we build your business - engineering 2k
TRANSCRIPT
W E B U I L D Y O U R B U S I N E S S
C O M PA N YP R E S E N TAT I O N
ABOUT US
ENGINEERING 2K
Engineering 2K, a public limited company, was established in the year 2000
and belongs to the FBH SpA Group.
It provides services and a complete set of specific technical skills:
among its workforce are highly skilled engineers, architects and
technicians with many years of experience in the industrial-logistics
sector and all the expertise required to carry out their work to exceptional
professional standards.
The company’s services range from feasibility studies, economic
evaluations and architectural and structural design to general contracting,
project management and the construction of mechanical and electrical
systems, as well as testing and facility management activities.
To date, the company has designed and built over 70 logistics buildings
with a total surface area of 2,500,000 square metres throughout Italy.
The company is ISO 9001:2008 certified, and in 2008 it obtained ISO
14001:2004 SOA certification for the execution of public works. It has also
applied for OHSAS 18001 certification and operates directly around Italy
and in Europe through investee companies.
The progress of construction sites can be monitored, day by day and in real
time, on the website www.eng2k.com.
Engineering 2K developed its French brand,
Ingénierie 2K, in 2017. This has enabled it to
gain further experience in the logistics sector
on a European level.
SERVICES
BIM TECHNOLOGYIn our pursuit of innovation, we aim to provide the
customer with a finished product that is always of the best
quality and in the shortest possible time.
We have therefore adopted BIM (Building Information Modelling),
a work program that uses product-oriented representations to create
a preliminary 3D layout of the building. This makes it possible to
share information and any changes with all the parties involved in the
development process, including architects, surveyors and investors.
THE ADVANTAGESof using this technology are:• No unforeseen changes during construction.
• Faster processing.
• More accurate cost estimates for a project.
• The structure can be seen in operation even before it is built.
PROJECT MANAGEMEN T
Design • development plans, feasibility studies, internal and external layout
• preliminary, planivolumetric, executive and structural projects
• mechanical and electrical design
• definition of technical specifications, works specifications, estimate of
costs and work accounting
• preparation of macrogantt charts
• BIM (Building Information Modelling)
Technical-administrative support • management with public administration
• building practices, land registry, fire brigade, local health authorities and
Arpa (the Italian national prevention and environment agency)
• Contract Manager, Safety Manager, building site, works accounting,
testing in general
GENERALCONTRACTOR• management of the work according to various criteria:
“turnkey” and “open book”
• planning of the work to be carried out with preparation
of GANTT charts
• relations with the customer/supervisor
• management and coordination of suppliers
• management and coordination of designers/professionals
• preparation of progress report with customer and supplier
• management and coordination of suppliers/contractors
FACI L ITY MANAGEMEN T
Routine Scheduled Maintenance (RSM) • execution of work envisaged by the contract/specifications
• relations with customers and suppliers
• verification and preparation of work reports, fault reports, etc.
Special repairs
• planning of repairs
• preparation of a project and cost quantification
• works management
• safety coordination
• practices with the various bodies (fire brigade, local health authorities)
Administrative management • invoicing for customers and suppliers
• drafting of economic/statistical reports
• drafting of plant manuals
• technical documentation of the property
• plant certifications and verification with reference standards
PROJECTS
AmazonPasso Corese (ROME)
The Amazon warehouse, located in Passo Corese (Rome), was designed as a three-storey building using the BIM system. The roofing materials are environmentally sustainable, as are the external panels made of mineral wool.
The first and second floors each have a prefabricated structure of 40,000 square metres and are characterised by JointLess type paving with high flatness specifications. This type of flooring is essential for use of the Kiva mobile robotic fulfilment systems in Amazon’s smart warehouses.
The building is equipped with a humidity control system for optimal management of the internal temperature in all seasons.
The warehouse passed the Blower Door Test that measures the air-tightness of a building, evaluating the rate of air exchange with the outside. The test confirmed that the property is perfectly insulated. A rooftop rainwater harvesting system is used for automatic irrigation of the green areas outside the building.
