water supply system for pune city project...

153
WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW “REVISED DPR”

Upload: others

Post on 02-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW

“REVISED DPR”

Page 2: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• DPR & DER submitted on July 12, 2013

• PPTs and Discussions on July 31, September 5

• PMC communicated observations vide Minutes of meeting with SGI & internal meetings

• All Ex. Engineers provided updated info on existing distribution pipes

• Detailed discussions with Ex. Engineers

DPR & DER DELIVERY AND PRESENTATIONS (1/2)

Page 3: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Revision and modifications based on comments received from Ex. Engineers presented on 29th January 2014

• Final DPR modified and submitted on 18th February 2014.

• Final DER modified and submitted on 24th February 2014.

DPR & DER DELIVERY AND PRESENTATIONS (2/2)

Page 4: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Objectives of study

• Review existing Water Supply System

• Population and Water Demand Projections

• Design of Proposed Water System on 24x7 basis:

Clear Water Transmission, Storage & Distribution

• Preparation of Capital, O & M cost

• Project Financial Analysis and Viability

Page 5: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Confirmation of sites for Service Reservoirs

• Check suitability of new sites for Service Reservoirs and Pump stations

• Feasibility of the alignments for transmission and Trunk distribution mains

JOINT SITE VISITS

Page 6: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

New sites of Service Reservoirs

Sr. No. New Location Earlier location No. of

SRs

1 PARVATI ZONE

1.1 Amenity space in Rohan Kritika

Parvati WTP compound 2

1.2 Police lines SR compound

Sarasbag Kothi 2

2 WARJE ZONE

2.1 Near SNDT HLR Gandhi Bhavan 1

2.2 Fergusson college Pune University 1

2.3 Khairewadi Pune University 3

2.4 Chikhalwadi Ambedkar stadium

Pune Univesrity 2

2.5 Panchavati hill Panchavati Garden 1

Page 7: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

New sites of Service Reservoirs

Sr. No. New Location Earlier location No. of

SRs

3 VADGAON ZONE

3.1 Seminary GSR Shivneri-Brahma Amenity space

1

3.2 Near Annad nagar Garden-survey no.46G

Hadpsar Bus Depot 3

3.3 Dorabji Paradise Amenity Space

Part of Cloud Nine 1

3.4 Dorabji Paradise Amenity Space

Nyati Amenity Space 1

3.5 High Bliss Society Amenity Space

Ujjwal Terrace 1

3.6 Near Institute ESR Charwad Wasti 1

Page 8: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

New sites of Service Reservoirs

Sr. No. New Location Earlier location No. of

SRs

4 BHAMA-ASKHED ZONE

4.1 Bishops school Wadgaon Sheri PS 2

4.2 Vegetable Market-Plot33 Near 509

Sanjay Park-Rohan Mithila

2

4.3 Gairan in Lohegaon near Haran Tala

Gurudwara Wasti 2

4.4

Palm Garden opposite to Mental Corner(Vishrantwadi zone)

Near Stone Querry 2

Page 9: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR sites not finalised

Sr. No. Location WS zone No. of

SRs

1 Survey no.7-Behind Raddison Hotel

Kharadi bypass 1

Page 10: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN PARVATI

Sr. No. Description Clarification

1 Shifting of ESRs from WTP to Rohan Kritika

Site shifted

2 Utilization of newly laid 900mm MS gravity main

Planned to be used for gravity system from Parvati BPT

3 Shifting of Sarasbag Kothi ESRs to Police lines

Existing SRs and sump proposed to be demolished

4 Transfer of supply to PCWW for area- Sangam bridge to Bund

LLR Zone Is now proposed from Jalmandir GSR to be reconstructed

5 Seminary GSRs to be supplied from Padmavati PS

Parvati PS-BPT-Padmavati- Seminary will result in higher head pumping

Page 11: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN VADGAON

Sr. No. Description Clarification

1 Utilization of WW tank as BPT

Now a BPT is proposed near Institute ESR which will supply to Ujjwal Terrace Zone. ( High Bliss ESR) and Venkatesh

Serenity ESR

2 Alignment of Gravity system from New Vadgaon sump-Sudatta Sankul-forest area

After joint site visit, the Alignments are revised

3 Non availability of site for BPT & PS at wonder city-Katraj

Pumping main from Vadgaon, to be extended.

Pumps for Agam Mandir 2 zones to be housed in New RG PS

4 Site for New RG PS shifted to Truck Terminus location

Proposals are modified with location at Santosh Nagar

Page 12: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN VADGAON

Sr. No. Description Clarification

5

PMC informed on November 11, 2013 that sites for Charwad vasti & Ujjwal terrace not available

Alternate site for Ujjawal Terrace-Amenity space of High bliss society

confirmed by joint site visit. Alternate location for Charwad vasti

and new BPT is considered at the site adjacent to the existing Institute ESR.

6 Additional SR at Seminary SR site

Shivneri zone divided in to 2, one from ex. Site(Brahma Amenity) and other at

Seminary

Page 13: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN CANTONMENT

Sr. No. Description Clarification

1 Revision of Bakri hill zones The capacity of existing GSR is a

constraint. The existing zones retained

2 Utilization of ex.1000mm pumping main For Sicilia

Accepted. The proposal will be modified

3 Utilization of 600mm main from Ram Tekdi-Tukai Tekadi SR

The existing pipeline will be utilized, adequate up to 2032

4 Alternative SR site for part of Cloud nine zone

One higher elevation DMA proposed to be supplied from new ESR in the

premises of Dorabji ESR Lower areas from the existing

location

5

Page 14: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN WARJE

Sr. No. Description Clarification

1 Supply to Ideal colony zone from SNDT

The new location for 4 Ml capacity ESR identified by PMC. The design is

revised

2 Confirmation of site for Sutardhara Booster

The new site identified by PMC. The design is revised

3 Revision of Bhosale nagar, Bopodi and Model colony zones

PMC identified 3 new sites, 1 at Khairewadi & 2 at Chikhal wadi.

Designs are revised

4 Supply from Holkar WW Holkar WTP is proposed to Supply Chikhalwadi ESRs i.e. Bopodi Zone

and Khadaki Cantonment Area

5 Supply to Sangam wadi zone Sangam wadi from BA gravity system

Page 15: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN WARJE

Sr. No. Description Clarification

6 Utilization of new ESR in Khadki Cant. area

Not proposed to be used in PMC area

7 Transmission main for Baner link Rd ESR

The alignment is now modified along high contour line, as per joint site visit

8 High elevation areas along Law college rd. on SNDT HLR

SNDT HLR zone modified to include this.

9 Alignment of Dukkar khind SR alignment through Forest

The alignment is modified, as per joint site visit

10 Utilization of 864mm diam. pipeline from CC to Pashan

This has been utilized as transmission main, for supply to Pashan &

Panchavati SRs

11 Utilization of 711mm MS pumping main-Pashan to Sus

This will be used in the proposed gravity system from CC BPT to Sus and

other SRs

Page 16: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN WARJE

Sr. No. Description Clarification

12 Supply to MAFCO & Asha nagar SRS from HLR, instead of pumping from MLR-sump

Asha nagar SR can not be supplied from SNDT HLR/Existing BPT

A new BPT in SNDT area is proposed to supply MAFCO, Asha nagar and Khaire

Wasti SRs by gravity

13 Reorganization of SNDT HLR and SNDT MLR zones

The zone boundaries are modified and designs are revised.

Page 17: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN BHAMA -ASKHED

Sr. No. Description Clarification

1 Shifting of ESRs from Wadgaon sheri PS

Two ESRS at new site-Bishops school-zones 2& 5

2 Khulewadi zone

Earlier Demand worked out based on DP and Metro corridor norms

Discussed revised DP on October 18. The revised 2032 demand 4.60Mld(20.69 mld). This zone is merged in Kharadi zone 3 and

the ESR capacity of the zone is increased to 4.5 ML

3 Thakarsi SRS Capacities & levels shall be as per DPR

Page 18: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

MAJOR ISSUES IN BHAMA -ASKHED

Sr. No. Description Clarification

4 Identification of 7 SRs to be tendered

Meeting with PMC. The locations and WS zones finalised

hydraulic levels as per SGI design. If staging height is increased, the network analysis to be revised.

PMC confirmed excluding these 7 SRs from SGI estimates

5 Cost of all SRs included in DPR.

Cost of 11 SRs is not considered by SGI as advised by PMC

10

PMC informed supply of 200 Mld from BA & 22 Mld from Chikhali in 2032 (285 MLD in 2047)

The WS zones from PCWW to BA Kharadi zones 1,2& 3

Kharadi bypass Chandan nagar zones 1& 2

Wadgaon sheri zone 4

Page 19: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WS Zone Location No. of SRs

GL LDL FSL Staging height

Dhanori zone 1 Dhanori-Amenity space

1 588.85m

609.63m

615.63m

21m

Lohgaon Lake zone 1

Dhanori-Amenity space

1 588.13m

610.00m

646.00m

22m

Vadgaon Sheri zone 3

Vadgaon Sheri PS premises

2 566.07m

585.00m

591.00m

19m

Sainath nagar Sainath nagar Amenity space

1 552.68m

568.00m

574.00m

16m

Bhange vasti Bhange vasti-Amenity space

1 556.95m

576.00m

582.00m

19m

Tingare nagar Nyati Amenity space

1 565.47m

581.00m

587.00m

16m

DETAILS OF 7 SERVICE RESERVOIRS

Page 20: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WS Zone Location No. of SRs

GL LDL FSL Staging height

Lohegaon Lake Zone 1

Dhanori-Amenity space

1 588.99m 610.00m 616.00m 21.00m

Munjaba wasti Munjaba Wasti ESR 1 584.04m 603.59m 609.59m 20.00m

Laxmi Nagar/Ram Nagar

Thakarsi Proposed ESR 4

1 574.43m 582.22m 588.22m 8.00m

Navi Khadki Yerwada

K. Bhaurao Patil ESR 1 563.94m 581.00m 587.00m 17.00m

DETAILS OF ADDITIONAL 4 SERVICE RESERVOIRS

Page 21: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COMMON POINTS ON DPR

Sr. No. Description Clarification

1 Transmission main- Min. diam. 450mm

A. Pumping Mains Based on Techno-economic analysis

Water Hammer Velocity-0.60m/sec to 2.5m/sec

A. Gravity Mains

Ensure min. terminal head 3m Velocity-0.60m/sec to 2.5m/sec

Minimum 450mm diam. will reduce

the velocity <0.60m/sec

Designs are modified with 450 mm as minimum diameter.

Page 22: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COMMON POINTS ON DPR

Sr. No. Description Clarification

2 Transmission mains Matreial -steel for all diameters

Design criteria agreed with PMC A. Pumping Mains

Up to 450mm DI Above 450mm-MS

B. Gravity Mains Up to 600mm DI

Above 600mm-MS

PMC Confirmerd the DPR proposals

Page 23: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COMMON POINTS ON DPR

Sr. No. Description Clarification

3 All distribution pipelines in the BDP area to be deleted

This directive from PMC has resulted in modification of designs , drawings &

estimates in 11 WS zones.

Proposals Modified

Page 24: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WS zone Ward Nos.

Sudatta Sankul 127

Institute ESR 130

Charwad vasti 130

Ujjawal Terrace 129

Agam Mandir-E 144

Agam Mandir-P 144

Mahadev Mandir 141

Kedareshwar-P 140,141

WS ZONES WITH BDP

Page 25: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WS zone Ward nos.

