Water Strategy
Environment & Sustainable Communities
2014/15 - 2016/17
Working with
2
Water Strategy 2014/15 - 2016/17
Water Strategy 2014/15 - 2016/17
Foreword from the Mayor of Bedford
3
Water scarcity and the increasing need to conserve water resources as our climate changes, is a key national and local priority. In England, the average person uses about 150 litres of water a day. This is water that has been cleaned, treated and pumped from reservoirs, rivers and aquifers.
The Council recognises and acknowledges the impact it has, and that of the services it delivers, and commits to manage and improve water efficiency across all areas of its operation. The Council want to demonstrate leadership in the area of water management to “get its own house in order”, whilst also encouraging partners and residents of Bedford Borough to assess and reduce their own water use.
Working in partnership with Anglian Water Business, Bedford Borough Council was one of the first local authorities in the UK to sign a Water Promise, pledging to cut water and waste water use by 20% by 2015 / 16. Wanting to lead by example, the Council believes this Water Strategy is one of the first to be created by a local authority in the UK; outlining how we intend to help secure future water resources whilst also reducing spend and carbon emissions across our estate.
We are proud to sponsor this Water Strategy. It provides an action plan towards achieving our aspirational 20% water reduction target and a long term framework through which to monitor, manage and reduce water resources.
Dave HodgsonMayor of Bedford
Philip SimpkinsChief Executive
4
Water Strategy 2014/15 - 2016/17
Contents
Foreword from the Mayor of Bedford 3
Contents 4
1. Introduction 6
1.1 National Drivers 6
1.2 Local Drivers 9
1.3 Our Vision 12
1.4 Our Baseline 12
1.4.1 High Consuming Sites 13
1.4.2 Benchmarking 14
1.4.2.1 Office Buildings 15
1.4.2.2 Leisure Facilities 16
1.4.2.3 Parks 16
1.4.2.4 Public Buildings 17
1.5 Our Target 18
2. Water Efficiency Opportunities 19
2.1 Measures Implemented Prior to the Baseline Period 19
2.1.1 Priory Country Park Visitors Centre: Rainwater Harvesting System 19
2.1.2 Water Efficiency Audits of Council Sites 19
2.1.3 Robinson Pool: Metering and Leakage 20
2.1.4 Oasis Pool: Metering and Leakage 20
2.1.5 Borough Hall: Toilet Refurbishment 21
2.2 Measures Implemented since the Baseline Period 22
2.2.1 Allhallows Multi-Storey Car Park Public Conveniences Refurbishment 22
2.2.2 Lurke Street Public Conveniences Refurbishment 22
2.2.3 Tariff Optimisation 23
2.2.4 Water Efficiency Audits (WEA) of Borough Hall and The Higgins Bedford 23
2.2.4.1 Borough Hall Water Efficiency Audit 23
2.2.4.2 The Higgins Bedford Water Efficiency Audit 25
2.2.5 Hillgrounds Changing Room: Leakage 26
2.2.6 Modernisation Programme: Toilet Closures 26
2.2.7 The Higgins Bedford Refurbishment: Rainwater Harvesting 26
2.2.8 Consolidated Billing 26
2.2.9 Installation of a Smart Meter at Borough Hall 26
5
Water Strategy 2014/15 - 2016/17
3. Future Water Saving Opportunities 28
3.1 No or Low Cost Measures 28
3.1.1 Building Manager’s Handbook 28
3.1.2 Site Checklist 28
3.1.3 Regular Meter Reads 29
3.1.4 Training 30
3.1.5 Water Efficiency Audits 30
3.1.6 Allotments and Parks 30
3.2 Medium Cost Measures 32
3.2.1 Borough Hall Taps 32
3.2.2 Foam Soap 33
3.2.3 Waterless Urinals 34
3.2.4 Improvements to Borough Hall Canteen 35
3.3 High Cost Measures 36
3.3.1 Vehicle Repair Depot: Grey Water Recycling and Rainwater Harvesting 36
4. Water Strategy Financing 37
5. Data Management 38
6. Programme Management 39
7. Leadership and Partnership 40
7.1 Policy 40
7.2 Web Pages 40
7.3 Promoting Water Butts to Residents in Bedford Borough 40
7.4 World Water Day / Anglian Water Business Love Every Drop Campaign 41
7.5 School Water Efficiency Audits 41
7.6 Working in Partnership with Fusion Lifestyle 42
7.7 Sharing Best Practise 42
8. Water Strategy Action Plan 43
8.1 Summary of Actions to follow up from Previous Water Efficiency Audits 43
Appendix A - Summary of Water Efficiency Audits Recommendations 49
Appendix B - Full Tariff Optimisation table 50
Appendix C - Summary of what actions have been achieved to date 51
6
Water Strategy 2014/15 - 2016/17
1. Introduction
1.1 National Drivers
Water resources within the UK are increasingly under stress. Striking a balance between water availability and the demand for water is becoming increasingly hard, owing to a growing population and the threat of climate change.
Currently there are 64.1 million people in the UK, with Britain’s population increasing by more than 400,600 people in the previous year alone.1 Water usage has been growing at more than twice2 the rate of population growth in the last century, with each person in the UK currently consuming 150 litres of water per day.3 As our population continues to grow, water resources are becoming increasingly stretched. On a global scale, the UN has warned that global water demand will outstrip current accessible supplies by 40% by 2030.4 On a national scale, by the 2050’s, the number of people in the UK living in areas affected by water supply-demand deficits could be between 27 million and 59 million.5
UK climate change medium emission projections suggest that summer mean temperatures could increase by as much as 8°C by 2080 (Figure 1), with summer rainfall decreasing by as much as 45% (Figure 3). This will result in less water in the environment to abstract, at a time when 25% of rivers are already at risk due to over abstraction.6 Winter rainfall may increase by 40-50%, resulting in an increasing risk of sewer flooding and water supply contamination (Figure 2).7
The drought in South East England in 2004-06 and at the end of 2011, and the floods of 2007 and 2013/14 brought into focus the challenges that we know climate change will bring.
1. Office for National Statistics mid-2012 to mid-2013 comparison
www.ons.gov.uk/ons/rel/pop-estimate/population-estimates-for-uk--england-and-wales--scotland-and-northern-ireland/2013/index.html
2. United Nations www.un.org/waterforlifedecade/scarcity.shtml
3. Future Water: The Governments water strategy for England www.gov.uk/government/uploads/system/uploads/attachment_data/file/69346/pb13562-future-water-080204.pdf
4. United Nations www.un.org/waterforlifedecade/pdf/01_2014_water_energy_efficiency.pdf
5. The National Adaptation Programme: Making the country resilient to a changing climate:
www.gov.uk/government/uploads/system/uploads/attachment_data/file/209866/pb13942-nap-20130701.pdf
6. ESPO Water Market 2017 meeting presentation provided by Anglian Water
7. Graphs taken from http://ukclimateprojections.metoffice.gov.uk/22104
7
Water Strategy 2014/15 - 2016/17
Figure 1: Change in summer mean temperature (°C) for the 2080s, Medium emissions scenario
Figure 2: Change in winter mean precipitation (%) for the 2080s, Medium emissions scenario
8
Water Strategy 2014/15 - 2016/17
Figure 3: Change in summer mean precipitation (%) for the 2080s, Medium emissions scenario
Acknowledging these challenges and the importance of increasing resilience against them, in 2008 Defra published ‘Future Water’, the Government’s water strategy for England. This document sets out the Government’s plans for water and outlines a series of steps to get there, including a target to reduce per capita water use to 130 litres per day.3 By implementing this strategy, water should be used more wisely, whilst at the same time, the carbon impact of water services will also be reduced. Abstracting, pumping, treating and heating water and treating and pumping wastewater consumes energy and releases greenhouse gas emissions. According to Anglian Water Business, for every 1000m3 water saved, it is estimated that 1.15 tonnes of carbon dioxide equivalent will be avoided.6
Water efficiency and water resource management feature highly in the National Adaptation Programme; a result of the extreme weather events experienced in the UK in the past few years. More investment is being directed towards these areas to build resilience to adapt to climate change e.g. Defra has contributed funding towards the Energy Saving Trust and Waterwise Green Deal guidance (2012). Reducing demand for water is a key priority for water companies and features significantly in Water Resource Management Plans.5
Water suppliers have a statutory duty to promote the efficient use of water by customers.8 The additional funding and support from the government encourages water companies and Green Deal providers to work in partnership on joint energy and water efficiency projects. This has resulted in water companies providing a range of activities such as tips for saving water, retrofit programmes, school education programmes and the offer of subsidised water butts. Bedford Borough’s water supplier, Anglian Water Business has its own national campaign to raise awareness about the value of water and encourage users to change how they consume water. The ‘Love Every Drop’ campaign was launched in 2010 and was followed more recently by its ‘Drop 20’ campaign. This encourages consumers to save 20 litres of water a day.
