waukesha pumps - search files/spx - waukesha... · operation maintenance & parts list read and...

37
OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha Pumps UNIVERSAL SP 420/520 SERIES EFFECTIVE DATE: SEPTEMBER 2005

Upload: lamque

Post on 04-Feb-2018

309 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

OPERATIONMAINTENANCE & PARTS LIST

Read and understand this manual prior to installing, operatingor maintaining this pump.

Waukesha PumpsUNIVERSAL SP 420/520 SERIES

EFFECTIVE DATE:

SEPTEMBER 2005

Page 2: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

395-03026

To avoid possible injury;SHUT OFF and LOCK OUTall power; relieve systempressure before servicing.

33-6

2

CAUTION

SAFETY

Warnings, cautions and notes are contained in this manual. To avoid serious injury and/orpossible damage to equipment, pay attention to these messages.

WARNING Hazards or unsafe practices which COULD resultin severe personal injury or death and how to avoid it.

CAUTION Hazards or unsafe practices which COULD resultin minor personal injury or product or property damage.

NOTE Important information pertaining directly to the subject.(Information to be aware of when completing the task.)

REPLACEMENT LABEL

REPLACEMENT LABEL

WARNINGTO AVOID SERIOUS INJURY, DO NOT

INSTALL OR SERVICE PUMP UNLESS

ALL POWER IS OFF AND LOCKED OUT.

WARNINGTO AVOID POSSIBLE SERIOUS INJURY,

SHUT OFF AND DRAIN PRODUCT FROM

PUMP PRIOR TO DISCONNECTING PIPING.

WARNINGDO NOT OPERATE

WITHOUT GUARD IN PLACE

Read and understand this manual prior to installing,operating or maintaining this pump.

WARNINGBECAUSE ALL PUMP PARTS ARE

EXTREMELY HEAVY, APPROPRIATELIFTING EQUIPMENT IS REQUIRED.

WARNINGTO AVOID ELECTROCUTION, ALL ELECTRICAL

SHOULD BE DONE BY A REGISTEREDELECTRICIAN, FOLLOWING INDUSTRYE

SAFETY STANDARDS.ALL POWER MUST BE OFF AND LOCKED OUT

DURING INSTALLATION.

Page 3: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

4 95-03026

Safety ................................................................... 3

Receiving and Warranty......... ............................ 5InspectionLoss or Damage

Introduction ......................................................... 6

InstallationBasic Dimensions ........................................ 7Capacity ratings .......................................... 7Pump and Drive Unit ................................... 8Piping Layout ............................................... 9Valves .......................................................... 9Strainers/Gages ........................................... 10Alignment ..................................................... 10-11Pump Rotation ............................................. 11Low Pressure Flush ..................................... 12High Pressure Flush .................................... 12

Start-up Check List ............................ .............. 13

Operation ............................................................. 14Lubrication ........................................................... 14Cleaning ............................................................... 14

Troubleshooting a Pump System ... .................. 15-18

MaintenanceSafety Precautions ...................................... 19Special Tools ............................................... 19

Disassembly ProceduresFluid Head Removal .................................... 20Cover Removal ............................................ 20Rotor Removal ............................................. 21Body Removal ............................................. 22Mechanical Seal Removal ........................... 23Gearcase Disassembly... Timing Gears ........................................... 24... Shaft and Bearing Removal .................... 25

TABLE OF CONTENTS

Assembly ProceduresShaft Sub Assembly ................................... 26

Bearings ................................................... 26

Shaft Installation in Gear Case Assembly ... 27-28Timing Gear Installation ........................... 28Adjusting Rotor to Body Backface ........... 29

Shims - All Models ................................................ 29

Fluid Head AssemblySeal Assembly ............................................. 30

Body Installation .................................................. 31

Rotor Installation ................................................. 31

Cover Installation ................................................. 31

Universal 420 Parts Listing ................................. 32Parts Listing ....................................... 33

Universal 520 Parts Listing ................................. 34Parts Listing ....................................... 35

SealsDouble Mechanical Seal .............................. 36Single Inner Mechanical Seal ...................... 37Single Outer Mechanical Seal ..................... 38

Parts Ordering ...................................................... 39

Page 4: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

595-03026

FACTORY INSPECTIONEach WAUKESHA pump is shipped completely assembled, lubricated and ready for use.The WAUKESHA pump is a precision product, designed to provide long, trouble-free service in a properlydesigned system with normal maintenance.

RECEIVING INSPECTIONPorts are rubber capped at the factory to keep out foreign objects. If covers are missing or damaged, athorough inspection of fluid head, by removing pump cover, is recommended. Be sure pumping head isclean and free of foreign material before rotating shaft.

LOSS OR DAMAGEIf your pump has been lost or damaged in transit, file a claim at once with the delivering carrier and ask foran Inspector to call. The carrier has signed the Bill of Lading acknowledging that the shipment has beenreceived from us in good condition.We will of course assist you in every way in collecting claims for loss, or damage, however, we are notresponsible for the collection of claims or replacement of material.

WARRANTYPlease read the Warranty statement to correctly determine if you have a claim. In warranty claims you musthave a "Returned Goods Authorization" (RGA) from the manufacturer before any returns will be accepted.Your Distributor will help you in a warranty problem. (See back pages for Information required)

WAUKESHA CHERRY-BURRELL WARRANTYSeller warrants its products to be free from defects in materials and workmanship for aperiod of one (1) year from the date of shipment. This warranty shall not apply to productswhich require repair or replacement due to normal wear and tear or to products which aresubjected to accident, misuse or improper maintenance. This warranty extends only to theoriginal Buyer. Products manufactured by others but furnished by Seller are exemptedfrom this warranty and are limited to the original manufacturer’s warranty.Seller’s sole obligation under this warranty shall be to repair or replace any products thatSeller determines, in its discretion, to be defective. Seller reserves the right either toinspect the products in the field or to request their prepaid return to Seller. Seller shall notbe responsible for any transportation charges, duty, taxes, freight, labor or other costs.The cost of removing and/or installing products which have been repaired or replaced shallbe at Buyer’s expense.Seller expressly disclaims all other warranties, express or implied, including withoutlimitation any warranty of merchantability of fitness for a particular purpose. The foregoingsets forth Sellers entire and exclusive liability, and Buyer’ exclusive and sole remedy, forany claim of damages in connection with the sale of products. In no event shall Seller beliable for any special consequential incidental or indirect damages (including withoutlimitation attorneys’ fees and expenses), nor shall Seller be liable for any loss of profit ormaterial arising out of or relating to the sale or operation of the products based on contract,tort (including negligence), strict liability or otherwise.

RECEIVING AND WARRANTY

Page 5: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

6 95-03026

INTRODUCTION

Sanitation Features

• Rotor/shaft connection sealed from product zone.

• Sidemount capability for better draining.

• 316L pump body standard.

• Exclusive, non-galling Waukesha “88” alloy rotorsstandard; permits running at tighter clearances andhigher efficiencies; 316L stainless also available.

• Mechanical seals standard.

Long-life features

• Large diameter shafts in seal area for greater strengthand stiffness.

• Heavy duty bearing frame (Gearcase)

• Double tapered roller bearings contribute further toprecise rotor movement and longer seal life.

• No bearing in product zone - accommodates severeoperating conditions.

• Greater flow capacity than conventional high-volumePD pumps.

• High pressure capability, up to 200 psi (13.7 bar) formore demanding jobs.

• Longer service life resulting from fresh engineeringapproach and high capacity components.

• The right seal for every application, plus interchange-ability when needed.

• Metal rotor. exclusive Waukesha “88 “ non-gallingalloy, for close running clearance.

*Mechanical seal material options.• Carbon• Ceramic• Silicon Carbide

Installation/Maintenance Flexibility

• Bi-directional flow. No flow direction specificationneeded.

• 4-Way mounting of gearcase, including verticalalignment of ports.

• Single-wing rotor option for handling particulates

• External shimming simplifies shaft height adjust-ments; reduces downtime.

