week8
TRANSCRIPT
DUCK LASTGROUP 7
WIND VANE
Table the component. part name vane circuit Socket Battery
part description
As the air to spin the motor.
IncludeA motor ,Battery holder, diodes
It is A slot Battery holder.And locked to the motorcycle.
Material Plastic Plastic, Mild Steel ,Copper
steel
manufacturing process
- Assembly Cutting,welding,drilling
quantity 1 piece 1 piece of each
1 piece
Cost (Bath) 15 69 5
Total Cost 89 Bath
The number of hours spent in each manufacturing process.
• Cutting Process 5 minutes• Welding Process 15 minutes• Drilling Process 10 minutes• Assembly Process 1 hour
Provide difficulties and problems encountered during the prototype development.
• Difficult to install the product on motorcycle.
• Find steel pipe has to be difficult.
The solutions for second prototype
• Search studies of various devices. Available in the market. Then edit with my product.
• The piece is then applied. Then re-use.
Thank You