Konark Indraue 121

Warje Malwadi 110

Ram Nagar 111

Atul Nagar 110

Chandani chowk zone -1 61

WS ZONES WITH BDP

Page 26: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COMMON POINTS ON DPR

Sr. No. Description Clarification

4 Reinstatement of roads

PMC had directed one lane to be considered for reinstatement

The Revised cost of reinstatement worked put in the range of Rs. 700

crores. Therefore original proposal of reinstatement of trench width retained

Page 27: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COMMON POINTS ON DPR

Sr. No. Description Clarification

5 Distribution mains to be deleted on private premises

The proposals are modified

Page 28: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

COST ESTIMATES

Sr. No. Description Clarification

1 Pipe rates are with central excise. PMC can avail excise exemption. The rates to be modified ?

Rates retained with central excise

2 Distribution system is proposed with K9 pipes for all diameters. Pl. confirm

PMC Confirmed K9 pipes

3 All sluice valves are of DI Pl. confirm

PMC confirmed DI sluice valves

4 The concrete guiniting is proposed as external protection to MS pipes. Option of 3LPE coating

PMC Confirmed CC guiniting

5 Underground type of FH proposed -One per sq.km in dense areas -One per 4sq.kms in Peripheral areas

PMC Confirmed

Page 29: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Design criteria (1/2)

Sr. No. Parameter Unit Description

1 Design Period 30 Years

Base year/Commissioning Year 2017

Intermediate stage 2032

Ultimate stage 2047

2 Net Domestic water allowance Lpcd 150

3 System Losses

Base year-2012 % 35

Year-2017 % 30

Year-2022 % 20

Year-2032 % 15

Design year-2047 % 15

4 Clear water pumping hours Hours 22

5 Stand by pump capacity % 100

6 Hydraulic Retention Time of sumps min 60

7 Peak factor for distribution 2.50

Page 30: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Sr. No. Parameter Unit Description

8 Pipe Material for Pumping main DI up to 450 mm

MS above

9 Pipe Material for Gravity main DI up to 600 mm

MS above

Minimum Diameter of Transmission Mains mm 450

10 Hydraulic Retention Time of BPTs min 10 (only standard capacities =

= 0.5 ML or 1 ML used)

11 Storage capacity of Service Reservoir 8 hours of daily water demand, i.e.

33%

12 Coefficient of Friction-“C”

Ductile Iron-CM lined 140

Mild Steel-CM lined 140

Cast Iron pipes-New (unlined) 100

Cast iron pipes-Old (unlined) 80

13 Terminal pressure in distribution Network m Normal 12m, but not below 10m

Design criteria (2/2)

Page 31: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Summary of Projections of all Methods

Recommended projected population: as per Metro+Wada policy

Population Projections

Year

A B C

Average

(Arithmetical +

Geometrical

Increase)

Growth Rate Metro+Wada

policy

2017 3,602,449 3,660,631 3,918,763

2022 4,063,195 4,205,832 4,430,320

2032 5,173,269 5,467,581 5,771,754

2042 6,614,462 6,834,477 6,939,529

2047 7,497,376 7,381,235 7,375,348

Page 32: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2012

Page 33: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2017

Page 34: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2022

Page 35: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2032

Page 36: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2042

Page 37: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Population Density- 2047

Page 38: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Water Demand

Year

Net Demand (MLD) System

Losses

Gross Demand (MLD)

PMC

Pune

Canton_

ment

Khadki

Canton_

ment

Total PMC

Pune

Canton_

ment

Khadki

Canton_

ment

Total

2017 712.63 12.53 12.06 737.28 30% 1018.14 17.91 17.22 1053.27

2022 926.97 12.53 12.06 951.56 20% 1158.83 15.66 15.07 1189.56

2032 1231.99 12.53 12.06 1256.58 15% 1449.41 14.75 14.18 1478.34

2042 1431.64 12.53 12.06 1456.23 15% 1684.27 14.75 14.18 1713.20

2047 1596.71 12.53 12.06 1621.30 15% 1877.67 14.75 14.18 1906.60

Page 39: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Existing water supply system

Description Transmission system Details

Parvati WTPs

Mutha Right Bank canal Two pipes of 1200mm & 1600mm diam. for drawing water to Stage 1 WTP of 220 MLD

3030mm diam. MS gravity main, up

to receiving chamber of WTP

Gravity supply to Parvati stage 2 WTP of 315 MLD

Cantonment

WTPs

3030mm diam. MS gravity main, up

to receiving chamber of WTP

Raw water pumping to MBR (in the premises of Parvati water works), and further

gravity supply to Pune Cantonment water works for stage 1 WTP of 240 MLD

Mutha Right Bank canal Supply to stage- 2 WTP of 100 MLD capacity

Warje WTPS Jack well at Khadakwasla dam,

1524mm diameter pumping main

- Supply to Warje stage 1 (9 MLD) WTP by 406mm branch;

- 1524mm pumping main for supply to Warje stage 2 WTP of 180 MLD

Holkar WTPs Jack well at Khadakwasla dam,

1524mm diam. pumping main

1000mm branch pumping main for 45 MLD WTP

Vadgaon WTP

stage 1

3030mm diam. MS gravity main, from

Khadakwasla

- 1524 mm branch gravity main

- Raw water PS

- 1524mm diam. pumping main to stage 1 WTP of 125 MLD.

Chikhali WTP Jack well at Ravet on Pavana river 711mm diam. pumping main to Chikhali WTP

Sources •Khadkwasla Dam - Allocation 16 TMC - 1242 MLD •Pavana River - 30 MLD, through Chikhali WTP

Raw water Transmission

Page 40: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Existing water supply system

Water Treatment Plants

Sr No NAME - LOCATION

CAPACITY in MLD

Existing Under

construction Total

1 Chikhali-(Pavana River) 29 29

2 Holkar 45 45

3

Cantonment Old 260 260

Cantonment New 100 100

Sub Total Cantonment 360 360

4

Parvati Old (line 1) 220 220

Parvati New (line 2) 315 315

Sub Total Parvati 535 535

5 Vadgaon stage 1 125 125

6

Warje Old 9 9

Warje New 186 186

Warje stage 3 200 200

Sub Total Warje 195 200 395

TOTAL 1289 200 1489

Page 41: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Name Sump in ML Pumping destinations

Parvati PH No.1 19.0 Parvati LLR, Parvati MLRs, Parvati HLRS

Parvati PH No.2 12.0 SNDT, Parvati HLRs

Parvati PH No.3 SNDT, Parvati HLRs

Cantonment Old WTP Pump

Station

9.00 Bakri Hill, Wanorie ESR, Wanorie HLRs,

Race course ESR, Thakarsi Hill SRs

Cantonment New WTP PH 4.20 Ram Tekdai, Kharadi ESRs

Warje 180 MLD WTP PH 4.20 Gandhi bhavan GSR, Chandani chowk GSR,

SNDT

Vadgaon 125 MLD WTP PH 4.80 Taljai HLRs, Washout ESR, Institute ESR

Holkar 45 MLD WTP PH 2.0 Vidyanagar sump

Padmavati Pump Station 8.0 Bibvewadi GSRs, Taljai MLR, Seminary GSR

SNDT MLR Pump Station 11.35 SNDT HLR

Vidyanagar Pump Station 1.0 Vidyanagar ESR, Viman nagar ESRs,

Dhanori ESR, Kalwad, Kalas

Rajeev Gandhi Udyan Pump Station 1.60 Kedareshwar GSR, Shreehari ESR

Katraj Pump Station 0.35 Agam Mandir GSR

(minor pump stations & boosters) - various

Existing water supply system

Pump Stations

Page 42: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Clear water transmission

Clear water transmission mains Total Length – 247,989 m

Complicated existing system:

• Transmission and distribution often mixed (e.g. many direct tappings in transmission mains)

• WTP systems often mixed (e.g. mixing between Warje water and Parvati water at SNDT HLR,

mixing between Holkar water and Chikhali water at Vidya Nagar ESR, mixing between Holkar

transmission and Cantonment distribution at 509 chowk, …)

• Only few flowmeters, often not working (e.g. SNDT MLR pump station, Katraj pump station, …)

All these add to the difficulty in management and control of the system (e.g. impossible to assess losses)

Page 43: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Summary of existing Service Reservoirs

WTP SUPPLY AREA

Total Storage

Capacity

(ML)

No. of

existing SRs

No. of

GSRs

No. of

ESRs

PARVATI 98.39 18 15 3

CANTONMENT 95.95 31 14 17

VADGAON 29.93 26 13 13

WARJE 91.60 20 18 2

HOLKAR 8.47 7 0 7

CHIKHALI 4.0 1 0 1

Total of PMC 328.34 103 60 43

Note: out of 103 existing SRs only 83 are currently in operation

Page 44: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Distribution System

Material Diameters in mm Length in km

Asbestos cement 80 to 300 15.465

Cast Iron 75 to 1000 2335.50

RCC 450 7.33

Ductile Iron 50 to 600 189.66

Galvanized Iron 25 to 100 34.39

Mild Steel 100 to 1524 91.35

Prestressed concrete 500 to 1600 6.70

PVC 63 to 250 8.13

Total 2688.525

Material Diameters in mm Length in km

Asbestos cement 80 to 300 15.47

Cast Iron 75 to 1000 2335.50

RCC 450 7.33

Ductile Iron 50 to 600 189.66

Galvanized Iron 25 to 100 34.39

Mild Steel 100 to 1524 91.35

Prestressed concrete 500 to 1600 6.70

PVC 63 to 250 8.13

Total 2688.53

Summary of Existing distribution system

Page 45: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

House Service connections

Registered connections

Total Number Domestic Non domestic Stand posts

149,360 134,017

(22,218 metered)

13,993

All metered 1,300

Connections by size

Diameter Metered

domestic

Metered

Non -domestic Stand Posts

15 mm 19,887 844 650

20 mm 1,213 12,211 650

25 mm 681 624

40 mm 169 122

50 mm 128 105

80 mm 73 37

100 mm 34 30

150 mm 22 14

200 mm 4 4

250 mm 5 1

300 mm 2 1

Totals 22,218 13,993 1,300

Problem of not registered Connections Household survey is required as first step for

regularization and metering program

Problems of Metering management Irregular readings

30% are not working

Complaints by users for measurement of air flow

Page 46: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Intermittent supply-wide variation of supply hours

• Quantity of per capita supply varies substantially, very low in North of Mula-Mutha

River

• Distribution network very old in many areas-high physical losses

• High level of Non Revenue Water

• Inadequate storage capacity

• Reservoirs working as distribution reservoirs, and also feeding other SRs using

distribution mains

• Fast depletion of reservoirs, resulting in high peak factors and small number of

supply hours

Assessment of existing water supply

Page 47: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

On Going Projects (1/2)

Component Description

A. Under Construction

Raw water pumping main

Khadakwasla to Parvati

2500mm MS - 11.70 km

Raw water Pump station for New

Warje WTP of 200 MLD

Jack well No.2

Raw water pumps

Raw water pumping main - 1626mm, L = 8.60 km

New Warje WTP - 200 MLD Conventional process Treatment

New Warje clear water pump

station

Sump - 10 ML and PH

Page 48: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

On Going Projects (2/2)

Component Description

B. Planned

Raw water pump station for

Parvati

Jack well and PH No.3

Raw water pumps

New water treatment plant at

Parvati-500 MLD

Conventional process Treatment

New Clear water pump station for

500 MLD plant

Sump - 18 ML and PH

Pumps for Pune Cantonment

Raw water pump station for New

Vadgaon WTP

Sump - 8.53 ML

Raw water pumps

Raw water pumping main for for

New Vadgaon WTP

2000mm dia. MS

New Vadgaon WTP-125 mld Conventional process Treatment

New clear water pump station for

Vadgaon

Sump - 11 ML - and PH

Raw water intake and pump

station for Bhama – Askhed

project

Intake well

Jack well and PH

Raw water pumps

Raw water pumping main 1700mm MS - 8.31 km

Water treatment plant -200 MLD

at Alandi road

Conventional process Treatment

MBR

Clear water Transmission system 1600mm diam. gravity main - 16.5 km and feeder mains to ESRs

Page 49: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Water supply sources

Additional supply of 85 MLD (increased up to 285 MLD) is considered from Bhama-Askhed, and remaining from the Khadakwasla system

Proposed water supply system

Source Water Allocation in TMC/y Water Allocation in MLD

Khadakwasla 16 1242

Bhama-Askhed 2.58 200

Pavna 0.30 22

Total 18.88 1464

Water Demand in 2032 19.05 1478

Deficit in 2032 0.18 14

Water Demand in 2047 24.57 1906

Deficit in 2047 6.00 443

Page 50: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

THE WTP CAPACITIES AND DEMANDS

Supply

Zone

NO.