• Upper or Lower shaft position.

• High-volume capacity with the reliability of aWaukesha

The Models 420 & 520 provide reliable and accurate pumping at high-volume capacities.Every revolution of the Model 420 pumps more than a gallon and a half of product. Model 520, more than 2gallons (9 liters).

Page 6: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

795-03026

INSTALLATION

MODEL DIM. A AA AO B CP D E Finch 21.00 5.62 27.25 22.00 49.60 18.75 7.50 16.50

420 mm 533.4 142.7 692,2 558.8 1259.8 476.2 190.5 419.1520 inch 21.00 5.82 27.25 22.00 51.42 18.75 7.50 16.50

mm 533.4. 147.8. 692.2 . 558.8 1306.1 4 76.2 190.5. 419.1

MODEL DIM G I J K L M N O Rinch 1.06 33.60 9.75 1.00 39.22 8.50 6.09 14.25 8.37

420 mm 26.92 853.4 247.6 25.4 996.2 215.9 154.7 362 212.6 520 inch 1.06 33.60 9.75 1.00 39.42 8.50 6.09 14.25 8.57

mm 26.92 853.4 247.6 25.4 1001.2 215.9 154.7 362 217.7

MODEL DIM U X 2Xinch 3.875 11.25 22.50

420 mm 98.42 285.7 571.5 520 inch 3.875 11.25 22.50

mm 98.42 285.7 571.5

FLANGESIZEANSI 6 “ANSI 8 “

DISPLACEMENT NOMINAL INLETMODEL PER REVOLUTION CAPACITY TO OUTLET 420 1.62 GAL (6.13 LITER) 650 GPM (147 M3/HR 6” (152.4 MM) 520 2.38 GAL (9.00 LITER) 830 GPM (187 M3/HR 8” (203.2MM)

Page 7: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

8 95-03026

PUMP INSTALLATIONThe installation of your Waukesha pump and its piping system should follow the practices described to giveoptimum performance, and be in accordance with local codes and restrictions.

All system equipment, such as motors, sheaves, drive couplings, speed reducers, etc., must be properlysized to insure satisfactory operation of your Waukesha pump within its limits.

CAUTION: Waukesha pumps are positive displacement, low slip design and will be severely damaged ifoperated with closed valves in discharge or inlet lines. Pump warranty is not valid for damages caused by ahydraulic overload from operation or start-up with a closed valve in the system.

WARNINGFull coupling guards must be installed to isolate operators and maintenancepersonnel from rotating components. Coupling guards are provided withWaukesha pumps as a part of a complete pump and drive package.

1. Installing the Pump and Drive Unit. Pumps of this type can be mounted on a common base plate withthe drive. The unit can be installed in several ways:

Leveling and/or vibration isolation pads. Portable bases-for movement to different locations.Many Commercail types are available.

GUARD

GUARD

Adjustable leg base, commonly used for sanitarypumps. For washdown under base. Can be easilymoved or repositioned.

Permanent installation on foundation with bolts andgrout. (Level unit before grouting.)

GUARDGUARD

Bottom ShaftMount

SidemountVertical Fluid Entry

Top ShaftMount

INSTALLATION

Page 8: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

995-03026

INLET INLET

OUTLET

OUTLET

BY-PASS FLOW

OUTLET

STANDARD SIDE MOUNT

CORRECTAIR POCKET

UPRIGHT MOUNTING SHOWN

RELIEFVALVE

INLET

VALVE VALVE

G.

F.

INCORRECT

OUTLET

OUTLET

INLET

A.

B.

C.INLET

D.

E.

.D

CHECKVALVE

CHECKVALVE

A. Piping support:Weight of piping and fluid-support piping indepen-dently with hangers or pedestals.

2. Good Piping Practice.All piping to the pump should be supported independently, to minimize the forces exerted on the pump. Suchforces can cause misalignment of pump parts and lead to excessive wear of rotors, bearings and shafts.NOTE: Pump dimensions and pump weightsare on page 7.

D. Inlet side-use check valves to keep inlet line full,particularly with low viscosity fluids, and in start-stopoperation.

E. Inlet Vacuum Service-use check valve on outletside.• Prevents backflow (air or fluid).• Facilitates initial start-up (minimizes differential pressure pump must supply to start flow).

F. ''Isolation'' Valves-permit pump maintenance andremoval safely and without emptying entire system.

Piping LayoutC. Inlet side: Slope piping up to inlet to avoid airpocket.

WARNINGTO AVOID SERIOUS INJURY, DO NOTINSTALL OR SERVICE PUMP UNLESSALL POWER IS OFF AND LOCKED OUT.

INSTALLATION

Thermal expansion of piping-can cause tremen-dous forces. Use thermal expansion joints tominimize forces on pump.

B. B. B. B. B. Flexible joints can also be used to limit thetransmission of mechanical vibration. Anchor freeends of any flexible hose in system.

G. Relief ValveTo protect the pump and piping system against exces-sive pressure, a relief valve should be installed. Anintegral relief valve, designed to bypass the fluid inter-nally from the pump outlet to the inlet, should not beused on applications where the discharge must beclosed for more than a few minutes. Prolonged opera-tion of the pump with closed discharge will causeheating of the fluid circulating through the relief valve.When such operation is necessary, the relief valve,whether integral, attachable, or line-mounted, shoulddischarge externally through piping connected to thefluid source, or if that is not practical, into the inletpiping near the source.

Page 9: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

10 95-03026

MAGNETIC TRAP

STRAINER

SHIM HEIGHT AS NEEDED

MOVE DRIVEAS NEEDED

WARNINGTO AVOID SERIOUS INJURY, DO NOTINSTALL OR SERVICE PUMP UNLESSALL POWER IS OFF AND LOCKED OUT.

Inlet Side-Strainers and Traps.Inlet side strainers and traps can be used to preventpump damage from foreign matter. Selection must becarefully made as clogging can easily occur, restrict-ing the inlet, causing cavitation and flow stoppage.

Pressure Gauges

Pressure and Vacuum gauges provide the easiestway to tell you something about the pump operation.

• Normal or abnormal pressures

• Overload conditions• Indication of flow

• Changes in pump condition

• Changes in system conditions

• Changes in fluid viscosity

3. Alignment of Pump to Drive.Pumps and drives which are ordered from thefactory and mounted on a common base plate areaccurately aligned before shipment. The alignmentshould be rechecked after the complete unit hasbeen installed and the piping completed. Periodicrechecking is advisable during the pump service life.

In-line Drives. For initial pump installation, and for rechecking alignment, the following steps areadvised:

Use a flexible coupling to connect the drive to the pump. Many different types are available, includingcouplings with slip or overload provision.

A flexible coupling is used to compensate for end play and small differences in alignment. Thepump and drive shaft should be aligned as closely as is possible.

INSTALLATION

Page 10: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

1195-03026

FEELER OR TAPER GAUGE

SHIM ASNEEDED

SHIM HEIGHT AS NEEDED

MOVE DRIVEAS NEEDED

TOP SHAFTDRIVE

DETERMINE ROTATION DIRECTION BY LOOKING AT THE MOTOR COUPLING.

TOP SHAFTDRIVE

LOWER SHAFT DRIVE

LOWER SHAFTDRIVE

Figure 1

VERTICALPOSITIONSHOWN

KEEP DISTANCETO MINIMUM

MOVE DRIVE TO CORRECT ANGULARAND PARALLEL MISALIGNMENT.

Aligning belt and chain drives. Using straight-edges and visual check:

Check angular alignment:Using feeler gauges, or taper gauges, adjust to getequal dimension at all points. At the same time setspace between coupling halves to manufacturer’srecommended distance.

Check parallel misalignment: Use straight edges and shims:

After piping is complete, and drive and couplings are aligned, turn pump shaft manuallyto see if it turns freely without binding.

Check rotation direction of drive to see that pump will rotate in proper direction.(“Liquid End” of pump is shown below.)

