waugh infrastructure portland city2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(waugh...

127
Portland City Asset Management Presentation October 2009

Upload: others

Post on 10-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Portland City

Asset Management PresentationOctober 2009

Page 2: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

2

Agenda

1. Thank you2. Bureaus and Needs3. Report Cards4. Investment Profiles5. 25 Year Plan6. Levels of Service

Page 3: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

3

Thank You

Page 4: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

4

Thank You

• Like our Prime Minister, I agree that New Zealand likes America

• Thank you sharing your resources and innovations with the world and making the world a better place to live

• Thank you for being prepared to put your sons and daughters in harms way to make the world a safer place to live

• Thank you for inviting me to share experiences with you

Page 5: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

5

Introduction

Page 6: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

AM and Organizations

5 Stages of Grief• Denial• Anger• Bargaining• Depression• Acceptance

5 Phases of Project Management

• Initial Enthusiasm• Inevitable problems• Search for blame• Punish the innocent• Praise and reward

non-participants

Page 7: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

7

Organizations and AM Planning

• 20% Embedded, resourced, good progress and results

• 60% Keeping up with requirements but still plenty of work to do

• 20% Compliance only – still in denial after 10 years

Page 8: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

2008/09 Issues

• All the costs are on the table for next 10 yr• Huge community debate (2 years) around

affordability of services – commissions, hearings, Council elections

• Populist politicians still do their stuff• BUT debate is informed by facts –

communities can wrestle with trade-offs

Page 9: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

9

John Howard, JRA Challenge –AMP on 7 Slides

1. What are the drivers?2. What is the target?3. What are various ways to get there?4. What are the obstacles, issues?5. How do we measure progress?6. How do we get over the obstacles?7. What don’t we know?

Page 10: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

7 Key Points for AMPs Key Points for

7 Slide AMP’s

KEY POINTS:

1. These are the things that drive us2. This is the target we are going for3. These are the various ways of getting there4. These are the obstacles/hills/ challenges/issues5. This is how we measure our progress6. This is how we get over the obstacles7. These are the things we don’t know.

1

3

4

5

67

2

Page 11: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

AM - No Lone Rangers, No Silver Bullets

Page 12: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

The Onion Scene

• All smelly• Make people cry• LAYERS

Page 13: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

13

Bureaus and Needs

Page 14: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

NZ Experiences

• Significant Assets• Regulatory Service Levels• Off Balance Sheet Caution• SWDC AMIP Team Example• Across Portfolio considerations

Page 15: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

15

Risk Management

Page 16: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

16

Risk Management

• Business Risks• Organization wide risks• Asset criticality analysis• Emergency risks• Use ISO Standards for risk management

Page 17: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset CriticalityWhat is Risk and Why Assess It?The consequences of an asset failing can be measured against the four well-beings:

• Economic• Environmental• Social• Cultural

The probability of failure can be expressed in words e.g.• Almost certain to occur (score = 1, one)• Likely to occur• Moderate• Unlikely to occur• Rare to occur (score = 0, zero)

Page 18: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset CriticalityCalculation of Criticality

Well-beings Effect Weighting Weighted Well-being

Social

Public image 5%

45% Service Availability 20%

Public Health and Safety 20%

Economic

Difficulty/Cost repair 10%

25% Financial loss to customer 10%

Financial loss to Council 5%

Cultural Offensive to Culture 10% 10%

Environmental Pollution/ Contamination/ Scouring 20% 20%

Page 19: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset CriticalityCalculation of Criticality

SAMPLE: Water Criteria Well-being Effect Items to Consider Severity Score

Soc

ial

Public Image Loss in Public Confidence No Result 0

Council looks bad 1

Council makes paper 2

Council make National TV 3

Council Lawsuit 4

Service Availability

Number of People Affected Type of People affected (schools, elderly, hospitals, industry as ‘equivalent number of domestic connections’)

