Page 1: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

Water Strategy

Environment & Sustainable Communities

2014/15 - 2016/17

Working with

Page 2: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

2

Water Strategy 2014/15 - 2016/17

Page 3: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

Water Strategy 2014/15 - 2016/17

Foreword from the Mayor of Bedford

3

Water scarcity and the increasing need to conserve water resources as our climate changes, is a key national and local priority. In England, the average person uses about 150 litres of water a day. This is water that has been cleaned, treated and pumped from reservoirs, rivers and aquifers.

The Council recognises and acknowledges the impact it has, and that of the services it delivers, and commits to manage and improve water efficiency across all areas of its operation. The Council want to demonstrate leadership in the area of water management to “get its own house in order”, whilst also encouraging partners and residents of Bedford Borough to assess and reduce their own water use.

Working in partnership with Anglian Water Business, Bedford Borough Council was one of the first local authorities in the UK to sign a Water Promise, pledging to cut water and waste water use by 20% by 2015 / 16. Wanting to lead by example, the Council believes this Water Strategy is one of the first to be created by a local authority in the UK; outlining how we intend to help secure future water resources whilst also reducing spend and carbon emissions across our estate.

We are proud to sponsor this Water Strategy. It provides an action plan towards achieving our aspirational 20% water reduction target and a long term framework through which to monitor, manage and reduce water resources.

Dave HodgsonMayor of Bedford

Philip SimpkinsChief Executive

Page 4: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

4

Water Strategy 2014/15 - 2016/17

Contents

Foreword from the Mayor of Bedford 3

Contents 4

1. Introduction 6

1.1 National Drivers 6

1.2 Local Drivers 9

1.3 Our Vision 12

1.4 Our Baseline 12

1.4.1 High Consuming Sites 13

1.4.2 Benchmarking 14

1.4.2.1 Office Buildings 15

1.4.2.2 Leisure Facilities 16

1.4.2.3 Parks 16

1.4.2.4 Public Buildings 17

1.5 Our Target 18

2. Water Efficiency Opportunities 19

2.1 Measures Implemented Prior to the Baseline Period 19

2.1.1 Priory Country Park Visitors Centre: Rainwater Harvesting System 19

2.1.2 Water Efficiency Audits of Council Sites 19

2.1.3 Robinson Pool: Metering and Leakage 20

2.1.4 Oasis Pool: Metering and Leakage 20

2.1.5 Borough Hall: Toilet Refurbishment 21

2.2 Measures Implemented since the Baseline Period 22

2.2.1 Allhallows Multi-Storey Car Park Public Conveniences Refurbishment 22

2.2.2 Lurke Street Public Conveniences Refurbishment 22

2.2.3 Tariff Optimisation 23

2.2.4 Water Efficiency Audits (WEA) of Borough Hall and The Higgins Bedford 23

2.2.4.1 Borough Hall Water Efficiency Audit 23

2.2.4.2 The Higgins Bedford Water Efficiency Audit 25

2.2.5 Hillgrounds Changing Room: Leakage 26

2.2.6 Modernisation Programme: Toilet Closures 26

2.2.7 The Higgins Bedford Refurbishment: Rainwater Harvesting 26

2.2.8 Consolidated Billing 26

2.2.9 Installation of a Smart Meter at Borough Hall 26

Page 5: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

5

Water Strategy 2014/15 - 2016/17

3. Future Water Saving Opportunities 28

3.1 No or Low Cost Measures 28

3.1.1 Building Manager’s Handbook 28

3.1.2 Site Checklist 28

3.1.3 Regular Meter Reads 29

3.1.4 Training 30

3.1.5 Water Efficiency Audits 30

3.1.6 Allotments and Parks 30

3.2 Medium Cost Measures 32

3.2.1 Borough Hall Taps 32

3.2.2 Foam Soap 33

3.2.3 Waterless Urinals 34

3.2.4 Improvements to Borough Hall Canteen 35

3.3 High Cost Measures 36

3.3.1 Vehicle Repair Depot: Grey Water Recycling and Rainwater Harvesting 36

4. Water Strategy Financing 37

5. Data Management 38

6. Programme Management 39

7. Leadership and Partnership 40

7.1 Policy 40

7.2 Web Pages 40

7.3 Promoting Water Butts to Residents in Bedford Borough 40

7.4 World Water Day / Anglian Water Business Love Every Drop Campaign 41

7.5 School Water Efficiency Audits 41

7.6 Working in Partnership with Fusion Lifestyle 42

7.7 Sharing Best Practise 42

8. Water Strategy Action Plan 43

8.1 Summary of Actions to follow up from Previous Water Efficiency Audits 43

Appendix A - Summary of Water Efficiency Audits Recommendations 49

Appendix B - Full Tariff Optimisation table 50

Appendix C - Summary of what actions have been achieved to date 51

Page 6: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

6

Water Strategy 2014/15 - 2016/17

1. Introduction

1.1 National Drivers

Water resources within the UK are increasingly under stress. Striking a balance between water availability and the demand for water is becoming increasingly hard, owing to a growing population and the threat of climate change.

Currently there are 64.1 million people in the UK, with Britain’s population increasing by more than 400,600 people in the previous year alone.1 Water usage has been growing at more than twice2 the rate of population growth in the last century, with each person in the UK currently consuming 150 litres of water per day.3 As our population continues to grow, water resources are becoming increasingly stretched. On a global scale, the UN has warned that global water demand will outstrip current accessible supplies by 40% by 2030.4 On a national scale, by the 2050’s, the number of people in the UK living in areas affected by water supply-demand deficits could be between 27 million and 59 million.5

UK climate change medium emission projections suggest that summer mean temperatures could increase by as much as 8°C by 2080 (Figure 1), with summer rainfall decreasing by as much as 45% (Figure 3). This will result in less water in the environment to abstract, at a time when 25% of rivers are already at risk due to over abstraction.6 Winter rainfall may increase by 40-50%, resulting in an increasing risk of sewer flooding and water supply contamination (Figure 2).7

The drought in South East England in 2004-06 and at the end of 2011, and the floods of 2007 and 2013/14 brought into focus the challenges that we know climate change will bring.

1. Office for National Statistics mid-2012 to mid-2013 comparison

www.ons.gov.uk/ons/rel/pop-estimate/population-estimates-for-uk--england-and-wales--scotland-and-northern-ireland/2013/index.html

2. United Nations www.un.org/waterforlifedecade/scarcity.shtml

3. Future Water: The Governments water strategy for England www.gov.uk/government/uploads/system/uploads/attachment_data/file/69346/pb13562-future-water-080204.pdf

4. United Nations www.un.org/waterforlifedecade/pdf/01_2014_water_energy_efficiency.pdf

5. The National Adaptation Programme: Making the country resilient to a changing climate:

www.gov.uk/government/uploads/system/uploads/attachment_data/file/209866/pb13942-nap-20130701.pdf

6. ESPO Water Market 2017 meeting presentation provided by Anglian Water

7. Graphs taken from http://ukclimateprojections.metoffice.gov.uk/22104

Page 7: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

7

Water Strategy 2014/15 - 2016/17

Figure 1: Change in summer mean temperature (°C) for the 2080s, Medium emissions scenario

Figure 2: Change in winter mean precipitation (%) for the 2080s, Medium emissions scenario

Page 8: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

8

Water Strategy 2014/15 - 2016/17

Figure 3: Change in summer mean precipitation (%) for the 2080s, Medium emissions scenario

Acknowledging these challenges and the importance of increasing resilience against them, in 2008 Defra published ‘Future Water’, the Government’s water strategy for England. This document sets out the Government’s plans for water and outlines a series of steps to get there, including a target to reduce per capita water use to 130 litres per day.3 By implementing this strategy, water should be used more wisely, whilst at the same time, the carbon impact of water services will also be reduced. Abstracting, pumping, treating and heating water and treating and pumping wastewater consumes energy and releases greenhouse gas emissions. According to Anglian Water Business, for every 1000m3 water saved, it is estimated that 1.15 tonnes of carbon dioxide equivalent will be avoided.6

Water efficiency and water resource management feature highly in the National Adaptation Programme; a result of the extreme weather events experienced in the UK in the past few years. More investment is being directed towards these areas to build resilience to adapt to climate change e.g. Defra has contributed funding towards the Energy Saving Trust and Waterwise Green Deal guidance (2012). Reducing demand for water is a key priority for water companies and features significantly in Water Resource Management Plans.5

Water suppliers have a statutory duty to promote the efficient use of water by customers.8 The additional funding and support from the government encourages water companies and Green Deal providers to work in partnership on joint energy and water efficiency projects. This has resulted in water companies providing a range of activities such as tips for saving water, retrofit programmes, school education programmes and the offer of subsidised water butts. Bedford Borough’s water supplier, Anglian Water Business has its own national campaign to raise awareness about the value of water and encourage users to change how they consume water. The ‘Love Every Drop’ campaign was launched in 2010 and was followed more recently by its ‘Drop 20’ campaign. This encourages consumers to save 20 litres of water a day.

8. Section 93A of the Water Industry Act 1991

Page 9: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

9

Water Strategy 2014/15 - 2016/17

1.2 Local Drivers

In Southern and Eastern regions of England, rainfall is relatively low, however per capita water consumption tends to be higher than elsewhere. In some areas abstraction is above its sustainable level. Combined with projections for rainfall and demand, this has led to the classification of all south-eastern areas as seriously water stressed. Figure 4, produced by the Environment Agency, shows relative water stress of water company areas. 9

9. Environment Agency – Areas of water stress: final classification 2007 -

www.gov.uk/government/uploads/system/uploads/attachment_data/file/69346/pb13562-future-water-080204.pdf

Figure 4: Map of areas of relative water stress produced by the Environment Agency

1. Anglian Water Business2. Bournemouth and West Hampshire Water3. Bristol Water4. Cambridge Water5. Essex and Suffolk Water6. Folkestone and Dover Water7. Mid Kent Water8. Northumbrian Water9. Portsmouth Water10. Severn Trent Water11. South East Water12. South Staffordshire Water13. South West Water14. Southern Water15. Sutton and East Surrey Water16. Tendring Hundred Water17. Thames Water18. Three Valleys Water19. United Utilities20. Wessex Water21. Yorkshire Water22. Anglian Water Business

(formerly Hartlepool Water)

Levels of Water Stress

Serious

Moderate

Low

Not assessed

Page 10: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

10

Water Strategy 2014/15 - 2016/17

Bedford Borough Council is a local authority based in Bedford, Bedfordshire with a population of approximately 157,800 people.10 The Council delivers a wide range of services, many of which result in large amounts of water being consumed, including leisure sites, swimming pools, parks, a golf course, community centres, day centres, care homes, libraries, offices, depots and allotments.