LOCATION

CAPACITY IN MLD WTP CAPACITY DEMAND

Existing

Under

construc

tion

To be

re-

placed

To be

built in

Stage 1

To be

built in

Stage 2

Year

2032

Year

2047

Year

2032

Year

2047

1 Chikhali / Bhama Askhed (Pavana) 29 200 85 200+29 285+29 214.68 306.54

2 Holkar 45 45 45 31.19 33.01

3

Cantonment-stage 1 260

70.8** 357.47 Cantonment stage 2 (**) 100 100 100

Cantonment stage 3 300 300

Sub Total Cantonment 360 300 100 400

4

Parvati stage 1 220 220

456.25 390.73 Parvati stage 2 315 315

Parvati stage 3 500 500 500

Sub Total Parvati 535 535 500 500 500

5

Vadgaon stage 1 125 12 137 137

277.45 356.71 Vadgaon stage 2 125 125 125

Vadgaon stage 3 * 125 125 125

Sub Total Vadgaon 125 262 387 387

6

Warje stage 1 9 9 9

428.49 461.96 Warje stage 2 186 186 186

Warje stage 3 200 200 200

Sub Total Warje 195 200 395 395

TOTAL PMC 1289 200 535 962 385 1656 2041 1478.9 1906.4

Note (*) Vadgaon Stage 3 should be built before 2026

Note (**) Supply to Cantonmnet area shall come from Parvati WTP up to 2032, until Future 300 MLD WTP is

constructed. Bhama Askhed stage 2 is increased up to 285 MLD capacity.

Page 51: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WTP supply zones – 2032

Page 52: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

WTP supply zones – 2047

Page 53: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Zone wise distribution of demand (MLD)

Page 54: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

CRITERIA FOR UPGRADING /REHABILITATION OF WTPs

• WTPs proposed for Rehabilitation: – Warje 180 Mld WTP

– Cantonment 100 MLd New WTP

– Holkar WTP

• Improved treatment process through monitoring and control of: – Water flow-rate monitoring with recording at WTP inlet and outlet

– Monitoring of turbidity and pH for: 1) raw water, 2) settled water, and 3) treated water

– Control of PAC dosage with dosing pumps for alum/PAC.

– Monitoring of filtration cycle with differential pressure gauges for each filter unit

– Measurement of the backwash water flow and the pressure & velocity air flow

– Upgraded chlorinator equipment for pre and post chlorination served by dedicated motive water booster pumps

– Measurement of chlorine content, both in pre- and in post-chlorination, by specific sensors and with alarms for high or low residual chlorine

Rehabilitation of Existing WTPs (1/2)

Page 55: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Upgrading of chlorination facilities: – Closure of Chlorine storage area, and provision of gas leakage detection and air extractor connected

with neutralization tower

– Gas leakage detection and air extractor also in the chlorination room

– Safety equipment in a cabinet located outside the room

• Recirculation of Filter backwash water by: – Piping for backwash water collection to settling tank

– Backwash settling tank

– Recirculation pumps & piping to WTP inlet unit

• SCADA for continuous monitoring and recording of WTP operation

Rehabilitation of Existing WTPs (2/2)

Page 56: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Rehabilitation of Existing SRs

RESULTS OF DIAGNOSTIC OF EXISTING RESERVOIRS

TOTAL NUMBER OF SRs CONSIDERED

RESERVOIR CONDITIONS

GOOD FAIR POOR To be

reconstructed To be abandoned

(small size) No works needed Local repairs Extensive Rehab.

103 25 20 16 18 24

Page 57: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Bakari Hill GSR - Ladder

Page 58: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Maharashtra Housing Board ESR 1 - Handrail

Page 59: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Thakarsi ESR 3 - Wall

Page 60: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Maharashtra Housing Board ESR 1 – Top Slab

Page 61: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Parvati Old MLR – Top Slab

Page 62: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR rehabilitation

Parvati HLR – Top Slab

Page 63: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs in Good conditions

SR. No. ZONE NAME SR Name Type of SR

(ESR/GSR)

SR Capacity

Extng. (ML)

1 Parvati – HLR 1 Parvati -HLR1 GSR 4.50

2 Waghjai Existing Waghjai Existing GSR GSR 1.00

3 Atul Nagar Warje Old WTP Pure Water Sump GSR 2.30

4 Karve Nagar Warje WTP GSR (U.C.) GSR 12.00

5 Gandhibhavan Zone 1 Gandhibhavan Old GSR GSR 6.40

6 Gandhibhavan Zone 2 Gandhibhavan New GSR GSR 6.40

7 ChandaniChowk Zone 2 ChandaniChowk New GSR GSR 8.50

8 Baner Hill SUS New GSR GSR 3.50

9 BanerGaon Zone 1 Pancard Club GSR GSR 5.00

10 Ganesh Khind/Aundh Chaturshringi GSR Under

Construction GSR 6.50

11 Hadapsar Industrial Colony Ram Tekdi tendered GSR GSR 6.00

12 Indraprastha Indraprashta ESR ESR 1.25

13 Satavwadi TukaiTekdi New GSR GSR 4.00

14 Bakari Hill Zone 1 Bakari Hill Old GSR GSR 6.00

15 Bakari Hill Zone 2 Bakari Hill New GSR (U.C.) GSR 6.00

16 Kharadi Zone 1 Kharadi ESR Under Construction ESR 2.50

17 Kharadi Zone 2 Kharadi Existing ESR ESR 2.50

18 Shastri Nagar MHB existing ESR 2 (1 ML) ESR 1.00

19 Digambar Nagar Tempo Chowk ESR 1 ESR 1.50

20 Tempo Chowk Tempo Chowk ESR 2 ESR 1.50

21 SundrabaiMarathe SundrabaiMarathe ESR ESR 1.60

22 Taljai HLR- Existing And New Taljai New HLR GSR 6.00

23 Shrihari Shrihari ESR ESR 1.00

24 Kedareshwar Existing Kedareshwar Existing GSR GSR 10.00

25 Seminary Existing Seminary Existing GSR GSR 7.00

Page 64: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs in Fair conditions

SR. No. SR Name Type of SR

(ESR/GSR)

SR Capacity

Extng. (ML)

1 Parvati -HLR4 GSR 1.00

2 Parvati -MLR 5 ML GSR 5.00

3 Kumbharwadi GSR GSR 1.25

4 ChandaniChowk Old GSR GSR 8.50

5 SUS Old GSR GSR 4.50

6 Chatushringi Old GSR GSR 4.50

7 Ram Tekdi existing GSR GSR 9.00

8 Chandan Nagar ESR 1 (3.5 ML) ESR 3.50

9 Chandan Nagar ESR 3 (1.5 ML) ESR 1.50

10 Dhanori Existing ESR ESR 1.00

11 B U Bhandari ESR ESR 1.50

12 Viman Nagar existing ESR1 (2.5 ML) ESR 2.50

13 Viman Nagar existing ESR2 (1 ML) ESR 1.00

14 Thakarsi Existing ESR 3 ESR 2.60

15 Institute Existing ESR ESR 1.00

16 Taljai Old HLR GSR 6.26

17 AgamMandir Existing ESR ESR 1.00

18 Dhankavadi GSR GSR 0.75

19 Bibvewadi old GSR GSR 3.40

20 VADGAON WTP ESR * ESR 2.00

Page 65: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs in Poor conditions

SR. No. SR Name Type of SR

(ESR/GSR)

SR Capacity

Extng. (ML)

1 Parvati -HLR2 GSR 4.50

2 Parvati -HLR3 GSR 4.50

3 Parvati -MLR 13 ML GSR 13.16

4 SNDT Existing HLR GSR 13.16

5 SNDT MLR GSR 11.35

6 Chatushringi New GSR GSR 8.40

7 Wanori HLR Circular GSR 5.45

8 WANORI ESR SMALL ESR 2.45

9 WANORI MLR RECTANGULAR GSR 4.45

10 Chandan Nagar ESR 2 (2.2 ML) ESR 2.20

11 Vidya Nagar ESR ESR 1.60

12 MHB existing ESR 1 (2 ML) ESR 2.00

13 Taljai MLR 1 GSR 3.40

14 Taljai MLR 2 GSR 3.40

15 Bibvewadi new GSR GSR 3.40

16 CHIKHALI MBR ESR 4.00

Page 66: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs to be reconstructed on the same site

Sr No NAME Comments

Capacity

(ML)

1 Swargate Police Line ESR 1 Not in Use

2 Swargate Police Line ESR 2 Not in Use

3 Swargate Police Line Sump Not in Use

4 AHIRE GAON GSR In operation 0.05

5 RAMNAGAR ESR In operation 0.04

6 DUKKARKHIND GSR Not in Use 0.35

7 Pune University GSR Not in Use

8 Mafco GSR 1 Not in Use

9 Mafco GSR 2 Not in Use

10 FC GSR 1 Not in Use

11 FC GSR 2 Not in Use

12 FC GSR 3 Not in Use

13 TUKAI TEKDI OLD 2 In operation 0.10

14 TUKAI TEKDI OLD 1 In operation 0.30

15 JAL MANDIR GSR (Note 1) In operation 17.00

16 Kusmade Wasti ESR (Reconstruct) Not in Use

17 THAKARSI SR 2 In operation 2.50

18 THAKARSI SR 3 In operation 2.50

19 Tarode Wasti GSR 1 (Reconstruct) Not in Use

20 Tarode Wasti GSR 2 (Reconstruct) Not in Use

Page 67: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs to be decommissioned

Sr. No. NAME Current WTP Zone CAPACITY (ML)

1 WANORI ESR Cantonment 2.45

2 RACE COURSE ESR Cantonment 1.8

3 UPPER INDIRA NAGAR ESR Parvati 0.45

4 SOMJAI ESR Vadgaon 0.1

5 RAJAS SOCIETY, CIRCULAR Vadgaon 0.1

6 RAJAS SOCIETY, RECTANGULAR Vadgaon 0.15

7 SANTOSH NAGAR GSR Vadgaon 0.25

8 CHARWAD WASTI ESR Vadgaon 0.15

9 MANAS SROVAR ESR Vadgaon 0.1

10 GOKUL NAGAR ESR Vadgaon 0.15

11 KAMBLE WASTI GSR Vadgaon 0.1

12 DALVI WADI ESR Vadgaon 0.1

13 SUTARDARA GSR Warje 0.3

Page 68: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Repairs of reservoirs in fair conditions

TYPICAL PROBLEMS PROPOSED INTERVENTIONS

Local spalling of RCC, with

exposed bars

Repair with cement mortar plaster – protection of tank surfaces

with epoxy based paint

Damaged aeration structures Reconstruct the structure

Local leakages signs on lateral

walls of tank

Injection with special bi-components sealing and replacement of

cracked internal plaster

Helicoidal Stars damaged steps

and parapet

Repairs with cement plaster

Corroded stairs, ladders and

handrails

Replacement stairs/ladders with aluminium alloy

Replacement of hand rails with zinc coated steel

Damaged walkways at bottom of

ESR tanks

Repair with cement plaster

Page 69: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Rehabilitation of reservoirs in poor conditions

TYPICAL PROBLEMS PROPOSED INTERVENTIONS

Extended spalling of concrete,

with severe erosion of bars in

the top slab

Removal and reconstruction of top slabs and, in some cases of the

internal columns

Sagging of SR top slabs As per item above

Several cracks and leakages

signs on the lateral walls

Sealing with injections with special mixes.

Removal & reconstruction of the plaster in all internal surfaces of

tank

Protective paint epoxy based

Extensive cracking or separation

of plaster in internal surfaces of

tank and on internal columns

As per item above

Corroded stairs, ladders and

hand rails

Replacement stairs/ladders with aluminium alloy

Replacement of hand rails with zinc coated steel

Damaged walkways at bottom of

ESR tanks

Reconstruction of damaged parts of walkways

Page 70: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Formation of water supply zones

Existing Service Reservoirs • Maximum utilisation of the storage capacity • Identification of areas compatible to hydraulic levels • Ensure terminal pressure of 12m • Select water supply zone which maximises the use of trunk distribution mains

Proposed Service reservoirs • Prospective reservoirs are identified after study of limitations of existing service reservoirs, in terms of

location, capacity and hydraulic levels • The list of such locations was prepared and discussed with PMC • The joint site visits have been conducted, for confirming availability and precise site location • The locations jointly agreed are considered for proposals • Final selection by consultants to optimize the zone formation

Other Guidelines • Zone formation based on geographical location, ground elevation and maximum travel • Nalla as zone limit • Major roads as zone limit • Major physical barriers as zone limits, such as River, Canal, Railway line, Expressway etc. • To avoid major undulations

Page 71: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

City divided in 141 water supply zones

Page 72: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Pune city water zones summary

Sr. No. Water Supply Zone Water supply in MLD

Water Zones (2032)

DMA (2032)

2032 2047 Nos. Nos.