The performance of the cladding of the building exceeds the requirements of Legislative Decree 311/06 and the energy rating is, therefore, very high.
150,414.00 sqmWarehouse covering
15.00 mUseful height
July 2016Start of works
8,300.00 sqmOffices covering
n°60Electro-hydraulic platforms
August 2017End of works
FM approved sprinkler system
Rooftop rainwater harvesting system
BMS Control system
1.1 MW photovoltaic system
BREEAM certification “Very Good”
LED lighting system
Leroy MerlinCastel San Giovanni (PC)
76,910.00 sqmWarehouse covering
11.50 mUseful height
January 2015Start of works
2,484.00 sqmOffices covering
n°124Electro-hydraulic platforms
August 2015End of works
BREEAM certification “Very Good”
FM approved sprinkler system
LED lighting system
Photovoltaic system for offices
15,000.00 sqmMezzanine covering
25 kWpPhotovoltaic system
Antifreeze systemHVAC
n°124Loading bays
The project for the customer Leroy Merlin, in Castel San Giovanni (PC), involved the design of a classic logistics warehouse with a pallet holder for stocking and a cross-docking section with an automatic pallet sorter.
The roofing materials are environmentally sustainable, as are the exterior panels made of mineral wool.
Ambient temperature is maintained inside the structure, which is neither heated nor cooled. There are anti-freeze air heaters for the sprinkler system.
The waterproof external cladding is made of coloured Aluzinc for a “green” effect.
NaturaSìBologna
BREEAM certification “Very Good”
Photovoltaic system for offices
NFPA approved sprinkler system
Rooftop rainwater harvesting system for the water-sanitation system
36,315.50 sqmWarehouse covering
13.50 mUseful height
December 2015Start of works
3,643.50 sqmOffices covering
n°33Electro-hydraulic platforms
December 2016End of works
NFPA approvedSprinkler system
The warehouse designed for the NaturaSì facility in Bologna is one of our most representative projects in architectural terms; our designers focused on the appearance of the building, using materials to create a structure and finishes of great visual impact. The roofing materials of the three-storey building (with a basement covering about 6,000 square metres, a ground floor and a first floor) are eco-sustainable, as are the external panels made of mineral wool; and, in particular, wood fibre insulation was used for the office building.
The warehouse is designed to accommodate cold rooms for storing food at between 1 and 4 °C, and for use of the Miniload system to manage the automated storage of food crates.
DB SHENKERBologna
13,794 sqmWarehouse covering
12 mHeight of warehouse
October 2016Start of works
2,682 sqmOffices covering
7.5 mHeight of cross-docking section
July 2017End of works
Large number of loading bays (100)
NFPA approved sprinkler system
LED lighting system
Photovoltaic system
BREEAM certification “Very Good”
BMS Control system
The logistics warehouse for our customer DB SHENKER in Bologna was designed using the BIM system.
The roofing materials are eco-sustainable, as are the external panels made of mineral wool. The structure is distinctive, with laminated lenticular wooden beams measuring 42 metres in length.
The office building is on three floors (ground, first and second floor).
The warehouse, which is not heated and instead kept at ambient temperature, consists of a storage area and a cross-docking section with a pallet storage system. The flooring of the warehouse was made using the JointLess system to guarantee specific flatness characteristics.
LOGISTICS PARKCastel San Giovanni
373,000 sqmRoad network and parking areas
YESPorter’s lodge
1,585,000 sqmLand area
652,000 sqmGreen areas
YESSiding
640,000 sqmTotal surface area
MAIN CUSTOMERS
CONTACT DETAILS
CONTACT DETAILS Engineering 2K SpA
Registered and Administrative Offices: Strada 1 Palazzo E1 20090 Assago Milanofiori (MI) 02-52879011 02-52879034
Operational Headquarters: Strada 1 Palazzo E1 20090 Assago Milanofiori (MI) 02-52879011 02-52879034
Operational Headquarters: Viale Dell’Industria, 19/F 29015 Castel San Giovanni (PC) 0523-1741100 0523-1741134
[email protected] www.eng2k.com
Engineering 2K is on the main social networks