Bedford Borough Council is situated in one of the driest regions of the UK. It is currently supplied by Anglian Water Business whose area is classified as seriously water stressed. The region receives a third less rainfall than the national average and when further reductions are experienced, the impacts are considerable. In April 2012, following the regions driest 18 months in a century, a hosepipe ban was enforced by Anglian Water Business. Figure 5 shows Bedford’s rainfall for the period. As you will note, Bedford’s annual rainfall for 2012 was 762.10 mm compared to 2011 which was only 379.52 mm.11

All public authorities have a duty to conserve water supplied or to be supplied to premises.12 Acknowledging the severity of water stress in the region, the need to adapt to a changing climate and also the wider environmental impacts of the water industry (i.e. contributing to national greenhouse gas emissions), the Council is committed to reducing the impact it has and that of the services it delivers in the Borough; as outlined in the following:

Bedford Borough Sustainable Community Strategy 2009-2021

Theme 2: A Greener Borough: Environment and Climate Change

Aim 5: Protect and enhance our natural resources including air, soil and water to minimise the impacts

of flooding, climate change and pollution.

10. Population figures taken mid 2012 source taken from Waste Data Flow - www.voa.gov.uk/corporate/statisticalReleases/140424_CTValuationListSummary.htm

11. Source taken from: www.tutiempo.net/en/Climate/BEDFORD/2012/35600.htm

12. Water Act 2003, section 83 www.legislation.gov.uk/ukpga/2003/37/section/83

Rainfall in Bedford 2010 - 2013 (mm)

Figure 5: Illustration of average annual rainfall in Bedford from 2010-2013

762.1mm2012379.5mm

2011

435.9mm 2010

523.2mm 2013

Page 11: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

11

Water Strategy 2014/15 - 2016/17

Corporate Plan 2012-2016

Theme 2: Protecting and Preserving the Local Environment

Aim 2B: Climate Change and Environmental Sustainability. Objective: ‘To ensure that the Borough

reduces its carbon footprint, including managing our waste more effectively’.

Climate Change Strategy 2015/16

Priority One: Tackling Climate Change

Energy Efficiency:

• Reduce the carbon emissions from the Council’s buildings (including schools)

• Support the communities and businesses of Bedford Borough to reduce energy consumption

and mitigate climate change.

Adapting to Climate Change:

• Prepare and adapt the Council’s services to the possible impacts of climate change.

• Support the residents and businesses of the Borough to prepare and increase their resilience

to the possible impacts of climate change.

Priority Two: Using Resources Efficiently

Water:

• Reduce water usage and conserve water where possible within the Council and encourage

residents and businesses to be water efficient.

Carbon Management Plan 2010/11-2014/15

The Council adopted a Carbon Management Plan in March 2011. The plan sets out a programme of

action for the Council to achieve its 40% aspirational carbon reduction target from 2009/10 levels.

Council’s Commitment: Aspirational 40% carbon reduction (from 09/10 baseline) by 2015.

Climate Local Commitments and Actions documentThe Climate Local Commitments and Actions document sets out locally owned and determined targets to

mitigate and adapt to the effects of climate change.

Theme 1: Mitigation: Low Carbon Pathways

Commitment: We will aim to reduce the Council’s carbon emissions by the aspirational target of 40% by

2015 (from the 2009/10 baseline)

Commitment: We will aim to reduce the water usage across all Council buildings by 20% by 2015/16.

Theme 2: Adaptation: Climate Resilience

Commitment: We will develop our understanding of the Council’s vulnerability to the changing climate.

Commitment: We will raise awareness and help communities of the Borough to improve their resilience

to the impacts of a changing climate.

Commitment: Ensure our estate, including parks and recreation facilities, are well-adapted to the

changing climate.

Commitment: Build Resilience into the Local Plan by establishing policies to reduce water use in new

and existing buildings (Allocations and Designations plan adopted in 2013) and ongoing enforcement of

Building Regulations water consumption standards.

Page 12: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

12

Water Strategy 2014/15 - 2016/17

1.3 Our Vision

Bedford Borough Council will work towards sustainable water use to protect the environment and secure water resources for future generations.

The Council is committed to manage and improve water efficiency across all areas of activity. The Council will provide local leadership to encourage partners and residents of Bedford to reduce water consumption.

1.4 Our Baseline

February 2012 to January 2013 was selected as the baseline year for the Council’s Water Strategy.

Working in partnership with Anglian Water Business, data relating to 134 Council sites was analysed.

• It was found that 102,490m3 of water was consumed and 92,241m3 of sewerage was discharged during this period.

• This equated to a total spend of approximately £101,000 for water and £89,000 for sewerage13, whilst resulting in 117.86 tonnes CO

2e14

• Assuming that 20% of the water used during the period is used for hot water, the Council spent £46,651.06 of its energy bill on heating water in the baseline period.15

• Annually, the Council uses enough water to fill 41 Olympic swimming pools16

13. Calculated on a 90% abatement from water use

14. Anglian Water conversion factors 0.452kg C02e/m3 water and 0.781kg C02e/m3 sewerage (based on regional factors derived from Defra conversion factors by Anglian Water)

www.anglianwater.co.uk/environment/why-we-care/carbon-management.aspx and Water efficiency self-assessment guide

15. Based on Anglian Water Business calculations that; 102,490m3/year at 20% = 20,498m3. Gas cost at £2.27/ m3 assuming a 90% efficient boiler = £46,651 heating water

from 10 degrees to 60 degrees centigrade

16. Based on Olympic swimming pool volume of 2,500m3

total spend of approximately

£101,000 for water and £89,000 for sewerage

118 tonnes CO2e

February 2012 to January 2013 baseline usage

102,490m3 of water

consumed

92,241m3 of sewerage discharged

Page 13: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

13

Water Strategy 2014/15 - 2016/17

1.4.1 High Consuming Sites

The Council prioritised those sites consuming the most water. A list of the top 15 highest consuming sites can be found in Table 1.

Site Name Site Yearly Consumption (m3)(Feb 2012-13)

Percentage of total yearly consumption (Feb 2012-13)

Oasis Beach Pool* 19,673 19.2%

Borough Hall 9,684 9.5%

Robinson Swimming Pool* 7,064 6.9%

Kempston Swimming Pool* 6,409 6.3%

Vehicle Repair Depot 6,215 6.1%

Bunyan Centre* 4,756 4.6%

Mowsbury Golf Course* 3,729 3.6%

Allhallows MSCP PC 3,597 3.5%

Mays Yard PC 2,413 2.4%

Bedford I-lab 1,961 1.9%

George Beal House 1,441 1.4%

The Higgins Bedford 1,421 1.4%

Hillgrounds Changing Room 1,286 1.3%

Bedford International Athletics Stadium* 1,090 1.1%

Barkers Lane offices 1,012 1%* Fusion Lifestyle is now responsible for the water costs and consumption

Table 1: Bedford Borough Council’s 15 highest consuming sites

As of 1st February 2014, Fusion Lifestyle took over the operation of the Council’s leisure sites which account for 42% of baseline water use. Fusion Lifestyle is now responsible for water costs and consumption at the leisure sites. Built into the contract with the Council is a requirement for Fusion Lifestyle to closely monitor water usage and make efforts to reduce water consumption. The Council will regularly monitor progress through Fusion Lifestyle’s Environmental and Energy Management Plan.

Page 14: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

14

Water Strategy 2014/15 - 2016/17

After removing those sites operated by Fusion Lifestyle, the Council identified its own priority list of 10 high consuming sites (Table 2).

Site Name Site Yearly Consumption (m3)(Feb 2012-13)

Percentage of total yearly consumption (Feb 2012-13)

Borough Hall 9,684 9.5%

Vehicle Repair Depot 6,215 6.1%

Allhallows MSCP PC 3,597 3.5%

Mays Yard PC 2,413 2.4%

Bedford I-Lab* 1,961 1.9%

George Beal House 1,441 1.4%

The Higgins Bedford 1,421 1.4%

Hillgrounds Changing Room 1,286 1.3%

Lurke Street MCP PC 1,196 1.2%

CSD Offices, Barkers Lane 1,012 1%

Corn Exchange 969 1%

*The Council is not directly responsible for the utility bills at Bedford I-lab. Water costs are recharged to the tenants on site through their tenancy agreement.

Table 2: Bedford Borough Council’s top 10 priority list (excluding Bedford I-Lab)

1.4.2 Benchmarking

Benchmarking was undertaken as part of the baseline study completed in partnership with Anglian Water Business. Sites were categorised as follows: office buildings, leisure sites/pools, parks and public buildings. An ‘other’ category was also introduced for those sites that did not accord with the classifications. Figure 6 shows the percentage split for 119 sites analysed (15 of the 134 accounts were unsuitable for this exercise).

As predicted, leisure sites made up the majority of the Council’s water usage (48%), with offices being the second largest consumer. As previously explained the Council is no longer directly responsible for any water consumption or cost relating to leisure sites/pools; however it will monitor progress made on site to improve water efficiency through Fusion Lifestyle’s Environmental and Energy Management Plan.

Page 15: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

15

Water Strategy 2014/15 - 2016/17

Figure 6: Benchmarked Council buildings (taken from Anglian Water Business Baseline Report)

Utilising the specified categories, Anglian Water Business benchmarked each building based on m2 of the building and their consumption. 0:00 is the optimum line; anything above that line is considered inefficient, anything below is considered to be efficient.

1.4.2.1 Office Buildings

Figure 7: Comparison of office buildings against anticipated consumption

When comparing office buildings (Figure 7), results were skewed owing to the Vehicle Repair Deport being wrongly included in this category. The Depot was well above the optimum line, whilst Borough Hall (the Council’s headquarters building) was well below. This does not correlate with Table 2 which shows Borough Hall as a priority site. Despite the obvious classification error, the graph does demonstrate the huge amount of water being consumed at the Vehicle Repair Depot and highlights the huge potential for water saving and reduction.