1 Parvati 212.46 280.36 12 31

2 Pune Cantonment 260.2 357.47 25 58

3 Vadgaon 277.45 356.71 32 85

4 Warje 428.49 461.96 34 98

5 Holkar 31.19 33.01 1 3

6 Bhama-Askhed 214.68 306.56 37 53

Total 1478.93 1906.42 141 328

Page 73: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

SR. No. Zone Name

Existing (Count)

Proposed (Count)

Existing Capacity (ML)

Proposed Capacity (ML)

Total Capacity

(ML)

ESR GSR ESR GSR ESR GSR ESR GSR ESR+GSR

1 Parvati - - - 7 9 3 - - - 33.66 33.00 29.50 96.16

2 Warje old - - - 1 1 - - - - - - 2.30 1.00 - - - 3.30

3 Warje New - - - 14 14 6 - - - 99.96 42.50 40.50 182.96

4 Cantonment 6 6 14 1 13.45 36.45 50.00 32.00 131.9

5 Bhama Askhed 12 - - - 28 - - - 17.94 - - - 69.50 - - - 87.44

6 Vadgaon 3 9 15 10 3.00 43.61 39.00 40.00 125.61

7 Holkar - - - - - - 2 - - - - - - - - - 7.00 - - - 7

Total 21 37 83 20 34.39 215.98 242.00 142.00 634.37

SUMMARY OF SERVICE RESERVOIRS PLANNED TO BE USED FOR YEAR 2047

Page 74: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR

Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Parvati

1 Parvati -HLR1 Parvati -HLR1 E GSR 9.51 47228 12.99 4.50 622.10 627.28

2 Parvati -HLR 2&3 Parvati -HLR2 E GSR

16.61 93547 27.06 4.50 621.28 627.28

Parvati -HLR3 E GSR 4.50 621.28 627.28

3 Parvati -HLR4 Parvati -HLR4 E GSR 2.90 14946 2.94 1.00 618.00 622.00

4 Parvati -MLRs Zone 2 Parvati -MLR 5 ML E GSR

46.50 237802 63.61 5.00 591.86 597.86

Parvati -MLR 17 ML P GSR 17.00 591.86 598.36

5 Parvati -MLR Zone 1 Parvati -MLR 13 ML E GSR

51.87 250665 66.86 13.16 593.17 598.35

Parvati -MLR 10 ML P GSR 10.00 593.17 599.67

6 Waghjai Existing Waghjai Existing GSR E GSR 3.17 17942 3.17 1.00 619.00 622.00

7 Waghjai Proposed Waghjai Proposed GSR P GSR 5.79 20541 7.09 2.50 620.15 626.15

8 Parvati WTP Rohan Kirtiki ESR 1 P ESR 8.42 43002 10.64 3.50 588.00 594.00

9 P L Deshpande Garden Rohan Kirtiki ESR 2 P ESR 11.60 59289 14.67 4.50 584.00 590.00

10 Saras Baugh

Swargate Police Line Proposed ESR 1

P ESR

17.98 71018 20.90

3.50 590.00 596.10

Swargate Police Line Proposed ESR 2

P ESR 3.50 590.00 596.10

11 Shaniwarwada

Swargate WW ESR 1 P ESR

24.48 117527 33.44

4.00 589.00 595.00

Swargate WW ESR 2 P ESR 4.00 589.00 595.00

Swargate WW ESR 3 P ESR 4.00 589.00 595.00

12 Crescent High School

Crescent High School ESR 1 P ESR

13.63 61696 16.99

3.00 608.50 614.50

Crescent High School ESR 2 P ESR 3.00 608.50 614.50

Page 75: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Warje old

13 Ahire Gaon Ahire Gaon ESR (Reconstruct)

P ESR 1.98 12344 2.91 1.00 605.00 611.00

14 Warje Malwadi Warje Old WTP Pure Water Sump

E GSR 2.29 12042 2.87

2.30

624.90 628.00 15 Atul Nagar 5.02 33114 6.30

Warje New

16 Ramnagar Ramnagar ESR (Reconstruct)

P ESR 4.69 28072 5.11 2.00 611.00 617.00

17 Dukkarkhind Dukkarkhind ESR (Reconstruct)

P ESR 5.26 25657 6.60 2.50 616.00 622.50

18 Kumbharwadi Kumbharwadi GSR E GSR 2.71 13861 3.96 1.25 593.30 598.30

19 Karve Nagar Warje WTP GSR (U.C.) E GSR 26.75 141442 36.11 12.00 591.00 597.00

20 Gandhibhavan Zone 1 Gandhibhavan Old GSR E GSR 15.52 83262 19.87 6.40 636.00 641.00

21 Gandhibhavan Zone 2 Gandhibhavan New GSR E GSR 13.16 63651 19.93 6.40 636.00 641.00

22 Chandani Chowk Zone 1 Chandani Chowk Old GSR E GSR 18.53 115819 25.82 8.50 665.00 670.00

23 Chandani Chowk Zone 2 Chandani Chowk New GSR E GSR

42.58 206703 52.53 8.50 657.07 665.07

Chandani Chowk Proposed GSR

P GSR 9.00 657.07 665.07

24 Ideal Colony / MIT College SNDT Proposed HLR P GSR 11.25 60158 13.73 4.50 617.00 623.00

25 Pune University - 4.30 5.88

26 Wakdewadi Khairewasti ESR 1 P ESR

24.23 69346 26.49 4.00 582.00 588.00

Khairewasti ESR 2 P ESR 4.00 582.00 588.00

27 Pashan Lake Pashan Proposed ESR 1 P ESR

13.38 84392 17.63 3.00 600.44 606.44

Pashan Proposed ESR 2 P ESR 3.00 600.44 606.44

28 Sus Sutarwadi SUS Old GSR E GSR 11.92 72843 13.77 4.50 653.00 657.00 29 Baner Hill SUS New GSR E GSR 5.39 49096 10.03 3.50 654.10 660.10 30 Baner Gaon Zone 1 Pancard Club GSR E GSR 8.02 71228 14.65 5.00 598.00 605.50

Page 76: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Warje New

31 Baner Gaon Zone 2 Pashan Baner Link Road ESR P ESR 4.95 44670 8.78 3.00 595.20 601.20

32 Balewadi Balewadi Jakat Naka ESR 1 P ESR

8.83 81827 16.46 3.00 590.00 596.00

Balewadi Jakat Naka ESR 2 P ESR 2.50 590.00 596.00

33 Baner West Green Zone Baner ESR P ESR 5.54 42550 10.00 3.50 615.00 621.00

34 Ram Nagar/ Laxman Nagar Sun Horizon ESR P ESR 7.01 55642 12.68 4.50 589.00 595.00

35 Panchavati Panchvati GSR P GSR 3.11 24136 5.71 2.00 641.00 647.00 36 SNDT HLR SNDT Existing HLR E GSR 34.24 133791 38.71 13.16 620.00 625.46 37 SNDT MLR SNDT MLR E GSR 28.85 106308 33.89 11.35 591.33 596.83