8. Section 93A of the Water Industry Act 1991
9
Water Strategy 2014/15 - 2016/17
1.2 Local Drivers
In Southern and Eastern regions of England, rainfall is relatively low, however per capita water consumption tends to be higher than elsewhere. In some areas abstraction is above its sustainable level. Combined with projections for rainfall and demand, this has led to the classification of all south-eastern areas as seriously water stressed. Figure 4, produced by the Environment Agency, shows relative water stress of water company areas. 9
9. Environment Agency – Areas of water stress: final classification 2007 -
www.gov.uk/government/uploads/system/uploads/attachment_data/file/69346/pb13562-future-water-080204.pdf
Figure 4: Map of areas of relative water stress produced by the Environment Agency
1. Anglian Water Business2. Bournemouth and West Hampshire Water3. Bristol Water4. Cambridge Water5. Essex and Suffolk Water6. Folkestone and Dover Water7. Mid Kent Water8. Northumbrian Water9. Portsmouth Water10. Severn Trent Water11. South East Water12. South Staffordshire Water13. South West Water14. Southern Water15. Sutton and East Surrey Water16. Tendring Hundred Water17. Thames Water18. Three Valleys Water19. United Utilities20. Wessex Water21. Yorkshire Water22. Anglian Water Business
(formerly Hartlepool Water)
Levels of Water Stress
Serious
Moderate
Low
Not assessed
10
Water Strategy 2014/15 - 2016/17
Bedford Borough Council is a local authority based in Bedford, Bedfordshire with a population of approximately 157,800 people.10 The Council delivers a wide range of services, many of which result in large amounts of water being consumed, including leisure sites, swimming pools, parks, a golf course, community centres, day centres, care homes, libraries, offices, depots and allotments.
Bedford Borough Council is situated in one of the driest regions of the UK. It is currently supplied by Anglian Water Business whose area is classified as seriously water stressed. The region receives a third less rainfall than the national average and when further reductions are experienced, the impacts are considerable. In April 2012, following the regions driest 18 months in a century, a hosepipe ban was enforced by Anglian Water Business. Figure 5 shows Bedford’s rainfall for the period. As you will note, Bedford’s annual rainfall for 2012 was 762.10 mm compared to 2011 which was only 379.52 mm.11
All public authorities have a duty to conserve water supplied or to be supplied to premises.12 Acknowledging the severity of water stress in the region, the need to adapt to a changing climate and also the wider environmental impacts of the water industry (i.e. contributing to national greenhouse gas emissions), the Council is committed to reducing the impact it has and that of the services it delivers in the Borough; as outlined in the following:
Bedford Borough Sustainable Community Strategy 2009-2021
Theme 2: A Greener Borough: Environment and Climate Change
Aim 5: Protect and enhance our natural resources including air, soil and water to minimise the impacts
of flooding, climate change and pollution.
10. Population figures taken mid 2012 source taken from Waste Data Flow - www.voa.gov.uk/corporate/statisticalReleases/140424_CTValuationListSummary.htm
11. Source taken from: www.tutiempo.net/en/Climate/BEDFORD/2012/35600.htm
12. Water Act 2003, section 83 www.legislation.gov.uk/ukpga/2003/37/section/83
Rainfall in Bedford 2010 - 2013 (mm)
Figure 5: Illustration of average annual rainfall in Bedford from 2010-2013
762.1mm2012379.5mm
2011
435.9mm 2010
523.2mm 2013
11
Water Strategy 2014/15 - 2016/17
Corporate Plan 2012-2016
Theme 2: Protecting and Preserving the Local Environment
Aim 2B: Climate Change and Environmental Sustainability. Objective: ‘To ensure that the Borough
reduces its carbon footprint, including managing our waste more effectively’.
Climate Change Strategy 2015/16
Priority One: Tackling Climate Change
Energy Efficiency:
• Reduce the carbon emissions from the Council’s buildings (including schools)
• Support the communities and businesses of Bedford Borough to reduce energy consumption
and mitigate climate change.
Adapting to Climate Change:
• Prepare and adapt the Council’s services to the possible impacts of climate change.
• Support the residents and businesses of the Borough to prepare and increase their resilience
to the possible impacts of climate change.
Priority Two: Using Resources Efficiently
Water:
• Reduce water usage and conserve water where possible within the Council and encourage
residents and businesses to be water efficient.
Carbon Management Plan 2010/11-2014/15
The Council adopted a Carbon Management Plan in March 2011. The plan sets out a programme of
action for the Council to achieve its 40% aspirational carbon reduction target from 2009/10 levels.
Council’s Commitment: Aspirational 40% carbon reduction (from 09/10 baseline) by 2015.
Climate Local Commitments and Actions documentThe Climate Local Commitments and Actions document sets out locally owned and determined targets to
mitigate and adapt to the effects of climate change.
Theme 1: Mitigation: Low Carbon Pathways
Commitment: We will aim to reduce the Council’s carbon emissions by the aspirational target of 40% by
2015 (from the 2009/10 baseline)
Commitment: We will aim to reduce the water usage across all Council buildings by 20% by 2015/16.
Theme 2: Adaptation: Climate Resilience
Commitment: We will develop our understanding of the Council’s vulnerability to the changing climate.
Commitment: We will raise awareness and help communities of the Borough to improve their resilience
to the impacts of a changing climate.
Commitment: Ensure our estate, including parks and recreation facilities, are well-adapted to the
changing climate.
Commitment: Build Resilience into the Local Plan by establishing policies to reduce water use in new
and existing buildings (Allocations and Designations plan adopted in 2013) and ongoing enforcement of
Building Regulations water consumption standards.
12
Water Strategy 2014/15 - 2016/17
1.3 Our Vision
Bedford Borough Council will work towards sustainable water use to protect the environment and secure water resources for future generations.
The Council is committed to manage and improve water efficiency across all areas of activity. The Council will provide local leadership to encourage partners and residents of Bedford to reduce water consumption.
1.4 Our Baseline
February 2012 to January 2013 was selected as the baseline year for the Council’s Water Strategy.
Working in partnership with Anglian Water Business, data relating to 134 Council sites was analysed.
• It was found that 102,490m3 of water was consumed and 92,241m3 of sewerage was discharged during this period.