Leisure site/pools

Offices

Parks

Public buildings

Sites not included

-6000.00

-4000.00

-2000.00

0.00

2000.00

4000.00

6000.00

Vehicle R

epair Depot

Bedford I-K

an

Foster Hill C

rematorium

and Chapel

Riverside H

ouse

CS

D O

ffices, Barkers

Lane

Queen S

treet MS

CP

CC

TV R

oom

Enterprise H

ouse

15 Greyfriars

23-27 Allhallow

s

Parking S

hop, 26 Harpur

Street

24 - 26 Cauldw

ell Street

The GateH

ouse, Creative

Arts

Roger C

ourt Block A

-K

ingsway

6 St P

auls Square

Norse R

oad Crem

atoriumO

ffices

Town H

all - Old

Bedford I-LA

B

Town H

all - New

Borough H

all

6000

4000

2000

0

-2000

-6000

-4000

Vehi

cle

Repa

ir D

epot

Berd

ford

I-Ka

n

Fost

er H

ill C

rem

ator

ium

an

d Ch

apel

Riv

ersi

de H

ouse

CSD

Offi

ces

Bark

ers

Lane

Que

en S

t. M

SCP

CCTV

Roo

m

Ente

rpris

e H

ouse

15 G

reyf

rairs

23-2

7 Al

lhal

low

s

Park

ing

Shop

26

Har

pur S

treet

24 -

26 C

auld

wel

l St

reet

The

Gat

eHou

se,

Crea

tive

Arts

Roge

r Cou

rt B

lock

A

King

sway

6 ST

Pau

ls S

quar

e

Nor

se R

oad

Crem

ator

ium

Offi

ces

Tow

n H

all

Bedf

ord

i-Lab

Tow

n H

all N

ew

Boro

ugh

Hal

l

48%

24%

4%

11%

13%

Cons

umpt

ion

vs A

ntic

ipat

ed C

onsu

mpt

ion

Site

Page 16: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

16

Water Strategy 2014/15 - 2016/17

1.4.2.2 Leisure Facilities

Figure 8: Comparison of leisure facilities against anticipated consumption

Eight leisure sites were analysed (Figure 8), including those now operated by Fusion Lifestyle (all but The Art Gallery and Museum). Surprisingly Mowsbury Golf Course was revealed as less efficient than Robinson Pool, a high consuming site with high footfall. A half open bypass valve, which resulted in large quantities of water bypassing the meter, is likely to have caused this discrepancy as water use was under reported. Oasis Beach Pool was clearly highlighted as the biggest user of water, however the data was somewhat skewed owing to a substantial leak identified during the baseline period. Kempston Pool was identified as the second highest consuming site when benchmarked on an m2 basis, despite using less water than Robinson Pool.

1.4.2.3 Parks

Figure 9: Comparison of park buildings against anticipated consumption

-2000

0

2000

4000

6000

8000

10000

12000

Oasis B

each Pool

Kem

pston Sw

imm

ingP

ool

Mow

sbury Golf C

ourse

Robinson S

wim

ming

Pool

The Higgins A

rt Gallery

and Museum

Cecil H

iggins Art

Gallery

Bedford InternationalA

thletics Stadium

Bunyan C

entre

12000

10000

8000

6000

4000

2000

-2000

0

Oas

is B

each

Po

ol

Kem

psto

n Sw

imm

ing

Pool

Mow

sbur

y G

olf

Cour

se

Robi

nson

Sw

imm

ing

Pool

The

Hig

gins

Be

dfor

d

Ceci

l Hig

gins

Be

dfor

d

Bedf

ord

Int.

Athl

etic

Sta

dium

Buny

an C

entre

-500.00

0.00

500.00

1000.00

1500.00

2000.00

2500.00

Bedford ParkCricket Pavillion

HillgroundsPlaying Fields

Addison HowardPark Changing

Room

Mowsbury ParkPavilion C

The Fountain Moor LaneChanging Room

Russell ParkBowling Green

Russell ParkPavilion

West LodgeBedford Park

Echodene Priory Street BowlPavilion

Allen Park SportsPavillion

2500

2000

1500

1000

500

-500

0

Bedf

ord

Park

Cric

ket P

avil-

lion

Hill

grou

nd

Play

ing

Fiel

ds

Addi

son

How

ard

Park

Ch

angi

ng

Room

Mow

sbur

y Pa

rkPa

vilio

n C

The

Foun

tain

Moo

r Lan

e Ch

angi

ng

Room

Russ

ell P

ark

Bow

ling

Gre

en

Russ

ell P

ark

Pavi

llion

Wes

t Lod

ge

Bedf

ord

Park

Echo

dene

Prio

ry S

treet

Bo

wl P

avili

on

Alle

n Pa

rk

Spor

t Pav

illio

n

Cons

umpt

ion

vs A

ntic

ipat

ed C

onsu

mpt

ion

Cons

umpt

ion

vs A

ntic

ipat

ed C

onsu

mpt

ion

Site

Site

Page 17: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

17

Water Strategy 2014/15 - 2016/17

Analysis of park sites (Figure 9) revealed 8 under-performing sites. Two have since identified and rectified leaks; Bedford Park Cricket Pavilion had ongoing pipework leaks up until the automatic public convenience (APC) was removed in 2013 and Hillgrounds Changing Room also had internal leakage problems up until 2014. The most efficient sites may perhaps be down to their footfall or because of the amount of water-using amenities in each, e.g. water at Bedford Park Pavilion supplied the pavilion and an APC whereas Echodene is simply a Club House for golf members.

1.4.2.4 Public Buildings

Figure 10: Comparison of public buildings against anticipated consumption

The final category applied was public buildings comprising of 19 buildings. Three of the least efficient buildings include Bedford Social Centre, George Beal House (residential care home) and Huddleston Way Day Centre. Two of the best performing sites are Bedford Central Library and Corn Exchange.

-2500.00

-2000.00

-1500.00

-1000.00

-500.00

0.00

500.00

1000.00

Bedford Social Centre / C

onduitR

oad Day C

entre

George Beal H

ouse

Huddleston W

ay Day C

entre /Bedford C

entre

Faraday Square Com

munity

Centre

Southfields Com

munity C

entre

Sunflower H

ouse

Tavistock Com

munity C

entre

Cherry Trees N

ursery

91 Bromham

Road - Foxgloves

Cauldw

ell Com

munity C

entre

Parkside House- 21A BedfordR

oad

Scott Hall C

omm

unity Centre

Goldington Social C

entre / Day

Centre

Kempston Youth C

entre

Bromham

Library

Queens Park Early years/

Childrens C

entre

Lifelong Learning - 21-23G

adsby St

Wootton Library

Putnoe Library

Church Lane C

omm

unity Centre

Raleigh & Southw

ay Centre

(incl. Southways N

ursery)

Jubilee Com

munity C

entre

Kempston Library

Kempston C

entre

Bromham

Mill

Corn Exchange

Bedford Central Library

1000

500

0

-500

-1000

-1500

-2500

-2000

Bedf

ord

Soci

al C

entre

/ Co

ndiu

t Rd

Day

Cen

tre

Hud

dles

ton

Way

Day

Ce

ntre

/ Be

dfor

d Ce

ntre

Fara

day

Squa

re

Com

mun

ity C

entre

Sunfl

ower

Hou

se

Tavi

stoc

k Co

mm

unity

Ce

ntre

Cher

ry T

rees

Nur

sery

91 B

rom

ham

Roa

d Fo

xglo

ves

Caul

dwel

l Com

mun

ity

Cent

rePa

rksi

de H

ouse

21A

Bedf

ord

Road

Scot

t Hal

l Com

mun

ity

Cent

reG

oldi

ngto

n So

cial

Ce

ntre

/ D

ay C

entre

Kem

psto

n Yo

uth

Cent

re

Brom

ham

Lib

rary

Que

en P

ark

Early

yea

rs /

Child

ren

Cent

reLi

felo

ng L

earn

ing

21-2

3G

adsb

y St

Woo

tton

Libr

ary

Putn

oe L

ibra

ry

Chur

ch L

ane

Com

mun

ity C

entre

Rale

igh

& S

outh

way

Cen

tre(in

c. S

outh

way

s N

urse

ry)

Jubi

latio

n Co

mm

unity

Cen

tre

Kem

psto

n Li

brar

y

Kem

psto

n Ce

ntre

Brom

ham

Mill

Corn

Exc

hang

e

Bedf

ord

Cent

ral L

ibra

ry

Sout

hfiel

ds C

omm

unity

Ce

ntre

Geo

rge

Beal

Hou

se

Cons

umpt

ion

vs A

ntic

ipat

ed C

onsu

mpt

ion

Site

Page 18: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

18

Water Strategy 2014/15 - 2016/17

1.5 Our Target

* any associated energy savings will be in addition to this

Figure 11: Bedford Borough Council Mayor Dave Hodgson and Director of Anglian Water Business Bob Wilson signing the Water Promise

Save approx. £38,000

on water bills*

Cut water usage

by 20%

Reduce our carbon footprint by 24tCO

2e

Cut wastewater

by 20%

By 2015 / 16 we will aim to:

Page 19: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

19

Water Strategy 2014/15 - 2016/17

2.1 Measures Implemented Prior to the Baseline Period

2.1.1 Priory Country Park Visitors Centre: Rainwater Harvesting System

2.1.2 Water Efficiency Audits of Council Sites

Over 23 Water Efficiency Audits (WEA’s) were completed by Anglian Water Business prior to the baseline period. Sites audited in 2012 included leisure centres, libraries, the crematorium and the cemetery. The day centres and the Council’s headquarters building were completed in 2010.

The WEA’s highlighted areas where the sites could make water savings. Measures included: • Installing water saving devices• Decreasing the flow rate of taps• Installing automatic flushing devices to urinals• Conducting soundness tests to check for leaks• Ensuring taps, hoses and similar devices were not left running when in use

A full list of sites and recommendations are included in Appendix A. Actions not already completed have been included in Table 9.

Leaks were found at George Beal House and Goldington day centre but were resolved in 2012. Water efficiency devices were installed at the majority of the sites at the time of the audits.

2. Water Efficiency Opportunities

In 2011 a rain water harvesting system was fitted as part of a refurbishment and eco-technology demonstration project. A 660 litre slim-line Wall Tank System was installed which is connected to the public toilets enabling them to be flushed by rainwater collected from the Visitor Centre’s roof.

The energy and water saving measures that have been put in place at the Visitor Centre can be easily accessed and viewed by visitors, who can see the technology in action. To complement the demonstrations, a range of interpretative material, including display boards and leaflets have also been produced to help raise awareness of energy and water efficient technology.

Page 20: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

20

Water Strategy 2014/15 - 2016/17

2.1.3 Robinson Pool: Metering and Leakage

At Robinson Pool it was recently (2013) discovered that one of the bypass valves on site had been left half open. This resulted in a continuous flow of water through the valve and consequently the meter under recorded water usage. This has since been resolved. In late 2012 a leak on site, caused by the pool grouting being worn away, was identified. This was repaired in March 2013. In 2014 Robinson Pool was fitted with a smart meter to enable real-time monitoring of water usage. Site managers can interrogate the data on the online system to identify any peaks in usage and other areas of wastage. Fusion Lifestyle has since been provided with these details so they can monitor usage going forward. Figure 12 shows a snapshot of the weekly consumption at Robinson Pool.