38 Bhosale Nagar Pune University GSR (Reconstruct) P GSR 15.20 64620 18.35 6.00 603.00 611.00

39 Gokhale Nagar Mafco Proposed GSR (Reconstruct)

P GSR 12.29 71039 17.85 6.00 610.30 616.80

40 Chatushrungi Temple Asha Nagar ESR P ESR 5.61 28607 6.19 2.00 618.00 625.00

41 BMCC College FC Proposed ESR 1 (Reconstruct) P ESR 4.39 15920 5.12 2.00 595.00 601.00

42 Modern College FC Proposed GSR (Reconstruct) P GSR 32.70 118685 38.17 13.00 586.00 592.50

43 Fergusson College FC ESR 2 P ESR 7.26 36412 9.83 3.50 600.00 606.00

44 Chatushrungi Zone 1 Chatushringi Old GSR E GSR 8.33 37807 12.97 4.50 604.38 608.38

45 Chatushrungi Zone 2 Chatushringi New GSR E GSR 20.33 127449 34.30 8.40 604.38 608.38

46 Ganesh Khind/Aundh Chaturshringi GSR Under Construction

E GSR 12.87 70194 19.14 6.50 601.88 606.88

Page 77: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Cantonment

47 Ram Tekdi Ram Tekdi existing GSR E GSR 22.32 71465 27.93 9.00 642.00 646.00

48 Hadapsar Industrial Colony Ram Tekdi tendered GSR E GSR 14.35 58820 18.30 6.00 638.00 646.00

49 Magarpatta - P GSR 10.21 87711 15.89

50 Indraprastha Indraprashta ESR E ESR 2.41 12772 3.76 1.25 592.70 596.70

51 Satavwadi Tukai Tekdi New GSR E GSR 8.26 44513 11.19 4.00 610.70 616.70

52 Gliding Centre Tukai Tekdi ESR (Reconstruct) P ESR 9.85 47610 10.88 3.50 611.00 617.00

53 Akashwani Anand Nagar ESR1 P ESR

13.76 85694 20.84 3.50 589.00 595.00

Anand Nagar ESR2 P ESR 3.50 589.00 595.00

54 Sadhana Vidyalaya Anand Nagar ESR3 P ESR 9.07 56529 13.75 4.50 585.00 591.00

55 Hadapsar Gaon Hadapsar Bus Depot ESR P ESR 9.40 58541 14.24 4.50 587.00 593.00

56 Bakari Hill Zone 1 Bakari Hill Old GSR E GSR 13.07 62145 15.97 6.00 639.50 644.00

57 Bakari Hill Zone 2 Bakari Hill New GSR (U.C.) E GSR 13.60 64636 16.61 6.00 639.12 643.62

58 Kale Borate Nagar Selen Park ESR P ESR 6.47 28953 7.03 2.50 612.40 618.40

59 Badade Mala Bhujbal Scheme ESR P ESR 7.68 49590 9.70 3.50 615.54 621.54

60 Koregaon Park Cantonment WTP ESR 1 P ESR

16.31 85735 21.22 3.50 583.00 589.00

Cantonment WTP ESR 2 P ESR 3.50 583.00 589.00

Page 78: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR

Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Cantonment

61 Jalmandir Cantonment Jalmandir GSR (Reconstruct)

P GSR 60.91 184766 92.67 32.00 575.00 580.55

62 Ghorpadi Wanori HLR Circular E GSR 11.37 77494 13.97 5.45 607.13 612.80

63 Mundhwa Gaon Zone 1 Ghorpadi Sicilia ESR 1 P ESR 7.75 74184 13.59 4.50 580.54 587.04

64 Mundhwa Gaon Zone 2

Ghorpadi Sicilia ESR 2 P ESR

8.66 82864 15.18

2.50 580.54 587.04

Ghorpadi Sicilia ESR 3 P ESR 2.50 580.54 587.04

65 Kharadi Zone 1 Kharadi ESR Under Construction

E ESR 5.74 27022 6.43 2.50 583.63 588.63

66 Kharadi Zone 2 Kharadi Existing ESR E ESR 7.46 29999 7.84 2.50 583.63 588.63

67 Kharadi Zone 3/ Khulewadi Kharadi Proposed ESR P ESR 12.77 50084 13.86 4.50 588.00 594.00

68 Kharadi Bypass Kharadi bypass ESR P ESR 8.18 36853 10.44 3.50 578.00 584.00

69 Wadgaon Sheri Zone 4 Chandan Nagar ESR 1 (3.5 ML)

E ESR 9.71 45425 9.99 3.50 578.00 583.50

70 Chandan Nagar Zone 1 Chandan Nagar ESR 3 (1.5 ML)

E ESR 4.28 18748 4.53 1.50 590.82 595.82

71 Chandan Nagar Zone 2 Chandan Nagar ESR 2 (2.2 ML)

E ESR 6.32 24867 6.69 2.20 584.30 588.80

Page 79: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Bhama Askhed

72 Undevelop Area Dhanori Dhanori Undeveloped Area ESR P ESR 4.70 38906 8.72 3.00 631.00 637.00

73 Dhanori Zone 1 Dhanori Proposed ESR 2 P ESR 3.23 21452 4.20 2.00 609.63 615.63

74 Dhanori Zone 2 Dhanori Existing ESR E ESR 2.46 15035 3.20 1.00 605.50 610.50

75 Gokul Nagar Dhanori Proposed ESR 1 P ESR 5.55 33598 6.32 2.50 610.00 616.00

76 Munjaba wasti Munjaba Wasti ESR P ESR 4.58 30279 5.88 2.00 603.59 609.59

77 Lohegaon Lake Zone 1 Dhanori Proposed ESR 3 P ESR 3.16 17455 4.66 2.00 610.00 616.00

78 Lohegaon Lake Zone 2 B U Bhandari ESR E ESR 2.30 28146 3.39 1.50 613.00 618.00

79 Ganesh Nagar - NA NA 1.15 6177 1.15 NA

80 Mhaske Wasti Mhaske Wasti ESR E ESR 0.45 2414 0.45 0.14 578.00 582.00

81 Kusmade Wasti Kusmade Wasti ESR (Reconstruct)

P ESR 2.86 14908 2.95 0.73 570.00 576.00

82 Vishrantwadi Vishrantwadi ESR 1 P ESR

10.26 56784 11.12 2.00 578.00 584.00

Vishrantwadi ESR 2 P ESR 2.00 578.00 584.00

83 Gurudwara Wasti Haran Tala ESR 1 P ESR

5.79 55406 9.93 2.00 616.00 622.00

Haran Tala ESR 2 P ESR 1.50 616.00 622.00

84 Tingre Nagar Tingre Nagar ESR P ESR 3.08 16516 3.08 2.00 581.00 587.00

85 Vidya Nagar Vidya Nagar ESR E ESR 4.04 24057 4.57 1.60 586.37 591.37

86 MHB Zone 1 MHB existing ESR 1 (2 ML) E ESR 5.66 18174 6.20 2.00 586.00 591.00

87 MHB Zone 2 MHB Proposed ESR P ESR 7.81 29066 8.56 3.00 581.00 587.00

88 Shastri Nagar MHB existing ESR 2 (1 ML) E ESR 3.00 12077 3.29 1.00 588.00 593.00

Page 80: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Bhama Askhed

89 Wadgaon Sheri Zone 1 Wadgaon Sheri Proposed ESR 1 P ESR 7.31 31357 7.63 2.50 581.00 587.00

90 Wadgaon Sheri Zone 2 Bishop School ESR 1 P ESR 8.53 38717 10.00 3.50 575.00 581.00

91 Wadgaon Sheri Zone 3 Wadgaon Sheri Proposed ESR 2&3

P ESR 7.70 32439 8.08

2.00 587.00 593.00

P ESR 2.00 587.00 593.00

92 Wadgaon Sheri Zone 5 Bishop School ESR 2 P ESR 6.32 34592 7.41 2.50 575.00 581.00

93 Sanjay Park Zone 1 Vegetable Market ESR 1 P ESR 12.76 52472 13.49 4.50 600.00 606.00

94 Sanjay Park Zone 2 Vegetable Market ESR 2 P ESR 12.24 56787 12.93 4.50 600.00 606.00

95 Viman Nagar Zone 1 (2.50 ML) Viman Nagar existing ESR1 (2.5 ML)

E ESR 7.76 30442 7.98 2.50 589.00 592.00

96 Viman Nagar Zone 2 (1.00 ML) Viman Nagar existing ESR2 (1 ML)

E ESR 3.37 8556 3.44 1.00 590.00 594.00

97 Viman Nagar Zone 3 Viman Nagar Proposed ESR P ESR 8.83 26435 9.35 3.00 588.00 594.00

98 Commerzone IT Park Yerwada Thakarsi ESR 1 (Reconstruct 2.5 to 3.5 ML)

P ESR 9.33 29397 10.59 3.50 582.22 588.22

99 Sangamwadi Sangamwadi ESR P ESR 7.70 42212 7.90 3.00 572.00 578.00

100 Laxmi Nagar/Ram Nagar Thakarsi Proposed ESR 4 P ESR 8.94 49690 9.07 3.00 582.22 588.22

101 Navi Khadki Yerwada K. Bhaurao Patil ESR P ESR 3.73 16394 3.85 1.50 581.00 587.00

102 Kashmiri Colony Thakarsi ESR 2 (Reconstruct 2.5 to 4.0 ML)

P ESR 10.98 51724 11.37 4.00 582.00 588.00

103 Kalyani Nagar Thakarsi Existing ESR 3 E ESR 5.91 18732 6.29 2.60 582.00 588.00

104 Digambar Nagar Tempo Chowk ESR 1 E ESR 3.98 19365 5.84 1.50 578.80 582.80

105 Tempo Chowk Tempo Chowk ESR 2 E ESR 3.72 19349 3.84 1.50 578.80 582.80

106 Sundrabai Marathe Sundrabai Marathe ESR E ESR 4.54 20163 5.13 1.60 588.43 592.80

107 Sainath Nagar Sainath Nagar ESR P ESR 5.00 25275 5.76 2.00 568.00 574.00

108 Bhange Wasti Bhange Wasti ESR 1 P ESR

5.95 41037 9.14 2.00 576.00 582.00

Bhange Wasti ESR 2 P ESR 1.00 576.00 582.00

Page 81: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Vadgaon

109 IHP IHP ESR1 P ESR

13.13 66335 14.22 2.50 585.00 591.00

IHP ESR2 P ESR 2.50 585.00 591.00 110 Paranjpe Layout Paranjpe Layout ESR P ESR 7.80 38610 10.83 4.00 591.00 597.00

111 Venkatesh Serenity Venkatesh Serenity GSR P GSR 6.74 43967 9.83 3.50 608.50 614.50

112 Ujjawal Terrace High Bliss Society ESR P ESR 6.87 47690 9.43 3.50 622.00 628.00

113 Charwad Vasti Institute Proposed ESR P GSR 4.65 23932 4.85 2.00 627.00 633.00

114 WTP Wash Out Proposed Near Vadgaon WTP Washout GSR

P GSR 7.52 39641 7.87 3.00 598.00 604.00

115 Sudatta Sankul Sudatta Sankul ESR P ESR 4.69 24274 5.02 2.00 604.00 609.00 116 Institute ESR Institute Existing ESR E ESR 2.31 3950 2.69 1.00 638.00 642.00 117 Taljai HLR Proposed Taljai Proposed HLR P GSR 9.17 53451 12.53 4.50 682.00 688.00

118 Taljai HLR- Existing And New

Taljai Old HLR E GSR 28.85 124610 35.31

6.26 686.81 693.56 Taljai New HLR E GSR 6.00 686.81 693.56

119 Taljai MLRs- Existing Taljai MLR 1 E GSR

15.07 84337 20.42 3.40 654.13 657.73

Taljai MLR 2 E GSR 3.40 654.13 657.73

120 Agam Mandir Existing Agam Mandir Existing ESR E ESR 2.15 19349 4.06 1.00 748.39 752.39

121 Agam Mandir Proposed Agam Mandir Proposed ESR P GSR 19.44 102977 25.35 9.00 692.00 698.00

122 Mahadev Mandir Mahadev Mandir GSR P GSR 8.76 48184 10.61 3.50 723.60 728.00

123 Shrihari Shrihari ESR E ESR 1.68 11119 3.00 1.00 668.00 672.50

124 Kedareshwar Existing Kedareshwar Existing GSR E GSR 22.10 132856 29.14 10.00 723.00 728.00

125 Kedareshwar-Proposed Kedareshwar Proposed GSR P GSR 9.67 45426 13.70 5.00 723.00 729.00

126 Kondhwa Road Shivneri Nagar ESR P ESR 7.31 43507 9.30 3.50 675.00 681.00

127 Sai Baba Nagar Steel Yard ESR P ESR 12.33 66379 12.68 4.50 682.16 688.16

Page 82: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs SR. No. Zone Name SR Name

SRs Existing/ Proposed

Type of SR Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity Proposed

LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Vadgaon

128 Upper Indira Nagar Upper Indira Nagar Proposed ESR

P ESR 4.55 28053 5.35 2.00 685.00 691.50

129 Shivneri Nagar Shivneri Nagar GSR P GSR 7.87 32602 8.85 3.00 660.00 667.00

130 Market Yard Seminary Proposed GSR P GSR 10.68 44206 12.00 4.00 675.00 681.00

131 Seminary Existing Seminary Existing GSR E GSR 15.56 80201 18.45 7.00 672.00 676.00

132 Konark Indrayu

Konark Indrayu GSR P GSR 6.04

56025

7.29 2.50 648.00 654.00

Konark Indrayu ESR P ESR 3.05 3.68 1.50 660.00 666.00

133 Dashbhuja Mandir Dhankavadi GSR E GSR 0.86 6820 1.34 0.75 680.80 684.30 134 Bibvewadi Zone 1 Bibvewadi old GSR E GSR 6.85 37691 10.43 3.40 654.13 657.73 135 Bibvewadi Zone 2 Bibvewadi new GSR E GSR 7.26 39896 11.04 3.40 654.13 657.73

136 Dorabji Paradise

Dorabji Paradise ESR 1 P ESR

8.56 64812 13.14

3.00 652.00 658.00

Dorabji Paradise ESR 2 P ESR 1.50 652.00 658.00

137 Cloud Nine Cloud Nine ESR P ESR 5.78 45523 9.23 3.00 635.00 641.00

138 Nyati Enclave Dorabji Paradise ESR 3 P ESR 4.45 29452 6.63 2.50 652.00 658.00

139 Tarode Wasti Tarode Wasti ESR (Reconstruct) P ESR 1.84 9632 2.59 1.00 636.00 642.00

140 Mohamad Wadi Mohamad wadi ESR P ESR 3.86 31717 5.85 2.00 630.00 636.00

Page 83: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Detailed Summary of Water

Supply Zones & Reservoirs

SR. No. Zone Name SR Name SRs

Existing/ Proposed

Type of SR

Demand (2032)

Population (2047)

Demand (2047)

SR Capacity Existing

SR Capacity

Proposed LDL FSL

E/P ESR/GSR MLD MLD ML ML m m

Holkar

141 Bopodi

Chikhalwadi ESR 1 (near Hockey Stadium)

P ESR

17.01 77645 18.83

3.00 585.00 591.00

Chikhalwadi ESR 2 (near Darga) P ESR 3.50 585.00 591.00

Page 84: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Clear Water Transmission System

Basic concepts in bulk transmission plan • Maximum utilisation of the existing facilities (SRs, BPTs, sumps, pumps, and transmission

mains)

• Maximum utilisation of gravity-driven systems and minimization of pumping

• Allocation of water from a WTP to SRs which are best suited in terms of o nearness of location o hydraulic level

• Avoid laying of pipelines through the congested areas

• Avoid to an extent possible, long and complex pipe networks

Page 85: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Clear Water Transmission System - Components

Clear water Pump Stations (No.) Pumping mains (km)

BPT (No.)