• This equated to a total spend of approximately £101,000 for water and £89,000 for sewerage13, whilst resulting in 117.86 tonnes CO
2e14
• Assuming that 20% of the water used during the period is used for hot water, the Council spent £46,651.06 of its energy bill on heating water in the baseline period.15
• Annually, the Council uses enough water to fill 41 Olympic swimming pools16
13. Calculated on a 90% abatement from water use
14. Anglian Water conversion factors 0.452kg C02e/m3 water and 0.781kg C02e/m3 sewerage (based on regional factors derived from Defra conversion factors by Anglian Water)
www.anglianwater.co.uk/environment/why-we-care/carbon-management.aspx and Water efficiency self-assessment guide
15. Based on Anglian Water Business calculations that; 102,490m3/year at 20% = 20,498m3. Gas cost at £2.27/ m3 assuming a 90% efficient boiler = £46,651 heating water
from 10 degrees to 60 degrees centigrade
16. Based on Olympic swimming pool volume of 2,500m3
total spend of approximately
£101,000 for water and £89,000 for sewerage
118 tonnes CO2e
February 2012 to January 2013 baseline usage
102,490m3 of water
consumed
92,241m3 of sewerage discharged
13
Water Strategy 2014/15 - 2016/17
1.4.1 High Consuming Sites
The Council prioritised those sites consuming the most water. A list of the top 15 highest consuming sites can be found in Table 1.
Site Name Site Yearly Consumption (m3)(Feb 2012-13)
Percentage of total yearly consumption (Feb 2012-13)
Oasis Beach Pool* 19,673 19.2%
Borough Hall 9,684 9.5%
Robinson Swimming Pool* 7,064 6.9%
Kempston Swimming Pool* 6,409 6.3%
Vehicle Repair Depot 6,215 6.1%
Bunyan Centre* 4,756 4.6%
Mowsbury Golf Course* 3,729 3.6%
Allhallows MSCP PC 3,597 3.5%
Mays Yard PC 2,413 2.4%
Bedford I-lab 1,961 1.9%
George Beal House 1,441 1.4%
The Higgins Bedford 1,421 1.4%
Hillgrounds Changing Room 1,286 1.3%
Bedford International Athletics Stadium* 1,090 1.1%
Barkers Lane offices 1,012 1%* Fusion Lifestyle is now responsible for the water costs and consumption
Table 1: Bedford Borough Council’s 15 highest consuming sites
As of 1st February 2014, Fusion Lifestyle took over the operation of the Council’s leisure sites which account for 42% of baseline water use. Fusion Lifestyle is now responsible for water costs and consumption at the leisure sites. Built into the contract with the Council is a requirement for Fusion Lifestyle to closely monitor water usage and make efforts to reduce water consumption. The Council will regularly monitor progress through Fusion Lifestyle’s Environmental and Energy Management Plan.
14
Water Strategy 2014/15 - 2016/17
After removing those sites operated by Fusion Lifestyle, the Council identified its own priority list of 10 high consuming sites (Table 2).
Site Name Site Yearly Consumption (m3)(Feb 2012-13)
Percentage of total yearly consumption (Feb 2012-13)
Borough Hall 9,684 9.5%
Vehicle Repair Depot 6,215 6.1%
Allhallows MSCP PC 3,597 3.5%
Mays Yard PC 2,413 2.4%
Bedford I-Lab* 1,961 1.9%
George Beal House 1,441 1.4%
The Higgins Bedford 1,421 1.4%
Hillgrounds Changing Room 1,286 1.3%
Lurke Street MCP PC 1,196 1.2%
CSD Offices, Barkers Lane 1,012 1%
Corn Exchange 969 1%
*The Council is not directly responsible for the utility bills at Bedford I-lab. Water costs are recharged to the tenants on site through their tenancy agreement.
Table 2: Bedford Borough Council’s top 10 priority list (excluding Bedford I-Lab)
1.4.2 Benchmarking
Benchmarking was undertaken as part of the baseline study completed in partnership with Anglian Water Business. Sites were categorised as follows: office buildings, leisure sites/pools, parks and public buildings. An ‘other’ category was also introduced for those sites that did not accord with the classifications. Figure 6 shows the percentage split for 119 sites analysed (15 of the 134 accounts were unsuitable for this exercise).
As predicted, leisure sites made up the majority of the Council’s water usage (48%), with offices being the second largest consumer. As previously explained the Council is no longer directly responsible for any water consumption or cost relating to leisure sites/pools; however it will monitor progress made on site to improve water efficiency through Fusion Lifestyle’s Environmental and Energy Management Plan.
15
Water Strategy 2014/15 - 2016/17
Figure 6: Benchmarked Council buildings (taken from Anglian Water Business Baseline Report)
Utilising the specified categories, Anglian Water Business benchmarked each building based on m2 of the building and their consumption. 0:00 is the optimum line; anything above that line is considered inefficient, anything below is considered to be efficient.
1.4.2.1 Office Buildings
Figure 7: Comparison of office buildings against anticipated consumption
When comparing office buildings (Figure 7), results were skewed owing to the Vehicle Repair Deport being wrongly included in this category. The Depot was well above the optimum line, whilst Borough Hall (the Council’s headquarters building) was well below. This does not correlate with Table 2 which shows Borough Hall as a priority site. Despite the obvious classification error, the graph does demonstrate the huge amount of water being consumed at the Vehicle Repair Depot and highlights the huge potential for water saving and reduction.
Leisure site/pools
Offices
Parks
Public buildings
Sites not included
-6000.00
-4000.00
-2000.00
0.00
2000.00
4000.00
6000.00
Vehicle R
epair Depot
Bedford I-K
an
Foster Hill C
rematorium
and Chapel
Riverside H
ouse
CS
D O
ffices, Barkers
Lane
Queen S
treet MS
CP
CC
TV R
oom
Enterprise H
ouse
15 Greyfriars
23-27 Allhallow
s
Parking S
hop, 26 Harpur
Street
24 - 26 Cauldw
ell Street
The GateH
ouse, Creative
Arts
Roger C
ourt Block A
-K
ingsway
6 St P
auls Square
Norse R
oad Crem
atoriumO
ffices
Town H
all - Old
Bedford I-LA
B
Town H
all - New
Borough H
all
6000
4000
2000
0
-2000
-6000
-4000
Vehi
cle
Repa
ir D
epot
Berd
ford
I-Ka
n
Fost
er H
ill C
rem
ator
ium
an
d Ch
apel
Riv
ersi
de H
ouse
CSD
Offi
ces
Bark
ers
Lane
Que
en S
t. M
SCP
CCTV
Roo
m
Ente
rpris
e H
ouse
15 G
reyf
rairs
23-2
7 Al
lhal
low
s
Park
ing
Shop
26
Har
pur S
treet
24 -
26 C
auld
wel
l St
reet
The
Gat
eHou
se,
Crea
tive
Arts
Roge
r Cou
rt B
lock
A
King
sway
6 ST
Pau
ls S
quar
e
Nor
se R
oad
Crem
ator
ium
Offi
ces
Tow
n H
all
Bedf
ord
i-Lab
Tow
n H
all N
ew
Boro
ugh
Hal
l
48%
24%
4%
11%
13%
Cons
umpt
ion
vs A
ntic
ipat
ed C
onsu
mpt
ion
Site
16
Water Strategy 2014/15 - 2016/17
1.4.2.2 Leisure Facilities
Figure 8: Comparison of leisure facilities against anticipated consumption
Eight leisure sites were analysed (Figure 8), including those now operated by Fusion Lifestyle (all but The Art Gallery and Museum). Surprisingly Mowsbury Golf Course was revealed as less efficient than Robinson Pool, a high consuming site with high footfall. A half open bypass valve, which resulted in large quantities of water bypassing the meter, is likely to have caused this discrepancy as water use was under reported. Oasis Beach Pool was clearly highlighted as the biggest user of water, however the data was somewhat skewed owing to a substantial leak identified during the baseline period. Kempston Pool was identified as the second highest consuming site when benchmarked on an m2 basis, despite using less water than Robinson Pool.
