water supply facilities work plan amendment. overview background statutory requirements meeting...

15
Water Supply Facilities Water Supply Facilities Work Plan Amendment Work Plan Amendment

Upload: betty-phelps

Post on 20-Jan-2018

214 views

Category:

Documents


0 download

DESCRIPTION

Background St. Johns River Water Management District (SJRWMD) –Consumptive use permitting program Projected demands Groundwater modeling City requesting permit modification –Water supply planning program 2003 Water Supply Assessment 2005 District Water Supply Plan

TRANSCRIPT

Page 1: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Water Supply Facilities Work Water Supply Facilities Work Plan AmendmentPlan Amendment

Page 2: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Overview• Background• Statutory Requirements• Meeting the Requirements• Identified Issues• Timetable

Page 3: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Background• St. Johns River Water Management

District (SJRWMD)– Consumptive use permitting program

• Projected demands• Groundwater modeling• City requesting permit modification

– Water supply planning program• 2003 Water Supply Assessment• 2005 District Water Supply Plan

Page 4: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

BackgroundPriority Water Resource Caution Area An area where traditional water supply sources (groundwater) will not be sufficient to meet demands of the growing population and the needs of the environment, agriculture and industry

Page 5: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

BackgroundWater Supply and Demand

5

10

15

20

25

2007 2010 2015 2020 2025

WSAUTILExample Groundwater

Allocation

Current Groundwater Allocation

Alternatives

Page 6: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Background• Alternative Water Supply Options Identified in

District Water Supply Plan for the City– St. Johns River near Lake George Surface Water Project

• 5 other entities identified• 33 mgd proposed quantity• $402 million total capital cost• $3.39 unit production (cost per 1,000 gal)

– Palm Coast Reclaimed Water System Expansion• 8.23 mgd projected flow• $16.61 million total capital cost• $0.77 unit production (cost per 1,000 gal)• $1 million current and $3 million future SJRWMD Cost-Share

Page 7: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Background• Flagler County Water Supply Plan

Cooperators Group– Representatives from:

• Local Governments• Water Suppliers

– Consultant Funded by SJRWMD– Goals

• County-Wide Water Supply Plan• Identify alternative water supplies to meet

future water needs

Page 8: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Statutory Requirements

• In 2002, 2004, and 2005, the Florida Legislature enacted bills to more effectively address the state’s water supply situation by improving the coordination between local land use planning and water supply planning.

Page 9: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Statutory Requirements• Ensure that the future land use plan is

based upon the availability of adequate water supplies and public facilities and services

• Ensure that adequate water supplies and facilities are available to serve new development no later than the date on which the City anticipates issuing a certificate of occupancy

Page 10: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Statutory Requirements• Revise the Infrastructure Element to:

– Incorporate the alternative water supply project(s) identified in the SJRWMD District Water Supply Plan

– Identify the projects and conservation/reuse programs necessary to meet water use demands

– Include a 2020 Water Supply Facilities Work Plan

Page 11: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Statutory Requirements• Revise the Intergovernmental Coordination

Element to coordinate the comprehensive plan with the SJRWMD District Water Supply Plan

• Revise the Conservation and Coastal Management Element to assess water needs and sources through 2020

• Revise the Capital Improvements Program annually to include projects identified in the first five years of the work plan

Page 12: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Meeting the Requirements• Cooperation with Utility Department• Contracting with consultant (CPH) to:

– Develop data and analysis– Develop 2020 Work Plan

• Planning Staff will:– Review deliverables (with utility staff)– Propose changes to Comprehensive Plan

based on data and analysis and Work Plan

Page 13: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Identified Issues• Relation of Capital Improvements

Program/Budget Process to Work Plan timeframes

• Consumptive Use Permit modification and future limits to groundwater withdrawals

• Significant costs of alternative water supply projects

Page 14: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

TimetableMay

PLDRB MeetingData and Analysis

City Council WorkshopJune PLDRB Public Hearing Transmittal Hearings

for Comprehensive Plan AmendmentEarly July City Council Workshop

and Public Hearing

September FDCA Issues Objections, Recommendations, & Comments (ORC) Report

October City Council Public Hearing

Adoption Hearing for Comprehensive Plan

Amendment

Page 15: Water Supply Facilities Work Plan Amendment. Overview Background Statutory Requirements Meeting the…

Discussion and QuestionsDiscussion and Questions