WEEKLY REPORT SPC Health & Wellness Building August 17—23rd This week activities: Next week activities: PMU #02: Continue with duct banks and pouring out both trenches in with flowable fill. Continue excavation and installing chill water piping. PMU #04—Finished trenching and in- stalling fire line. Continue pumping out ground water PMU #02: Continue installing steel piping and welding fittings for the chill water and continue excavating trench and hauling out spoils. Con- tinue installing asphalt at both trenches in Mittman. Continue with ground water investi- gation Click here for drone footage!

Upload: others

Post on 15-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WEEKLY REPORT - Alamo Colleges DistrictWEEKLY REPORT SPC Health & Wellness Building June 1—June 7th This week activities: Next week activities: • Continue pumping water from crawl

WEEKLY REPORT SPC Health & Wellness Building

August 17—23rd

This week activities: Next week activities:

• PMU #02: Continue with duct banks and pouring out both trenches in with flowable fill.

• Continue excavation and installing chill water piping.

• PMU #04—Finished trenching and in-stalling fire line.

• Continue pumping out ground water

• PMU #02: Continue installing steel piping and welding fittings for the chill water and continue excavating trench and hauling out spoils. Con-tinue installing asphalt at both trenches in Mittman.

• Continue with ground water investi-gation

Click here for drone footage!

Page 2: WEEKLY REPORT - Alamo Colleges DistrictWEEKLY REPORT SPC Health & Wellness Building June 1—June 7th This week activities: Next week activities: • Continue pumping water from crawl

Wellness PMU #02

PMU #02