1.4.2.3 Parks
Figure 9: Comparison of park buildings against anticipated consumption
-2000
0
2000
4000
6000
8000
10000
12000
Oasis B
each Pool
Kem
pston Sw
imm
ingP
ool
Mow
sbury Golf C
ourse
Robinson S
wim
ming
Pool
The Higgins A
rt Gallery
and Museum
Cecil H
iggins Art
Gallery
Bedford InternationalA
thletics Stadium
Bunyan C
entre
12000
10000
8000
6000
4000
2000
-2000
0
Oas
is B
each
Po
ol
Kem
psto
n Sw
imm
ing
Pool
Mow
sbur
y G
olf
Cour
se
Robi
nson
Sw
imm
ing
Pool
The
Hig
gins
Be
dfor
d
Ceci
l Hig
gins
Be
dfor
d
Bedf
ord
Int.
Athl
etic
Sta
dium
Buny
an C
entre
-500.00
0.00
500.00
1000.00
1500.00
2000.00
2500.00
Bedford ParkCricket Pavillion
HillgroundsPlaying Fields
Addison HowardPark Changing
Room
Mowsbury ParkPavilion C
The Fountain Moor LaneChanging Room
Russell ParkBowling Green
Russell ParkPavilion
West LodgeBedford Park
Echodene Priory Street BowlPavilion
Allen Park SportsPavillion
2500
2000
1500
1000
500
-500
0
Bedf
ord
Park
Cric
ket P
avil-
lion
Hill
grou
nd
Play
ing
Fiel
ds
Addi
son
How
ard
Park
Ch
angi
ng
Room
Mow
sbur
y Pa
rkPa
vilio
n C
The
Foun
tain
Moo
r Lan
e Ch
angi
ng
Room
Russ
ell P
ark
Bow
ling
Gre
en
Russ
ell P
ark
Pavi
llion
Wes
t Lod
ge
Bedf
ord
Park
Echo
dene
Prio
ry S
treet
Bo
wl P
avili
on
Alle
n Pa
rk
Spor
t Pav
illio
n
Cons
umpt
ion
vs A
ntic
ipat
ed C
onsu
mpt
ion
Cons
umpt
ion
vs A
ntic
ipat
ed C
onsu
mpt
ion
Site
Site
17
Water Strategy 2014/15 - 2016/17
Analysis of park sites (Figure 9) revealed 8 under-performing sites. Two have since identified and rectified leaks; Bedford Park Cricket Pavilion had ongoing pipework leaks up until the automatic public convenience (APC) was removed in 2013 and Hillgrounds Changing Room also had internal leakage problems up until 2014. The most efficient sites may perhaps be down to their footfall or because of the amount of water-using amenities in each, e.g. water at Bedford Park Pavilion supplied the pavilion and an APC whereas Echodene is simply a Club House for golf members.
1.4.2.4 Public Buildings
Figure 10: Comparison of public buildings against anticipated consumption
The final category applied was public buildings comprising of 19 buildings. Three of the least efficient buildings include Bedford Social Centre, George Beal House (residential care home) and Huddleston Way Day Centre. Two of the best performing sites are Bedford Central Library and Corn Exchange.
-2500.00
-2000.00
-1500.00
-1000.00
-500.00
0.00
500.00
1000.00
Bedford Social Centre / C
onduitR
oad Day C
entre
George Beal H
ouse
Huddleston W
ay Day C
entre /Bedford C
entre
Faraday Square Com
munity
Centre
Southfields Com
munity C
entre
Sunflower H
ouse
Tavistock Com
munity C
entre
Cherry Trees N
ursery
91 Bromham
Road - Foxgloves
Cauldw
ell Com
munity C
entre
Parkside House- 21A BedfordR
oad
Scott Hall C
omm
unity Centre
Goldington Social C
entre / Day
Centre
Kempston Youth C
entre
Bromham
Library
Queens Park Early years/
Childrens C
entre
Lifelong Learning - 21-23G
adsby St
Wootton Library
Putnoe Library
Church Lane C
omm
unity Centre
Raleigh & Southw
ay Centre
(incl. Southways N
ursery)
Jubilee Com
munity C
entre
Kempston Library
Kempston C
entre
Bromham
Mill
Corn Exchange
Bedford Central Library
1000
500
0
-500
-1000
-1500
-2500
-2000
Bedf
ord
Soci
al C
entre
/ Co
ndiu
t Rd
Day
Cen
tre
Hud
dles
ton
Way
Day
Ce
ntre
/ Be
dfor
d Ce
ntre
Fara
day
Squa
re
Com
mun
ity C
entre
Sunfl
ower
Hou
se
Tavi
stoc
k Co
mm
unity
Ce
ntre
Cher
ry T
rees
Nur
sery
91 B
rom
ham
Roa
d Fo
xglo
ves
Caul
dwel
l Com
mun
ity
Cent
rePa
rksi
de H
ouse
21A
Bedf
ord
Road
Scot
t Hal
l Com
mun
ity
Cent
reG
oldi
ngto
n So
cial
Ce
ntre
/ D
ay C
entre
Kem
psto
n Yo
uth
Cent
re
Brom
ham
Lib
rary
Que
en P
ark
Early
yea
rs /
Child
ren
Cent
reLi
felo
ng L
earn
ing
21-2
3G
adsb
y St
Woo
tton
Libr
ary
Putn
oe L
ibra
ry
Chur
ch L
ane
Com
mun
ity C
entre
Rale
igh
& S
outh
way
Cen
tre(in
c. S
outh
way
s N
urse
ry)
Jubi
latio
n Co
mm
unity
Cen
tre
Kem
psto
n Li
brar
y
Kem
psto
n Ce
ntre
Brom
ham
Mill
Corn
Exc
hang
e
Bedf
ord
Cent
ral L
ibra
ry
Sout
hfiel
ds C
omm
unity
Ce
ntre
Geo
rge
Beal
Hou
se
Cons
umpt
ion
vs A
ntic
ipat
ed C
onsu
mpt
ion
Site
18
Water Strategy 2014/15 - 2016/17
1.5 Our Target
* any associated energy savings will be in addition to this
Figure 11: Bedford Borough Council Mayor Dave Hodgson and Director of Anglian Water Business Bob Wilson signing the Water Promise
Save approx. £38,000
on water bills*
Cut water usage
by 20%
Reduce our carbon footprint by 24tCO
2e
Cut wastewater
by 20%
By 2015 / 16 we will aim to:
19
Water Strategy 2014/15 - 2016/17
2.1 Measures Implemented Prior to the Baseline Period
2.1.1 Priory Country Park Visitors Centre: Rainwater Harvesting System
2.1.2 Water Efficiency Audits of Council Sites
Over 23 Water Efficiency Audits (WEA’s) were completed by Anglian Water Business prior to the baseline period. Sites audited in 2012 included leisure centres, libraries, the crematorium and the cemetery. The day centres and the Council’s headquarters building were completed in 2010.
The WEA’s highlighted areas where the sites could make water savings. Measures included: • Installing water saving devices• Decreasing the flow rate of taps• Installing automatic flushing devices to urinals• Conducting soundness tests to check for leaks• Ensuring taps, hoses and similar devices were not left running when in use
A full list of sites and recommendations are included in Appendix A. Actions not already completed have been included in Table 9.
