BRIEF ABOUT US
WE are ISO 9001-:2008 CERTIFIED EPIC contractor in Oil and Gas Industry MAIN AREA OF BUSINESS:
Mechanical – Specialized in Major Turnaround Maintenance Works & Tank Rehabilitation.
Electrical & InstrumentationCivilBlasting, Coating, Insulation & Fire-ProofingScaffolding Trading
BRIEF ABOUT US
MAJOR ACHIEVEMENTS
One of the largest contractor at QP Refinery Only Contractor to receive appreciation letter from QP for completing
the QP turnaround works ahead of schedule with best quality & safety achievement.
Largest contractor in Qatar having wide experience in Tank rehabilitation and Maintenance works.
ETS
MECHANICALELECTRICAL
& INSTRUMENTATION
CIVIL
BLASTINGCOATING
INSULATIONFIRE PROOFING
SCAFFOLDING TRADING
ETS DIVISIONS
MECHANICAL DIVISION
The Mechanical Division has a wide experience in EPIC & Maintenance Contracts in Oil & Gas, Petrochemical and Fertilizer Industries.
CORE BUSINESS:
Plant Turnaround Maintenance Works Rehabilitation of storage tanks EPIC Contracts for Mechanical Installations Maintenance of Rotatory and Static Equipment Specialized in Industrial Cleaning GRE Piping - Installation and Maintenance
ELECTRICAL & INSTRUMENTATION DIVISION
The E&I Division has a wide experience in EPIC and Maintenance Contracts in Oil & Gas, Petrochemical , Fertilizer & Commercial Industries.
CORE BUSINESS:
Installation of HV, MV Switchgears , PCC, MCC and Switchboards Cable Laying , Termination & Testing and Commissioning Testing & Commissioning of Transformers Installation , Testing and commissioning of street light system EPIC of CP System Installation of bus duct and bus bar system DCS, PLC, ESD,F & G, SCADA & CCTV, Field Instruments
CIVIL DIVISION
The Civil Division has a wide experience in EPIC Contracts in industrial, Commercial and residential facilities construction and maintenance.
CORE BUSINESS:
EPIC of Buildings, Warehouses, Workshops, Control Rooms and Substations. Construction of Industrial , Commercial and Residential Projects. Civil Infrastructure for Industrial Projects like Under Ground Services Foundations for heavy equipment including Design & Detailed Engineering Earthworks, Sheet Piling, Dewatering Utility Services, Structural & Steel Erection Maintenance works. Construction of Roads, Landscaping Construction of Filling Stations
BLASTING, COATING & INSULATION DIVISION
This Division has a wide experience in Blasting, Coating and Insulation during Plant Maintenance, construction & Installation contracts in Oil & Gas, Petrochemical , Fertilizer & Commercial Industries.
CORE BUSINESS:
Epoxy - 100% solids, coal tar, phenolic coatings Glass flake reinforced vinyl ester, polyester, phenolic & epoxy systems Zinc - organic and inorganic, moisture-cured Polyester based coating systems Silicones & high temperature coating systems 100% expanded or unexpanded, aliphatic and aromatic urethanes Acrylics, alkyds - water and oil Cementatious fire-proof coatings & intumescent coating systems Chlorinated rubber coatings & heat-resistant coating systems
Hot and Cold Insulation Fire Proofing Works
SCAFFOLDING
This Division has a wide experience in Scaffolding during Plant Maintenance, construction & Installation contracts in Oil & Gas, Petrochemical , Fertilizer & Commercial Industries.
CORE BUSINESS:
Conventional tube & fitting scaffolding Load Bearing Scaffolding Baskets and Rigging by cables and boards. Suspended scaffolding works
TRADING
This Division has a wide experience in trading of mechanical equipment for Oil & Gas, Petrochemical , Fertilizer, Commercial & Steel Industries.