Gravity mains (km) @ WTP

Intermediate PS

Existing / Planned

7 (2 planned by other consultants)

2 68.73 1 24.81

Proposed 2 1 68.10 8 71.13

PUMP STATION

BREAK PRESSURE TANK SERVICE

RESERVOIRS

DISTRIBUTION

NETWORK

Page 86: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Parvati Transmission System Clear water pump stations

at Water Treatment Plants:

o Parvati New WTP (planned)

o Parvati Proposed PS (proposed)

Clear water pumping mains

o Existing – 3150 m

o Proposed – 7310 m

Break Pressure Tanks

o BPT near Parvati HLR (proposed)

Clear water gravity mains

o Existing – 0

o Proposed – 5775 m

Page 87: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Parvati New WTP (planned)

Parvati system- Pump Stations

Proposed pump station no.1

Description Unit Details

Clear water sump

Capacity ML 18.0

Size m 110 x 30 x 6

Full supply level (FSL) RL. m 567.25

Lowest draw level (LDL) RL. m 561.25

Page 88: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Parvati system- Pump Stations

Proposed pump station no.2

Description Unit Details

Clear water sump

capacity ML 9.0

Size m 70x 22

Full supply level (FSL) RL. m 567.15

Lowest draw level (LDL) RL. m 561.25

Page 89: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Parvati system- Pump Stations

Zone wise distribution from Parvati water works

Sr No Description Distribution in MLD

2032 2047

1 Pune Cantonment Water Works 243.79

3 Parvati MLR ws zone-1 51.87 66.86

4 Parvati MLR ws zone-2 46.50 63.61

5 Parvati HLR1 for ws zone-1 9.51 12.99

6 Parvati HLR2 & HLR3 for ws zone-2 16.61 27.06

7 Parvati HLR4 for ws zone-3 2.90 2.94

Subtotal HLRs 29.02 42.99

8 Waghjai Existing 3.17 3.17

9 Waghjai-proposed 5.79 7.09

10 Parvati WTP 8.42 10.64

11 P L Deshpande Garden 11.60 14.67

12 Proposed Parvati BPT

12.1 Sarasbag Kothi 17.98 20.90

12.2 Shaniwarwada 24.48 33.44

12.3 Crescent high school 13.63 16.99

Subtotal-12 56.09 71.33

13 SNDT sump, MLR, and HLRs 110.37

Total 456.25 390.73

Page 90: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Parvati system- Pump Stations / SRs

RESERVOIRS IN PARVATI SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 7 3 0 9 7 12

Capacity 33.66 29.50 0 33 33.66 62.5

Zone wise distribution from SNDT SRs / PS / BPT

Sr No Description Distribution in MLD

2032 2047

1 SNDT MLR 33.89

2 SNDT HLR 38.71

3 Ideal Colony / MIT College 13.73

SNDT PS

4 SNDT Proposed BPT

4.1 Gokhale Nagar 17.85

4.2 Chatushrungi Temple 6.19

Total 0.00 109.83

Page 91: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Cantonment Transmission System Clear water pump stations

at Water Treatment Plants:

o Cantonment 100 MLD WTP (existing) Intermediate pump stations:

o Cantonment Proposed PS (proposed)

Clear water pumping mains

o Existing – 31,145 m

o Proposed – 14,320 m

Break Pressure Tanks

o Ram Tekdi BPT (proposed)

Clear water gravity mains

o Existing – 300 m

o Proposed – 16,830 m

Page 92: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Cantonment 100 MLD WTP (existing)

Cantonment system- Pump Stations

1 CLEAR WATER SUMP

Construction Capacity

(ML) Size

Full Supply Level

FSL

Lowest Draw

Level

LDL

RCC 9.0 85m x 27m 576.23 573.41

• Cantonment Proposed PS (proposed)

Description Unit Details

1Clear water sump

Capacity ML 12.50

Size m 75x30

Full supply level (FSL) RL. m 580.55

Lowest draw level (LDL) RL. m 575.00

Page 93: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Cantonment system- Pump Stations

Zone wise distribution from proposed pump station at Pune Cantonment water

works

Sr No Description Distribution in MLD

2032 2047

1 Wanori HLR for Ghorpadi ws zone 11.37 13.97

2 Proposed ESRs in the PCWW for Koregaon

park ws zone 16.31 21.22

3 Existing GSR-old for Bakari hill zone 1 13.07 15.97

4 Existing GSR-new for Bakari hill zone 2 13.60 16.61

5 Existing Wanori GSR for Pune cantonment

area 14.75 14.75

6 Ghorpadi Sicilia zone 28.77

7 Proposed Jal mandir zone 60.91 92.67

8 Ram Tekadi Existing GSR for Ram Tekdi zone 22.32 27.93

9 Ram Tekadi proposed GSR for Hadapsar

Industrial colony zone 14.35 18.30

10 Proposed Ram Tekadi BPT 77.11 107.28

Total 243.79 357.47

Page 94: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Cantonment system- Pump Stations / SRs

RESERVOIRS IN CANTONMENT SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 6 1 6 14 12 15

Capacity 36.45 32 13.45 50 49.90 82

Zone wise distribution from Ram Tekdi BPT

Sr No Description Distribution in MLD

2032 2047

1 Badade Mala 7.68 9.7

2 Kale Borate Nagar 6.47 7.03

3 Gliding Centre / Hadapsar Gaon 9.85 10.88

4 Satavwadi 8.26 11.19

5 Magarpatta 10.21 15.89

6 Hadapsar Gaon 9.4 14.24

7 Sadhana Vidyalaya 9.07 13.75

8 Akashwani 13.76 20.84

9 Indraprastha 2.41 3.76

Total 77.11 107.28

Page 95: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon Transmission System (1/2) Clear water pump stations

at Water Treatment Plants:

o Vadgaon old WTP (existing)

o Vadgaon new WTP (planned) Intermediate pump stations:

o Rajeev Gandhi PS (existing)

o Proposed Santosh NagarPS (proposed)

Clear water pumping mains

o Existing – 8,355 m

o Proposed – 18,050 m

Page 96: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon Transmission System (2/2) Break Pressure Tanks

o New WTP Clear Water sump (planned)

o Taljai BPT (proposed)

o Institute BPT (proposed)

o Steel Yard BPT (proposed)

o Konark Indrayu BPT (proposed)

Clear water gravity mains

o Existing – 12,640 m

o Proposed – 27,020 m

Page 97: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Vadgaon old WTP (existing)

Vadgaon system- Pump Stations

1 CLEAR WATER SUMP

Construction Capacity

(ML) Size

Full Supply Level

FSL

Lowest Draw Level

LDL

RCC 4.8 40m x 30m 615.00 611.00

• Vadgaon new WTP (planned)

Description Unit Details Remarks

1Clear water sump and BPT

Capacity ML 6.90

Two compartments of

0.50 for BPT & 6.40 Ml

sump

Size m 50 x 25 -

Full supply level (FSL) RL. m 620.50 -

Lowest draw level (LDL) RL. m 615.00 -

Page 98: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon system- Pump Stations

Zone wise distribution from the existing (125 MLD) pump station at Vadgaon

Sr No Description Distribution in MLD

Remarks 2032 2047

1 Existing Institute ESR, Charwad vast GSR

and proposed Institute BPT 20.57 26.80

2 Proposed Santosh nagar pump station 113.47 113.47

Total 134.04 140.27

Details of the Proposed Santosh Nagarpump station

Description Unit Details

1 Clear water sump

Capacity ML 6.00

Size m 40 x 30

Full supply level (FSL) RL. m 661.50

Lowest draw level (LDL) RL. m 656.50

Page 99: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon system- Pump Stations

Zone wise distribution from the proposed pump station at Vadgaon

Sr No Description Distribution in MLD

2032 2047

1 Taljai HLRs-Existing 28.85 35.31

2 Taljai HLR -Proposed 9.17 12.53

3 Dhankavadi GSR-Existing for Dashbhuja Mandir zone 0.86 1.34

4 Taljai BPT - -

4.1 Taljai MLRs 15.07 20.42

4.2 Bibvewadi GSRs 14.11 21.47

4.3 Shreehari ESR 1.68 3.0

4.4 Rajiv Gandhi pump station-Existing 40.53 53.45

4.5 Proposed Santosh nagar pump station - 30.98

Subtotal-4 71.39 129.32

Total 110.27 178.50

Zone wise distribution from Rajiv Gandhi Pump Station

Sr No Description Distribution in MLD

2032 2047

1 Kedareshwar Existing 22.10 29.14

2 Kedareshwar Proposed 9.67 13.70

3 Mahadev Mandir 8.76 10.61

Total 40.53 53.45

Page 100: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon system- Pump Stations / SRs

RESERVOIRS IN VADGAON SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 9 10 3 15 12 25

Capacity 43.61 40 3 39 46.61 79

Zone wise distribution from Santosh Nagar Pump Station

Sr No Description Distribution in MLD

2032 2047

1 Agam Mandir Existing 2.15 4.06

2 Agam Mandir Proposed 19.44 25.35

3 Konark Indrayu 9.09 10.97

4 Upper Indira Nagar 4.55 5.35

5 Sai Baba Nagar 12.33 12.68

6 Konark Indrayu BPT

6.1 Dorabji Paradise / Nyati Enclave 13.01 19.77

6.2 Cloud Nine 5.78 9.23

6.3 Mohmadwadi 3.86 5.85

6.4 Tarode Wasti 1.84 2.59

7 Steel Yard BPT

7.1 Market Yard 10.68 12.00

7.2 Seminary Existing 15.56 18.45

7.3 Kondhwa Road 7.31 9.30

7.4 Shivneri Nagar 7.87 8.85

Total 113.47 144.45

Page 101: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Warje Transmission System Clear water pump stations

at Water Treatment Plants:

o Warje 180 MLD WTP (existing)

o Warje 200 MLD WTP (under construction) Intermediate pump stations:

o SNDT sump & PH (existing)

Clear water pumping mains

o Existing – 24,775 m

o Proposed – 23,660 m

Break Pressure Tanks

o SNDT BPT (existing)

o SNDT BPT (proposed)

o Old 9 MLD WTP pure water sump (existing)

o Chandani Chowk BPT (proposed)

Clear water gravity mains

o Existing – 11,865 m

o Proposed – 21,500 m

Page 102: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• 180 MLD WTP PH (existing)

Warje system- Pump Stations

1 CLEAR WATER SUMP

Construction Capacity

(ML) Size

Full Supply Level

FSL

Lowest Draw

Level

LDL

RCC 4.2 47m x 23m 574.00 570.00

Salient features of the proposed supplementary pump station

Description Unit Details

1 Clear water sump

Capacity ML 0.40

Size m 20 x 5

Full supply level (FSL) RL. m 574.00

Lowest draw level (LDL) RL. m 570.00

• 180 MLD WTP PH (proposed supplementary)

Page 103: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• 200 MLD WTP PH (under construction)

Warje system- Pump Stations

Salient features of the proposed pump station at Warje water works

Description Unit Details

1Clear water sump

Capacity ML 10.0

Size m 2 sumps of 30m diam.