Leaks were found at George Beal House and Goldington day centre but were resolved in 2012. Water efficiency devices were installed at the majority of the sites at the time of the audits.
2. Water Efficiency Opportunities
In 2011 a rain water harvesting system was fitted as part of a refurbishment and eco-technology demonstration project. A 660 litre slim-line Wall Tank System was installed which is connected to the public toilets enabling them to be flushed by rainwater collected from the Visitor Centre’s roof.
The energy and water saving measures that have been put in place at the Visitor Centre can be easily accessed and viewed by visitors, who can see the technology in action. To complement the demonstrations, a range of interpretative material, including display boards and leaflets have also been produced to help raise awareness of energy and water efficient technology.
20
Water Strategy 2014/15 - 2016/17
2.1.3 Robinson Pool: Metering and Leakage
At Robinson Pool it was recently (2013) discovered that one of the bypass valves on site had been left half open. This resulted in a continuous flow of water through the valve and consequently the meter under recorded water usage. This has since been resolved. In late 2012 a leak on site, caused by the pool grouting being worn away, was identified. This was repaired in March 2013. In 2014 Robinson Pool was fitted with a smart meter to enable real-time monitoring of water usage. Site managers can interrogate the data on the online system to identify any peaks in usage and other areas of wastage. Fusion Lifestyle has since been provided with these details so they can monitor usage going forward. Figure 12 shows a snapshot of the weekly consumption at Robinson Pool.
Figure 12: Robinson Pool Water consumption graph
2.1.4 Oasis Pool: Metering and Leakage
A smart meter was installed at Oasis Pool in January 2013. Having analysed the consumption data on the online system, the manager identified that peaks in usage were a result of backwashing the swimming pool. Due to the tariff Oasis Pool is on, they are charged for their maximum demand (high quantity of water used at peak times); if they exceed this level of maximum demand then they are charged excess fees. Figure 13 shows a snapshot of the weekly consumption at Oasis Pool taken from the online tool.
Figure 13: Oasis Pool water consumption graph
Summary for period:
Max Consumption: Average Consumption Min Consumption Total Consumption
3.480 Water Flow m3 / 15min 0.392 Water Flow m3 / 15min 0.010 Water Flow m3 / 15min 263.750m3
Average Water Flow m3 / 15 min
Water Flow m3 / 15 min
Min Water Flow m3 / 15 min
Max Water Flow m3 / 15 min
Wat
er F
low
m3
/ 15m
in
Time / Day Date
Average Water Flow m3 / 15 min
Water Flow m3 / 15 min
Min Water Flow m3 / 15 min
Max Water Flow m3 / 15 min
Summary for period:
Max Consumption: Average Consumption Min Consumption Total Consumption
1.480 Water Flow m3 / 15min 0.391 Water Flow m3 / 15min 0.000 Water Flow m3 / 15min 262.560m3
Wat
er F
low
m3
/ 15m
in
Time / Day Date
21
Water Strategy 2014/15 - 2016/17
2.1.5 Borough Hall: Toilet Refurbishment
A tap left running can waste over 100 litres an hour. Even a small 5mm stream from a single tap will waste 60 litres an hour or 526,000 litres a year at a cost of £1,300.17
In 2010/2011 the Council also removed all kettles (around 350 in total) and replaced these with hot water heaters in the kitchen areas.
17. Anglian Water Business - Water Efficiency Self- Assessment Guide http://www.anglianwater.co.uk/_assets/media/Water-Efficiency-Self-Assessment.pdf
As part of the toilet refurbishments in 2008/2009, percussion/push taps were fitted in the majority of toilets to increase water efficiency and prevent taps being left on. These taps are now fitted as standard in any new Council buildings or during refurbishment programmes. An example of the taps currently installed is shown below.
One drip per second wastes 4 litres per day
1.5mm stream wastes 320
litres per day 3mm stream wastes 985
litres per day 6mm stream wastes 3,500 litres per day
22
Water Strategy 2014/15 - 2016/17
2.2 Measures Implemented Since the Baseline Period
2.2.1 Allhallows Multi-Storey Car Park Public Conveniences Refurbishment
2.2.2 Lurke Street Public Conveniences Refurbishment
The public conveniences were refurbished in 2013/14 and all taps and toilets were fitted with electronic sensors (with a separate button to override this if necessary).
The urinals were also fitted with motion sensors, with a 12 hour automatic flush for hygiene purposes. The hot water is fed from low content water heaters; thereby eliminating the need for large storage heaters.
A safety system was installed which shuts off valves overnight, preventing any occurrences of leaks. There are also foam soap dispensers; another potential water saver.
The toilets were closed from 2012 to 2014 and have now been refurbished and re-opened to the public.
Following refurbishment, the toilets are split into one disabled toilet and one unisex toilet. Due to the nature of these toilets, push taps and WC flushing sensors were unable to be fitted. Instead, the toilets are fitted with quarter-turn lever taps and dual flush WC’s.
23
Water Strategy 2014/15 - 2016/17
2.2.3 Tariff Optimisation
Anglian Water Business completed a tariff review of 134 Council sites in 2013, identifying sites which were on the wrong tariff as well as sites which could save money by switching to a more cost effective tariff.
Site Name Current Tariff
Site Consumption (m3) Proposed Tariff Potential Saving Total
Bunyan Centre* Green 4,756 Orange £715.58
Mowsbury Golf Course* Blue 3,729 Orange £201.00
George Beal House Green 1,441 Orange £158.26
The Higgins Bedford Green 1,421 Orange £154.90
Bedford Park Cricket Pavilion Green 2,010 Orange £152.44
91 Bromham Road - Foxgloves Domestic 751 Orange £151.68
Mill Meadows Domestic 832 Orange £146.15
Hillgrounds Changing Rooms Green 1,283 Orange £131.70
CSD Offices, Barkers Lane Green 1,012 Orange £86.14
56 Singer Way Orange 0 Green £84.00*Sites now run by Fusion Lifestyle
Table 3: Tariff optimisation top 10 sites
There were 19 sites which could save more than £30 per year just by switching tariffs (please refer to Appendix B). The top ten highest saving sites are shown in Table 3.
By switching tariffs for the 19 sites, the Council has saved approximately £2,500 per year on its water bills.
2.2.4 Water Efficiency Audits (WEA) of Borough Hall and The Higgins Bedford
In April 2014, Water Efficiency Audits were completed at Borough Hall and The Higgins Bedford by Anglian Water Business. Despite Borough Hall already being visited in 2010, the building has undergone a number of changes and the consumption has increased over the years; therefore another audit was deemed beneficial. The recommendations made for each respective site were as follows:
2.2.4.1 Borough Hall Water Efficiency Audit
Anglian Water Business found there to be 4 leaking urinals and 3 leaking toilet cisterns which could save £1,692.50 a year when fixed. Reparation works were completed in July 2014. The WEA also recommended reducing the flow rate of the taps to 7.5 litres/minute which would save up to £872.10 /year. Table 4 outlines the actions to be taken.
The majority of the taps in Borough Hall are push taps which are considered water efficient. However, there are a number of taps in the building which were not included in the refurbishment programme; improvements to these will be looked into. If all of the recommendations were put in place, Borough Hall could save up to 8% of its annual consumption.
