Watershed Scale Habitat Restoration of Lower Klamath Tributaries
Rocco Fiori (Fiori GeoSciences) & Sarah Beesley (Yurok Tribal Fisheries Program)
![Page 2: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/2.jpg)
Contributors
• Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist, Yurok Tribal Fisheries Program
• Aldaron McCovey - Fisheries Technician, Yurok Tribal Fisheries Program
• Steven Nova - Fisheries Technician, Yurok Tribal Fisheries Program • Robert Grubbs – Fisheries Technician, Yurok Tribal Fisheries Program
• Scott Silloway – Fisheries Biologist, Yurok Tribal Fisheries Program
• Andrew Antonetti – Fisheries Biologist, Yurok Tribal Fisheries Program
• Walter Mecklenburg – Fisheries Biologist, Yurok Tribal Fisheries Program
![Page 3: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/3.jpg)
Thanks To Funding Partners, Landowners and Cooperators
• U.S. Fish and Wildlife Service
• U.S. Bureau of Reclamation
• National Oceanic and Atmospheric Administration
• CA Dept of Fish and Wildlife
• Green Diamond Resources Company
• Yurok Tribe Watershed Restoration Dept.
• Yurok Tribe Environmental Program
![Page 4: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/4.jpg)
Discussion Topics
Complementary wood loading & off-channel construction techniques in 2nd to 5th Order Streams
Bank Based Jams Bar Apex Jams Stumps Off-Channel Features
Biologic Hot Spots
Tributary Confluences Pre-existing Side Channels & Wetlands Springs Beaver Activity
Wood loading & augmentation applied until natural recruitment supplies wood needed to restore geomorphic function and self-maintaining habitat requirements
Long Term Approach
![Page 5: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/5.jpg)
Hyporheic Exchange Mechanisms and Function
Redd Site Selection and Spawning Habitat Used by Chinook Salmon. From: Geist & Dauble (1998).
Geomorphic Controls on Hyporheic Exchange. From: Wondzell & Gooseff (Pre-Print).
Influence of Subsurface Structures on Hyporheic Exchange. From: Ward et al. (2011).
![Page 6: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/6.jpg)
Project Locations
Terwer Creek DA = 31 mi2
McGarvey Creek DA = 8.9 mi2
Klamath Estuary
Hunter Creek DA = 23.8
mi2
![Page 7: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/7.jpg)
Hunter Creek Watershed
Site 1
Site 2
Site 3 Site 4
Site 5
Site 6
Site 7
Homes
Bridges
![Page 8: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/8.jpg)
Hunter Creek Watershed
BAJ & BBJs
BBJs
BAJs, BBJs & Stumps
Alcove & Side Channel
Side Channels
![Page 9: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/9.jpg)
Hunter Creek Site 1
Pre-Construction As-Built
BAJ 1
BBJ
Side Channel
Alcove BAJ 1
BAJ 1
![Page 10: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/10.jpg)
Hunter Creek Site 1
Hunter Creek
Side
Channel
Alcove
BBJ
![Page 11: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/11.jpg)
Hunter Creek Site 4
Tributary
Confluence
Construction 2012
As-Built 2012
![Page 12: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/12.jpg)
Hunter Creek Site 4
As-Built 2012
Post 5-yr RI flood WY15
![Page 13: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/13.jpg)
Hunter Creek Site 4
As-Built 2012
Post 5-yr RI flood WY15
![Page 14: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/14.jpg)
Hunter Creek Site 7 - BAJ 1
First flows 2014
Post 5-yr RI flood WY15
![Page 15: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/15.jpg)
Hunter Creek Site 7 BAJ 2, BBJs & Stumps
BBJ BBJ
Stump BBJs
![Page 16: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/16.jpg)
Hunter Creek Site 7 BAJ 2
Post 5-yr RI flood WY15
![Page 17: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/17.jpg)
BAJ 3
BRJ 1
BAJs 4 & 5
BAJ 6
Hunter Creek Site 7 BAJs and BRJ
As-Built 2014
First flows 2014
![Page 18: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/18.jpg)
Hunter Creek BAJ 3 - Chaos Jam
Pre-Project 2012
Construction 2012
![Page 19: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/19.jpg)
Hunter Creek BAJ 3 - Chaos Jam
As-Built 2014
First flows 2014
![Page 20: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/20.jpg)
Hunter Creek BAJ 3 - Chaos Jam
5-yr RI flood 12/21/14
1.2-yr RI flood 2/07/15
![Page 21: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/21.jpg)
Hunter Creek Site 7 Bank Based Jams
Digger Log & Stump
Bar Roughness
Jam
![Page 22: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/22.jpg)
Hunter Creek Site 7 - BAJ 4, 5 & 6
Hyporheic fed side channel
BAJ 4
BAJ 5
BAJ 5
![Page 23: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/23.jpg)
Hunter Creek Site 7 BAJ 6
As-Built 2014
First Flows 2014
![Page 24: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/24.jpg)
Post 5-yr RI Flood WY15
Hunter Creek Site 7 - BAJ 6
![Page 25: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/25.jpg)
Hunter Creek Site 7 – PADR 1 & 2
As-Built 2014
Pre- Construction 2014
![Page 26: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/26.jpg)
Hunter Creek Site 7 – PADR 1 & 2
![Page 27: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/27.jpg)
Hunter Creek Site 7 – PADR 1 & 2
First Flows 2014
Post 5-yr RI flood WY15
![Page 28: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/28.jpg)
Hunter Creek Site 7 – PADR 1 & 2
First Flows 2014
Post 5-yr RI flood WY15
![Page 29: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/29.jpg)
Terwer Creek
![Page 30: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/30.jpg)
Terwer Creek
![Page 31: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/31.jpg)
ELJ 1
Alcove B
Crib
Wall
Jam
Alcove A
Willow
Baffles
Terwer Creek
Integrated Use of ELJs, Alcoves & BioEngineering
ELJ 2
ELJ 3 ELJ 4
![Page 32: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/32.jpg)
ELJ 1 - Post-
Construction
2 Years Post-
Construction
Flow
![Page 33: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/33.jpg)
ELJ 1
ELJ 1
Terwer Creek First Winter
Post-Project
Side Channel
![Page 34: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/34.jpg)
Next Steps
Valley Sidewall
Valley Sidewall
Flow
Valley Sidewall
Valley Sidewall
VALLEY FLOOR MANAGED AS TRANSPORTATION & FLOOD CORIDOR
ECO-HYDRAULIC FUNCTION DISRUPTED BY FLOODPLAIN ROADS, LEVEES AND OTHER LAND USES
VALLEY FLOOR MANAGED AS FLOODPLAIN
RELOCATE ROAD
DISEMCUMBER THE CHANNEL MIGRATION ZONE
BEAVER AS LEAD-ENGINEER
Road
Road
![Page 35: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/35.jpg)
Salmon Need Wood – We Need Salmon
Thank You
![Page 36: Watershed Scale Habitat Restoration of Lower Klamath ... · • Rocco Fiori – Engineering Geologist/Operating Engineer, Fiori GeoSciences • Sarah Beesley – Fisheries Biologist,](https://reader034.vdocuments.site/reader034/viewer/2022050216/5f61d2c842f163440d3ee678/html5/thumbnails/36.jpg)
Off Road Vehicle Impacts