1 Connection 0

2-20 Connections (half block) 1

21-40 Connections (Block) 2

41-500 Connections 3

>500 Connections 4

Public Health and Safety

No problem 0

Damage to property 1

People become sick for a short period 2

Injury to people 3

Loss of life 4

Page 20: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset CriticalityCalculation of Criticality

Weighting

Assessment of Effects Criticality Scoring

SocialEconomic Cultural Environmental

5 20 20 10 10 5 10 20

Criteria Pub

lic Im

age

Ser

vice

Ava

ilabi

lity

Pub

lic H

ealth

and

Saf

ety

Diff

icul

ty/C

ost o

f Rep

air

Fin

anci

al L

oss

to C

usto

mer

Fin

anci

al L

oss

to C

ounc

il (in

sura

nce,

fine

s)

Offe

nsiv

e to

Cul

ture

Pol

lutio

nC

onta

min

atio

nS

cour

ing

Tot

al S

core

= W

eigh

ting

x Le

vel

Hig

hest

indi

vidu

al

wei

ghte

d po

int S

core

Crit

ical

ity A

sses

sed

from

Tot

al S

core

Crit

ical

ity A

sses

sed

from

Hig

hest

Poi

nt

Ove

rall

Crit

ical

ity

Backflow preventer (4 found in AMS) 3 3 4 4 2 3 2 3 310 80 High Medium High

Facilities- SCADA, Repeaters, Bores/Pumps, Disinfection Plant. (‘High’criticality, manage separately)

3 4 3 4 2 2 2 3 305 80 High Medium High

Page 21: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

21

Impact of Criticality on Expected Life

Impact of Criticality on Expected Life

High Criticality

Assets

Low Criticality

Assets

Condition Assessment

Planned Maintenance

Reactive to Failures

Impact of Criticality & other factors on Interventions

High Criticality

Assets

Low Criticality

Assets

High Criticality

Assets

Low Criticality

Assets

Failures on high critical assets may need more

interventions and the asset may be renewed earlier

Key

Planned maintenance is done to ensure the high critical

asset does not fail, not only to extend the expected life

Low critical assets that fail early may justify condition

assessment earlier than when due for removal

Page 22: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Risk Aversion

Page 23: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

23

Individual Pipe Analysis 683 Critical Water Supply Pipes

Note: Associated valves will have similar scores.13.6% of the total number of pipe assets, 5014.1.6% [82 pipes] have a Criticality Score >300

100

200

300

400

500

600

Asset ID - every 10th ID is shown here

Wei

ghte

d C

ritic

ality

HIGH[82]

MEDIUM[601]

Page 24: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

24

Critical Asset Analysis

Page 25: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Canterbury University Risk Course (Associate professor Piet Beukman)

Page 26: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Risk model cont’d

• Decision criteria to focus effort– Larger the box, greater the effort needed– Increasing knowledge requirement – More

development required– Increasing complexity – More formal method

required– Increasing time pressure – More individual

autonomy required– Increasing novelty – More understanding

required

Page 27: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

27

Report Cards

Page 28: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

AM Practice and ScorecardsSource: Don Vincent, GHD Australia

Sector Australia 2001

NZ 2004

National Roads

C All RoadsD-

State Roads

C- BridgesC+

LocalRoads

D

Railways D- D-

Airports B C+

Ports B C+

Page 29: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Aust. Scorecard

Page 30: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

NZ Scorecard

Page 31: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

City of Hamilton Example

Page 32: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

Copyright Notice• There is a large amount of development and Intellectual

Property tied up in this work• Waugh Infrastructure Management Ltd reserves its

copyright on this work and requests that it not be copied, reverse engineered or distributed in any form

Page 33: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Context of Policy – LGA 2002

Page 34: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Compulsory Policies

a) a revenue and financing policy; andb) a liability management policy; andc) an investment policy; andd) a policy on development contributions or financial

contributions; ande) a policy on partnerships between the local authority

and the private sector; andf) a policy on the remission and postponement of rates

on Maori freehold land.