Full supply level (FSL) RL. m 580.00

Lowest draw level (LDL) RL. m 573.00

Zone wise distribution from the existing sump at old warje WTP

Sr No Description Distribution in MLD

2032 2047

1 Atul nagar zone 5.02 6.30

2 Warje-Malwadi zone 2.29 2.87

3 Ahire Gaon zone 1.98

Total 9.29 9.17

Page 104: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Warje system- Pump Stations

Zone wise distribution from the existing pump station at existing 180 MLD Warje WTP

Sr No Description Distribution in MLD

Remarks 2032 2047

1 Gandhi Bhavanzones 1 and 2 28.68 39.80

2 Chandani chowk zones 1 and 2 61.11 78.35

3 SNDT existing BPT 105.38 77.02 In second stage, the part of

the supply to SNDT will

come from Parvati WTP Total 195.17 195.17

Zone wise distribution from the proposed pump station at 200 MLD Warje WTP

Sr No Description Distribution in MLD

Remarks 2032 2047

1 Proposed Ram nagar ESR 4.69 5.11

2 Ahire gaon ESR 2.91

2 Proposed Karve nagar GSR 26.75 36.11

3 Kumbharwadi GSR and Dukkar Khind ESR 7.97 10.56

3 SNDTHLR, MLR -SUMP 116.47

4 Chandani chowk BPT 68.15 109.71

5 SNDT existing BPT 93.22

Total 224.03 257.62

Page 105: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Warje system- Pump Stations Zone wise distribution from Chandani Chowk BPT

Sr No Description Distribution in MLD

2032 2047

1 Panchavati 3.11 5.71

2 Pashan Lake 13.38 17.63

3 Baner Gaon Zone 1 8.02 14.65

4 Baner Gaon Zone 2 4.95 8.78

5 Baner West 5.54 10.00

6 Balewadi 8.83 16.46

7 Ram Nagar / Laxman Nagar 7.01 12.68

8 Baner Hill 5.39 10.03

9 Sus Sutarwadi 11.92 13.77

Total 68.15 109.71

Zone wise distribution from SNDT Existing BPT

Sr No Description Distribution in MLD

2032 2047

1 Modern College 32.70 38.17

2 BMCC College 4.39 5.12

3 Fergusson College 7.26 9.83

4 Chatushrungi Zone 1 8.33 12.97

5 Chatushrungi Zone 2 20.33 34.30

6 Ganesh Khind / Aundh 12.87 19.14

7 Pune University 4.30 5.88

8 Bhosale Nagar 15.20 18.35

9 Wakdewadi 26.49

Total 105.38 170.25

Page 106: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Warje system- Pump Stations / SRs

RESERVOIRS IN WARJE SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 15 6 0 15 15 21

Capacity 102.26 40.50 0 43.50 102.26 84

Zone wise distribution from SNDT SRs / PS / BPT

Sr No Description Distribution in MLD

2032 2047

1 SNDT MLR 28.85

2 SNDT HLR 34.24

3 Ideal Colony / MIT College 11.25

SNDT PS

4 SNDT Proposed BPT

4.1 Gokhale Nagar 12.29

4.2 Chatushrungi Temple 5.61

4.3 Wakdewadi 24.23

Total 116.47 0.00

Page 107: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Holkar Transmission System Clear water pump stations

at Water Treatment Plants:

o Holkar WTP PH (existing)

Clear water pumping mains

o Existing – 1,300 m

o Proposed – 4,755 m

Page 108: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Holkar WTP PH (existing)

Holkar system- Pump Stations

Description Unit Details Remarks

1 Clear water sump and BPT

Capacity ML 1.20 -

Size m 2 wells of 15m diam. -

Full supply level (FSL) RL. m 550.50 -

Lowest draw level (LDL) RL. m 547.00 -

Zone wise distribution from the Holkar pump station

Sr No Description Distribution in MLD

Remarks 2032 2047

1 Khadki Cantonment Board 14.18 14.18 -

2 Bopodi zone 17.01 18.83 -

Total 31.19 33.01 -

Page 109: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Holkar system- SRs

RESERVOIRS IN HOLKAR SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 0 0 0 2 0 2

Capacity 0 0 0 6.5 0 6.5

Page 110: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Bhama Askhed Transmission System

Clear water pump stations

at Water Treatment Plants:

o Bhama Askhed WTP (plan & design by other consultant)

Break Pressure Tanks

o Bhama Askhed MBR (plan & design by other consultant)

Page 111: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Bhama Askhed system- SRs

RESERVOIRS IN BHAMA ASKHED SUPPLY AREA

Description GSRs ESRs Total

Existing Proposed Existing Proposed Existing Proposed

Num SR 0 0 12 28 12 28

Capacity 0 0 17.94 69.50 17.94 69.50

Page 112: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• The storage capacity shall be subdivided in two compartments

• Normal design water depth in GSRs 6,00m

• 5.00m free space to be maintained around GSR

• The reinforcement bar cover in the foundation of minimum 40mm

• Waterstops shall be placed at all the construction joints, either horizontal or vertical

• The top slab shall have minimum rebar cover of at least 30 mm in the lower face

• Impervious plaster layer of 40 mm on internal RCC surfaces in contact with water

• All internal surfaces of the reservoirs shall be covered by an epoxy based paint

• Ventilation openings, every 200 sqm of top slab surface

• The ladders for access to the internal part of the GSRs shall be made with aluminium alloy

Proposed GSR design criteria

Page 113: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• ESR tank normally of circular shape, with a normal water depth of 6 m

• The top slab shall have minimum rebar cover of at least 30 mm in the lower face to ensure

more protection against corrosion of the rebars

• Waterstops at all the construction joints, either horizontal or vertical

• Columns of the supporting structure shall have height generally below 22m

• Stairs for access to the tank shall be preferably built with a conventional staircase resting on a

framework of columns and beams

• Impervious plaster layer of 40 mm, on all the internal RCC surfaces of the tank

• All internal surfaces of the reservoirs shall be covered by an epoxy based paint

• Parapet and handrails protected from corrosion by zinc coating and paint

• Ladders for access to the interior of the tank in aluminium alloy

Proposed ESR design criteria

Page 114: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Existing distribution network updated in coordination with PMC Engineers

• Existing water supply zones considered for this exercise

• The existing i.e. 2012 water demand used for the analysis

• Peak factor of 1.7 used, considering 24 hours supply

• Results confirm low to very low pressures in many areas

Network modeling of existing distribution system

Page 115: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Parvati system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 116: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Cantonment system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 117: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Vadgaon system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 118: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Warje system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 119: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Holkar system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 120: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Chikhali system Performance Analysis – 24x7

Pressure

0.00

10.00

30.00

50.00

m

PRESENT DEMAND, PEAK FACTOR = 1.7

Page 121: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• Water distribution system analysed for each zone with WATER GEMS software

• A water supply zone is divided in to two or more DMAs, to minimize the pressure

variation

• The Pressure Reducing Valves (PRVs) are proposed to restrict the terminal

pressures

• Pipes of GI,AC, RCC, PSC, PVC replaced with MS and DI pipes

• Old CI pipes replaced with suitable DI pipes

Distribution System

Page 122: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Summary Of Existing and Proposed Pipes in Distribution System

Sr. No. ZONE NAME

SUMMARY OF PIPE LENGTH IN METRES

EXISTING PIPES TOTAL

EXISTING PROPOSE

D SERVICE

LINES TOTAL

PROPOSED

TOTAL EXISTING + PROPOSED

RETAINED REPLACE

D

1 Parvati Zone 298,594

45,641 344,235

127,534

28,353

155,887 454,481

2 Warje Old Zones

26,118

1,728

27,846

3,890

5,423

9,313 35,431

3 Warje New WTP Zones 666,936

53,205 720,141

378,959

41,630

420,589 1,087,525

4 Cantonment Zones 405,623

45,613 451,236

242,565

104,252

346,817 752,440

5 Bhama Askhed Zones 342,557

28,129 370,686

163,181

91,916

255,097 597,654

6 Vadgaon Zones 560,808

38,881 599,689

305,044

116,288

421,332 982,140

7 Holkar Zones

25,224

5,041

30,265

8,331

1,034

9,365 34,589

Total

2,325,860

218,238

2,544,098

1,229,504

388,896

1,618,400 3,944,260

Page 123: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Data from House Unit Property Registration

Considered Housing typologies

Estimate of consumer meters

ARV Slab No. of Properties

<1000 61,547

1001 to 3000 205,801

3001 to 5000 180,614

5001 to 10,000 151,479

>10,000 68,920

Total No. 668,361

Typology Number of flats/units

in the building

Size and number of the meter

connection

1 1 no. 1 x 15 mm

2 2 to 6 no. 1 x 15 mm

3 7 to 12 no.2 x 15 mm or no. 1 x 20 mm

4 13 to 24 no.2 x 20 mm or no. 1 x 25 mm

5 25 to 52 no.1 x 40 mm

6 52 to 96 no. 1 x 50 mm

7 >96 no. 2 x 40 mm

Page 124: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Estimate of consumer meters

ARV Slab No. of

Properties

Type1

Individ

houses

Type 2

2 to 6

units

Type 3

7 to 12

units

Type 4

13 to 24

units

Type 5

25 to 52

units

Type 6

52 to 96

units

Type 7

>96

units

<1000 61,547 10%

61,547

1001 to 3000 205,801 20% 25% 30% 25%

41,160 12,863 6,860 2,858

3001 to 5000 180,614 30% 40% 30%

13546 8027 3010 1693

5001 to 10,000 151,479 10% 30% 40% 20%

3787 5049 3366 947

>10,000 68,920 10% 10% 20% 20% 20% 10%

1723 766 574 538 280 69

Totals 668,361 102,707 31,919 20,704 9,810 3,179 280 69

Unreg. Slum units 33,000

Total Resid. Cnx 135,707 31,919 20,704 9,810 3,179 280 69

Assumed Housing Typology for ARV slabs

Page 125: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Estimate of consumer meters

Numerical results for Connections by size

Connection

Diameter

Domestic

Connections Commercial

Industrial/

Institutional

Total at year

2012

Total at year

2017

(coef. 1.315)

15 mm 171,089 2,110 173,199 220,500

20 mm 34,376 26,864 61,240 78,000

25 mm 7,848 994 8,842 11,300

40 mm 3,317 156 3,473 4,440

50 mm 280 37 95 412 500

80 mm - 30 37 67 100

100 mm 30 34 64 90

150 mm 14 22 36 50

200 mm 4 4 8 10

250 mm 1 5 6 7

300 mm - 3 3 3

Totals 216,910 30,240 200 247,350 315,000

Page 126: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Consumer Meters

Mech. Turbine type

Multi Jet

< 50 mm dia.

Woltmann

≥ 50 mm dia.

Ultrasonic Electromagnetic

Consumer Water Meters

House Connection

Distribution

Line

Ferrule Water

Meter

Air Valve (if required)

Consumer

Ball Valve

* Recommended

Recommended type of Water Meter

Page 127: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

AMR System

Advantages of AMR System

• Reduce meter reading Cost & Time due to lesser human resources

• Safety & Privacy issues avoided due to wireless data collection

• Enhanced monitoring of system integrity

• Water Audit in the DMA possible

• More efficient and accurate billing

• Improved Cash Flow

• Improved Customer Service

• Help in detecting anomalies in water consumption

Data Collection

WALK BY MODE

DRIVE BY MODE

Data Transmission & Analysis

Billing

Page 128: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Salient features considered WTPs

• Measurement of Parameters such as turbidity, pH, residual chlorine at strategic locations

• Measurement of differential pressure across the filters

Pump houses - Existing

• Measurement of sump level and tripping all the pumps in case of very low level

• Measurement of flow from the rising main

• Communication for acquiring electrical parameters such as voltage, current, power, power factor for each pump

• Start/stop of pumps from the operator stations and status display of pumps

SCADA

Page 129: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Pump houses - New

• Measurement of sump level and tripping all the pumps in case of very low level in the sump and high water level in the SR / BPT

• Measurement of flow and pressure for individual pumps and display on the operator station of the current operating point and the best efficiency point.