Warning Note: Covers have been removed for illustration purposes only.The pump cannot be operated with the cover removed.

INSTALLATION

After piping is complete and before belts are installed, turn pump shaft manually to see that it turnsfreely. Check rotation direction of pump to see that pump will rotate in proper direction (see figure 1)Install belts and tension them correctly. Install belt guard.

Page 11: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

12 95-03026

OUT

IN

IN

OUT

INSTALLATION

LOW PRESSURE FLUSH(STANDARD RECOMMENDATION)

a. Set flow rate of approximately 1/4 GPM formost applications. For high temperature applica-tions, increase flow.

b. Flushing media is restricted on inlet side andhas free flow to drain on outlet side.

HIGH PRESSURE FLUSHThis method is good for abrasive applicationsand products that tend to "set" on seal faces.

a. Set flow rate of approximately 1/4 GPM formost applications.

Solenoid is recommended to stop flushingwhen pump is stopped. Restriction andpressure gauge is at discharge end. Do notexceed 30 PSI with standard seals.

RESTRICTORPRESSURE GAUGE

HIGH PRESSURE

LOW PRESSURE

Page 12: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

1395-03026

START-UP CHECK LISTThe Waukesha Pump is a positive displacement pump and thus can develop very high pressures.To protect lines, equipment and personnel, certain precautions must be taken.

1. Review page 9, particularly "Relief Valves". Install relief valves if needed.

2. Check that piping and pump are clean and free of foreign material, such as welding slag,gaskets, etc. Do not use pump to flush system.

3. See that all piping connections are tight and leak-free. Where possible, check system with“non-hazardous” fluid.

4. Check to see that pump and drive are lubricated. See page 14. Check DriveLubrication Instruction.

5. Check that all guards are in place and secure.

6. Seals: Double mechanical and double O-ring seals with flushing require adequate supply andflow of clean flushing fluids.

7. See that all valves are open on discharge system, and that free flow path is open todestination.

8. See that all valves are open on inlet side, and that fluid can reach pump.

9. Check direction of pump and drive rotation. (See page 11)

10. Start pump drive. Where possible, start at slow speed, or jog.

Check to see that liquid is reaching pump within several minutes. If pumping does not begin and stabilize,check items under “No Flow” or “Insufficient Flow” on (Page 15)Troubleshooting a Pumping System.

Page 13: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

14 95-03026

OIL LEVEL

OIL FILL

OIL FILLTOP SIDE

OILLEVEL

TOP SHAFT DRIVE

OIL FILLBOTTOM SHAFT DRIVE

OIL LEVELBEARING GREASE

FITTINGS (4)

MOUNTING POSITIONS

A

C SIDEMOUNT DRIVE

B

DRAIN

DRAIN

OIL DRAIN

To avoid possible injury;SHUT OFF and LOCK OUTall power; relieve systempressure before servicing.

33-6

2

CAUTIONLUBRICATIONThe gears are factory lubricated with Micro-Plate No.140 oil at the quantity shown for top or bottom shaftmounts. If you mount your pump other than top orbottom shaft drive, check oil level.

The bearings are factory greased with Micro-Plate#555 grease.

Change oil every 500 hours. If pump is installedwhere moisture and condensation are heavy, changeoil more frequently.

Bearings must be greased every 250 hours or lessdepending on moisture and condensation condi-tions.

NOTE: For hot or cold extremes use appropriatelubricant as shown in the following tables.

OILSAE 140

-10° to 350° F. (-23° to 177° C.)

*OIL CAPACITY (GEARS)SHAFT

MODEL TOP OR SIDE BOTTOM MOUNT

420/520 3.0 Quart (3.4 Liter) 4.7 Quart (4.5 Liter)

GREASESilicone -20° to 5° F.( -29° to 15° C.)

NLGI Grade 2 (5° to 350° F.(-15° to 177° C.)

Normal operation covers a speed range of 0-600 RPM and pressure range of 0-200 PSI. Temperature rangewith standard rotors is -40° to 200° F. and with hot clearance rotors, 180° to 300° F. (For operation at highertemperatures, consult Waukesha Cherry-Burrell.)

See START-UP CHECK LIST (Page 13) and TROUBLESHOOTING (Page 15-18) for additional operationinformation.

CLEANINGThe standard Waukesha pumps without CIP proper-ties, are designed to be completely disassembled forthorough and easy cleaning.Clean the pump every day or at the end of a process.Disassemble the fluid head as outlined. Remove and

clean the cover O-ring, pump seals and rotor nutassembly. Inspect and replace O-rings if required.NOTE:Where possibility of material "setting up" during shutdown exists, flushing with solvent or dis-assembly offluid head and manual cleaning are required.

DRIVE LUBRICATIONRefer to drive manufacturer's manual shipped withunit.

OPERATION

2-16-99

* QUANTITIES SHOWN ARE FOR REFERENCE ONLY.ALWAYS FILL TO OIL LEVEL PLUG SHOWN.

Page 14: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

1595-03026

WARNINGTO AVOID SERIOUS INJURY, DO NOT

INSTALL OR SERVICE PUMP UNLESS

ALL POWER IS OFF AND LOCKED OUT.

WARNINGTO AVOID POSSIBLE SERIOUS INJURY,

SHUT OFF AND DRAIN PRODUCT FROM

PUMP PRIOR TO DISCONNECTING PIPING.

No flow, pump Drive motor not running Check resets, fuses, circuitnot turning breakers

Keys sheared or missing Replace

Drive belts, power transmission Replace or adjustcomponents slipping or broken

Pump shaft, keys, or gears Inspect: replace partssheared

No flow, pump Valve closed in inlet line Open valvenot priming

Inlet line clogged or restricted Clear line, clean filters, etc.

Air leaks due to bad seals or pipe Replace seals; check lines forconnections leakage (can be done by air

pressure or by filling with liquidand pressurizing with air)

Pump speed too slow Increase speed. Filling inlet lineswith fluid may allow initialstart-up. Foot valve may solvestart-up problems permanently.

Liquid drains or siphons from Use foot valve or check valvessystem during off periods

TROUBLESHOOTING A PUMPING SYSTEM

Once a pump is properly selected and installed in a system, operation should be trouble free. However, inexisting systems, or as pump and system conditions change, problems may develop. Following are sometroubleshooting hints to help identify and solve problems.

Problem Probable Causes Solutions

Page 15: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

16 95-03026

Problem Probable Causes Solutions

No flow, pump "Air" lock. Fluids which "gas off", Manual or automatic air bleed fromnot priming or vaporize, or allow gas to come pump or lines near pump

out of solution during off periods

Extra clearance rotors, worn pump Increase pump speed, use footvalve to improve priming

Net inlet pressure available too low Check NIPA, NIPR~, recalculatesystem. Change inlet system as needed.

On "Vacuum'' inlet system: On Install check valve in discharge line initial start-up, atmospheric "blowback'' prevents pump fromdeveloping enough differentialpressure to start flow.

Insufficient flow Speed too low to obtain Check flow-speed curvedesired flow

Air leak due to bad seals or Replace seals, check inlet fittings.pipe connections

Fluid vaporization Strainers, foot valves, inlet fittings Clear lines. If problem continues,("starved'' pump inlet) or lines clogged inlet system may require change

Inlet line size too small, inlet line Increase inlet line size. Reduce length,too long. Too many fittings minimize direction and size changes,or valves. Foot valve, strainers reduce number of fittings.too small .

NIPA too low Raise liquid level in source tank

NIPA too low Increase by raising or pressurizingsource tank

NIPA - Net Inlet Pressure Available at PumpNIPR - Net Inlet Pressure Required by Pump

TROUBLESHOOTING

Page 16: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

1795-03026

Problem Probable Causes Solutions

Fluid vaporization NIPA too Low Select larger pump size with(''starved'' pump inlet) smaller NIPR

Fluid viscosity greater Reduce pump speed and acceptthan expected lower flow, or change system to

reduce line losses.