Page 35: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset Management PoliciesThe objective of an Asset Management Policy for an Activity is to ensure that Council’s service delivery is optimised to deliver agreed community outcomes and levels of service, manage related risks, and optimise expenditure over the entire life cycle of the service delivery, using appropriate assets as required.An AM Policy requires that the management of assets be in a systematic process to guide planning, acquisition, operation and maintenance, renewal and disposal of the required assets.Delivery of service is required to be sustainable in the long term and deliver on Council’s economic, environmental, social, and cultural objectives.

Page 36: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Asset Management PoliciesKey Issue - Selecting the Appropriate Level of Asset ManagementAuthorities that manage assets on behalf of their communities need to define an appropriate level of asset management for the asset or activity being managed.

For some authorities and asset / activity groups this may not necessarily be fully comprehensive (advanced)

asset management practices.

Page 37: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

‘Core’ asset management practice is basic technical asset management planning undertaken at a level designed to meet minimum legislative and organisational requirements for financial planning and reporting. ‘Core’ practice provides technical management outputs for current levels of service, demand management, asset lifecycles, asset forward replacement programmes, new capital expenditure and associated cash flow projections.

Page 38: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

‘Core Plus’ asset management practice is undertaken at a level between ‘Core’ and ‘Comprehensive’ practice. The focus is to build on the basic technical asset management planning of ‘Core’ practice by introducing improved maintenance management and more advanced asset management techniques (as appropriate). Further use is made of risk management, asset lifecycle management, and service standard optimisation techniques.(Previously undefined)

Page 39: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

‘Comprehensive’ asset management practice is system optimisation planning undertaken to optimise activities and programmes to meet agreed current and future service standards. This is achieved through the development of management tactics based on the collection and analysis of key information on asset condition, performance, demand for service, lifecycle costs, risk costs and asset lifecycle treatment options.

Page 40: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

IIMM Section 2.2.4 states:• Selecting the appropriate asset management level for an

organisation, which for some organisations or asset types may not need to progress beyond a core approach, will depend on a number of factors, including:

• The costs and benefits to the organisation• Legislative requirements• The size, condition and complexity of the assets• The risk associated with failures• The skills and resources available to the organisation• Customer expectations

Page 41: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Proposed Methodology

Page 42: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

Initial Assessment: Population Analysis - NZ2006 Census Main and Secondary Urban Areas(Usually Resident Population Count)

Total New Zealand 4,027,947Total Main Urban Areas 2,892,831Total Secondary Urban Areas 243,081

Page 43: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Selecting the Appropriate Level of Asset Management

Number Towns Population Suggested Initial AM Level (Waugh Infrastructure Mgmt Ltd) Notes

10 90,000 and above Comprehensive (Advanced) Auckland split by Councils

34 10,000 – 90,000 Core Plus

31 5,000 – 10,000 Core

559 Less than 5,000 Core

www.drinkingwater.org.nz

Page 44: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Recap: Asset Management Policy• Develop 2 page (approx policy) for each asset group• Summarise the results of the practice analysis• Outline overall objectives of service delivery for that

asset group• Insert into introduction of AMP• Council adopts as policy• Sets appropriate practice for that

asset group• Allows management of AM practice

sophistication

Core

Core Plus

Comprehensive

Page 45: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

45

Asset Management a journey

• 1998 – LTFS – 1st AMP, Renewals• 2001 – First AMP revisions• 2005 – LTCCP – 2nd AMP, CAPEX• 2008 – LTCCP – 3rd AMP

AMP a 20 year plan, improving information each cycle

Page 46: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

46

Basic Asset Management

BasicAsset Management

Creation/

Aquisition

Operations &

Maintenance

Replacement

ASSET

LIFECYCLE

Page 47: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

47

Comprehensive Asset Management

Comprehensive Asset ManagementAdapted from: Integrated Asset Management Guidelines for Road Networks(Austroads 2002)

Page 48: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

48

Asset Management Plans

• Required to support 10 year financial and community plans

• Look out 20 years or longer if required• Collate relevant information regarding

service delivery and assets in one place• Sit within planning frameworks (see

example)