CORE BUSINESS: Supply of mechanical equipment & Spares Supply of Computer Numerical Control Machines to Nakilat (Ship Repair Yard) Vertical Turning Centre- IMT Machines- Italy. Pipe and Angle Cutting Machine to a Diameter of 800mm (BEHRINGER- Germany) Supply of Automatic Pipe Flange Welding Machine by using Robot DEUMA-Germany) Supply of welding Generators and Diesel Generators Supply monopoles for QTEL Supply of Machine Tools from HMT (India) to Nakilat (Ship Repair Yard)
CERTIFICATIONS
CERTIFICATIONS
APPRECIATION
ETS VISION AND QUALITY POLICY
COMPANY HEALTH AND SAFETY POLICY
COMPANY ENVIRONMENT POLICY
OUR GOALS
Zero Accident & Time Loss involving Direct and Third Party Workers. Zero Equipment Accident & Time Lost involving Direct &Third Party Equipment Zero Property Damage Accidents and Incidents Zero Environmental Damages, Accidents and Incidents Zero Accidents & Time Loss on Travel to and from work sites
2008 2009 2010 2011 2012
Management 12 14 18 22 28
Administration Staff
22 28 32 45 68
Discipline En-gineers
8 11 20 28 32
Supervisory Staff
60 85 88 105 130
Skilled Techni-cians
140 140 180 220 280
Skilled Workers 130 160 180 220 340
Unskilled Labours
285 330 380 390 450
2575
125175225275325375425475
Management Administration StaffDiscipline Engineers Supervisory StaffSkilled TechniciansSkilled WorkersUnskilled Labours
MANPOWER STATISTICS FROM YEAR 2008-2012
MANPOWER GROWTH
2008 2009 2010 2011 20120
200
400
600
800
1000
1200
1400
1600
650
760
895
1010
1400
2008 2009 2010 2011 2012
Total Man-hours in the year 1728000 2304000 2376000 2736000 2088000
Lost Work Case 0 0 0 0 0
Restricted Work Case 2 3 3 4 1
Medical Treatment Case 0 1 2 1 1
Fatality 0 0 0 0 0
First Aid Case 6 8 8 12 4 Road Traffic Accident 1 0 1 1 0 Fire 0 0 1 0 0 Near Miss 6 8 4 5 0 Spill / Leak 0 0 0 0 0 Damage / Loss 0 1 0 0 0 Total Incidents 15 21 19 23 6 Accident Frequency Rate (per 100000MHRS)
-
-
-
-
-
Incident Rate 2.50
2.63
2.30
2.42
0.41
SAFETY STATISTICS FROM YEAR 2008 TO 2012
Safety environment is our commitment
Build ETS into an enviable entity by Demonstrating excellence in all activities undertaken by the
company Solve problems innovatively Preserve and improve human life. Corporate social responsibility Honesty & integrity Consistency in Quality
It is easy to write these words … it is far more difficult to see these fulfilled in reality. As the foundation of ETS is built of skill, integrity, and responsibility, we were able to achieve our goal…
ETS MISSION
Facilities
Site Activities
Site Activities
Completed Projects Sr Contract No Client Contract Description Duration Start
Date End Date
1 GEN/973/07-2005 Q-Tel Finishing works at basement level for new HQ. 2Months 4/17/2005 6/16/2005
2 GEN/984/18-2005 Q-Tel Construction of steel structure room to accommodate data center at NOC project 2Months 6/12/2005 8/25/2005
3 GEN/1027/61-2005 Q-Tel Construction of substation at new industrial area exchange 4Months 1/1/2006 5/1/2006
4 GEN/993/27-2005 Q-Tel Extension of APN RLU building 6Months 6/8/2006 12/3/2006
5 GTC/06/237/OED Qatar Petroleum
Rehabilitation of crude oil and fire water tanks within Dukhan fields 2years 12/3/2006 11/15/2008
6 MWC/06/122 Qatar Petroleum
Installation and commissioning of new band saw machine including training at of QP personnel at Dukhan field support workshop
2Days 1/23/2007 1/25/2007
7 MWC/07/036 Qatar Petroleum
Cleaning and inspection of E1105A, E1106 and E1116 at FSP Plant within Dukhan fields 4Days 4/8/2007 4/12/2007
8 MWC/07/021 Qatar Petroleum
Maintenance and inspection of regeneration gas cooler at Fahail main dehydration plant within Dukhan fields 17Days 5/7/2007 5/24/2007
9 MWC/07/037 Qatar Petroleum
Maintenace and inspection of 31-E-4002 hot oil exchanger at Jaleha degassing in the Daukhan fields. 9Days 5/13/2007 5/22/2007
Completed Projects 10 MC07100400 Qatar
PetroleumGRE 12" Line replacement on 31P4022 fire water pump discharge line at jaleha degassing station within Dukhan fields.
9Days 7/23/2007 8/2/2007
11 LTC/07/130 Qatar Petroleum
Plant shutdown works at power water injection stations within Dukhan fields 9Months 9/2/2007 5/28/2008
12 MC07107600 Qatar Petroleum
Maintenance and inspection of 31-E-4002 hot oil exchanger at Jaleha degassing in the Dukhan fields.
