroom Renovations)

As-BuiltRobert Bellot Senior Project Manager

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 71: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

SITE DRAWINGS Certified by a professional land surveyor and clearly shows all as-

built conditions boundary elevations and utilities

All survey shall meet the Florida Rules 5J-17050 ndash Minimum

Technical Standards for Surveying and Mapping

CM to provide complete set of as-built drawingsdocuments in

PDF format in addition to the hard copy CM to obtain updated

record CAD drawings from architectengineer to prepare as-built

NOTE CMrsquos responsibility to locate all private and public utilities

prior to the beginning of construction ndash Design Standards

As-BuiltRobert Bellot Senior Project Manager

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 72: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Closeout DocumentsJonathan Iglesias CAFM System Administrator

bull Equipment Transfer Control bull Format for equipment information

bull Locationbull Usage Informationbull Datesbull CostPurchasebull Warranty

Archibus Data Transfer

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 73: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Firm Project Total Construction AmountConstruction Project Manager Contract Completion Date

CATEGORIES NOT PERFORMED SATISFACTORY INFERIORAPPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE

1 Quality of Technical ServicesArchitectural

Mechanical EngElectrical EngStructural EngCivil EngOther

2 AdministrationCoordination of Design Team3 Timeliness of Services4 Quality of Technical Documentation5 Cooperation Concern for College Interests6 Administration of Project Paperwork7 Achievement of Study Program or Design Objectives8 AdministrationEnforcement of Contract Documents9 Code Compliance 10 Overall Performance during the rating period

Recommendation for future work Yes NoComments

Name Title and Signature of Reviewing Official Construction Project Manager Signature_________________________________ Date______________Director Signature_________________________________ Date______________

CONSULTANT PERFORMANCE EVALUATION

Consultant Performance EvaluationDeborah Czubkowski District Director of Design and Construction

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 74: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Sheet1

X

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 75: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Sheet2

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 76: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Sheet3

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
CONSULTANT PERFORMANCE EVALUATION
Firm
Project Total Construction Amount
Construction Project Manager Contract Completion Date
CATEGORIES NOT PERFORMED SATISFACTORY INFERIOR
APPLICABLE NOTABLY WELL PERFORMANCE PERFORMANCE
1 Quality of Technical Services
Architectural
Mechanical Eng
Electrical Eng
Structural Eng
Civil Eng
Other
2 AdministrationCoordination of Design Team
3 Timeliness of Services
4 Quality of Technical Documentation
5 Cooperation Concern for College Interests
6 Administration of Project Paperwork
7 Achievement of Study Program or Design Objectives
8 AdministrationEnforcement of Contract Documents
9 Code Compliance
10 Overall Performance during the rating period
Recommendation for future work Yes No
Comments
Name Title and Signature of Reviewing Official
Construction Project Manager Signature_________________________________ Date______________
Director Signature_________________________________ Date______________
Revised May 01 2013
Page 77: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

Lessons LearnedDeborah Czubkowski District Director of Design and Construction

bull Coordination of trades (avoid conflicts between speakers light fixtures etc)

bull Data and electrical coordination

bull SPM is the main point of contact ndash only one responsible to coordinate changes

bull ID drawing is the official document for equipment location

bull First Day of Class Completion Dates

bull If in doubt ask the Senior Project Manager

bull Donrsquot change the schedule of values on the pay apps

bull Retainage must be billed on a separate pay app

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
Page 78: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S

SIGN UP SHEET IS BEING PASSED AROUND FOR FUTURE INFORMATIONAL TRAINING SESSIONS ON

bull PROCORE bull PAY APPLICATIONSbull DESIGN AND CONSTRUCTION STANDARDS

  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80
Page 79: WELCOME! [] 101 Presentation 9-20-18.pdfSection 1013.38, F.S., permanent archival of plans, and submission of project data as requested to the Department pursuant to § 1013.50, F.S
  • Slide Number 1
  • Slide Number 2
  • Slide Number 3
  • Slide Number 4
  • Slide Number 5
  • HOUSEKEEPING
  • Slide Number 7
  • Slide Number 8
  • Slide Number 9
  • Slide Number 10
  • Slide Number 11
  • Slide Number 12
  • Slide Number 13
  • Slide Number 14
  • Slide Number 15
  • Slide Number 16
  • Slide Number 17
  • Slide Number 18
  • Slide Number 19
  • Slide Number 20
  • Slide Number 21
  • Slide Number 22
  • Slide Number 23
  • Slide Number 24
  • Procorersquos Responsibilities
  • Tips
  • Slide Number 27
  • Slide Number 28
  • Slide Number 29
  • Slide Number 30
  • Slide Number 31
  • Slide Number 32
  • Slide Number 33
  • Slide Number 34
  • Slide Number 35
  • Slide Number 36
  • Slide Number 37
  • Slide Number 38
  • Slide Number 39
  • Slide Number 40
  • Slide Number 41
  • Slide Number 42
  • Slide Number 43
  • Slide Number 44
  • Slide Number 45
  • Slide Number 46
  • Slide Number 47
  • Slide Number 48
  • Slide Number 49
  • Slide Number 50
  • Slide Number 51
  • Slide Number 52
  • Slide Number 53
  • Slide Number 54
  • Slide Number 55
  • Slide Number 56
  • Slide Number 57
  • Slide Number 58
  • Slide Number 59
  • Slide Number 60
  • Slide Number 61
  • Slide Number 62
  • Slide Number 63
  • Slide Number 64
  • Slide Number 65
  • Slide Number 66
  • Slide Number 67
  • Slide Number 68
  • Slide Number 69
  • Slide Number 70
  • Slide Number 71
  • Slide Number 72
  • Slide Number 73
  • Slide Number 74
  • Slide Number 75
  • Slide Number 76
  • Slide Number 77
  • Slide Number 78
  • Slide Number 79
  • Slide Number 80