Page 49: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

49

Investment Profiles

Page 50: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Investment Constraints

• Investment Drivers• Investment Constraints• Underfunding Investment - $136M pa• The UK investment experience• The 136M Challenge• Smoothing the investment profile

Page 51: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

51

LTCCP Progress 2002 - 2008

• The right debate: too much technical detail• Still signs of 3 year budgeting• Many AMP’s not sufficiently robust• Systems and process issues• Resource shortages in planning• Resource shortages in delivery (40 – 50%

carryover’s)

Page 52: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

52

LTCCP Progress 2002 - 2008

Page 53: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

53

NZ Forecast Operating Expenditure

Page 54: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

54

NZ Forecast Operating Revenues

Page 55: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

55

ACC SW 10 year financial forecast

Page 56: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

56

MCC Roads – 20 year expenditure

Page 57: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

57

Asset Lifecycle Management

• Asset creation• Asset operation and maintenance• Asset renewal• Capital expenditure requirements• Asset disposal and aftercare

Page 58: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

58

Renewal Forecasts - NSCC

Page 59: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

59

Economic renewals

Page 60: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

60

Total Capital Expenditure

Page 61: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

61

Renewals vs. Depreciation

Page 62: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

62

Depreciation Calculations

Page 63: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

63

Expenditure Forecasts

Page 64: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

64

Remaining useful life, pipe length and material type

0

10

20

30

40

50

60

0 - 10 10 - 20 20 - 30 30 - 40 40 - 50 50 - 60 60 - 70 70 - 80 80 - 90 90 - 100

Age Groups

Leng

th k

m

Unknown

Steel

Ribloc

Resin

PVC

HDPE

Earthenware

Concrete

uPVC

AC

Page 65: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

65

An Integrated Approach

Consider Infrastructure Interdependencies!• Still not handling

this well - Contract

Separation- Integrated

Planning

Page 66: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

66

Financial Management

• 10 year financials• Generally supported by 20 years asset

analysis• Must state significant assumptions• Feed into LTCCP financials

Page 67: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

67

NSCC WS Confidence Ratings

Page 68: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

68

25 Year Plan

Page 69: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

69

Demand Management

• Planning and managing future demand• Use of demand models• Monitoring technological changes• Population shifts• Demographic shifts• Water resources

Page 70: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

70

Social – Age changes(source Dr Natalie Jackson, Infrastructure Management Summit, Rotorua, 2005)

Page 71: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

71

Social – Age change by TLA(source Dr Natalie Jackson, Infrastructure Management Summit, Rotorua, 2005)

Page 72: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

72

Demographic changes2001 Actuals verse 2006 Actuals

Males Females

-6.0% -4.0% -2.0% 0.0% 2.0% 4.0% 6.0%

0-4

5-9

10-14

15-19

20-24

25-29

30-34

35-39

40-44

45-49

50-54

55-59

60-64

65-69

70-74

75-79

80-84

85 Years and over

Age

Ran

ge

Percentage of Age at each Stage

2001 Actual Males 2001 Actual Females 2006 Actual Males 2006 Actual Females

Page 73: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Portland 1959

• Dwight Eisenhower President• Interstate started 1956

– I5 October 1966, 308 mile– I84 July 1980, 375 mile

• Alsaka and Hawaii join the Union• Oregon Centenial Exposition• Gas 25c / gallon

Page 74: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Portland 1959

Page 75: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Portland 1959

Page 76: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Portland 1959 – Paul Bunyan

Page 77: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Not in Portland 1959

• Interstate• Internet• Light Rail• Street Cars??• Aerial Tram to College• Color TV• iPhones, Cell Phones

Page 78: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Population Changes

• Portland City 1960 = 372,676• Portland City 2009 = 529,121 (+42%)

• Portland Metro 1960 = 1M• Portland Metro 2009 = 2.1M• Portland Metro 2059 = 3.85M (+83%)

Page 79: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

Expected Asset Lives

• Bridge, 50 – 100 years• Interstate, 50 years• Water Pipe, 80 – 100 years• Road, 25 years• Rail, 50 years• Building, 50 years• Other Structures, 50 years