Fluid temperature higher than Reduce temperature, reduce speed expected (vapor pressure higher) and accept lower flow or change

system to increase NIPA

Insufficient flow. Fluid Flow diverted in branch line, open Check system and controlsbeing bypassed valve, etc.somewhere

Insufficient flow. Hot (HC) or extra clearance rotors Replace with standard clearanceHigh slip on '"cold'' fluid, and/or low rotors

viscosity fluid

Worn pump Increase pump speed (within limits).Replace rotors, recondition pump.

High pressure Reduce pressure by system changes

Noisy operation Cavitation

High fluid viscosity, Slow down pump, reduceHigh vapor pressure fluids, temperature, change systemHigh temperature

NIPA less than NIPR To increase NIPA or reduce NIPR, see Engineering Manual

Air or gas in fluid

Leaks in pump or piping Correct leaks

Dissolved gas or naturally Minimize discharge pressure. Also aerated products see "Cavitation'' above.

•Mechanical noisesRotor to body contact

Improper assembly Check clearance with shims.See page 29.

TROUBLESHOOTING

Page 17: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

18 95-03026

TROUBLESHOOTINGProblem Probable Causes Solutions

Noisy operation • Rotor to body contactDistortion of pump due to Reassemble pump or reinstallimproper piping installation. piping to assure free running

Pressure higher than rated Reduce pressure if possible

Worn bearing Rebuild with new bearings.Lubricate regularly

Worn gears Rebuild with new gears. Lubricate regularly

Rotor to rotor contact

Loose or mis-timed gears. twisted Rebuild with new partsshaft, sheared keys. worn splines

• Drive component noise-gear Repair or replace drive train trains, chains, couplings, bearings.

Pump requires • Higher viscous losses than If within pump rating, increase driveexcessive power expected size(overheats, stalls.high current draw,breakers trip)

• Higher pressure than Reduce pump speed, increase expected line sizes

• Fluid characteristics

Fluid colder than expected. Heat fluid. insulate or heat traceviscosity high lines. Use pump with more running

clearances.

Fluid sets up in line and pump Insulate or heat trace line.during shut down Install "soft start" drive.

Install recirculating bypass system.Flush with other fluid.

Fluid builds up on pump surfaces Use pump with more running(example. latex, chocolate. clearancefondants)

''Short'' pump High corrosion rate Upgrade material of pumpservice life

Pumping abrasives Larger pumps at slower speeds,can help

Speeds and pressures higher Reduce speeds and pressures bythan rated changes in system

Worn bearings and gears due to Set up and follow regularlack of lubrication lubrication schedule

Misalignment of drive and piping. Check alignment of piping. CheckExcessive overhung load or drive alignment and loads. (Page 11)misaligned couplings.

Page 18: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

1995-03026

8

1

2

6

4 5

7

10

11/12

9

3

WARNINGDO NOT OPERATE

WITHOUT GUARD IN PLACE

Because all pump parts areextremely heavy, appropriatelifting equipment is required.

FLUID HEAD DISASSEMBLYRECOMMENDED SAFETY PRECAUTIONS• Completely flush all product and cleaning solutions from the pump fluid head before any componentremoval is started.• Lock out, or disconnect all power sources to the pump drive motor before starting any work.• Drain and (or) close off all inlet and discharge piping before disconnecting piping from fluid head.

WARNING

WARNINGTO AVOID POSSIBLE SERIOUS INJURY,

SHUT OFF AND DRAIN PRODUCT FROM

PUMP PRIOR TO DISCONNECTING PIPING.

MAINTENANCE

SPECIAL TOOLSSpecial tools are required to aid in the disassembly andreassembly of the fluid head. These tools are asfollows:

420 UHC TOOL KIT #103996Item Part No. Description Qty1 101423 Shaft Extension Tool 12 101418 Rotor Lifting Device 13 30-78 Hex Hd Capscrew 1/2-13x1” 24 30-360 Eyebolt 1/2-13 x .75" ZP 25 103985 Guide Bolt 3/4-10 X 11” 26 103986 Seal Preload Tool 1

520 UHC TOOL KIT #103998Item Part No. DescriptionQty1 101423 Shaft Extension Tool 12 101418 Rotor Lifting Device 13 30-78 Hex Hd Capscrew 1/2-13x1” 24 30-360 Eyebolt 1/2-13 x .75" ZP 25 103985 Guide Bolt 3/4-10 X 11” 27 103987 Seal Preload Tool 1

420/520 TORQUE WRENCH KIT #103997Item Part No. Description Qty8 105908 3/4” Drive Torque Wrench 1

9 103989 Adapter Socket Drive 3/4 x 1 110 103990 Adapter Socket Drive 1 x 1.5” 111 103991 Drive Socket, 4-1/2” 112 108788 Drive Socket, 4” Hex 1

• 1000 pound capacity hoist and suitablelifting straps or chains.

5-21-98

Page 19: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

20 95-03026

FLUID HEAD COVER REMOVALNOTE: THE FLUID HEAD COVER WEIGHSAPPROXIMATELY 200 POUNDS. LIFTING EQUIPMENT IS REQUIRED.

1. Install an eye bolt into the tapped hole at the top of the cover ( or at both ends if the pump is sidemounted.).

2. Position the hoist over the fluid head and attach it to the eye bolt(s) on the cover. Apply light lifting load tothe cover.

3. Remove the cover bolts

4. Install two (2) guide bolts thru cover using holes near the eye bolt locations.

5. Install two (2) 1/2-13 bolts in the tapped holes over the cover dowel pins. Break the cover loose from thedowel pins by alternately tightening the 1/2” bolts.

6. Support the cover with the hoist and remove it from the fluid head.

7. Remove the 1/2” bolts from the cover.

8. Remove the guide bolts from the fluid head.

9. Clean and inspect the cover, O-ring, and all bolts for signs of wear or damage. Repair or replace anyquestionable component.

Because all pump parts areextremely heavy, appropriatelifting equipment is required.

WARNINGMAINTENANCE

GUIDE BOLT (2)

1/2-13 BOLT (2)

COVER REMOVAL

Page 20: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

2195-03026

FLUID HEAD DISASSEMBLYROTOR REMOVAL

NOTE: THE MODEL 420 ROTOR WEIGHS AP-PROXIMATELY 80 POUNDS. MODEL 520 ROTORWEIGHTS APPROXIMATELY 100 POUNDS.LIFTING EQUIPMENT IS RECOMMENDED.

1. Remove fluid head cover as described by thefluid head cover removal procedure in theprevious section.

2. Use a block that will not mark the rotors to limitthe rotation of the rotors during rotor nut re-moval. This may be a 2”x 2”x8” long piece ofwood (or equal).

3. Remove the outer (encapsulated) jam nut andthe inner rotor retaining nut from both shaftsusing the torque wrench and socket or othersuitable wrench.

4. Install the shaft extension tool on the shaftwhose rotor is to be removed and slide the rotorout of the body and out onto the extension.Using the hoist and rotor lifting device, removethe rotor from the extension.

5. Move the extension to the other shaft andremove the other rotor from the fluid head.

6. Mark all components so that they can bereinstalled on the same shafts that they whereremoved.

7. Remove the rotor drive keys from the shafts.8. Clean and inspect the components for wear or

damage and repair or replace any questionablecomponents.

MAINTENANCE

ATTACH EXTENSION

BLOCK

LOOSEN ROTOR NUTS

REMOVE KEYS

SLIDE AND POSITION ROTOR

REMOVE ROTOR NUTS

USE ROTOR REMOVAL TOOL TO REMOVE ROTORS

Page 21: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

22 95-03026

FLUID HEAD DISASSEMBLYBODY REMOVAL

NOTE: THE MODEL 420 BODY WEIGHTSAPPROXIMATELY 650 POUNDS. THE MODEL520 BODY WEIGHTS APPROXIMATELY 720POUNDS. LIFTING EQUIPMENT IS RE-QUIRED.

