WD Innovation Project
Project Management
AfshinDeborah
Waad
Project Plan
Scope
Duration
Budget
1 Year
$1,000,000
Resource OverviewName
Accountant
Technician
Mechanical Draftsman
Electrical Draftsman
Electrical Engineer
Engineering Manager
Hardware Engineer
HR Manager
Licencing Agent
Marketing Manager
Mechanical Engineer
Patent Agent
Patent Attorney
Photographer
Project Control Officer
Project Coordinator
Project Inspector
Project Manager
Project Sponsor
Quality Manager
Software Engineer
Market Researcher
Mechanical Technician
Request for Information/Quotations
Project Coordinator...
Resource Name
Blower fanBuilding premises Condenser systemContingencyElectrical partsGear boxHosesInlets/outlets connectorsInner drumMotorOuter drumPermission and license Market researchReceiversSoftwareSpinner discSteel inner tubeSteel outer tubeTouch screen displayTraining coursesTesting and commissioning Modified motor
Phase 1 Milestone - Project Kicked Off
Phase 2
Phase 3Milestones - Received Motor/Parts & Prototype Approved
Phase 4Milestone – Ceremony & Signed Contract
Phase 5 Milestone - Completed Project
PMO
Design & Engineering
Prototype
Marketing
Closing
Risks
• The prototype will fail
• Suppliers do not meet the requirements expected within our product
• The prospected Investors do not show interest in the machine
• The innovation has been done by a rival before our completion
Prototype Failed
WE ARE COMMITTED TO IMPROVING OUR CUSTOMER’S USER EXPERIENCE
Task Cost OverviewCOST STATUS
COST DETAILS
WE PRODUCE EXCEPTIONAL RESULTS
PMO Design Prototype Marketing Project Closure
$0.00$50,000.00
$100,000.00$150,000.00$200,000.00$250,000.00$300,000.00$350,000.00$400,000.00$450,000.00
Actual Cost Remaining Cost Baseline Cost
Name Fixed Cost Actual Cost Remaining Cost Cost Baseline Cost Cost Variance
PMO $0.00 $386,120.00 $0.00 $386,120.00
$386,120.00 $0.00
Design $0.00 $27,916.52 $0.00 $27,916.52 $27,916.52 $0.00
Prototype $0.00 $300,268.88 $0.00 $300,268.88
$55,968.87 $244,300.01
Marketing $0.00 $119,900.00 $0.00 $119,900.00
$119,900.00 $0.00
Project Closure $0.00 $12,000.00 $0.00 $12,000.00 $12,000.00 $0.00
Tracking Dashboard
Earned Value Analysis
EARNED VALUE OVER TIME VARIANCE OVER TIME
OUR FINANCIAL GROWTH IS STABLE & RISING
'16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '17 '17 '17 '17 '17
-$600,000.00
-$500,000.00
-$400,000.00
-$300,000.00
-$200,000.00
-$100,000.00
$0.00
$100,000.00
$200,000.00
$300,000.00
CV SV Actual Cost
'16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '16 '17 '17 '17 '17 '17
-$600,000.00
-$500,000.00
-$400,000.00
-$300,000.00
-$200,000.00
-$100,000.00
$0.00
CV SV
EAC – Estimate At Completion ACWP - Actual Cost of Work Performed BCWP – Budget Cost of Work Performed
$925,323.25 $527,556.17 $448,021.86
Ensuring the project team had all the necessary
requirements to complete the deliverables.
Even though our risk was probable, the
impact was difficult to absorb for our
timeline.
Putting aside a 10% contingency helped us stay on budget.
Lessons Learned
WHEN WE WORK SMART
Resources
rewci.com/dryer-booster-fan-suncourt-dry06.html alibaba.com appliancepartspros.com/washer-parts.html http://deepblue.lib.umich.edu/bitstream/handle/2027.42/58690/?
sequence=1 http://www.farnam-custom.com/air_heaters/thermal_process_controller.php
http://www.brighthubengineering.com/consumer-appliances-electronics/38895-working-parts-of-awashing-machine/ http://www.washerdryercomboz.com/ventless-dryers-and-how-they-work/
http://www.thestar.com/business/2014/10/28/urbanization_is_new_normal_for_canada_report_ says.
html The Systems Engineering Tool Box – Dr. Stuart Burge A systematic innovation case study: new concepts of domestic appliance drying cycle S. Graziosi, D. Polverini, P. Faraldi and F. Mandorli –
http://en.wikipedia.org/wiki/Requirements_analysis Google/images
Thank You