wc-r4100-48-vessel installation

2
WC-R4100-48-VESSEL INSTALLATION Prior to installation please check received items against the "Packing List". Please report any missing items to your retailer immediately. Professional installation recommended. Protect all surfaces from sharp objects, high heat sources,direct prolonged sunlight and chemical hazards. PACKING LIST 12 2 1 Vanity/Counter/Sink Electric drill Silicone Tape measure Drill bit ( Pencil Screwdriver ) INSTALLATION INSTRUCTIONS Φ8 Insert the anchor into the screw hole for reinforcement. 4 12 12 12 4 X Diameter 8mm Depth 40mm Mark screw position Draw horizontal line PACKING LIST REQUIRED TOOLS NOT IN BOX Mark the position of the screw holes on the wall by measuring the space between the centers of the mounting brackets on the back of the vanity. Vertical position (X) is decided by the purchaser. Remember to mark low enough to accommodate the sink on the top of the vanity counter or it will be too high when installed. Use a spirit level to ensure the screw holes are horizontal.

Upload: others

Post on 12-Apr-2022

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WC-R4100-48-VESSEL INSTALLATION

WC-R4100-48-VESSELINSTALLATION

Prior to installation please check received

items against the "Packing List".

Please report any missing items to your

retailer immediately. Professional installation recommended.

Protect all surfaces from sharp objects,

high heat sources,direct prolonged

sunlight and chemical hazards.

PACKING LIST

12

21

Vanity/Counter/Sink

Electric drill Silicone Tape measure Drill bit ( Pencil Screwdriver)

INSTALLATION INSTRUCTIONS

Φ8

Insert the anchor into the screw hole for reinforcement.

412

12

12

4

X

Diameter 8mmDepth 40mm

Mark screw position

Draw horizontal line

PACKING LIST

REQUIRED TOOLS NOT IN BOX

Mark the position of the screw holes on the wall by measuring the space between the centers of the mounting brackets on the back of the vanity.Vertical position (X) is decided by the purchaser. Remember to mark low enough to accommodate the sink on the top of the vanity counter or it will be too high when installed. Use a spirit level to ensure the screw holes are horizontal.

Page 2: WC-R4100-48-VESSEL INSTALLATION

wall

3 4

5 6

Attach vanity to wall by lowering ontothe mounting brackets

Adjust the mounting attachment as required

Attach counter to cabinet with siliconesealant applied to top of front and sidecabinet edges. Do not over-apply. Allow to dry for 24 hours for proper curing.

Licensed professional installation is recommended. These instructions are for mounting into studs or other in-wall reinforcement, drywall alone is not sufficient to support wall-hung vanities. Other installation techniques may require a licensed professional.

LLoowweerr ssccrreewwaaddjjuussttss ddeepptthh

UUppppeerr ssccrreeww aaddjjuussttss vveerrttiiccaall ppoossiittiioonn

silicone

silicone