1. Remove the fluid head cover and rotors asdescribed in the preceding procedures.

2. Disconnect the inlet and discharge pipingfrom the pump body.

3. Remove the twelve (12) 5/16”seal seatretaining bolts from the back side of thepump body.

4. Loosen, but do not remove, the four (4) 3/4”body mounting plate retaining bolts.

5. Position the hoist over the fluid head andsecure it to the pump body and apply liftingtension to the body. Two 1/2-13 tappedholes are provided at the top and bottom (depending on mounting position) for use witheye bolts to aid in lifting

6. Remove the four (4) 3/4” retaining bolts andinstall loosely install them into the tappedholes in the fluid head mounting plate.

7. Install two (2) 3/4-10 x 11” long guide boltsinto the two retaining bolt holes.

8. Alternately tighten the body retaining bolts todisengage the body dowel pins from thegearcase and carefully slide the body awayfrom the shaft mounted mechanical seals.

9. Remove the body from the gearcase with thehoist, after clearing the mechanical seals.

10. Clean and Inspect the components for wearor damage and repair or replace question-able parts.

MAINTENANCE

BODY REMOVAL

PLACE RETAININGBOLTS (4) HERE

GUIDE BOLT (2)

PUSH BODY OFF GEARCASE

SEAL SEATRETAINING BOLTS (12)

Page 22: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

2395-03026

FLUID HEAD DISASSEMBLY

MECHANICAL SEAL REMOVAL

NOTE: THE MECHANICAL SEALS ARE NOTHEAVY; HOWEVER, THEY ARE EXPENSIVE, ANDARE SOMEWHAT FRAGILE.

1. Remove the cover, rotors, and body as de-scribed in the previous procedures.

2. Disconnect the flush tubes from the seal seatgland plate if this has not already been done.

3. Slip the inner seal preload tool over the endof the shaft.

4. Install the rotor retaining nut, and hand tighten itagainst the preload tool and shaft shoulder.

5. Remove the setscrews in the inner seal seatretainer.

6. Remove the rotor retaining nut and preload tool.7. Remove the inner seal seat retainer.8. Inspect the shaft and remove burrs caused by

the setscrews before removing the inner sealand inner seal O-ring to avoid causing damageto either component.

9. Remove the T-seal and gland plate.10. Remove the inner seal.

Double Mechanical Seal

11. Remove the outer seal setscrews and slide theouter seal assembly off the shaft

Inspect all components for wear or damage andrepair or replace any questionable parts.

MAINTENANCE

FLUSH TUBES

GLAND PLATE

FLUSH KIT

OUTER SEAL

LOCKWASHER5/16-18 X 1-1/2 HEX HEADCAPSCREW (12)

GASKETT SEAT

INNER SEALSETSCREW

PRE-LOAD TOOL ROTOR NUT

SHIELD/SLINGER

SETSCREW

SETSCREW

PRE-LOAD TOOL

ROTOR NUT

Page 23: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

24 95-03026

CAUTION NOTE: THIS PROCEDURE IS BESTPERFORMED AT A PROPERLY EQUIPPEDSERVICE FACILITY. THE COMPONENTS ARELARGE,HEAVY, AND IN MOST CASES REQUIRESPECIAL TOOLS AND LIFTING EQUIPMENT.

TIMING GEARS1. Drain the gear lubricant from the drive end of thegearcase.2. Remove the twelve (12) hex head cap screwsfrom the timing gear cover, and remove the cover.

3. The timing gears are retained with locknuts andlockwashers. Using a hammer and punch, disen-gage the lockwasher locking tabs from the matingnotches in the locknuts.

The locknuts and lockwashers may now be re-moved.

GEARCASE DISASSEMBLY

(Note: The locknuts were installed with a minimum of600 foot-pounds of torque using a special spannertype socket. A shaft locking device was also used tokeep the shafts from rotating during the tighteningoperation.)

4. Remove the timing gears and the timing gear keys.The gears should slide off the shafts. If a gear pulleris required, three tapped holes are provided in eachgear for that purpose.

5. With the gears removed, install a spacer ( same length as the gear width (3”)) and reinstall the bearing nut.The nut needs to be only hand tight, but, fully engaged on the shaft threads. This prevents the shaft assem-bly from prematurely disassembling during the removal from the gearcase.

MAINTENANCE

DRAIN OIL HERE

LOCKNUT

TABBED LOCKWASHER

LOCKWASHER TAB

Page 24: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

2595-03026

BEARING REMOVAL

The recommended position for the gearcase wouldhave shafts up .

Bearing Retainer6. Remove the four front bearing retainer screwsfrom each front bearing retainer, and remove thefront bearing retainers.

GEARCASE DISASSEMBLY

BearingsRemoval of the bearings from the shafts willrequire a large bearing press and an experiencedoperator.The bearings are fitted to the shaft with a .0015”/.0025” interference fit, and must be pressedoff. This is only required if the bearings are defectiveand the shaft is to be saved.(Note: If the shaft is defective, the bearings will belost during removal; therefore, this entire operationshould be avoided.)

Shaft Assemblies7. The shafts may now be removed from the gear-case. Screw the shaft lifting extension tool ontoshaft. Use proper size hoist to lift.

WARNINGShaft assemblies weight approximately350 pounds each.

8. Remove the front bearing seats and any shimsfrom the front bearing bores.9. Remove the rear bearing seals from the rearbearing bores of the gearcase.10. Clean and inspect all components for wear ordamage.

BEARING SEATS, SHIMS AND SEALS

MAINTENANCE

FRONT BEARING RETAINER SCREWS

SEAT

SHIMS

REAR BEARING SEALS

SHAFT ASSEMBLY REMOVAL WITH TOOL

Page 25: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

26 95-03026

1. Position the shaft in a fixture with the drive enddown.

2. Use a bearing heater to heat a front and rearbearing to 300° F. (Do not exceed this tempera-ture.)

3. Install the front bearing (14) on the shaft. Makesure that it is fully seated against the shaftshoulder.

4. Install the front bearing rear seal (12) on theshaft. This component is symmetrical; There-fore, it can be mounted either way.

5. Install the bearing spacer (11) on the shaft. Thiscomponent is symmetrical; Therefore, it can bemounted either way.

6. Install the rear bearing inner seal 9) on theshaft. Make sure that the turned hub on theinner seal engages the bearing spacer.

7. Install the rear bearing (14) on the shaft.

SHAFT SUBASSEMBLY PROCEDURE

GEARCASE ASSEMBLY

8. Install the gear spacer on the shaft.9. Using a timing gear, seat all components, and allow the bearings to cool.10. Remove the timing gear, and install a spacer and the bearing nut. This will secure all components

during assembly into the gearcase. ( Several gear spacers may be used if a designated gear spacer isnot available.)

11. Repeat steps 1 through 9 for the other shaft.

ITEM PART NO. DESCRIPTION5 100432 TIMING GEAR, DRIVE SHAFT6 100433 TIMING GEAR, SHORT SHAFT7 100425 FRONT BEARING11 108178 BEARING SPACER

ITEM PART NO. DESCRIPTION14 100429 REAR BEARING15 100430 GEAR SPACER20 STD 236 022 LOCKNUT, BEARING AN-2222 100435 FRONT BEARING SEAT

ITEM

MAINTENANCE

5, 6

11

7

15

14

DRIVE END

1120 17

15 14 22 7

Page 26: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

2795-03026

GEARCASE ASSEMBLY

INSTALLATION OF SHAFTS INTOTHE GEARCASE.

1. Mount the gearcase vertically with the fluidhead mounting surfaces up.

2. Install a front bearing seat (Item 22, page 33& 35) in each of the front bearing bores of thegearcase.

3. Using a hoist and special lifting tool, lift ashaft and carefully slide it into the gearcase.

4. Repeat this step for the other shaft. Locatethe drive shaft according to your drive need.

5. Before continuing, a critical measurement must be taken to determine the need for a bearing shim.measure the distance between the fluid head mounting surface and the rotor seat surface on thecorresponding shaft. Do this for both shafts. If both dimensions are the same, then no shims areneeded. If there is a difference, then a shim must be added to the shaft assemble with the shortestdimension. The thickness of the shim is equal to the difference between the two measurements.

