week8

8
DUCK LAST GROUP 7 WIND VANE

Upload: kafanomsod

Post on 04-Aug-2015

507 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Week8

DUCK LASTGROUP 7

WIND VANE

Page 2: Week8

Table the component. part name vane circuit Socket Battery

part description

As the air to spin the motor.

IncludeA motor ,Battery holder, diodes

It is A slot Battery holder.And locked to the motorcycle.

Material Plastic Plastic, Mild Steel ,Copper

steel

manufacturing process

- Assembly Cutting,welding,drilling

quantity  1 piece 1 piece of each

1 piece

Cost (Bath) 15 69 5

Page 3: Week8

       Total Cost  89 Bath    

Page 4: Week8

The number of hours spent in each manufacturing process.

• Cutting Process   5 minutes• Welding Process 15 minutes• Drilling Process 10 minutes• Assembly Process 1 hour

Page 5: Week8

Provide difficulties and problems encountered during the prototype development.

• Difficult to install the product on motorcycle.

• Find steel pipe has to be difficult.

Page 6: Week8

The solutions for second prototype

• Search studies of various devices. Available in the market. Then edit with my product.

• The piece is then applied. Then re-use.

Page 7: Week8
Page 8: Week8

Thank You