Figure 12: Robinson Pool Water consumption graph

2.1.4 Oasis Pool: Metering and Leakage

A smart meter was installed at Oasis Pool in January 2013. Having analysed the consumption data on the online system, the manager identified that peaks in usage were a result of backwashing the swimming pool. Due to the tariff Oasis Pool is on, they are charged for their maximum demand (high quantity of water used at peak times); if they exceed this level of maximum demand then they are charged excess fees. Figure 13 shows a snapshot of the weekly consumption at Oasis Pool taken from the online tool.

Figure 13: Oasis Pool water consumption graph

Summary for period:

Max Consumption: Average Consumption Min Consumption Total Consumption

3.480 Water Flow m3 / 15min 0.392 Water Flow m3 / 15min 0.010 Water Flow m3 / 15min 263.750m3

Average Water Flow m3 / 15 min

Water Flow m3 / 15 min

Min Water Flow m3 / 15 min

Max Water Flow m3 / 15 min

Wat

er F

low

m3

/ 15m

in

Time / Day Date

Average Water Flow m3 / 15 min

Water Flow m3 / 15 min

Min Water Flow m3 / 15 min

Max Water Flow m3 / 15 min

Summary for period:

Max Consumption: Average Consumption Min Consumption Total Consumption

1.480 Water Flow m3 / 15min 0.391 Water Flow m3 / 15min 0.000 Water Flow m3 / 15min 262.560m3

Wat

er F

low

m3

/ 15m

in

Time / Day Date

Page 21: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

21

Water Strategy 2014/15 - 2016/17

2.1.5 Borough Hall: Toilet Refurbishment

A tap left running can waste over 100 litres an hour. Even a small 5mm stream from a single tap will waste 60 litres an hour or 526,000 litres a year at a cost of £1,300.17

In 2010/2011 the Council also removed all kettles (around 350 in total) and replaced these with hot water heaters in the kitchen areas.

17. Anglian Water Business - Water Efficiency Self- Assessment Guide http://www.anglianwater.co.uk/_assets/media/Water-Efficiency-Self-Assessment.pdf

As part of the toilet refurbishments in 2008/2009, percussion/push taps were fitted in the majority of toilets to increase water efficiency and prevent taps being left on. These taps are now fitted as standard in any new Council buildings or during refurbishment programmes. An example of the taps currently installed is shown below.

One drip per second wastes 4 litres per day

1.5mm stream wastes 320

litres per day 3mm stream wastes 985

litres per day 6mm stream wastes 3,500 litres per day

Page 22: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

22

Water Strategy 2014/15 - 2016/17

2.2 Measures Implemented Since the Baseline Period

2.2.1 Allhallows Multi-Storey Car Park Public Conveniences Refurbishment

2.2.2 Lurke Street Public Conveniences Refurbishment

The public conveniences were refurbished in 2013/14 and all taps and toilets were fitted with electronic sensors (with a separate button to override this if necessary).

The urinals were also fitted with motion sensors, with a 12 hour automatic flush for hygiene purposes. The hot water is fed from low content water heaters; thereby eliminating the need for large storage heaters.

A safety system was installed which shuts off valves overnight, preventing any occurrences of leaks. There are also foam soap dispensers; another potential water saver.

The toilets were closed from 2012 to 2014 and have now been refurbished and re-opened to the public.

Following refurbishment, the toilets are split into one disabled toilet and one unisex toilet. Due to the nature of these toilets, push taps and WC flushing sensors were unable to be fitted. Instead, the toilets are fitted with quarter-turn lever taps and dual flush WC’s.

Page 23: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

23

Water Strategy 2014/15 - 2016/17

2.2.3 Tariff Optimisation

Anglian Water Business completed a tariff review of 134 Council sites in 2013, identifying sites which were on the wrong tariff as well as sites which could save money by switching to a more cost effective tariff.

Site Name Current Tariff

Site Consumption (m3) Proposed Tariff Potential Saving Total

Bunyan Centre* Green 4,756 Orange £715.58

Mowsbury Golf Course* Blue 3,729 Orange £201.00

George Beal House Green 1,441 Orange £158.26

The Higgins Bedford Green 1,421 Orange £154.90

Bedford Park Cricket Pavilion Green 2,010 Orange £152.44

91 Bromham Road - Foxgloves Domestic 751 Orange £151.68

Mill Meadows Domestic 832 Orange £146.15

Hillgrounds Changing Rooms Green 1,283 Orange £131.70

CSD Offices, Barkers Lane Green 1,012 Orange £86.14

56 Singer Way Orange 0 Green £84.00*Sites now run by Fusion Lifestyle

Table 3: Tariff optimisation top 10 sites

There were 19 sites which could save more than £30 per year just by switching tariffs (please refer to Appendix B). The top ten highest saving sites are shown in Table 3.

By switching tariffs for the 19 sites, the Council has saved approximately £2,500 per year on its water bills.

2.2.4 Water Efficiency Audits (WEA) of Borough Hall and The Higgins Bedford

In April 2014, Water Efficiency Audits were completed at Borough Hall and The Higgins Bedford by Anglian Water Business. Despite Borough Hall already being visited in 2010, the building has undergone a number of changes and the consumption has increased over the years; therefore another audit was deemed beneficial. The recommendations made for each respective site were as follows:

2.2.4.1 Borough Hall Water Efficiency Audit

Anglian Water Business found there to be 4 leaking urinals and 3 leaking toilet cisterns which could save £1,692.50 a year when fixed. Reparation works were completed in July 2014. The WEA also recommended reducing the flow rate of the taps to 7.5 litres/minute which would save up to £872.10 /year. Table 4 outlines the actions to be taken.

The majority of the taps in Borough Hall are push taps which are considered water efficient. However, there are a number of taps in the building which were not included in the refurbishment programme; improvements to these will be looked into. If all of the recommendations were put in place, Borough Hall could save up to 8% of its annual consumption.

Page 24: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

24

Water Strategy 2014/15 - 2016/17

Recommendation Potential Savings Implemented? Actions

Reduce flow of cold taps to 7.5 litres/minute

302.4m3 / year Not currently To review the benefits of reducing the flow rate of taps against fitting aerators 0.24 tonnes CO

2 / year

£667.60 / year (water + wastewater)

Reduce flow of hot taps to 7.5 litres/ minute

45.4m3 / year Not currently To review the benefits of reducing the flow rate of taps against fitting aerators 3528 kWh / year (power saving to heat

hot water)

0.69 tonnes CO2 / year

£204.50 (water + wastewater)

Repair 4 leaking urinals 338m3 / year Identified and fixed July 2014

N/A- All completed

0.26 tonnes CO2 / year

£744.90 / year (water + wastewater)

Repair 3 leaking toilet cisterns 430m3 / year Identified and fixed July 2014

N/A- All completed

0.34 tonnes CO2 / year

£947.60 / year

Table 4: WEA recommendations for Borough Hall

Figure 14 shows the historical water consumption based on actual meter readings at Borough Hall. The increase in usage is likely to be due to staff moving into the building and the presence of the leaking urinals and cisterns.

Annual water consumption

Figure 14: Long term water consumption trends for Borough Hall

Dai

ly w

ater

use

(m

3 /d)

Date

Key Daily usage m3

5045403530252015105

17/0

3/20

13

06/0

5/20

13

25/0

6/20

13

14/0

8/20

13

03/1

0/20

13

22/1

1/20

13

11/0

1/20

14

02/0

3/20

14

21/0

4/20

14

10/0

6/20

14

Page 25: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

25

Water Strategy 2014/15 - 2016/17

2.2.4.2 The Higgins Bedford Water Efficiency Audit

The WEA at The Higgins Bedford made recommendations to reduce water consumption by 29% and costs by up to £629 / year (Table 5). Additional recommendations were made for installing percussion taps in public areas when replacement is required. Upon receipt of the report an order was raised to repair the leaking cistern, investigate the hot and cold water tap flow and install the water saving devices. All projects have now been implemented.

Recommendation Potential Savings Implemented? Actions

Reduce the flow of cold taps to 7.5 litres /minute

117.6m3 / year Works completed July 2014 N/A- All completed

0.09 tonnes CO2 / year

£302.70 / year

Reduce the flow of hot taps to 7.5 litres /minute

12.6m3 / year Works completed July 2014 N/A- All completed

980 kWh / year (power saving to heat hot water)

0.19 tonnes CO2 / year

£61.40 / year

Install save-a-flush devices in WC cisterns

72m3 / year Works completed July 2014 N/A- All completed

0.06 tonnes CO2 / year

£185.30 / year

Repair leaking toilet cistern 31m3 / year Works completed July 2014 N/A- All completed

0.02 tonnes CO2 / year

£79.80 / year

Table 5: WEA recommendations for The Higgins

Figure 5 shows the water consumption at The Higgins Bedford. There are three meters on site; the purple line shows the consumption of the main meter. The increase in usage is thought to be due to the full site refurbishment undertaken over the past few years.

Long-term water consumption

Figure 15: Long term water consumption trends for The Higgins Bedford

Dai

ly w

ater

use

(m

3 /d)

Date

Key 99A809230M

17/0

5/09

06/0

7/09

25/0

8/09

14/1

0/09

03/1

2/09

22/0

1/10

13/0

3/10

02/0

5/10

21/0

6/10

10/0

8/10

29/0

9/10

18/1

1/10

07/0

1/11

26/0

2/11

17/0

4/11

06/0

6/11

26/0

7/11

14/0

9/11

03/1

1/11

23/1

2/11

11/0

2/12

01/0

4/12

21/0

5/12

10/0

7/12

29/0

8/12

18/1

0/12

07/1

2/12

26/0

1/13

17/0

3/13

06/0

5/13

25/0

6/13

14/0

8/13

03/1

0/13

22/1

1/13

11/0

1/14

02/0

3/14

21/0

4/14

10/0

6/14

5045403530252015105

Page 26: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

26

Water Strategy 2014/15 - 2016/17

2.2.5 Hillgrounds Changing Room: Leakage

Having reviewed the results of the benchmarking activity completed by Anglian Water Business and analysed recent bills, Hillgrounds changing room was investigated to determine why water consumption was so high. Investigations found this was a result of an overflowing toilet cistern and one of the hot water cylinders regularly purging large quantities of water. This was resolved and the consumption on site has since dropped from 740m3 (July 2013 – January 2014) to 157m3 (January – July 2014).

Issues such as these highlight the importance of regularly monitoring usage on site as well as checking internal fixtures for problems.