24
Water Strategy 2014/15 - 2016/17
Recommendation Potential Savings Implemented? Actions
Reduce flow of cold taps to 7.5 litres/minute
302.4m3 / year Not currently To review the benefits of reducing the flow rate of taps against fitting aerators 0.24 tonnes CO
2 / year
£667.60 / year (water + wastewater)
Reduce flow of hot taps to 7.5 litres/ minute
45.4m3 / year Not currently To review the benefits of reducing the flow rate of taps against fitting aerators 3528 kWh / year (power saving to heat
hot water)
0.69 tonnes CO2 / year
£204.50 (water + wastewater)
Repair 4 leaking urinals 338m3 / year Identified and fixed July 2014
N/A- All completed
0.26 tonnes CO2 / year
£744.90 / year (water + wastewater)
Repair 3 leaking toilet cisterns 430m3 / year Identified and fixed July 2014
N/A- All completed
0.34 tonnes CO2 / year
£947.60 / year
Table 4: WEA recommendations for Borough Hall
Figure 14 shows the historical water consumption based on actual meter readings at Borough Hall. The increase in usage is likely to be due to staff moving into the building and the presence of the leaking urinals and cisterns.
Annual water consumption
Figure 14: Long term water consumption trends for Borough Hall
Dai
ly w
ater
use
(m
3 /d)
Date
Key Daily usage m3
5045403530252015105
17/0
3/20
13
06/0
5/20
13
25/0
6/20
13
14/0
8/20
13
03/1
0/20
13
22/1
1/20
13
11/0
1/20
14
02/0
3/20
14
21/0
4/20
14
10/0
6/20
14
25
Water Strategy 2014/15 - 2016/17
2.2.4.2 The Higgins Bedford Water Efficiency Audit
The WEA at The Higgins Bedford made recommendations to reduce water consumption by 29% and costs by up to £629 / year (Table 5). Additional recommendations were made for installing percussion taps in public areas when replacement is required. Upon receipt of the report an order was raised to repair the leaking cistern, investigate the hot and cold water tap flow and install the water saving devices. All projects have now been implemented.
Recommendation Potential Savings Implemented? Actions
Reduce the flow of cold taps to 7.5 litres /minute
117.6m3 / year Works completed July 2014 N/A- All completed
0.09 tonnes CO2 / year
£302.70 / year
Reduce the flow of hot taps to 7.5 litres /minute
12.6m3 / year Works completed July 2014 N/A- All completed
980 kWh / year (power saving to heat hot water)
0.19 tonnes CO2 / year
£61.40 / year
Install save-a-flush devices in WC cisterns
72m3 / year Works completed July 2014 N/A- All completed
0.06 tonnes CO2 / year
£185.30 / year
Repair leaking toilet cistern 31m3 / year Works completed July 2014 N/A- All completed
0.02 tonnes CO2 / year
£79.80 / year
Table 5: WEA recommendations for The Higgins
Figure 5 shows the water consumption at The Higgins Bedford. There are three meters on site; the purple line shows the consumption of the main meter. The increase in usage is thought to be due to the full site refurbishment undertaken over the past few years.
Long-term water consumption
Figure 15: Long term water consumption trends for The Higgins Bedford
Dai
ly w
ater
use
(m
3 /d)
Date
Key 99A809230M
17/0
5/09
06/0
7/09
25/0
8/09
14/1
0/09
03/1
2/09
22/0
1/10
13/0
3/10
02/0
5/10
21/0
6/10
10/0
8/10
29/0
9/10
18/1
1/10
07/0
1/11
26/0
2/11
17/0
4/11
06/0
6/11
26/0
7/11
14/0
9/11
03/1
1/11
23/1
2/11
11/0
2/12
01/0
4/12
21/0
5/12
10/0
7/12
29/0
8/12
18/1
0/12
07/1
2/12
26/0
1/13
17/0
3/13
06/0
5/13
25/0
6/13
14/0
8/13
03/1
0/13
22/1
1/13
11/0
1/14
02/0
3/14
21/0
4/14
10/0
6/14
5045403530252015105
26
Water Strategy 2014/15 - 2016/17
2.2.5 Hillgrounds Changing Room: Leakage
Having reviewed the results of the benchmarking activity completed by Anglian Water Business and analysed recent bills, Hillgrounds changing room was investigated to determine why water consumption was so high. Investigations found this was a result of an overflowing toilet cistern and one of the hot water cylinders regularly purging large quantities of water. This was resolved and the consumption on site has since dropped from 740m3 (July 2013 – January 2014) to 157m3 (January – July 2014).
Issues such as these highlight the importance of regularly monitoring usage on site as well as checking internal fixtures for problems.
2.2.6 Modernisation Programme: Toilet Closures
As part of the Council’s modernisation programme to review all services across its operations, in 2013 the Council closed some toilets that were in poor condition and those with low usage. This has enabled it to focus its resources on the remaining sites to provide Clean, Safe and Accessible facilities to cater for all users (young, old, disabled, nursing parents) which Bedford can be proud of. One of these removed sites was Bedford Park Cricket Pavilion where the water also supplied Bedford Park West APC. This site had suffered with leaks and very high usage which was thought to be caused by the original old lead supply pipe fracturing in numerous places when the APC was periodically high pressure washed. The APC was removed in April 2013 but the supply remains for the Pavilion.
2.2.7 The Higgins Bedford Refurbishment: Rainwater Harvesting
The Higgins Bedford was refurbished during 2012/13. As part of the works, a rain water harvesting system was installed supplying the main public toilets. The system comprises of a 2,500 litre tank that is used to top up the mains water which flushes the public toilets in the gallery.
2.2.8 Consolidated Billing
In 2014, the Council moved to consolidated billing. Prior to this, bills were sent directly to individual sites and there was limited monitoring of the Council’s water and sewerage. Having worked with Anglian Water Business to set up the new billing system, data relating to all of the Council’s water accounts was collated in a spreadsheet showing all the bills with respective costs and consumption information. This is now sent to both the Councils Energy Management Unit (EMU) within the Environmental Services department and to Accounts on a monthly basis. The bills are now paid centrally and monitored by the Energy Management Unit through TEAM Sigma. Using Team Sigma, the Energy Management Unit can quickly determine if a bill is too high, it can be compared to previous bills, the consumption can be monitored and the sites can also be compared and benchmarked against one another. The Energy Management Unit have already identified potential cost savings, for example a site that has been wrongly paying VAT since 2008 (it should be zero-rated); Anglian Water Business has since credited £1,184.50 back to the Council.
2.2.9 Installation of a Smart Meter at Borough Hall
Due to increased usage on site over the past few years, a Smart Meter was installed at Borough Hall at the beginning of 2014. The meter provides the Energy Management Unit and the facilities manager with access to real-time data online and the ability to monitor and target usage.
27
Water Strategy 2014/15 - 2016/17
The Energy Management Unit noted that water was being used out of hours as the base-load was not 0 (see red line in Figure 16). Further investigations by the facilities manager revealed that this was due to un-repaired leaks on the cisterns (identified in the WEA) and out of hours working including weekend meetings.
Figure 17 shows data after the leaks were repaired. The base-load (as per the red line - minimum water flow) has since reduced.