1month 12/25/2007 1/24/2008
13 GTC/07/158/FP Black Cat EPIC for smokeless flare & automatic blow down 7 Months 10/9/2008 4/9/2008
14 GTC/06/264 OED Danway Construction of substation including civil works
for Qatar Petroleum Dukhan 6Months 5/30/2008 11/30/2008
15 GTC/07/122/OED Danway Construction of substation including civil works
for Qatar Petroleum Dukhan 6Months 7/30/2008 12/30/2008
16 MC08107800 Qatar Petroleum Repair of roller shutter at Ummbab
17 MC08122300 Qatar Petroleum
Maintenance and inspection of 14-E-5214 hot oil crude exchanger
18 APB/Agency/March/F0148 AP Bava Const Cement Plant insulation for QATAR NATIONAL
CEMENT 1 month 4/1/2009 4/30/2009
19 MC09100700 Qatar Petroleum Installation of new security barriers at material 3 Months 3/2/2009 6/2/2009
Completed Projects 20 NWDHGTC07/12
2/ED Danway Power supply stations in Dukhan township no. DKN-6 1 year 7/30/2008 7/29/2009
21 GC08111600 Qatar Petroleum
Shutdown maintenance services at at Jaleha pant within Dukhan fields 6Months 2/1/2009 8/13/2009
22 CCCT-PGTIL-0018 GTL Fabrication of pipe supports for PEARL GTL project Ras Laffan 1 year 9/1/2008 10/8/2009
23 SC081055000 Qatar Petroleum
Protective Coating of water Pipe spools for Dukhan Fields 4 months 1/6/2009 30-9-2009
24 GC09102900 Qatar Petroleum
Turn around works at NFIS distribution stations and KHUFF plant within dukhan fields 372 days 7/10/2009 7/10/2010
25 GTC/06/188/OED
Qatar Petroleum
Removal of safety relief valves at various operational facilities within Dukhan fields 3Years 11/19/2006 11/18/2009
26 GC09101200 Qatar Petroleum
Manpower support services for 2009 shutdown at QP Refinery 1 year 1/18/2009 3/17/2010
27 GTC/06/210/FSD
Qatar Petroleum
Vinyl ester wrapping of pipe lines on call off basis in the Dukhan fields 3Years 9/10/2006 9/9/2009
28 GC07102000 Qatar Petroleum
EPIC of Oil Free Air Screw Compressor and Air Dryers at Arab-D Plant in Dukhan 30 Months 2/3/2008 2/10/2010
29 GT08MtT0023-001
Qatar Petroleum Machine Tools for Nakilat Ship Repair Yard-2 18 Months 2/6/2009 12/12/2010
30 LC09102300 Qatar Petroleum
EPIC of power supply for electrical workshop at QPSFA within Dukhan Fields
Fifteen (15)
months6/12/2009 5/2/2011
Completed Projects
31 MC11104700 Qatar PetroleumCleaning & Internal Inspection of Fahahil South Three Phase Separator 13v-4001 within Dukhan Fields
2 days 10/7/2011 11/7/2011
34 GT08MT0023-002 Qatar Petroleum Machine Toools for Nakilat Ship Repair Yard
35 GT08MT0087-001 Qatar Petroleum Sheet Metal shop requirements for Nakilat
36 GTC-012/10 Seef Limited Pacol Water Injection System 6 Months 1/4/2011 30/09/2011
37 LC11105700 Qatar PetroleumReplacement of Drift Eliminator and Pond Cleaning Works in Cooling Tower at FSP within Dukhan Fields
5 Months 11/8/2011 10/1/2012
38 GC08104200 Qatar Petroleum Miscell maintenance works on call off basis in the Dukhan fields 3.3 Years 12/1/2008 2/29/2012
39 LC08104300 Qatar Petroleum Maintenance of roller shutters on call off basis in Dukhan fields. 3.3 Years 12/21/2008 3/20/2012
40 TC/32/04/10 QATAR FUEL Construction of WOQOD Petrol Station- Muaither
10 Months 16/12/2010 16.10.2011
41 GT09MT0055-001 Qatar Petroleum
Installation, testing and commissioning of Pipe Spool Fabrication Equipment-II for Nakilat Ship yard
10 Months 19/02/2011 19/11/2011
42 LT11112000 Qatar PetroleumOverhauling of 1212C1/C2/C3/C4/C5, 1306C, 1209C and 1335E at QP Refinery, Mesaieed 1 month 27/01/12 26.02.2012
43 PO-1014337 QAFAC
Cementitious Fire Proofing Repair works of CCR structure up to 10 mt. level and new coating appliction on pipe supports inside Sphere tanks dyke.