2.2.6 Modernisation Programme: Toilet Closures

As part of the Council’s modernisation programme to review all services across its operations, in 2013 the Council closed some toilets that were in poor condition and those with low usage. This has enabled it to focus its resources on the remaining sites to provide Clean, Safe and Accessible facilities to cater for all users (young, old, disabled, nursing parents) which Bedford can be proud of. One of these removed sites was Bedford Park Cricket Pavilion where the water also supplied Bedford Park West APC. This site had suffered with leaks and very high usage which was thought to be caused by the original old lead supply pipe fracturing in numerous places when the APC was periodically high pressure washed. The APC was removed in April 2013 but the supply remains for the Pavilion.

2.2.7 The Higgins Bedford Refurbishment: Rainwater Harvesting

The Higgins Bedford was refurbished during 2012/13. As part of the works, a rain water harvesting system was installed supplying the main public toilets. The system comprises of a 2,500 litre tank that is used to top up the mains water which flushes the public toilets in the gallery.

2.2.8 Consolidated Billing

In 2014, the Council moved to consolidated billing. Prior to this, bills were sent directly to individual sites and there was limited monitoring of the Council’s water and sewerage. Having worked with Anglian Water Business to set up the new billing system, data relating to all of the Council’s water accounts was collated in a spreadsheet showing all the bills with respective costs and consumption information. This is now sent to both the Councils Energy Management Unit (EMU) within the Environmental Services department and to Accounts on a monthly basis. The bills are now paid centrally and monitored by the Energy Management Unit through TEAM Sigma. Using Team Sigma, the Energy Management Unit can quickly determine if a bill is too high, it can be compared to previous bills, the consumption can be monitored and the sites can also be compared and benchmarked against one another. The Energy Management Unit have already identified potential cost savings, for example a site that has been wrongly paying VAT since 2008 (it should be zero-rated); Anglian Water Business has since credited £1,184.50 back to the Council.

2.2.9 Installation of a Smart Meter at Borough Hall

Due to increased usage on site over the past few years, a Smart Meter was installed at Borough Hall at the beginning of 2014. The meter provides the Energy Management Unit and the facilities manager with access to real-time data online and the ability to monitor and target usage.

Page 27: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

27

Water Strategy 2014/15 - 2016/17

The Energy Management Unit noted that water was being used out of hours as the base-load was not 0 (see red line in Figure 16). Further investigations by the facilities manager revealed that this was due to un-repaired leaks on the cisterns (identified in the WEA) and out of hours working including weekend meetings.

Figure 17 shows data after the leaks were repaired. The base-load (as per the red line - minimum water flow) has since reduced.

Figure 16: Graph of Borough Hall consumption April 2014

Figure 17: Graph of Borough Hall consumption October 2014

Average Water Flow m3 / 15 min

Water Flow m3 / 15 min

Min Water Flow m3 / 15 min

Max Water Flow m3 / 15 min

Summary for period:

Max Consumption: Average Consumption Min Consumption Total Consumption

1.380 Water Flow m3 / 15min 0.395 Water Flow m3 / 15min 0.060 Water Flow m3 / 15min 262.187m3

Summary for period:

Max Consumption: Average Consumption Min Consumption Total Consumption

1.050 Water Flow m3 / 15min 0.262 Water Flow m3 / 15min 0.010 Water Flow m3 / 15min 175.980m3

Month / Year

Wat

er F

low

m3 /

15m

in

Time / Day Date

Wat

er F

low

m3 /

15m

in

Page 28: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

28

Water Strategy 2014/15 - 2016/17

3.1 No or Low Cost Measures

3.1.1 Building Manager’s Handbook

It is expected that water management will be the responsibility of every employee in Bedford Borough Council. This is essential if the aspirational 20% reduction target is to be realised. To increase awareness, a best practice guide in the form of a handbook will be created specifically for building managers. This will cover and include the following:

• How to read water meters and record regular reads; a worksheet will be provided to building managers (linked to 3.1.3)

• How to check pipes and fixtures regularly to ensure there are no leaks and that they are properly insulated against frost

• How to report leakage• How to calculate flow rates on taps and urinals • How to analyse water consumption data• How to identify responsibility of supply pipework• A list of water saving opportunities• A list of useful contacts and resources

Supporting the building manager’s handbook will be a number of resources including:• Site checklist to enable building managers to identify and record assets and meter locations• Awareness raising campaign material, such as posters. These will include messages such as:- Only fill kettles with the amount of water required (where applicable) - Wash up large amounts using a bowl - Turn off taps after use - Notices on how to turn off taps (where applicable) - Reminder to limit shower use - Reminder of stop tap locations

Action Lead Completed by

Produce a building managers handbook to demonstrate best practice in water management, efficiency and reduction

Energy Management Unit in partnership with Anglian Water Business

February 2015

Create posters to encourage water efficiency and water saving tips (to be distributed to building managers)

Energy Management Unit in partnership with Anglian Water Business

February 2015

Create site audit checklist to enable building managers to review current assets and metering arrangements

Energy Management Unit in partnership with Anglian Water Business

February 2015

Launch the building managers handbook and supporting resources

Energy Management Unit in partnership with Anglian Water Business

March 2015

3.1.2 Site Checklist

As part of the building managers’ handbook, a site checklist will be included. In order to identify further opportunities within Council buildings, building managers will be asked to complete an on-site audit, identifying the number and type of water fixtures within their site. From this, the Energy Management Unit will work with building managers to propose measures that can improve efficiency. As part of this audit, building managers will be asked to identify the locations of meters on site. Any issues arising from this will be addressed.

3. Future Water Saving Opportunities

Page 29: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

29

Water Strategy 2014/15 - 2016/17

Action Lead Completed by

Produce and distribute a site checklist for water fixtures and metering (this will form part of the building managers handbook)

Energy Management Unit March 2015

Complete the site checklist and return to the Energy Management Unit

Building Managers March 2015

Collate information from the site checklist. Review opportunities and seek to implement any appropriate measures

Energy Management Unit and Building managers

April 2015

If a meter on site cannot be located, the Energy Management Unit will work with Anglian Water Business to conduct site surveys

Energy Management Unit , Building Managers and Anglian Water Business

April 2015

Plot meter locations on GIS, drawing upon information already held and information learned from the site checklist

Energy Management Unit, GIS Team

April 2015

Explore opportunities to incorporate a site checklist within existing processes e.g. workplace inspections

Energy Management Unit Ongoing

3.1.3 Regular Meter Reads

It is usually a requirement that commercial sites are metered; Anglian Water Business typically read meters every 6-12 months. For the rest of the year sites are usually billed to estimated reads. This can be very inaccurate with the read being either too high or too low; directly impacting on the bill received. If the estimates are continuously lower than the actual read, when Anglian Water Business gains a higher actual read the bill will reflect the difference and will often be a lot higher than expected. This can adversely affect the Councils ability to forecast budgets.

To minimise these issues, building managers will be asked to take monthly meter readings. This will ensure the Council is being billed correctly and also enable building managers to check for leaks (i.e. if water consumption suddenly increases without explanation then there could be a leak). Currently analysis of meter reads is the only method (for sites without automatic meter readers) to monitor usage and therefore monitor savings when measures are installed.

Action Lead Completed by

Complete and record meter readings on a monthly basis

Site managers / appointed staff Ongoing action- monthly

Submit monthly meter readings to Anglian Water Business and the Energy Management Unit

Site managers / appointed staff Ongoing action- monthly

Input meter readings into Team Sigma Energy Management Unit Ongoing action- monthly

Energy Team to work with Team Energy to develop a method of uploading water data into Team Sigma; making recording and monitoring water usage quicker and easier

Energy Management Unit 2015

Page 30: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

30

Water Strategy 2014/15 - 2016/17

3.1.4 Training

In order to increase understanding and awareness, initial training will be provided to building managers at the launch of the building manager’s handbook. Should further information be required by building managers, further talks and training sessions will be arranged. Anglian Water Business is able to attend and assess sites to resolve any queries or provide advice on water saving. Should guidance be required, the Energy Management Unit will liaise with Anglian Water Business to arrange site visits.

The Energy Management Unit will investigate the possibility of incorporating training sessions on the Councils e-learning system to raise awareness of water management issues. Information will also be included on the Council’s intranet pages with regards to water saving.

Action Lead Completed by

Complete initial training for building managers at the launch event for the building manager’s handbook

Energy Management Unit in partnership with Anglian Water Business

March 2015

Arrange and carry out talks or training sessions on water efficiency as required

Energy Management Unit Ongoing action- as required

Look into the possibility of an e-learning course on My View (intranet) for staff to complete to raise water awareness and update intranet pages

Energy Management Unit / ICT May 2015

3.1.5 Water Efficiency Audits

Water Efficiency Audits were completed at a number of Council sites between 2010 and 2012, yet only a select few sites were assessed.

The Council will review those sites which have not yet been assessed, to determine if further audits would be beneficial. The Council will work in conjunction with Anglian Water Business to complete any audits which are deemed appropriate.

Action Lead Completed by

Identify sites which have yet to have a WEA completed, or those that should be revisited

Energy Management Unit January 2015

Commission WEAs where appropriate Energy Management Unit /Anglian Water Business

February 2015

Assess recommendations from completed WEAs and seek to implement opportunities

Energy Management Unit March 2015

3.1.6 Allotments and Parks

Written into the Climate Local Commitments and Action document is an ongoing action for the Council’s Parks department to investigate the potential of rain water harvesting and other water conservation measures. The Energy Management Unit will work with the Parks Unit to investigate opportunities by firstly better understanding how water is currently used, secondly identifying any measures that have already been implemented to date and finally investigating any potential measures which could be implemented.

Page 31: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

31

Water Strategy 2014/15 - 2016/17

In 2010 a Climate Change for Gardeners poster was developed by the Sustainability Team. This is displayed at allotment sites. The poster encourages gardeners to consider drought resistant plants, drainage, the use of water butts and avoiding the use of the garden hose.

The Council will review its own planting regime to see where improvements can be made. Opting for drought tolerant varieties and including mushroom compost and water retaining gel granules etc. in planting approaches may result in a reduced watering requirement, as well as a reduction in the amount of

resource (and cost) required.

Action Lead Completed by

Identify the needs of parks and allotments, how the water is currently used and if any measures have already been implemented to date

Energy Management Unit / Parks, Allotments

March 2015

Investigate potential measures to implement at parks and/or allotments, including changes to the current planting regime rain water harvesting and improved watering practises

Energy Management Unit / Parks, Allotments

March/April 2015

Implement proposed measures Energy Management Unit /Parks/Allotments

May 2015

Page 32: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

32

Water Strategy 2014/15 - 2016/17

3.2 Medium Cost Measures

3.2.1 Borough Hall Taps

A number of taps in Borough Hall were not converted to push taps when the toilets were refurbished in 2008/2009. A review of these taps will be undertaken and a proposal put in place to increase their efficiency. Three options are available (flow restrictors, tap aerators and percussion taps), as detailed in Table 6, with subsequent benefits and disadvantages.