6. If a shim is required, it must be added at this time. Remove the appropriate shaft and the front bearingseat, and place the required shim(s) in the front bearing bore. Then reinstall the front bearing seat andshaft assembly.

7. Recheck the measurement made in step 5. Allowable differences between the two shafts will be±.001”.

MAINTENANCE

BEARINGSHIM STACK

FRONT BEARING SEAT

SPECIALLIFTINGTOOL

MEASURE BOTH SHAFT S. APPLY SHIM UNDERFRONT BEARING SEAT, IF REQUIRED.

Page 27: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

28 95-03026

INSTALLATION OF SHAFTS INTOTHE GEARCASE.

8. Apply bearing lubricant to the shafts at thefront seal location to aid in installation ofthe seal. Apply silicone sealant to the frontbearing retainers. Install the front bearingretainers (P/N 100441) and seals (P/N100442).

GEARCASE ASSEMBLY

9. Turn the gearcase over to expose the timinggear end of the housing and remove the lock-nuts and temporary spacers from the shafts.

10. Install the gear spacers (P/N 100430) on theshafts.

11. Install the rear bearing seals (P/N 100431) inthe gearcase.

12. Install the timing gear keys in the shafts.13. Allign and install the timing gears on the shafts.14. Install the lockwashers and locknuts on the

shaft and torque the nuts to 600 ft-lbs. Lock inplace by bending a tab on the lockwasher, usinga hammer and drift punch

15. Install a new gearcase cover seal (P/N 100531)in the timing gear cover.

16. Apply silicone sealant to the gearcase (be sureto seal the areas around all of the tapped coverbolt holes.) and install the timing gear cover.

17. Refill timing gear housing with Micro-Plate gearlubricant and grease all bearings with Micro-Plate bearing grease.

MAINTENANCE

TIMING GEARS

FRONT BEARING RETAINER

FRONT BEARINGRETAINER SEAL

KEY

LOCKNUT

LOCKWASHER

GEAR

SPACER

REAR BEARING SEAL

BENDTABINTOSLOT

COVERSEAL

TIMINGGEARCOVER

CAPSCREWFLAT WASHER

Page 28: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

2995-03026

ADJUSTING ROTOR TO BODYBACKFACE CLEARANCE.

If the shafts and bearings or just the shafts werereplaced, in all probability, the fluid head willprobably need to be reshimmed to achieve theproper rotor to body backface clearance. TheModel 420 and 520 pumps are designed toacomplish this without removing the shafts fromthe gearcase. All fluid head shimming is donebetween the fluid head (body) and the fluid headmounting plate as described in the followingproceedure.

1. Install the pump fluid head on the gearcase.Make sure that all mating surfaces between thefluid head mounting plate and the gearcasemounting surface are clean and free of all burrs.The shaft seals need not be installed for thisoperation, and it is much simpler if they are not.

2. Measure the height difference between the rotorseat surface on the shaft and the end of thebody shaft hub. The rotor seat surface on theshaft should protrude above the hub by .009”±.001”. Measure both of the shafts and recordeach.

3. If the measurement differs from the dimensionstated in step 2 shims will have to be added orremoved from between the fliud head and thefluid head mounting plate. If the measurementis OK, then go to step 8.

4. Remove the fluid head from the gearcase.

5. Remove the four retaining bolts from each fluidhead mounting plate. One at a time, removeeach mounting plate and add or subtract shims(P/N 100472-100476) until the desired height isreached. (Example: If step 2 yielded a mea-surement of .005”, then .004” of shim wouldneed to be added to the existing shim stack.)

6. Reinstall the fluid head mounting plates over thenew shim stack and secure with the sockethead retaining bolts. Torque the bolts to 70 ft-lbs.

7. Repeat steps 1,2 and 3 above.8. Remove the fluid head from the gearcase.

Refer to the section on fluid head assembly for thecomplete the reassembly process.

GEARCASE ASSEMBLYMAINTENANCE

MEASURE DISTANCE BETWEEN HUB SHAFTSHOULDER AND ROTOR SHOULDER

SHIM

MOUNTING PLATE

FLUID HEADMOUNTING PLATE

FLUID HEAD(BODY)

SHIM LOCATION

TIGHTEN BODY PLATE BOLTS TO 70 FT LBS

Page 29: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

30 95-03026

DOUBLE SEAL1. Slide sheild/slinger on shaft.2. Slide the outer seal assembly onto the shaft

Care must be taken when assembling the outerseal into the outer seal retainer. All compres-sion springs must be fully seated in the re-tainer. The drive notches in the outer sealmust be properly aligned with the seal drivepins in the outer seal retainer.

3. The leading edge of the outer seal should be.610-inches from the shaft shoulder. Fastenseal in place by tightening the two setscrews.

4. Install the gland plate.5. Install the gaskets on both sides of the T-seat.

Lubricate the faces on the T-seat with a foodgrade lubricant or other approved fluid andinstall the T-seat.

6. The inner seal may be assembled prior toinstalling on shaft. Care should be taken tomake sure that all springs are properly seatedand that the seal face drive pins are properlyaligned with the notches in the inner seal face.Use food grade lubricants on all O-rings duringseal assembly to enhance performance.

FLUID HEAD ASSEMBLY

PUMP MODEL A B420 2.898” 7.148”520 4.773” 9.023”

MECHANICAL SEAL DIMENSIONS

7. Install the inner seal.8. Slip the inner seal preload tool over the end

of the shaft. Install the rotor retaining nut,and hand tighten it against the preload tooland shaft shoulder.

9. *Tighten the setscrews in the inner seal seat retainer.

10. Remove the rotor retaining nut and preloadtool.

WAUKESHA MECHANICAL SEAL INSTALLATION

MAINTENANCE

*REPLACE SETSCREWS EACH TIME THE SEAL ISREMOVED FROM THE SHAFT.

REF. 1.750”

B

A

.610” REF.

REF. 1.500”

INNER SEAL RETAINER

SETSCREW (2) INNER SPRING SETSCREW (2)

OUTER SEALT-SEAT

OUTER SEAL

SEALPRE-LOAD TOOL

ROTOR NUT

SHIELD/SLINGER

Page 30: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

3195-03026

BODY INSTALLATION

The installation of the body is the reverse of theremoval procedure ( page 22 with the follow-ing suggestions:

1. Use the guide bolts to align the body with thegearcase. This is very helpful in preventingdamage to the mechanical seals.

2. After body is fully installed, connect the sealflush lines and test for leaks by opening flushlines and establishing a flow thru the seal

NOTE Omit step 2 if unit has a singlemechanical seal

ROTOR INSTALLATION

The installation of the rotors is the reverse of theremoval procedure ( page 21) with the follow-ing suggestions:

1. Replace all rotor and rotor nut O-rings withnew ones.

2. The rotor drive keys may be installed after therotor is fully seated against the shaft shoulderand the shaft extension tool has been re-moved.

3. USE LIBERAL AMOUNTS OF FOOD GRADEANTI-SEIZE COMPOUND ON ROTORRETAINING NUT AND ENCAPSULATED JAMNUT THREADS. IF NUTS DO NOT ROTATEFREELY, BY HAND, ON SHAFT THREADS,REMOVE THEM AND CLEAN OR REPAIRTHREADS.

4. Rotor nuts are to be tightened to 600 foot-pounds using the torque wrench and socket.

5. Check for proper rotor to cover clearance.Minimum is .010”

COVER INSTALLATION

The installation of the cover is the reverse of theremoval procedure with the following sugges-tions:

1. Lubricate the cover O-ring.2. Use anti-seize compound on all cover bolt

threads.

