water supply april 2013 fire training. problems identified infrequency of fire incidents staging...

15
Water Supply April 2013 Fire Training

Upload: lily-dunnaway

Post on 29-Mar-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Water SupplyApril 2013 Fire Training

Page 2: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Problems Identified

• Infrequency of fire incidents• Staging• Lay-in or don’t lay-in• Initial set-up • Inlet versus discharge

Page 3: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

• Supply engine roles and responsibilities• Fill site engine roles and responsibilities• Assigning individuals to assist with

water supply• Apparatus operators not staying with

their truck

Other Problems Identified

Page 4: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Staging

• #1 issue• All incidents begin with staging• Staging does not work without

using the map book

Page 5: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Standard Setup

• First Engine – Proceeds to the scene• First Tanker – Lays in to the attack engine– End of driveway–Hydrant

• Second Engine – Establishes water supply• Second Tanker – Level 1 stage• Third Engine – Locate and establish a fill

site

Page 6: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

• Offensive or Defensive• Primary Size-up–Columbia E901 is on the scene of a single

story residential structure, flames showing side 1, E901 is assuming Route J command, all units Level 1 stage and check in on Gold on arrival.

Attack Engine

Page 7: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Attack Engine

• Secondary Size-up• “Working Fire”–Columbia from Route J Command, 360

complete, working fire side 1 bravo quadrant, this house is on a walkout basement, command post is at E901, we are in the offensive strategy.

Page 8: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Size-up Scenarios

• 706 S. Olivet

• 4038 Highway WW

Page 9: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

• Level 1 Stage• Announce Staging location• Rural Operations– Lay-in to the scene from end of driveway

• Urban Operations– Lay-in from nearest hydrant

• Nurse attack engine• Assist the attack engine operator

First Arriving Tanker

Page 10: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

Long Driveways• 91% less than 1000' (12500 driveways)• 6% between 1000-1500 (840 driveways)• 3% over 1500 (440 driveways)

Page 11: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

• Arrive on scene safely• Level 1 Stage• Announce Staging location and roll you

are assuming• Never pass last water source

Supply Engine

Page 12: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge

• Locate the most appropriate fill site on the BCFPD map book prior to leaving the station

• Announce staging location and roll you are assuming

• Establish the fill site and announce location to the IC or water supply officer

Fill Site Engine

Page 13: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge
Page 14: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge
Page 15: Water Supply April 2013 Fire Training. Problems Identified Infrequency of fire incidents Staging Lay-in or dont lay-in Initial set-up Inlet versus discharge