Benefits of flow restrictors Disadvantages

Water savings up to 10 litres / min Orifice may block up with lime-scale build up

Retrofit available Does not regulate pressure

Cheap and easy to install

Benefits of tap aerators Disadvantages

Water savings up to 10 litres / min Not effective at pressure < 1 bar

Retrofit available Standard do not regulate pressure (unless pressure compensating aerators)

Flow rate reduced to 2.5 - 8 litres/min

No splashing

Benefits of percussion taps Disadvantages

Retrofit available Self-closing timing needs to be set up correctly

Automatically closes after use Can sometimes jam

Savings can vary Payback period can be 2-3 years

Table 6: Benefits and Disadvantages of tap proposals

Action Lead Completed by

Investigate the number of turn taps in Borough Hall and conduct a flow test on the taps. Complete a desktop assessment to determine the best solution

Energy Management Unit / Facilities manager

January 2015

Implement project to upgrade current push taps in Borough Hall

Energy Management Unit / Facilities manager

February 2015

Page 33: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

33

Water Strategy 2014/15 - 2016/17

3.2.2 Foam Soap

Evidence suggests that by changing from liquid soap to foam soap, organisations can save water and cost. It is also claimed to be better for the environment.

Independent research commissioned by the Deb group in 2009 found that of 150 people washing their hands, around 16 – 45%18 less water was used when they used foam soap compared to liquid soap. Envirowise predict up to 50%19 of water can be saved. For every 100 people employed, this equates to a potential annual reduction of 56,000 litres of water. The study also demonstrated other benefits of foam soap, such as it being more environmentally friendly (more biodegradable) and reductions in energy costs and carbon emissions (as warm water is usually used for hand washing).20 Table 7 summarises the conclusions of the study.

Benefits of foam soap Disadvantages of foam soap

If 100 people wash their hands three times a day, using foam soap compared to lotion soap this could save 254 kg CO

2 a year

Purchase of new dispensers

Equivalent efficacy from foam is delivered using 36% less product per hand wash

Purchase of foam soap

100 people would have roughly 69,000 hand washing events each year ‐ with the lotion soap they would use 76 one litre cartridges per year, but with the foam soap this would drop to just 46 cartridges.

Foam soap uses 26% less packaging than lotion soaps; just 11mg of packaging per wash compared to 15mg with lotion hand wash.

On a per hand wash basis, foam soap has less than half the Chemical Oxygen Demand (COD) (150mg per hand wash) of lotion soap (332mg per wash), which means that foam soap will biodegrade more easily.

When testing the lotion soap, 150 participants used an average of 1,758ml water with the tap on for 21.8 seconds. For foam soap, this reduced to 1,475ml water with the tap on for 19.7 seconds. This amounted to a 16% water saving

Table 7: The benefits and disadvantages of foam soap

Foam soap is already used in some of the Council’s public conveniences. The Council will investigate other opportunities for utilising foam soap.

Action Lead Completed by

Complete a desktop assessment to ascertain the current costs associated with liquid soap and the potential savings associated with utilising foam soap. Develop a business case (if appropriate) and agree proposals

Energy Management Unit /Facility Managers

February 2015

Implement foam soap at Council sites (if appropriate)

Energy Management Unit April 2015

18 www.debgroup.com/sg/about-us/press-media/2012/washroom-solution-saves-water-time-and-money

19 Envirowise Water Management Leaflet www.envirowise.gov.uk/water

20 www.nationalpurity.com/foaming-hand-soap-really-work/

Page 34: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

34

Water Strategy 2014/15 - 2016/17

3.2.3 Waterless Urinals

To further reduce the Council’s water use in public conveniences and Council buildings, waterless urinals will be investigated. Evidence suggests that waterless urinals can have a number of benefits, including:

• Reductions in annual water bills (A urinal that flushes 9 litres of water, every 15 minutes, 24 hours a day, 365 days of the year, will use 315,000 litres a year21)

• Elimination of lime-scale build up• More fragrant washroom• Reduction in the likelihood of blockages and floods• Reductions in costs associated with maintenance etc.

Action Lead Completed by

Installation of a sub meter at Allhallows Multi Storey Car Park Toilets to monitor water consumed by the urinals

Design Services January 2015

Complete a trial of a waterless urinal system at Allhallows Multi Storey Car Park Toilets and analyse results

Energy Management Unit March/April 2015

Complete a business case to roll out waterless urinals to other Bedford Borough Council sites (if appropriate)

Energy Management Unit April 2015

Implement waterless urinals (if/where appropriate) Energy Management Unit June 2015

21 Anglian Water Business: Water Efficiency Self- Assessment Guide www.anglianwater.co.uk/_assets/media/Water-Efficiency-Self-Assessment.pdf

Page 35: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

35

Water Strategy 2014/15 - 2016/17

3.2.4 Improvements to Borough Hall Canteen

Action Lead Completed by

Investigate the feasibility of changing the dishwasher in Borough Hall canteen to a newer, more efficient model

Energy Management Unit January 2015

Conduct a flow test on the taps in Borough Hall canteen and complete a desktop assessment to investigate the benefits of fitting flow regulators or tap aerators to the kitchen taps

Property Services December 2014

Investigate if the rinsing device in Borough Hall canteen is being used efficiently and/or could be upgraded to a more efficient model

Energy Management Unit January 2015

Implement any appropriate projects in Borough Hall canteen Property Services April 2015

The canteen in Borough Hall contains a large Hobart dishwasher which is at least over 6 years old. The Council will investigate if there are any new, more efficient, cost effective devices available. Any replacement will have to meet the requirements of the kitchen staff.

All of the taps in the canteen are lever or turn taps; flow regulators and aerators will be investigated. There is also a high pressure rinsing device (this rinses off food at high pressure before the plates etc. are put into the dishwasher) which will be reviewed to determine if this is being used efficiently and if there are any alternative, more efficient devices available.

Page 36: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

36

Water Strategy 2014/15 - 2016/17

3.3 High Cost Measures

3.3.1 Vehicle Repair Depot: Grey Water Recycling and Rainwater Harvesting

Both grey water recycling and rain water harvesting provide an opportunity to re-use wasted water and draw less water from the mains.

The Council’s Vehicle Repair Depot is currently one of the highest performing sites in terms of water usage (Tables 1 and 2). The site currently consumes thousands of litres of water a day, the majority of which is believed to be used to wash down vehicles and to fill up sweepers.

The Council is investigating the site to determine if more efficient ways of managing water use can be found. Initially it will seek to understand the water mass balance of the site; where inputs and losses currently are, by installing sub meters. It will then look to identify no/low cost measures to implement initially.

Having a holistic view of the site, the Council will then explore the possibility of installing water recycling and water harvesting technologies. It will look into the possibility of utilising a wash water reclamation system for Council vehicles and it will review the current gravity fed main water system, used to fill road sweeping vehicles, to determine if a rain water harvesting facility would be feasible.

Action Lead Completed by

Install 2 sub-meters at the Vehicle Repair Depot (one on the existing vehicle wash down area and one on the vehicle fill area) and complete a water mass balance study

Site Manager / Property Services / Energy Management Unit / Anglian Water Business

January / February 2015

Identify and implement no/low cost measures at the Vehicle Repair Depot

Energy Management Unit / Site manager / Anglian Water Business / Property Services Managers

February 2015

Investigate the feasibility of grey water recycling and rain watering harvesting at the Vehicle Repair Depot and build and present a business case for approval (if appropriate)

Site Manager / Energy Management Unit /Anglian Water Business

April 2015

Implement water recycling project(s) at the Vehicle Repair Depot (if appropriate)

Site Manager / Energy Management Unit June 2015

Page 37: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

37

Water Strategy 2014/15 - 2016/17

Local government funding and the delivery of local government services continues to be the subject of significant scrutiny, with demands for the achievement of increased efficiencies and cost effectiveness in the delivering of critical public services. There is continued emphasis towards fundamentally changing the way that the public sector operates with the overall aim to achieve greater public choice, local decision making and greater efficiencies within an overall reduction in real spend.

One of the proposals under ‘Innovation and Entrepreneurship’ is the pursuance of ‘invest to save’ opportunities with a financial return on the investment in transforming activities over an acceptable payback period. Where projects are investigated and found to be financially feasible, as well as providing other significant benefits (e.g. reduced carbon emissions), a business case will be produced and presented for approval initially to the relevant Head of Service/ Assistant Director for the business area and then onto the finance team for consideration/ approval .

Projects of a smaller and medium nature may well have to be funded and justified under the relevant annual revenue business budget.

The Council will continue to identify any other external funding opportunities, including grants which some areas of the Council may benefit from.

4. Water Strategy Financing

Page 38: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

38

Water Strategy 2014/15 - 2016/17

To monitor and manage the Council’s water and wastewater usage, data is currently taken from the consolidated billing file (an Excel spreadsheet) received from Anglian Water Business and is manually inputted into the Council’s energy management software: Team Sigma.

Using this data, the Energy Management Unit interrogates the data and produces cost and consumption reports to analyse trends (see Figure 18 for an example of a simple cost report produced for Borough Hall)

Any meter readings received by building managers are also manually entered into the Team Sigma software.

Figure 18: Water bill overview report for Borough Hall from TEAM Sigma

The Energy Management Unit will seek to streamline this process by working with its water supplier and Team Energy to develop electronic billing files compatible with the Team Sigma software. In line with processes already established for electricity and gas consumption data, these files will then enable water data to be electronically uploaded straight into TEAM Sigma.

In order to embed water management throughout the organisation and to make water and wastewater consumption more visible to staff, the Energy Management Unit will seek to roll out a new, free, module within the Team Sigma software: the Energy Viewer. This will allow building managers to log in and easily access their bills and water data, giving them more control over their data and thus usage. This will also enable them to input their meter reads.

The Energy Management Unit will work in partnership with its water supplier to produce a cost and consumption report on an annual basis to monitor progress in achieving its aspirational target, against the baseline period.

5. Data Management

Water bills overview 1 April 2013 to 1 Oct 2014

Key

Water 46.5%

Sewage 52.4%

Maximum Daily Demand (MDD) 1.1%

Cost ex-VAT

46.5%52.4%

1.1%

Page 39: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

39

Water Strategy 2014/15 - 2016/17

Strategic ownership and oversight of the Water Strategy will be provided by the Council’s Sustainability Committee. Proposals will be presented to the Committee for approval and Committee members will champion and provide leadership on water management.

