weekly updates 2
TRANSCRIPT
HTR PRODUCTIONSWeekly Updates
Tuesday 16th June – Tuesday 23rd June
Register and Location
Thuvaaragan Kuruparan – PresentHassan Shahid – Present Rikhel Trivedi – Present
Location: Oaks Park High School, Media Department in Room A29
Discussions
With this being the second week of being in a group. At this point we had all chosen which paperwork we all want to do. Throughout this week our teacher had allowed us to use lesson time to look for locations and take pictures of our locations. We had planned out a range of locations as to record the bedroom scene we would need access to a care home. Unfortunately not all care homes are willing enough to allow us to film inside the care home. However we did get our actor and back up actor sorted since we could not proceed if we had no actor.
Within the time frame from the previous weekly update, as a group we had completed some of our paperwork such as the target audience and the first draft of the script. The group blog has been constantly updated to make sure no errors and taking place.
Points to cover for next week
To begin thinking about the different possible shots we could use in our short film
To find out a care home who is willing to let us film To set out a date to film To gather all props such as the wheelchair for the film Next weekly updates: 23rd June – 30th June