PT BAJA TEHNIK REKATAMA Established : 2002, 100% PMA (foreign capital company) Capital : USD 1,000,000 Line of Business - Fabrication, Installation and maintenance

Upload: tranduong

Post on 10-Apr-2018

219 views

Category:

Documents


4 download

TRANSCRIPT

PT BAJA TEHNIK REKATAMAEstablished : 2002, 100% PMA (foreign capital company)Capital : USD 1,000,000Line of Business

- Fabrication, Installation and maintenance

- Equipment List

Work List (fabrication & installation only)OverseasWork records

year Customer Work details Loadingside

Dischargingside

scope

1995 HochovenNetherlands

Relocation of one unit blast furnace

IjmuidenNetherlands

KemamanMalaysia

Totaltransport

1995 VoestalpineAustria

LD 2 relocation LinzAustria

Via flushingTo Kemamam

Dismantletransport

1997 VoestalpineAustria

C R mill transport LinzAustria

Surabaya Dismantletransport

1997 VoestalpineAustria

Sinther plant scrapping LinzAustria

Scrappingclearing

1998 VoestalpineAustria

LD 1 scrapping LinzAustria

Scrappingclearing

1999 VoestalpineAustria

Coking plant scrapping LinzAustria

Scrappingclearing

1999 VoestalpineAustria

Chemical plant scrapping LinzAustria

Scrappingclearing

2002 VoestalpineAustria

Power plant clearingAnd new plant installation

LinzAustria

LinzAustria

Clearing Transport New installation

2003 RotemKorea

LD shopEquipment renovation

Masan Korea

Via Hamburg toLinz

Transportinstallation

2005 RotemKorea

LD shop Equipment renovation (Alceloir)

Masan Korea

Via Antwerp toCharloi

Transportinstallation

2006 RotemKorea

KIA SlovakiaNew plant installation

Masan Korea

Via Constanza to Zilina

Transportinstallation

2007 DoosanIMGB

Melting shopCrane system supply(ladle cranes, chargingCranes and other cranes.

BusanKorea

Via ConstanzaTo Bucharest

Transportinstallation

2008 DoosanIMGB

Complete Quenching system(max 150 ton Chargeable)

SurabayaIndonesia

Via ConstanzaToBucharest

ManufactureTransportInstallation

2008 PT WiraMustika

Galvanizing line #5, #6& #7

Shanghai Jakarta Transportinstallation

2008 PT Intan Nasional Industri

Float glass line Tianjin, China Medan Partial manufacture & installation

2008 MiwonIndonesia

Distillation plantinstallation

MasanKorea

Bamdar Lampung Transport installation

2009 PT Boma Bisma Indra

Casting line revamping Local supply Pasuruan Partial manufacture & installation

2010 KS DRI plant TienjinChina

Batu LicinVia Surabaya

Transport

2011 GDS Tbk Plate mill expansionEquipment, including main motors and sub station.

Changwon,Tianjinchina

Surabaya Transportinstallation

2012 PT Hankook Tire Indoneia

GIS & Transformer installation

Shanghai, Changwon

Cikarang TransportInstallation

2012 PT Jaya Pari Steel Tbk

Plate mill revamping Taichung, Tawan Kobe

Surabaya TransportInstallation