Where larger projects require capital investment, an ‘invest to save’ business case will be submitted to both the relevant Head of Service/ Assistant Director and the Finance Team for consideration/ approval.

The Energy Management Unit will work with individual building managers, property services, Anglian Water Business, other Council departments and external companies (where appropriate) to deliver water management projects. Bedford Borough Council staff will be kept updated on work undertaken via existing communication channels, such as ‘Connect’ (internal staff newsletter), ‘My View’ (the Council’s intranet pages) and the Energy Champions scheme.

Progress achieved against the Councils water reduction target and the implementation of this Water Strategy will be reported in the following ways:

• Through the Councils performance management framework: “Delivery of the Water Strategy” (a key performance indicator) and the water saving which results will be reported on an annual basis

• An annual report which details trends in water consumption against the baseline period and provides an overview of projects completed in the respective year will be produced using available billing data (See Data Management)

• Ongoing updates on progress made against the baseline will be reported back to the Sustainability Committee on a regular basis (as appropriate)

6. Programme Management

Page 40: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

40

Water Strategy 2014/15 - 2016/17

Whilst the Council is dedicated to reducing its own water consumption, it also strives to lead by example by working with the community and schools in a number of ways to promote water efficiency.

7.1 Policy

To embed water efficiency across the organisation, policy documents will be reviewed to ensure they reflect this priority. The Council will specifically seek to develop a policy document (or update an existing policy) to stipulate the use of water efficient fixtures (in new and existing buildings) that meet and/or exceed Building Regulation Standards; ensuring that the most water efficient option is sought. Where extra investment is required to reduce longer term costs, a business case will need to be presented for approval.

7.2 Web Pages

The Council currently has a page on its website specifically promoting water conservation. The Council’s water butt kit special offer is outlined and details on free home water efficiency audits offered by Anglian Water Business, as well as tips on water savings at home, are provided.22

A section of the Council’s website is dedicated to raising awareness of sustainability issues amongst schools in the Borough. The Council will create a page dedicated to water saving for schools and include useful links and advice. A secure area on the website also exists for schools and this too will be updated.

7.3 Promoting Water Butts to Residents in Bedford Borough

The Council have been working with Straight to promote a special offer on Water Butt kits to residents in Bedford since 2010. To date approximately 450 water butts have been sold as part of this offer. It is estimated that around 24,000 of water can be collected from the average residential roof each year.23 These kits are advertised on the Council’s webpage and at any water events the Council holds/attends.

Figure 19: An example of a previous campaign leaflet for the Council’s Water Butt offer

22 www.bedford.gov.uk/environment_and_planning/sustainability/water_conservation.aspx

23 www.bbc.co.uk/gardening/basics/techniques/watering_savingwater1.shtml

7. Leadership and Partnership

Page 41: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

41

Water Strategy 2014/15 - 2016/17

7.4 World Water Day / Anglian Water Business Love Every Drop Campaign

Every year the Council holds a stand in the town centre promoting World Water Day. Here the Council promote the water butts offer and also Anglian Water Business’s Love Every Drop and Drop 20 campaigns. The Sustainability Team hand out leaflets, which provide advice on how to save water, and free water saving devices (courtesy of Anglian Water Business) which include shower saves (which reduce the flow of water in non-electric showers) and save-a-flush devices for use in toilet cisterns.

The Council will continue to support these annual campaigns.

Figure 20: World Water Day stand in Bedford 2014

7.5 School Water Efficiency Audits

In 2011 and 2012, the Energy Management Unit promoted Anglian Water Business’s free water efficiency audits to Bedford Borough schools. Around 30 schools benefited from this free service and the majority found they could make simple, no/low cost savings. Recommendations included changing tariffs, installing water saving devices, changing flush times of urinals, installing self-closing taps and/or checking for leaks. Table 8 highlights a number of the schools audited that could save a large amount of money each year by applying the suggested measures.

School Total potential financial savings per year

Springfield Lower school £2,032

Hastingsbury Business & Enterprise College £1,736

Elstow Lower School £1,191

Biddenham Upper £929

Hazeldene Lower £755

Wootton Lower £510

St John Rigby £433

Castle Lower £403

Table 8: WEA’s Schools savings

Page 42: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

42

Water Strategy 2014/15 - 2016/17

The Council will continue to work with schools and look at the possibilities of rolling out the Building Managers Handbook as well as any posters produced. The Council will work with Anglian Water Business and the schools to promote water efficiency and work towards a better understanding of Bedford schools water consumption.

7.6 Working in Partnership with Fusion Lifestyle

Built into the contract with the Council is a requirement for Fusion Lifestyle to closely monitor water usage and make efforts to reduce water consumption. The services specification document, which forms part of the contract documentation, requires Fusion to:

• Operate the leisure facilities in an environmentally sensitive and sustainable manner, to reduce energy consumption, reduce water and wastewater consumption.

• Have a clear policy and implement effective operational practices that demonstrably have a positive effect on the environment. This shall be set out in an Environmental Management Method Statement and shall include:

- Proposed approach to energy management (including as appropriate reducing energy consumption, energy conservation and use of renewable energy) - Targets for reducing CO2

emissions - Increasing water efficiency and maximising water recycling opportunities

• Establish an “Environmental and Energy Management Plan” Year. The plan, actions and results will be reviewed by/with the Authority (the Sustainability Team) on a quarterly basis and will include:

- Accurate records of electricity, gas and water consumption for each of the Centres - Maximising energy conservation and benchmarking energy consumption - Carbon management - Maximising water use reduction and recycling opportunities

The Council will continue to monitor progress through Fusion Lifestyle’s Environmental and Energy Management Plan and monthly utility reports.

7.7 Sharing Best Practise

Wherever possible, the Council actively seeks to share best practise with other local authorities, organisations and individuals to share expertise and lessons learnt. The Council will continue to raise awareness of the successes and challenges of implementing this Water Strategy through local and regional networks, case studies and other means available.

Page 43: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

43

Water Strategy 2014/15 - 2016/17

Appendix C summarises all actions implemented by the Council to date.

The following action plan details the projects which will be investigated/implemented through the delivery of this Water Strategy.

Action Project Lead Completion Date

Estimated level of cost to implement

Estimated level of cost saving

Site(s) affected

Building Managers Handbook

Produce a building managers handbook to demonstrate best practice in water management, efficiency and reduction

Energy Management Unit in partnership with Anglian Water Business

February 2015

Low Low Multiple

Create posters to encourage water efficiency and water saving tips (to be distributed to building managers)

Energy Management Unit in partnership with Anglian Water Business

February 2015

Create site audit checklist to enable building managers to review current assets and metering arrangements

Energy Management Unit in partnership with Anglian Water Business

February 2015

Launch the building managers handbook and supporting resources

Energy Management Unit in partnership with Anglian Water Business

March 2015

Site Checklist

Produce and distribute a site checklist for water fixtures and metering (this will form part of the building managers handbook)

Energy Management Unit

March 2015 Low

Low – Medium

Multiple

Complete the site checklist and return to the Energy Management Unit

Building Managers March 2015 Low

Collate information from the site checklist. Review opportunities and seek to implement any appropriate measures

Energy Management Unit and Building managers

April 2015

Low – MediumIf a meter on site cannot be located,

the Energy Management Unit will work with Anglian Water Business to conduct site surveys

Energy Management Unit , Building Managers and Anglian Water Business

April 2015

Plot meter locations on GIS, drawing upon information already held and information learned from the site checklist

Energy Management Unit , GIS Team

April 2015 Low

Explore opportunities to incorporate a site checklist within existing processes e.g. workplace inspections

Energy Management Unit

Ongoing Low

8. Water Strategy Action Plan

Page 44: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

44

Water Strategy 2014/15 - 2016/17

Action Project Lead Completion Date

Estimated level of cost to implement

Estimated level of cost saving

Site(s) affected

Regular Meter Reads

Complete and record meter readings on a monthly basis

Site managers / appointed staff

Ongoing action- monthly

Low Low Multiple

Submit monthly meter readings to Anglian Water Business and the Energy Management Unit

Site managers / appointed staff

Ongoing action- monthly

Input meter readings into Team Sigma

Energy Management Unit

Ongoing action- monthly

Energy Team to work with Team Energy to develop a method of uploading water data into Team Sigma; making recording and monitoring water usage quicker and easier

Energy Management Unit

2015

Training

Complete initial training for building managers at the launch event for the building manager’s handbook

Energy Management Unit in partnership with Anglian Water Business

March 2015

Low Low MultipleArrange and carry out talks or training sessions on water efficiency as required

Energy Management Unit

Ongoing action - as required

Look into the possibility of an e-learning course on My View (intranet) for staff to complete to raise water awareness and update intranet pages

Energy Management Unit / ICT

May 2015

Water Efficiency Audits

Identify sites which have yet to have a WEA completed, or those that should be revisited

Energy Management Unit

January 2015

Low

Low

Multiple

Commission WEAs where appropriate Energy Management Unit /Anglian Water Business

February 2015 Low

Assess recommendations from completed WEAs and seek to implement opportunities

Energy Management Unit

March 2015 Low - Medium

Page 45: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

45

Water Strategy 2014/15 - 2016/17

Action Project Lead Completion Date

Estimated level of cost to implement

Estimated level of cost saving

Site(s) affected

Allotments and Parks

Identify the needs of parks and allotments, how the water is currently used and if any measures have already been implemented to date

Energy Management Unit / Parks, Allotments

March 2015

Low

Low

Allotments and Parks

Investigate potential measures to implement at parks and/or allotments, including changes to the current planting regime rain water harvesting and improved watering practises

Energy Management Unit / Parks, Allotments

March/April 2015

Implement proposed measures Energy Management Unit /Parks/Allotments

May 2015 Low – Medium

Borough Hall Taps

Investigate the number of turn taps in Borough Hall and conduct a flow test on the taps. Complete a desktop assessment to determine the best solution

Energy Management Unit / Facilities manager

January 2015 Low

Low - Medium

Borough Hall

Implement project to upgrade current push taps in Borough Hall

Energy Management Unit / Facilities manager

February 2015 Medium

Foam Soap

Complete a desktop assessment to ascertain the current costs associated with liquid soap and the potential savings associated with utilising foam soap. Develop a business case (if appropriate) and agree proposals

Energy Management Unit /Facility Managers

February 2015 Low

Low - Medium

Multiple

Implement foam soap at Council sites (if appropriate)

Energy Management Unit

April 2015 Medium

Waterless Urinals

Installation of a sub meter at Allhallows Multi Storey Car Park Toilets to monitor water consumed by the urinals