Figure 16: Graph of Borough Hall consumption April 2014
Figure 17: Graph of Borough Hall consumption October 2014
Average Water Flow m3 / 15 min
Water Flow m3 / 15 min
Min Water Flow m3 / 15 min
Max Water Flow m3 / 15 min
Summary for period:
Max Consumption: Average Consumption Min Consumption Total Consumption
1.380 Water Flow m3 / 15min 0.395 Water Flow m3 / 15min 0.060 Water Flow m3 / 15min 262.187m3
Summary for period:
Max Consumption: Average Consumption Min Consumption Total Consumption
1.050 Water Flow m3 / 15min 0.262 Water Flow m3 / 15min 0.010 Water Flow m3 / 15min 175.980m3
Month / Year
Wat
er F
low
m3 /
15m
in
Time / Day Date
Wat
er F
low
m3 /
15m
in
28
Water Strategy 2014/15 - 2016/17
3.1 No or Low Cost Measures
3.1.1 Building Manager’s Handbook
It is expected that water management will be the responsibility of every employee in Bedford Borough Council. This is essential if the aspirational 20% reduction target is to be realised. To increase awareness, a best practice guide in the form of a handbook will be created specifically for building managers. This will cover and include the following:
• How to read water meters and record regular reads; a worksheet will be provided to building managers (linked to 3.1.3)
• How to check pipes and fixtures regularly to ensure there are no leaks and that they are properly insulated against frost
• How to report leakage• How to calculate flow rates on taps and urinals • How to analyse water consumption data• How to identify responsibility of supply pipework• A list of water saving opportunities• A list of useful contacts and resources
Supporting the building manager’s handbook will be a number of resources including:• Site checklist to enable building managers to identify and record assets and meter locations• Awareness raising campaign material, such as posters. These will include messages such as:- Only fill kettles with the amount of water required (where applicable) - Wash up large amounts using a bowl - Turn off taps after use - Notices on how to turn off taps (where applicable) - Reminder to limit shower use - Reminder of stop tap locations
Action Lead Completed by
Produce a building managers handbook to demonstrate best practice in water management, efficiency and reduction
Energy Management Unit in partnership with Anglian Water Business
February 2015
Create posters to encourage water efficiency and water saving tips (to be distributed to building managers)
Energy Management Unit in partnership with Anglian Water Business
February 2015
Create site audit checklist to enable building managers to review current assets and metering arrangements
Energy Management Unit in partnership with Anglian Water Business
February 2015
Launch the building managers handbook and supporting resources
Energy Management Unit in partnership with Anglian Water Business
March 2015
3.1.2 Site Checklist
As part of the building managers’ handbook, a site checklist will be included. In order to identify further opportunities within Council buildings, building managers will be asked to complete an on-site audit, identifying the number and type of water fixtures within their site. From this, the Energy Management Unit will work with building managers to propose measures that can improve efficiency. As part of this audit, building managers will be asked to identify the locations of meters on site. Any issues arising from this will be addressed.
3. Future Water Saving Opportunities
29
Water Strategy 2014/15 - 2016/17
Action Lead Completed by
Produce and distribute a site checklist for water fixtures and metering (this will form part of the building managers handbook)
Energy Management Unit March 2015
Complete the site checklist and return to the Energy Management Unit
Building Managers March 2015
Collate information from the site checklist. Review opportunities and seek to implement any appropriate measures
Energy Management Unit and Building managers
April 2015
If a meter on site cannot be located, the Energy Management Unit will work with Anglian Water Business to conduct site surveys
Energy Management Unit , Building Managers and Anglian Water Business
April 2015
Plot meter locations on GIS, drawing upon information already held and information learned from the site checklist
Energy Management Unit, GIS Team
April 2015
Explore opportunities to incorporate a site checklist within existing processes e.g. workplace inspections
Energy Management Unit Ongoing
3.1.3 Regular Meter Reads
It is usually a requirement that commercial sites are metered; Anglian Water Business typically read meters every 6-12 months. For the rest of the year sites are usually billed to estimated reads. This can be very inaccurate with the read being either too high or too low; directly impacting on the bill received. If the estimates are continuously lower than the actual read, when Anglian Water Business gains a higher actual read the bill will reflect the difference and will often be a lot higher than expected. This can adversely affect the Councils ability to forecast budgets.
To minimise these issues, building managers will be asked to take monthly meter readings. This will ensure the Council is being billed correctly and also enable building managers to check for leaks (i.e. if water consumption suddenly increases without explanation then there could be a leak). Currently analysis of meter reads is the only method (for sites without automatic meter readers) to monitor usage and therefore monitor savings when measures are installed.
Action Lead Completed by
Complete and record meter readings on a monthly basis
Site managers / appointed staff Ongoing action- monthly
Submit monthly meter readings to Anglian Water Business and the Energy Management Unit
Site managers / appointed staff Ongoing action- monthly
Input meter readings into Team Sigma Energy Management Unit Ongoing action- monthly
Energy Team to work with Team Energy to develop a method of uploading water data into Team Sigma; making recording and monitoring water usage quicker and easier
Energy Management Unit 2015
30
Water Strategy 2014/15 - 2016/17
3.1.4 Training
In order to increase understanding and awareness, initial training will be provided to building managers at the launch of the building manager’s handbook. Should further information be required by building managers, further talks and training sessions will be arranged. Anglian Water Business is able to attend and assess sites to resolve any queries or provide advice on water saving. Should guidance be required, the Energy Management Unit will liaise with Anglian Water Business to arrange site visits.
The Energy Management Unit will investigate the possibility of incorporating training sessions on the Councils e-learning system to raise awareness of water management issues. Information will also be included on the Council’s intranet pages with regards to water saving.
Action Lead Completed by
Complete initial training for building managers at the launch event for the building manager’s handbook
Energy Management Unit in partnership with Anglian Water Business
March 2015
Arrange and carry out talks or training sessions on water efficiency as required
Energy Management Unit Ongoing action- as required
Look into the possibility of an e-learning course on My View (intranet) for staff to complete to raise water awareness and update intranet pages
Energy Management Unit / ICT May 2015
3.1.5 Water Efficiency Audits
Water Efficiency Audits were completed at a number of Council sites between 2010 and 2012, yet only a select few sites were assessed.
The Council will review those sites which have not yet been assessed, to determine if further audits would be beneficial. The Council will work in conjunction with Anglian Water Business to complete any audits which are deemed appropriate.
Action Lead Completed by
Identify sites which have yet to have a WEA completed, or those that should be revisited
Energy Management Unit January 2015
Commission WEAs where appropriate Energy Management Unit /Anglian Water Business
February 2015
Assess recommendations from completed WEAs and seek to implement opportunities
Energy Management Unit March 2015
3.1.6 Allotments and Parks
Written into the Climate Local Commitments and Action document is an ongoing action for the Council’s Parks department to investigate the potential of rain water harvesting and other water conservation measures. The Energy Management Unit will work with the Parks Unit to investigate opportunities by firstly better understanding how water is currently used, secondly identifying any measures that have already been implemented to date and finally investigating any potential measures which could be implemented.
31
Water Strategy 2014/15 - 2016/17
In 2010 a Climate Change for Gardeners poster was developed by the Sustainability Team. This is displayed at allotment sites. The poster encourages gardeners to consider drought resistant plants, drainage, the use of water butts and avoiding the use of the garden hose.
The Council will review its own planting regime to see where improvements can be made. Opting for drought tolerant varieties and including mushroom compost and water retaining gel granules etc. in planting approaches may result in a reduced watering requirement, as well as a reduction in the amount of
resource (and cost) required.
Action Lead Completed by
Identify the needs of parks and allotments, how the water is currently used and if any measures have already been implemented to date
Energy Management Unit / Parks, Allotments
March 2015
Investigate potential measures to implement at parks and/or allotments, including changes to the current planting regime rain water harvesting and improved watering practises
Energy Management Unit / Parks, Allotments
March/April 2015
Implement proposed measures Energy Management Unit /Parks/Allotments
May 2015
32
Water Strategy 2014/15 - 2016/17
3.2 Medium Cost Measures
3.2.1 Borough Hall Taps
A number of taps in Borough Hall were not converted to push taps when the toilets were refurbished in 2008/2009. A review of these taps will be undertaken and a proposal put in place to increase their efficiency. Three options are available (flow restrictors, tap aerators and percussion taps), as detailed in Table 6, with subsequent benefits and disadvantages.