Page 80: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

80

Levels of Service

Page 81: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

81

Levels of Service

• Align to deliver community outcomes• Community and Technical levels of service• Management and public reporting• Community consultation on levels of

service (see example)• Presentation of costed options• Community agreed service levels set

tariffs, charges, rates

Page 82: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

82

Importance verses Satisfaction

-1.2 -1 -0.8 -0.6 -0.4 -0.2 0 0.2 0.4

Street furniturePeriodic restrictions on water usageLighting in town centreUpkeep of cemeteriesReduction of waste water odourPublic ToiletsWaste water reliabilityLighting in neighbourhoods within our townsProvision of footpathsParking in town centreReliability of waterRecycling measures for solid wasteAnimal controlRubbish collection servicesSafe, sealed TOWN road surfacesWaste water environmental qualitySafe, sealed COUNTRY road surfacesGood quality of water supplyStorm water drainageRoad safety education programs

Ser

vice

Degree of Variance

MinorExpectation being exceededExpectation not being met

Major

Page 83: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

83

Community Consultation

Page 84: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

84

Response Analysis

Page 85: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

85

Levels of Service LinkagesWastewater

Outcome Community Outcomes

How the Wastewater Activity Contributes

Measurement (Level of Service) Measurement Procedure Current Level of Service Target Level of Service

High standards of public and environmental health

Protecting the communities from wastewater related health issues by providing community reticulated systems in agreed areas

Adoption of a Sanitary assessment for the district as required by the LGA, update every 12 years.

Resolution of Council Adopted June 2006 Adopted and updated every 12 years

Long term planning through Asset Management Plans will provide confidence of a sustainable infrastructure

Adoption of an approved Asset Management Plan

Resolution of Council Adopted and updated every 3 years

Adopted and updated every 3 years

Full compliance with Resource Consent conditions in TA

Full compliance at both treatment plants

Discharges from treatment plants meet standards set by Environment Waikato

Wastewater testing carried out as per EW requirements

Non-compliance for nitrogen and phosphorous in Cambridge

Full compliance at both treatment plants

Not currently measured No more than x dry weather overflows from pump stations per year

Number of Pump station overflow Review Failure information sheets

Not currently measured No more than y overflows from pump stations per rainfall event

Sustainable, sate and healthy infrastructure

Managing appropriately the discharges to air, water and land from the wastewater system ensures a healthy and safe infrastructure.

Customer complaints of odour events

Quarterly audit of odour events (EW and INFRA)

9 complaints per annum <= 5 odour events per year

Long term planning of maintenance, renewals and provision for growth will provide assurance for a sustainable and efficient utility service

Adoption of an approved Asset Management Plan

Resolution of Council Not adopted Adopted

Efficient and effective utility services

Satisfaction with Councils services/facilities reflects how effective the utility service is to the community

Percentage of satisfied residents with the overall performance of the wastewater systems

Annual NRB Survey 63% residents are satisfied with the services

70% satisfied residents

Plan for future growth A Development Contribution Policy has been adopted

Resolution of Council Adopted Adopted

Affordable services Monitor the Customer Satisfaction Level of the overall wastewater service provided to reticulated areas

Percentage of satisfied residents with the overall performance of the wastewater systems

Annual NRB Survey 63% residents are satisfied with the services

70% satisfied residents

High standards of infrastructure

Ensure appropriate response times to the public requests for service are maintained and the wastewater system that directly affects the use of the system is operating correctly.

