    Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12

    PLL | 1

    1 Training Details:Sr.

    No.

    Date Contractor No. of

    Participants

    Time of

    Training Total Hrs

    1

    20/4/12

    Damani

    Topic: Use of PPE during scaffold erection.

    06 10min 1 hr

    2

    20/4/12

    Damani

    Topic : Use of PPE during scaffold erection.

    04 10min 40min

    3 19/4/12

    Topic :Safety Precaution during lifting the

    load, Lifting tool Tackle & Mini crane safety

    04 15min 1 Hr.

    4 17/4/12Specialized Trg By Mr. Waghela on Fire

    Fighting Installation16 90min 24Hrs

    Safety Induction Nil = 0 Min. ( Hrs.)

    Safety Mass Talk (00 no) = 0 Min . ( Hrs.)

    Safety Tool Box Talk (03 nos) = 160Mins. (2hrs 40min.)

    Specialized Training (01) = 1440 mins (24Hrs.)

    2 Accident Statistics: No Major Accident at Site.

    3 Kaizen:

  • 8/2/2019 weekly report 16 to 21 Apr12[1]

    2/5

    Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12

    PLL | 2

    Before After Location Remarks

    a)

    D Bldg

    south side,

    Central

    Man Enclosure Gate

    provided to Lift shaft

    b) D Bldg

    Central

    core

    Steel Railing installed

    Fire shaft

    .

    c)

    Earlier railing was not done D Bldg

    south side

    Steel Railing done to A

    shaft

    d) Earlier railing done but

    removed by fininshing agency D Bldg.

    south side.

    Plumbing shaft railin

    done.

  • 8/2/2019 weekly report 16 to 21 Apr12[1]

    3/5

    Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12

    PLL | 3

    e) D Bldg

    North side

    Electrical shaft railing

    done.

    f) Third Party Inspection Of

    MINI crane :

    Cont : A K Enterprises

    D Bldg.

    Terrace

    Level

    Mini crane Third Part

    inspection done.

    g) Edge barrication

    Earlier Camp edge barrication

    not done.

    D Bldg

    South side

    Labor

    camp

    Railing done for edge

    barrication.

    h) HK audit & operational

    control audt done at Ashok

    garden site & report alreadysent to HO.

    HOUSEKEEPING.a) D Bldg.

    south side

    campUnwante debris ,steel

    accumulated

  • 8/2/2019 weekly report 16 to 21 Apr12[1]

    4/5

    Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12

    PLL | 4

    b) D Bldg.

    south side

    camp

    waste generated in ca

    area need to be remov

    c) D Bldg.1stfloor

    Lobby area

    North side

    POP waste generated to be clean

    d)

    D Bldg.

    2 nd floor

    Lobby area

    North side

    POP waste generated

    to be clean

    e) D Bldg 1st

    2nd floor

    North

    West side

    Debris filled with bags

    pieces accumulated on

    floor.

    f)

  • 8/2/2019 weekly report 16 to 21 Apr12[1]

    5/5

    Weekly HSE ReportSite: - PTP KURLA Date: - 24/4/12

    PLL | 5

    D Bldg.

    North East

    corner 2nd

    floor

    Marble , tiles cut piec

    stored on floor area.

    f) D Bldg.

    near

    sevalal

    Store 1st

    floor

    Large amt of Marble, t

    cut pieces accumulate

    floor

    Pending HSE Issues:

    a) Inspite of several time instruction A.H.U. Shaft , Fire shaft barricationremoved for fishing work & not reinstalled again.

    b) Labours working without Induction training

    Agency : ORETH , SEVALAL, Aman const,AK construction.