FLUID HEAD ASSEMBLYMAINTENANCE

GUIDE BOLT (2)3/4-10 X 2-1/2 BOLT (16)

COVER INSTALLATION

INSTALL NUTS TO 600 FT.LBS TORQUE

ROTOR KEYS

ROTOR LIFTING TOOL

Page 31: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

32 95-03026

82 13 03 92 23

24 83 04 83 93 83 5 (W

AR

E R

ING

OP

TIO

N N

OT

SH

OW

N)

3

34 94 14

01 3 4 25

05 64,44 64,54 35

22 32 21 6 3 51

91 7

2 15

61 81 12 02

61 71

74 84 1 72 63

216 91

73 43

52 62 42 43 73 5

41

94 33

15

7A2

UN

IVE

RS

AL

MO

DE

L S

P 4

20

SIN

GL

E A

ND

DO

UB

LE

ME

CH

AN

ICA

L S

EA

LS

(See

pag

es 3

6-38

ITE

M 3

4

5-13-97

Page 32: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

3395-03026

UN

IVE

RS

AL

MO

DE

L S

P 4

20

ITE

M

D

ES

CR

IPT

ION

PA

RT

NU

MB

ER

QT

Y42

0 G

EA

RC

AS

E S

UB

AS

SE

MB

LY10

0401

11

GE

AR

CA

SE

1003

361

2G

EA

RC

AS

E C

OV

ER

1005

301

33/

8-16

x1 H

EX

HE

AD

CA

P S

CR

EW

30-3

012

4S

EA

L, G

EA

RC

AS

E C

OV

ER

1005

311

4*I

NP

UT

SH

AF

T IS

OL

ATO

RX

0877

21

5S

HA

FT,

DR

IVE

1005

321

6S

HA

FT,

SH

OR

T10

0424

17

BE

AR

ING

, FR

ON

T10

0425

210

FLA

TW

AS

HE

R 3

/843

-189

1212

SPA

CE

R, B

EA

RIN

G10

8378

214

BE

AR

ING

, RE

AR

1004

292

15S

PAC

ER

, GE

AR

1004

302

16S

EA

L, O

UT

ER

, RE

AR

BE

AR

ING

1004

312

17G

EA

R, T

IMlN

G,

DR

IVE

SH

AF

T10

7659

21

8G

EA

R, T

IMIN

G,

SH

OR

T S

HA

FT

1076

592

19K

EY,

1X

1x2.

5" L

g10

0434

220

LO

CK

NU

T, B

EA

RIN

G A

N-2

2S

TD

23

6 0

22

221

LO

CK

WA

SH

ER

, BE

AR

ING

W-2

2S

TD

13

6 0

22

222

SE

AT, F

RO

NT

BE

AR

ING

1004

352

23S

HIM

, FR

ON

T B

EA

RIN

G .0

02”

1004

36A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

03”

1004

37A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

05”

1004

38A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

10”

1004

39A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

20”

1004

40A

R24

*RE

TAlN

ER

, FR

ON

T B

EA

RIN

G11

4820

224

*RE

TAIN

ER

, FR

ON

T B

EA

RIN

G

FO

R U

SE

WIT

H B

EA

RIN

G I

SO

LAT

OR

1226

792

25S

EA

L, F

RO

NT

BE

AR

ING

RE

TAIN

ER

1004

422

25

*BE

AR

ING

ISO

LAT

OR

X08

770

226

1/2-

13x1

HE

X S

OC

FLA

T H

EA

D30

-478

82

7P

LU

G, O

IL11

5798

327

ALE

VE

L IN

DIC

AT

OR

1157

991

28B

OD

Y-F

LUID

HE

AD

15

0 L

B F

LA

NG

E10

0478

1B

OD

Y-F

LU

ID H

EA

D 3

00

LB

FL

AN

GE

1014

011

29M

OU

NT

ING

PLA

TE

316

-SS

T10

0471

230

BO

DY

SH

IMS

316

.002

”10

0472

AR

BO

DY

SH

IMS

316

.003

”10

0473

AR

BO

DY

SH

IMS

316

.005

”10

0474

AR

BO

DY

SH

IMS

316

.010

”10

0475

AR

BO

DY

SH

IMS

316

.020

”10

0476

AR

ITE

MD

ES

CR

IPT

ION

PAR

T N

O.

Q

TY

31D

OW

EL

PIN

, BO

DY

1004

772

32S

OC

KE

T H

EA

D C

AP

SC

RE

W 1

8 -

830

-228

X8

33H

EX

HE

AD

CA

P S

CR

EW

18-

8-S

ST

30-5

024

34S

EA

L O

PT

ION

(SE

E P

AG

E 3

6-38

)2

35R

OT

OR

1227

472

36B

US

HIN

G, D

OW

EL

PIN

30

4-S

ST

1003

342

37R

OT

OR

DR

IVE

KE

Y 3

16

-SS

T10

0481

438

O-R

ING

GR

OU

P O

PT

ION

BU

NA

(S

EE

PA

GE

36-

38)

439

INN

ER

RO

TO

R N

UT

31

610

0482

240

OU

TE

R R

OT

OR

NU

T W

M-8

810

1712

241

CO

VE

R S

TAN

DA

RD

316

SS

1004

791

42C

OV

ER

DO

WE

L P

IN S

S10

0470

143

HE

X H

EA

D B

OLT

- 1

8-8

SS

T30

-444

1244

NA

ME

PLA

TE

001

061

002

145

CA

UT

ION

PLA

TE

33-2

21

46D

RIV

E S

CR

EW

SS

T30

-355

124

7M

OU

NT

ING

FO

OT

(S

HIM

) S

TE

EL

1004

692

48H

EX

HE

AD

BO

LT 1

8-8

SS

T30

-383

449

WA

SH

ER

, FLA

T S

ST

43-5

516

50G

RE

AS

E F

ITT

ING

BD

0 0

92

00

08

51S

ILIC

ON

E S

EA

LA

NT,

RT

V0

00

14

2 3

00

AR

52D

RIV

E K

EY

153

EY

EB

OLT

XX

INS

ER

T, W

EA

R R

ING

, 42

0/5

20

1213

49X

XF

HS

CS

, 5/1

6-1

8 X

1.0

0”

WE

AR

RIN

G S

CR

EW

S30

-612

.AR

= A

S R

EQ

UIR

ED

* O

PT

ION

AL

EQ

UIP

ME

NT

Page 33: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

34 95-03026

82 13 03 92 23

24 83 04 83 93 83 5 (W

AR

E R

ING

OP

TIO

N N

OT

SH

OW

N)

3

34 94 14

01 3 4 25

05 64,44 64,54 35

22 32 21 63 51

91 7

2 15

61 81 12 02

61 71

74 84 1 72 63

216 9 1

73 43

52 62 42 43 73 5

41

94 33

15

7A2

UN

IVE

RS

AL

MO

DE

L S

P 5

20

SIN

GL

E A

ND

DO

UB

LE

ME

CH

AN

ICA

L S

EA

LS

(See

pag

es 3

6-38

ITE

M 3

4

Page 34: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

3595-03026

UN

IVE

RS

AL

MO

DE

L S

P 5

20

ITE

MD

ES

CR

IPT

ION

PAR

T N

O.