Percentage of satisfied residents with the overall performance of the wastewater systems

Annual NRB Survey 63% residents are satisfied with the services

70% satisfied residents

Page 86: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

86

New Zealand Overview

Page 87: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

87

New Zealand Overview

1. Geology and Geography2. Development History3. Asset Management Commences4. Renewals and Backlogs5. Local Government Act 20026. Long Term Council Community Plans7. Progress 2002 - 2008

Page 88: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

88

Geography - New Zealand Regions

Page 89: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

89

Geography South Island -Timaru

Page 90: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

90

Geology - Alpine Fault

Page 91: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

91

Geology Alpine Fault (2)

Page 92: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

92

Geology - Wellington Fault

Page 93: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

93

Geology - Volcanoes

Page 94: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

94

Geology – Auckland Volcanoes

Page 95: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

95

Infrastructure Development History

• 1840 European Settlement• 1840 – 1900 breaking in• 1900 – 1930 infrastructure build phase 1• 1946 – 1975 infrastructure build phase 2• 1984 – 1994 maintain• 1995 – 2005 infrastructure build phase 3

Page 96: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

96

Infrastructure development

• Settlement - Early 1900’s Initial infrastructure build. Loans from UK.

• 1950’s/1960’s – wealth effect and next infrastructure build. Govt subsidy.

• 1980’s/1990’s – relatively poor = maintain• 2000’s-2020’s – relatively wealthy =

replace and build• 2030 onwards – less new build?

Maintain?

Page 97: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

97

Infrastructure 1800’s - 1900’sRakaia River Bridge, Bollman Truss, completed 1882

Page 98: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

98

Infrastructure 1960’sBenmore Dam commissioned 1965

Page 99: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

99

Infrastructure NowMangere WWTP commissioned 2003

Page 100: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

100

Future Infrastructure?Waitakere CC Massey Leisure Centre

Page 101: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

101

NZ History and Possible Trends

Page 102: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

GDP Changes

Page 103: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

103

Crown Core Debt 1984 - 1996

Page 104: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

104

Infrastructure possible trends

• Approx. 20 year window of wealth and willingness to pay to replace and build new infrastructure

• Funding mechanisms – is cash funding the most logical way?

• Basics taken care of – more emphasis on community infrastructure

Page 105: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

105

Asset Management Begins

February 1998Queensland: Power Shortage

Failure of four generators

August 1998

NSW: Water CrisisHealth Warnings

Re: Fitness of water to drink

October 1998

Queensland: Power ShortageFailure of a generator

August 1999

Victoria: Baby

Boom9 Months after Longford

Explosion

January 2001

500 Power Failures

South Australia

February 1998

NZ: Power Crisis9000 Commercial

Lost power for 6 weeks

June 1998

Victoria: Ice Blockage

in pipelineNatural Gas Supply

Disruption

July 1998NSW: Water Crisis

Health Warnings

re: Fitness of water to drink

September 1998

Victoria: Longford ExplosionShutdown of natural Gas

Supply to 1.4m Customers

October 1999

Sydney CBD Power Failure

February 2000

Power Crisis

South Australia/VictoriaHigh temperatures, Labour strike,

Generators Overloaded

2000/2001

Class Action against ESSO

Longford Explosion

Major Infrastructure Failures in Australia and New Zealand, 1998-2001

Page 106: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

106

NZ Auditor General – Importance of Infrastructure

• Auditor General concerned with Council balance sheets

• Value of infrastructure loss of service potential (depreciation) not shown

• What were the costs• 1996 - National law changed 10 year

financial plans required supported by AMP’s

Page 107: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

107

1998 AMP’s – Renewal Focus

• Collection of data and building of asset registers

• Analysis of information to support 10 year financial plans

• Infrastructure effects of 1984 – 1994 recession become apparent

• Major asset renewal and maintenance backlogs are recorded

Page 108: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

108

Local Government Act 2002• Previous Act 1974• Provides power of general competence• Requires extensive community

consultation• Requires 10 year financial plans that

must be formally updated and audited every 3 yrs

• Requires 10 year plans supported by asset or activity management plans

Page 109: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

109

Long Term Council Community Plans (LTCCP)

• 10 year plan, updated 3 yearly• Community Outcomes – healthy, wealthy

and wise• 4 well-beings: Economic, Environmental,

Social and Cultural• Delivering agreed levels of service to the

community

Page 110: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

110

Long Term Council Community Plans (LTCCP)