• Communication for acquiring electrical parameters such as voltage, current, power, power factor for each pump

• Start/stop of pumps from the operator stations and status display of pumps

• Computation of pump efficiency on line

• Measurement of vibration at strategic locations, pump trip at high vibration/temperature levels

SCADA

Page 130: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Reservoirs

• Measurement of inlet and outlet flow

• Measurement of level and conversion into volume resident in reservoirs

• Possible reservoir leakage diagnostic from the above

• Motorized valves at inlets and outlets to isolate reservoirs and control wherever needed

DMAs

• Measurement of flow at strategic locations

• Measurement of pressure at strategic locations

SCADA

Page 131: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Instrument

Description of water supply system component

Rehabilitatio

n of WTPs Pump station

Transmission

and

Distribution

systems

Service

Reservoirs

Distribution

System

Electro magnetic flow meter √ √ √

Ultrasonic level transmitters √ √

Residual chlorine transmitters √

pH transmitters √

Turbidity transmitters √

Differentialpressure transmitters √

Controllers √ √ √ √ √

Pressure transmitters √ √ √

Vibration system √

SCADA

Page 132: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Cost Summary of Water Supply System components

Particulars Cost in INR

Land Acquisition 406,165,150

Clear water Transmission mains 4,308,430,020

Clear water Pump Stations 1,389,525,091

Proposed Service Reservoirs 2,931,026,213

Distribution system 17,465,011,566

Rehabilitation of existing service reservoir’s 237,264,296

SCADA 31,803,804

Consumer survey 55,459,672

Rehabilitation of existing water treatment plants 56,588,925

Pilot DMA project 161,247,509

Total 27,042,522,246

Page 133: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Overall Project Cost Analysis

Consumer meters

12%

Bulk Flow meter 1%

Cost of pipes and specials for

Transmission System 14%

Cost of pipes and specials for

Distribution System 26%

Valves 2%

Consumer awareness &

consumer Survey 2%

Instrumentation & Control

2%

Change of House Connections

6%

IT & Billing works 1% Pump House works

16%

Land Acquisition cost 4%

Other Works 14%

Page 134: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Clear water Transmission mains

WTP Zone Cost in INR

Parvati zone 793,849,457

Pune Cantonment zone 897,534,647

Vadgaon zone 1,255,268,234

Warje zone 1,272,531,598

Holkar zone 89,246,083

Bhama –Askhed zone NA

Total 4,308,430,020

Page 135: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Clear water pump stations

WTP Zone Cost in INR

Parvati zone 308,510,793

Pune Cantonment zone 297,468,614

Vadgaon zone 382,327,060

Warje zone 386,602,479

Holkar zone 14,616,145

Total 1,389,525,091

Page 136: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Proposed Service reservoirs

WTP Zone Cost in INR

Parvati zone 482,901,888

Pune Cantonment zone 601,120,828

Vadgaon zone 738,992,527

Warje zone 630,348,110

Holkar zone 60,902,855

Bhama–Askhed zone 416,760,005

Total 2,931,026,213

Page 137: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Distribution system

WTP Zone Cost in INR

Parvati zone 2,380,607,250

Pune Cantonment zone 3,465,464,160

Vadgaon zone 3,997,822,481

Warje zone 4,534,000,090

Holkar zone 122,916,449

Bhama–Askhed zone 2,964,201,136

Total 17,465,011,566

Page 138: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Distribution System Cost Analysis

Consumer meters 19% Bulk Flow meter

1%

Cost of pipes and specials

41%

Valves 2%

Consumer awareness

3%

Instrumentation & Control

2%

Change of House Connections

11%

IT & Billing works 2%

Road reinstatement works

7% Other Works

12%

Page 139: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Gross Project Cost Sr No DESCRIPTION OF COMPONENT COST IN INR

A Land Acquisition 406,165,150

B Physical infrastructure components

1 Rehabilitation of existing water treatment plants 56,588,925

2 Clear water pump stations 1,389,525,091

3 Clear water transmission System 4,308,430,020

4 Rehabilitation of existing Service reservoirs 237,264,296

5 Service reservoirs 2,931,026,213

6 Distribution system 17,465,011,566

7 Pilot DMA works 161,247,509

8 SCADA 31,803,804

9 Consumer survey 55,459,672

Sub Total-B 26,580,897,424

Total cost of water supply components (A+B) 26,987,062,574

C Shifting of utilities 53,161,795

D Statutory compliances 5,000,000

Total Net cost 27,100,684,041

Add Cost of consultancy services at 1% 271,006,840

Add Contingencies at 3% 813,020,521

Total Gross cost 28,184,711,402

Page 140: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Operation & Maintenance cost

OP&MAINT COST OF PMC Lahks Rs/year 2017 2018 2019 2020 2021

Water Withdrawal Charges " " / " 2,772 2,857 2,940 3,022 3,104

Salaries of PMC staff (*) " " / " 7,406 7,536 7,668 7,803 7,940

Electricity Charges " " / " 6,798 6,966 7,133 7,301 7,468

Chemicals for WTPs " " / " 517 547 577 607 637

Communications cost (**) " " / " 376 380 384 387 391

Stationery and consumables " " / " 196 198 200 202 204

Maintenance & repair of

Existing Assets

" " / " 2414 2414 2414 2414 2414

Maintenance & repair of

Propsed works

" " / " 3148 3148 3148 3148 3148

Leak detection Charges " " / " 100 100 100 100 100

Leak Repair Charges " " / " 1582 1582 1582 1582 1582

Consultancy Services " " / " 328 328 328 328 328

New Connections " " / " 0 1253 1253 1253 1253

Billing & Collection " " / " 162 171 181 190 200

Total in Lahks Lahks Rs/year 25798 27478 27907 28336 28769

Total in crores R cr/ Year 258.0 274.78 279.07 283.4 287.7

Volume of water sold in PMC

service area( Cum)

269,107,200 284,749,640 300,392,080 316,034,520 331,676,960

Unit cost incidence of O&M /m3

of water sold

Rs/m3 9.59 9.65 9.29 8.97 8.67

Page 141: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

FINANCIAL ANALYSIS

Page 142: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Financial Analysis covers:

• Analysis of Pune Water Supply Project on stand alone basis

• Analysis of PMC’s overall finances

• Analysis of project on PMC’s finances and

• Sustainability analysis

Coverage of Financial Analysis

Page 143: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

• CAPEX is linked with sequencing of implementation schedule of different components

• Spread over a period of four years (2014 to 2017)

• Expenditure on Pilot DMA, Consumer Survey, Shifting of Utilities included in CAPEX and capitalized as per JNNURM guidelines

• Contingencies provided @ 3% of base cost

• 1% provision for Project Design and Management

• Price contingencies not included in CAPEX

Assumptions for Capital Expenditure (CAPEX)

Page 144: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Capital expenditure

Sr. Component 2014 2015 2016 2017 Total

(Rs. Lakhs)

1 Land Acquisition 4062 - - - 4062

2 Shifting of Utilities 85 170 170 106 531

3 Pilot DMA 1612 - - - 1612

4 Consumer Survey 444 111 - - 555

5 Statutory Compliances 15 25 10 50

6 Physical Infrastructure

6.1 Construction of Reservoirs 3286 9766 9766 6492 29310

6.2 Rehabilitation of Reservoirs 836 949 588 - 2373

6.3 Rehabilitation of WTPs. 189 377 - - 566

6.4 Pumping Stations 2384 7107 4722 - 14213

6.5 Transmission, Distribution, Metering 25057 72538 72590 47549 217734

Total Base Cost 37970 91043 87846 54147 271006

7 Contingencies @ 3% 1139 2731 2635 1624 8130

8 Project Design & Management @ 1% 380 910 878 541 2710

9 TOTAL PROJECT COST 39489 94685 91360 56313 281846

Annual Percentage of Expenditure 14% 34% 32% 20% 100%

Page 145: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

FINANCING OPTIONS FOR PROJECT

• Financing Plan based on JNNURM Norms

• Cost of Land Acquisition not considered for Central and State Government financing

• Options available for PMC to raise finance: Own surplus revenue Term Loan from State Government Term Loan from Banks Term Loan from Financial Institutions Debt from Capital Market (Bonds) Private Equity – Capital Contribution

by PPP

• Budgetary Provision for Price Contingencies is Essential

Sources Share Amount (Rs. Lakhs )

Central Government

50% 138811

State Government 20% 55524

PMC 30% 87511

Total Financing 100% 281846

Proposed Sources for PMC’s Share

From own surplus 15% 43756

Term Loan from Financial Institution

15% 43755

Total PMC’s Share 30% 87511

Page 146: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

ANNUAL CONTRIBUTIONS AND SOURCES OF FINANCE

Sr. Component Share 2014 2015 2016 2017 Total

(Rs. Lakhs)

1 Central Government

50% 17632 47343 45680 28156 138811

2 State Government

20% 7053 18937 18272 11263 55524

3 Pune Municipal Corporation

3.1 From Revenue Surplus

15% 7402 14203 13704 8447 43756

3.2 Term Loan from Fin. Institution

15% 7402 14203 13704 8447 43756

Sub-total (3) 30% 14804 28406 27408 16894 87511

4 TOTAL FINANCING

100% 39489 94685 91360 56313 281846

Page 147: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Assumptions for Income and Expenditure Projections – Pune Water Supply Project

Sr. Component Assumption / Basis

1 Revenue Income

1.1 Connection Charges One time connection charges to be recovered in five equal installments

1.2 Usage Charges Based on telescopic tariff with periodical revision to ensure recovery of O&M cost

1.3 Revision in tariff Every five years at the rate of 10% for connection and usage charges

2 Operating Expenditure

2.1 Establishment Charges Based on new staffing pattern proposed for different facilities

2.2 O&M Charges Water Charges, Electricity Charges, Chemicals, Petrol and Consumables, Maintenance and Repairs, Consultancy, New Connections, Billing and Collections

2.3 Debt Service Moratorium Period for repayment of principal – 3 years Interest Rate – 12% Repayment Period – 10 Years

2.4 Contingencies for O&M Water Charges, Salaries and Chemicals for WTP : 3% Other O&M Components – 5%

Page 148: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Assumptions for Financial Indicators to ascertain Project Viability

Sr. Component Assumption / Basis

1 Net Present Value NPV of overall cost (CAPEX + OPEX) and O&M cost (CAPEX) should be positive

2 Internal Rate of Return

IRR should be at least equal to cover cost of finance (interest rate) and if possible some risk factor

3 Coverage of PMC’s contribution to CAPEX

• Overall operating surplus generated by PMC should be sufficient to cover PMC’s share in CAPEX

• Projected allocation to Budget “C” should be sufficient to cover PMC’s annual share in CAPEX

Page 149: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Proposed water tariffs

Type of Connection 2018-2022 2023-2027 2028-2032

One time Connection Charges (Rs. / Connection)

Domestic Connections 5,000 5,500 6,050

Non-Domestic Connections 10,000 11,000 12,100

Water Consumption Charges (Rs. / KL)

0 to 22.5 lpcd (150 Liters) 3.00 4.00 5.00

22.5 to 30 lpcd (150 to 200 Ltrs.) 6.00 7.00 7.00

30 to 37.5 lpcd (200 to 250 Ltrs) 9.00 10.00 11.00

Above 37.5 lpcd (Above 250 Ltrs) 10.00 11.00 13.00

Non-Domestic Connections 35.00 39.00 43.00

Based on telescopic tariff rates. If consumption exceed stipulated limit, entire consumptions will be charged on the basis of applicable rate.

Page 150: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

PROJECTED INCOME AND EXPENDITURE PUNE WATER SUPPLY PROJECT (STAND ALONE BASIS)

Sr. Component 2018 2023 2028 2033

1 REVENUE INCOME (Rs. Lakhs)

1.1 Connection Charges 95 489 653 698

1.2 Water Charges (Usage Charges) 29614 43014 49695 63552

TOTAL REVENUE INCOME 29709 43503 50348 64250

2 REVENUE EXPENDITURE

2.1 Establishment Charges 7761 9818 12425 15735

2.2 O&M Charges 20861 27741 36886 48778

2.3 Loan Repayment (Principal) 4376 4376 - -

2.4 Interest 4463 1838 - -

TOTAL REVENUE EXPENDITURE 37460 43772 49312 64512

OPERATING SURPLUS/DEFICIT -7751 -269 1037 -263

OPERATING SURPLUS/DEFICIT WITHOUT DEBT SERVICING

1088 5945 1037 -263

With revised tariff structure, PMC will be able to generate operating surplus up to 2032. Thereafter additional revision in tariffs will be essential.

Page 151: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Impact of Pune Water Supply Project on PMC’s Finances

• PMC’s contribution of Rs. 875 Crores in CAPEX is spread over four years

• Annual CAPEX contribution without debt funding compared to overall Revenue Surplus ranges between 9% to 15% of surplus with annual average of 11%

• Annual CAPEX contribution with debt funding compared to overall Revenue Surplus ranges between 4% to 8% with annual average of 6%

Page 152: WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW103.249.97.197/sites/default/files/reports_dpr/DPR_presentation_R13... · Amenity space in Rohan Kritika Parvati WTP compound 2 1.2

Summary of Financial Indicators

Sr. Description of Indicator Results Remarks

1 NPV of O&M Rs. 84.27 Crores Positive

IRR of O&M 15% Covers cost of finance + Risks

2 NPV of Overall Project Rs. 8.04 Crores Positive

IRR of Overall Project 16% Covers cost of finance + Risks

3 Sustainability of Project

3.1 % of PMC share in new CAPEX to Total Revenue Surplus without debt funding

9% to 15% during construction period PMC can afford allocation of

funds of own contribution (30% of Project Cost) for project 3.2 % of PMC share in new CAPEX to

Total Revenue Surplus with debt funding

4% to 8% during construction period

3.3 Benefit Cost Ratio 1.04 BC Ratio is more than 1