Design Services January 2015

Low

Low - Medium

Allhallows MSCP

Complete a trial of a waterless urinal system at Allhallows Multi Storey Car Park Toilets and analyse results

Energy Management Unit

March/April 2015

No Cost

MultipleComplete a business case to roll out waterless urinals to other Bedford Borough Council sites (if appropriate)

Energy Management Unit

April 2015 Low

Implement waterless urinals (if / where appropriate)

Energy Management Unit

June 2015 Medium

Page 46: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

46

Water Strategy 2014/15 - 2016/17

Action Project Lead Completion Date

Estimated level of cost to implement

Estimated level of cost saving

Site(s) affected

Improvements to Borough Hall Canteen

Investigate the feasibility of changing the dishwasher in Borough Hall canteen to a newer, more efficient model

Energy Management Unit

January 2015 Low

Low - Medium

Borough Hall

Conduct a flow test on the taps in Borough Hall canteen and complete a desktop assessment to investigate the benefits of fitting flow regulators or tap aerators to the kitchen taps

Property Services / Energy Management Unit

December 2014

Low

Investigate if the rinsing device in Borough Hall canteen is being used efficiently and/or could be upgraded to a more efficient model

Energy Management Unit

January 2015 Low

Implement any appropriate projects in Borough Hall canteen

Property Services April 2015 Medium

Vehicle Repair Depot

Install 2 sub-meters at the Vehicle Repair Depot (one on the existing vehicle wash down area and one on the vehicle fill area) and complete a water mass balance study

Site Manager /Property Services / Energy Management Unit / Anglian Water Business

January/ February 2015

Low

Low - Medium

Vehicle Repair Depot

Identify and implement no/low cost measures at the Vehicle Repair Depot

Energy Management Unit / Site manager / Anglian Water Business/Property Services

February 2015 Low

Investigate the feasibility of grey water recycling and rain watering harvesting at the Vehicle Repair Depot and build and present a business case for approval (if appropriate)

Site Manager/Energy Management Unit / Anglian Water Business

April 2015 Low - Medium

Medium - High

Implement water recycling project(s) at the Vehicle Repair Depot (if appropriate)

Site Manager / Energy Management Unit

June 2015 High

Page 47: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

47

Water Strategy 2014/15 - 2016/17

Action Project Lead Completion Date

Estimated level of cost to implement

Estimated level of cost saving

Site(s) affected

Data Management

Work with Anglian Water Business and TEAM Energy to develop electronic billing files compatible with TEAM Sigma software

Energy Management Unit

Ongoing

Low Low Multiple

Roll out the Team Sigma Energy Viewer to building managers

Energy Management Unit

June 2015Low Low Multiple

Programme Management

Produce an annual report which details trends in water consumption

Energy Management Unit

OngoingLow Low Multiple

Raise staff awareness (e.g. Connect, My View, Energy Champions)

Sustainability Unit OngoingLow Low Multiple

Leadership and Partnership

Develop a policy document to stipulate water efficient practices

Energy Management Unit / Design Services

June 2015Low

Low - Medium

Multiple

Update the Council and school webpages

Energy Management Unit

February 2015Low Low Multiple

Continue to support initiatives to raise water efficiency awareness in the community

Sustainability Team

OngoingLow

Community Initiative

Community

Provide ongoing support to schools to become more water efficient e.g. roll out building managers handbook

Energy Management Unit

OngoingLow

Community Initiative

Schools

Work in partnership with Fusion Lifestyle to reduce consumption in leisure sites

Energy Management Unit / Design Team

OngoingLow

Community Initiative

Leisure sites

Page 48: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

48

Water Strategy 2014/15 - 2016/17

8.1 Summary of Actions to Follow Up from Previous Water Efficiency AuditsA number of recommendations identified through previous water efficiency audits have yet to be taken forward by our sites. Table 9 summarises a series of actions which will be followed up and investigated.

Site (date of WEA) Recommendation Action Completed by

Foster Hill Cemetery (2012) Ensure that all urinals flush no more than three times per hour

Investigate the flush regime of the urinals and make suggested improvements

March 2015

Norse Road Cemetery (2012) Install one automatic flushing device to the urinal and ensure that all urinals flush no more than three times per hour

Investigate the flush regime of the urinals and make suggested improvements

Install water saving devices in 20 WC cisterns

Investigate the feasibility of installing these devices.

Bedford Central Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

Investigate the flow rate of the taps and the type of taps. Install appropriate measures

Kempston Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

Investigate the flow rate of the taps and the type of taps. Install appropriate measures

Wootton Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

Investigate the flow rate of the taps and the type of taps. Install appropriate measures

Putnoe Library (2012) Install water saving devices in WC cisterns

Investigate the feasibility of installing these devices

Parkside House (2010) Install water saving devices in WC cisterns

Investigate the feasibility of installing these devices

Conduit Road Day Centre (2010)

It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this.

Investigate leak on site

George Beal House (2010) Install water saving devices in WC cisterns

Investigate the feasibility of installing these devices

Table 9: Summary of actions to follow up from previous water efficiency audits

Page 49: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

49

Water Strategy 2014/15 - 2016/17

Site Location Recommendation Year ImplementedFoster Hill Cemetery (2012)

All toilet cisterns

Install water saving devices in 20 WC cisterns Fitted 2012Make regular checks to ensure none of the WC cisterns are overflowing

Ongoing

Male toilets Ensure that all urinals flush no more than three times per hour To investigateSite Ensuring taps, hoses and similar devices are not left running

when in useOngoing Behaviour Change

Norse Road Cemetery (2012)

All toilet cisterns

Install water saving devices in 20 WC cisterns To investigateMake regular checks to ensure none of the WC cisterns are overflowing

Ongoing Behaviour Change

Male toilets Install one automatic flushing device to the urinal and ensure that all urinals flush no more than three times per hour

To investigate

Site Ensuring taps, hoses and similar devices are not left running when in use

Ongoing Behaviour Change

Bedford Central Library (2012)

Site Read revenue meters on a monthly basis Ongoing Behaviour Change

Toilet washbasins

Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

To investigate

Putnoe Library (2012)

All toilet cisterns

Install water saving devices in WC cisterns To investigate

Kempston Library (2012)

Site Read revenue both meters on a monthly basis Ongoing Behaviour Change

Toilet washbasins

Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

To investigate

Wootton Library (2012)

Site Read revenue meters on a monthly basis Ongoing Behaviour Change

Toilet washbasins

Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute

To investigate

Parkside House (2010)

All toilet cisterns

Install water saving devices in WC cisterns To investigate

Site Ensuring taps, hoses and similar devices are not left running when in use

Ongoing Behaviour Change

Conduit Road Day Centre (2010)

Site It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this

To investigate

Kempston Centre (2010)

Site Read the revenue meter on a monthly basis Ongoing Behaviour Change

All toilet cisterns

Install water saving devices in WC cisterns Installed

George Beal House (2010)

Site Read the revenue meter on a monthly basis Ongoing Behaviour Change

All toilet cisterns

Install water saving devices in WC cisterns To investigate

Site It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this

Resolved 2012

Huddleston Way Day Centre (2010)

Site Ensuring taps, hoses and similar devices are not left running when in use

Ongoing Behaviour Change

Appendix A - Summary of Water Efficiency Audits Recommendations

Any actions are incorporated into Table 9.

Page 50: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

50

Water Strategy 2014/15 - 2016/17

Site Name Current Tariff

Site Consumption m3

Proposed Tariff

Potential Financial Saving Total

91 Bromham Road - Foxgloves Domestic 751 Orange £151.68

Allen Park Sports Pavilion Orange 67 Green £73.35

Bedford Park Cricket Pavilion Green 2,010 Orange £152.44

Bedford Social Centre / Conduit Road Day Centre Green 857 Orange £60.08

Bunyan Centre Green 4,756 Orange £715.58

Corn Exchange Green 969 Orange £78.91

CSD Offices, Barkers Lane Green 1,012 Orange £86.14

George Beal House Green 1,441 Orange £158.26

Kempston Centre Green 854 Orange £59.57

Lurke Street MSCP Orange 62 Green £73.58

Mowsbury Golf Course Blue 3,729 Orange £201.00

Priory Street Bowl Pavilion Orange 24 Green £79.97

Southfields Community Centre Green 682 Orange £30.66

Sunflower House Green 685 Orange £31.16

The Higgins Bedford

Green 1,421 Orange £154.90

Hillgrounds Changing Rooms Green 1,283 Orange £131.70

Cricket Pitches Bedford Park Orange 63 Green £37.61

56 Singer Way Orange 0 Green £84.00

Mill Meadows Domestic 832 Orange £146.15

Appendix B - Full Tariff Optimisation table

Page 51: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

51

Water Strategy 2014/15 - 2016/17

Site Action Implemented in

Borough Hall Percussion taps installed 2008/2009

Day centres and Borough Hall Water Efficiency Audits 2010

Borough Hall Kettles removed 2010/2011

Priory Country Park Rain Water Harvesting Installed 2011

Leisure centres, libraries, the crematorium and the cemetery

Water Efficiency Audits 2012

The Higgins Bedford Rain Water Harvesting Installed 2012/13

Robinson Pool Leak fixed 2013

Oasis Pool Smart meter installed 2013

All sites Tariff optimisation 2013

Various Public Conveniences Modernisation programme closed down PC’s and removed APCs

2013

Allhallows MSCP PC Public Convenience full refurbishment, sensor taps, WC and urinals

2013/2014

Lurke Street MSCP PC Public Convenience refurbishment. Dual flush toilets

2014

Robinson Pool Smart Meter installed 2014

Borough Hall Water Efficiency Audit 2014

Borough Hall Fixed leaking WCs and urinals 2014

The Higgins Bedford Water Efficiency Audit 2014

The Higgins Bedford Installed save-a-flush devices 2014

The Higgins Bedford Repaired leaking cistern 2014

The Higgins Bedford Reduced the flow of cold and hot taps to 7.5 litres /minute

2014

Hillgrounds Changing Rooms Overflowing cistern and purging water cylinders repaired

2014

Borough Hall Smart Meter installed 2014

All sites Consolidated billing 2014

Appendix C - Summary of what actions have been achieved to date

Page 52: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

52

Water Strategy 2014/15 - 2016/17

Page 53: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

53

Water Strategy 2014/15 - 2016/17

Page 54: Water Strategy - Microsoft...Water Strategy 2014/15 - 2016/17 Foreword from the Mayor of Bedford 3 Water scarcity and the increasing need to conserve water resources as our climate

ENV124_14 [email protected] www.bedford.gov.uk

01234 718286

Sustainability Team

Borough Hall

Cauldwell Street

Bedford

MK42 9AP

www.bedford.gov.uk