Page 111: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

111

LTCCP Reporting

Page 112: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

112

Asset Management Practice -NZ

Page 113: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

113

Asset Management Practice NZ

1. NAMS and Manuals2. Asset Management Plans3. Levels of Service4. Demand Management5. Risk Management 6. Asset Lifecycle Management7. Financial Management8. Systems and Processes9. Improvement Planning

Page 114: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

114

National Asset Management Steering Committee (NAMS)

Member Organisations

• INGENIUM- The Association of Local Government Enginee ring in New Zealandhttp://www.ingenium.org.nz/

• SOLGM - Society of Local Government Managers New Zea landwww.solgm.org.nz

• LGNZ - Local Government New Zealandwww.lgnz.co.nz

• Office of the Auditor General NZhttp://www.oag.govt.nz/

• NZWWA- New Zealand Water and Waste Associationhttp://www.nzwwa.org.nz/

• NZRA- New Zealand Recreation Association.http://www.nzrecreation.org.nz/

• ALGIM- Association of Local Government Information M anagerswww.algim.org.nz

• LAPA- Local Authority Property Association

Page 115: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

115

NAMS Manuals

Page 116: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

116

Infrastructure Asset Management – What is it?

“The goal of infrastructure asset management is to meet a required level of service , in the most cost effective manner, through the management of assets for present and future customers.” International Infrastructure Management Manual (IIMM) 2006

Page 117: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

117

Infrastructure Asset Management – What is it?

• A lifecycle approach• Cost effective management strategies• For the long term• Defined Levels of Service• Monitoring performance• Managing the impact of growth• Managing Risk• Sustainability

Page 118: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

118

Infrastructure Asset Management

- Why do it?• Improve governance and accountability• Enhance Service Management and

customer satisfaction• Improve Risk Management• Improve financial efficiency• Make sustainable decisions

Be proactive – not reactive

Page 119: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

119

AM – Applied Common Sense

• Most of the building blocks are already there

• Multi-discipline: engineering, accounting, economics, planning

• Integration across organizations• Breaks down silo’s• NZ – started because we had no money

and needed to make the $ go further and smarter

Page 120: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

120

Systems and Processes

• Systems and processes support AM• Critical to success• NZ RAMM/DTims for Roading• Multiple different systems for utilities,

parks, property• Business process integration vital• Audit look for reliability of systems and

processes

Page 121: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

121

What is needed in an AM Information System?

Page 122: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

122

Council Size – AMIS SelectionCategory 2006 Pop.

Band# Councils Typical AMIS

TypeTypical AMIS

Large City 405,000 –104,000

9 ERPPropriety

SAPHansen

City – Prov. District

100,000 –40,000

24 Propriety ConfirmHansen

District 40,000 –20,000

15 Small Propriety or Simple/GIS

HuefnerBizeAsset

Small District Less than 20,000

24 Simple/GIS BizeAsset

Page 123: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

123

Resource Succession• Additional resources no longer easily

available• Experienced asset managers difficult to

find• Effective succession planning needed

to resource AM programmes• Some initiatives now underway in NZ

(but 5 - 10 year lag)• Cadet initiatives

Page 124: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

124

Resources• AM programmes must be adequately resourced• Adding AM to a large job description is not going to

work• A good operational/project engineer is not

necessarily a good asset manager• On-going AM budget is required (additional to

historic budgets)• Small Councils have difficulty attracting and retaining

experienced Asset Managers

Page 125: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

125

Improvement Planning

• Cover the gaps in practice• 3 years forward programme• Must be funded and resourced• Delivery of programme is audited• Best results – monthly improvement team

meeting

Page 126: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

126

Summary

Page 127: Waugh Infrastructure Portland City2ll9dn42z3p92lpwvutsqo11-wpengine.netdna-ssl.com/...(Waugh Infrastructure Mgmt Ltd) Notes 10 90,000 and above Comprehensive (Advanced) Auckland split

127

Asset Management

• A journey• Multi-disciplinary• Long Term benefits• Co-ordinates effort• Improves planning across municipality• Part of a planning framework