QT

YIT

EM

DE

SC

RIP

TIO

N

P

AR

T N

UM

BE

RQ

TY

52

0 G

EA

RC

AS

E S

UB

AS

SE

MB

LY10

0401

11

GE

AR

CA

SE

1003

361

2G

EA

RC

AS

E C

OV

ER

1005

301

33/

8-16

x1 H

EX

HE

AD

CA

P S

CR

EW

30-3

012

4S

EA

L, G

EA

RC

AS

E C

OV

ER

1005

311

4IN

PU

T S

HA

FT

ISO

LAT

OR

X08

772

15

SH

AF

T, D

RIV

E10

0673

16

SH

AF

T, S

HO

RT

1006

751

7B

EA

RIN

G, F

RO

NT

1004

252

10F

LAT

WA

SH

ER

3/8

43-1

8912

12S

PAC

ER

, BE

AR

ING

1083

782

14B

EA

RIN

G, R

EA

R10

0429

215

SPA

CE

R, G

EA

R10

0430

216

SE

AL,

OU

TE

R, R

EA

R B

EA

RIN

G10

0431

217

GE

AR

, TIM

lNG

, D

RIV

E S

HA

FT

1076

592

18

GE

AR

, TIM

ING

, S

HO

RT

SH

AF

T10

7659

219

KE

Y, 1

x1x2

.5"

Lg10

0434

220

LO

CK

NU

T, B

EA

RIN

G A

N-2

2S

TD

23

6 0

22

221

LO

CK

WA

SH

ER

, BE

AR

ING

W-2

2S

TD

13

6 0

22

222

SE

AT, F

RO

NT

BE

AR

ING

1004

352

23S

HIM

, FR

ON

T B

EA

RIN

G .0

02”

1004

36A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

03”

1004

37A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

05”

1004

38A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

10”

1004

39A

RS

HIM

, FR

ON

T B

EA

RIN

G .0

20”

1004

40A

R24

RE

TAlN

ER

, FR

ON

T B

EA

RIN

G11

4820

224

RE

TAIN

ER

FR

ON

T B

EA

RIN

G

FO

R U

SE

WIT

H B

EA

RIN

G I

SO

LAT

OR

1226

792

25S

EA

L, F

RO

NT

BE

AR

ING

RE

TAIN

ER

1004

422

25B

EA

RIN

G IS

OLA

TO

RX

0877

02

261/

2-13

x1 H

EX

SO

C F

LAT

HE

AD

30-4

788

27

PL

UG

, OIL

1157

983

27A

LEV

EL

IND

ICA

TO

R11

5799

128

BO

DY-

FLU

ID H

EA

D 1

50

LB

FL

AN

GE

1014

041

BO

DY-

FL

UID

HE

AD

30

0 L

B F

LA

NG

E10

0677

129

MO

UN

TIN

G P

LAT

E 3

16-S

ST

1004

712

30B

OD

Y S

HIM

S 3

16 .0

02”

1004

72A

RB

OD

Y S

HIM

S 3

16 .0

03”

1004

73A

RB

OD

Y S

HIM

S 3

16 .0

05”

1004

74A

RB

OD

Y S

HIM

S 3

16 .0

10”

1004

75A

RB

OD

Y S

HIM

S 3

16 .0

20”

1004

76A

R

31D

OW

EL

PIN

, BO

DY

1004

772

32S

OC

KE

T H

EA

D C

AP

SC

RE

W 1

8 -

830

-228

X8

33H

EX

HE

AD

CA

P S

CR

EW

18-

8-S

ST

30-5

024

34S

EA

L O

PT

ION

(SE

E P

AG

E 3

6-38

)2

35R

OT

OR

1227

072

36B

US

HIN

G, D

OW

EL

PIN

30

4-S

ST

1003

342

37R

OT

OR

DR

IVE

KE

Y 3

16

-SS

T10

0481

438

O-R

ING

GR

OU

P O

PT

ION

BU

NA

(S

EE

PA

GE

36-

38)

439

INN

ER

RO

TO

R N

UT

31

610

0482

240

OU

TE

R R

OT

OR

NU

T W

M-8

810

1712

241

CO

VE

R S

TAN

DA

RD

316

SS

1004

791

42C

OV

ER

DO

WE

L P

IN S

S10

0470

143

HE

X H

EA

D B

OLT

- 1

8-8

SS

T30

-444

1244

NA

ME

PLA

TE

001

061

002

145

CA

UT

ION

PLA

TE

33-2

21

46D

RIV

E S

CR

EW

SS

T30

-355

124

7M

OU

NT

ING

FO

OT

(S

HIM

) S

TE

EL

1004

692

48H

EX

HE

AD

BO

LT 1

8-8

SS

T30

-383

449

WA

SH

ER

, FLA

T S

ST

43-5

516

50G

RE

AS

E F

ITT

ING

BD

0 0

92

00

08

51S

ILIC

ON

E S

EA

LA

NT,

RT

V0

00

14

2 3

00

AR

52D

RIV

E K

EY

153

EY

EB

OLT

XX

INS

ER

T, W

EA

R R

ING

420

/520

1213

49X

XF

HS

CS

, 5/1

6-1

8”X

1.0

W

EA

R R

ING

SC

RE

WS

30-6

12

.AR

= A

S R

EQ

UIR

ED

Page 35: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

36 95-03026

DOUBLE MECHANICAL SEAL

*100402 102516 102517 102518 102519 102520 107000 DESCRIPTION SC/SC-C/SC S SC/SC-C/SC V SC/SC-C/SC E SC/SC-TN/SC S SC/SC-TN/SC V SC/SC-TN/SC E SC/SC-C/SC E1 INBOARD SEAL 10515 102503 102504 100512 102503 102504 1025042 GASKET 10512 102524 102525 100515 102524 102525 1070013 SEAT 420-014-031 420-014-031 420-014-031 420-014-031 420-014-031 420-014-031 420-014-0314 O-RING S75260 V70260 E70260 S75260 V70260 E70260 E702605 GLAND 100514 100514 100514 100514 100514 100514 1005146 5/16-18X1¼ HHCS 30-353 30-353 30-363 30-353 30-353 30-353 30-3537 5/16 LOCKWASHER 43-15 43-15 43-15 43-15 43-15 43-15 43-158 FLUSH KIT 35897 35897 35897 35897 35897 35897 358979 OUTBOARD SEAL 100513 102508 102509 102513 102514 102515 10250910 SHIELD/SLINGER 114035 114035 114035 114035 114035 114035 114055

DOUBLE MECHANICAL SEAL

*WAUKESHA HEAVY DUTY STANDARD SEAL

ITE

M

PART NUMBER

10

Page 36: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

3795-03026

SINGLE MECHANICAL SEAL ASSEMBLIES TYPE “MP” (INNER)ROTATING O-RING SEAL ASSEMBLYFACE MATERIAL WITH O-RINGSSILICONE SILICONE 102512CARBIDE FLUOROELASTOMER 102503

EDP 102504

SINGLE INNER MECHANICAL SEAL

420 - 520 INNER SEAL ASSEMBLY 102150 *AS SUPPLIED BY VENDOR

*1 1 102526 FACE, SILICONE/CARBIDE ROTOR*2 1 102527 RETAINER*3 24 102528 SPRING*4 4 102529 SETSCREW 5 1 SEE TABLE RETAINER O-RING*6 3 WITH ITEM 2 DRIVE PIN 7 1 SEE TABLE SHAFT O-RING

ITEM REQ’D PART NUMBER DESCRIPTION

O-RING ITEM 5 ITEM 7 MATERIALS70246 S70242 SILICONE RUBBERV70246 V70242 FLUOROELASTOMERE70246 E70242 EDP

Page 37: Waukesha Pumps - Search files/SPX - WAUKESHA... · OPERATION MAINTENANCE & PARTS LIST Read and understand this manual prior to installing, operating or maintaining this pump. Waukesha

38 95-03026

SINGLE OUTER MECHANICAL SEAL

SINGLE MECHANICAL SEAL ASSEMBLIES TYPE “CO” (OUTER)ROTATING O-RING SEAL ASSEMBLYFACE MATERIAL O-RING WITH O-RING

SILICONE S75345 102513CARBON FLUOROELASTOMER V70345 102514

EDP E70345 105515

420 - 520 INNER SEAL ASSEMBLY 102138 *AS SUPPLIED BY VENDOR

ITEM REQ’D PART NUMBER DESCRIPTION*1 1 102659 FACE, CARBON ROTOR2 1 SEE TABLE O-RING

*3 1 102661 RETAINER*4 9 102693 SPRING*5 1 102552 SPLIT RING*6 34 102663 SETSCREW7 1 114035 SHIELD/SLINGER

7