2 Months 15/12/11 14.02.2012
Ongoing Projects
Sl. Contract No Client Contract Description Duration Start Date End Date
1 GC08105100 Qatar Petroleum Provision of manpower for Dukhan workshop 4 Years 12/1/2008 11/30/2012
2 GC09103500 Qatar Petroleum
Provision of valve greasing support services on call off basis 4Years 11/30/2008 3/10/2013
3 LC08109900 Qatar Petroleum Repair/replacement of GRE Fire water pipeline 3 years 15-4-2009 14-4-2012
4 LC09106400 Qatar Petroleum
Maintenance of plant heaters on call-off basis within Dukhan fields. 4 Years 3/1/2010 2/1/2014
5 GC09104900 Qatar Petroleum
EPIC of Mosques, Eid Musalla and Extension of Jabel Tank RTU Building within Dukhan Fields.
Twenty Seven (27) Months
6/12/2009 5/3/2012
6 GC09106400 Qatar Petroleum
Pipeline Maintenance under road crossing on call-off basis within Dukhan Fields.
Four (4) Years 14/02/2010 13/02/2014
7 LC09105500 Qatar Petroleum
Site cleaning services on call-off basis within Dukhan Fields.
Five (5) years 1/3/2010 28/02/2015
8 GC091098B0 Qatar Petroleum
Re-Supporting and Replacement of Pipe Supports, Sand Clearance on a Call-Off Basis in Mesaieed.
Five (5) years 1/4/2010 31/03/2015
9 GTC-011/09 Seef Limited Call - Off Contract for Manpower Support, for 3 Years 3 years 1/5/2010 30/4/2013
10 GTC-006/10 Seef Limited Civil Maintenance Call-off Contract 3 years 31/10/2010 31/10/2013
11 GC10101900 Qatar Petroleum Epic of Fire Training Ground Upgrade within Dukhan Fields 18 Months 10/11/2010 9/5/2012
12 LT10107300 Qatar Petroleum Supply and Installation of Grating at PS/2 & PS3 3 years 27/3/2011 27/03/2014
13 GC111009A0 Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Operations Engineering Department) 3 years 15/6/2011 14/06/2014
14 GC111009B0 Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Production Department- Dukhan) 3 years 1/8/2011 31/07/2014
15 GC111009C0 Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Gas Recycling Department-Dukhan) 3 years 15/6/2011 14/06/2014
16 GC111009D0 Qatar Petroleum Provision of Maintenance Personnel in the Dukhan Fields (Gas Production Operations- Dukhan) 3 years 15/6/2011 14/06/2014
17 TC/37/04/11 QATAR FUEL Construction of WOQOD Petrol Station-Pearl Qatar 10 Months 20/9/2011 20/07/2012
18 GC111026B0 Qatar PetroleumCivil & Sand Removal Works in QP Gas Operations Areas (OffShore) for 3 years 3 years 18/12/11 17.01.2015
19 GC11106600 Qatar PetroleumEpic for the Installation of Electricity & Water Tariff Meters within Dukhan Fields 2 years 30/01/12 29.01.2014
20 GC11105300 Qatar PetroleumCivil and Electrical Refurbishment works at Various Accommodations in Dukhan Township 3 Years 18/03/12 17.03.2015
21 TDR-035/21/2011 QATAR STEEL Contract for Supply of Heavy Vehicle Drivers & Operators 3 Years 1/5/2012 30.04.2015
22 TDR-001/23/2012 QATAR STEEL Opening & Closing of DR2 Plant during April 2012 Shutdown 2 Weeks 21/04/12 03.05.2012
23 GC11101800 Qatar PetroleumRehabilation of 83 Nos. Storage Tanks, Spheres and Bullets at QP Refinery, Mesaieed 6 years 1/5/2012 30.04.2018
24 GC11112500 Qatar PetroleumTurnaround Maintenance Works at Khatiyah Plants Within Dukhan Fields 7 Months 15/8/2012 13.03.2013
25 LC12102600 Qatar PetroleumRepair/replacement of GRE Fire water pipeline on Call off Basis within Dukhan Fields 3 Years 14/7/2012 13.07.2015