Benefits of flow restrictors Disadvantages
Water savings up to 10 litres / min Orifice may block up with lime-scale build up
Retrofit available Does not regulate pressure
Cheap and easy to install
Benefits of tap aerators Disadvantages
Water savings up to 10 litres / min Not effective at pressure < 1 bar
Retrofit available Standard do not regulate pressure (unless pressure compensating aerators)
Flow rate reduced to 2.5 - 8 litres/min
No splashing
Benefits of percussion taps Disadvantages
Retrofit available Self-closing timing needs to be set up correctly
Automatically closes after use Can sometimes jam
Savings can vary Payback period can be 2-3 years
Table 6: Benefits and Disadvantages of tap proposals
Action Lead Completed by
Investigate the number of turn taps in Borough Hall and conduct a flow test on the taps. Complete a desktop assessment to determine the best solution
Energy Management Unit / Facilities manager
January 2015
Implement project to upgrade current push taps in Borough Hall
Energy Management Unit / Facilities manager
February 2015
33
Water Strategy 2014/15 - 2016/17
3.2.2 Foam Soap
Evidence suggests that by changing from liquid soap to foam soap, organisations can save water and cost. It is also claimed to be better for the environment.
Independent research commissioned by the Deb group in 2009 found that of 150 people washing their hands, around 16 – 45%18 less water was used when they used foam soap compared to liquid soap. Envirowise predict up to 50%19 of water can be saved. For every 100 people employed, this equates to a potential annual reduction of 56,000 litres of water. The study also demonstrated other benefits of foam soap, such as it being more environmentally friendly (more biodegradable) and reductions in energy costs and carbon emissions (as warm water is usually used for hand washing).20 Table 7 summarises the conclusions of the study.
Benefits of foam soap Disadvantages of foam soap
If 100 people wash their hands three times a day, using foam soap compared to lotion soap this could save 254 kg CO
2 a year
Purchase of new dispensers
Equivalent efficacy from foam is delivered using 36% less product per hand wash
Purchase of foam soap
100 people would have roughly 69,000 hand washing events each year ‐ with the lotion soap they would use 76 one litre cartridges per year, but with the foam soap this would drop to just 46 cartridges.
Foam soap uses 26% less packaging than lotion soaps; just 11mg of packaging per wash compared to 15mg with lotion hand wash.
On a per hand wash basis, foam soap has less than half the Chemical Oxygen Demand (COD) (150mg per hand wash) of lotion soap (332mg per wash), which means that foam soap will biodegrade more easily.
When testing the lotion soap, 150 participants used an average of 1,758ml water with the tap on for 21.8 seconds. For foam soap, this reduced to 1,475ml water with the tap on for 19.7 seconds. This amounted to a 16% water saving
Table 7: The benefits and disadvantages of foam soap
Foam soap is already used in some of the Council’s public conveniences. The Council will investigate other opportunities for utilising foam soap.
Action Lead Completed by
Complete a desktop assessment to ascertain the current costs associated with liquid soap and the potential savings associated with utilising foam soap. Develop a business case (if appropriate) and agree proposals
Energy Management Unit /Facility Managers
February 2015
Implement foam soap at Council sites (if appropriate)
Energy Management Unit April 2015
18 www.debgroup.com/sg/about-us/press-media/2012/washroom-solution-saves-water-time-and-money
19 Envirowise Water Management Leaflet www.envirowise.gov.uk/water
20 www.nationalpurity.com/foaming-hand-soap-really-work/
34
Water Strategy 2014/15 - 2016/17
3.2.3 Waterless Urinals
To further reduce the Council’s water use in public conveniences and Council buildings, waterless urinals will be investigated. Evidence suggests that waterless urinals can have a number of benefits, including:
• Reductions in annual water bills (A urinal that flushes 9 litres of water, every 15 minutes, 24 hours a day, 365 days of the year, will use 315,000 litres a year21)
• Elimination of lime-scale build up• More fragrant washroom• Reduction in the likelihood of blockages and floods• Reductions in costs associated with maintenance etc.
Action Lead Completed by
Installation of a sub meter at Allhallows Multi Storey Car Park Toilets to monitor water consumed by the urinals
Design Services January 2015
Complete a trial of a waterless urinal system at Allhallows Multi Storey Car Park Toilets and analyse results
Energy Management Unit March/April 2015
Complete a business case to roll out waterless urinals to other Bedford Borough Council sites (if appropriate)
Energy Management Unit April 2015
Implement waterless urinals (if/where appropriate) Energy Management Unit June 2015
21 Anglian Water Business: Water Efficiency Self- Assessment Guide www.anglianwater.co.uk/_assets/media/Water-Efficiency-Self-Assessment.pdf
35
Water Strategy 2014/15 - 2016/17
3.2.4 Improvements to Borough Hall Canteen
Action Lead Completed by
Investigate the feasibility of changing the dishwasher in Borough Hall canteen to a newer, more efficient model
Energy Management Unit January 2015
Conduct a flow test on the taps in Borough Hall canteen and complete a desktop assessment to investigate the benefits of fitting flow regulators or tap aerators to the kitchen taps
Property Services December 2014
Investigate if the rinsing device in Borough Hall canteen is being used efficiently and/or could be upgraded to a more efficient model
Energy Management Unit January 2015
Implement any appropriate projects in Borough Hall canteen Property Services April 2015
The canteen in Borough Hall contains a large Hobart dishwasher which is at least over 6 years old. The Council will investigate if there are any new, more efficient, cost effective devices available. Any replacement will have to meet the requirements of the kitchen staff.
All of the taps in the canteen are lever or turn taps; flow regulators and aerators will be investigated. There is also a high pressure rinsing device (this rinses off food at high pressure before the plates etc. are put into the dishwasher) which will be reviewed to determine if this is being used efficiently and if there are any alternative, more efficient devices available.
36
Water Strategy 2014/15 - 2016/17
3.3 High Cost Measures
3.3.1 Vehicle Repair Depot: Grey Water Recycling and Rainwater Harvesting
Both grey water recycling and rain water harvesting provide an opportunity to re-use wasted water and draw less water from the mains.
The Council’s Vehicle Repair Depot is currently one of the highest performing sites in terms of water usage (Tables 1 and 2). The site currently consumes thousands of litres of water a day, the majority of which is believed to be used to wash down vehicles and to fill up sweepers.
The Council is investigating the site to determine if more efficient ways of managing water use can be found. Initially it will seek to understand the water mass balance of the site; where inputs and losses currently are, by installing sub meters. It will then look to identify no/low cost measures to implement initially.
Having a holistic view of the site, the Council will then explore the possibility of installing water recycling and water harvesting technologies. It will look into the possibility of utilising a wash water reclamation system for Council vehicles and it will review the current gravity fed main water system, used to fill road sweeping vehicles, to determine if a rain water harvesting facility would be feasible.
Action Lead Completed by
Install 2 sub-meters at the Vehicle Repair Depot (one on the existing vehicle wash down area and one on the vehicle fill area) and complete a water mass balance study
Site Manager / Property Services / Energy Management Unit / Anglian Water Business
January / February 2015
Identify and implement no/low cost measures at the Vehicle Repair Depot
Energy Management Unit / Site manager / Anglian Water Business / Property Services Managers
February 2015
Investigate the feasibility of grey water recycling and rain watering harvesting at the Vehicle Repair Depot and build and present a business case for approval (if appropriate)
Site Manager / Energy Management Unit /Anglian Water Business
April 2015
Implement water recycling project(s) at the Vehicle Repair Depot (if appropriate)
Site Manager / Energy Management Unit June 2015
37
Water Strategy 2014/15 - 2016/17
Local government funding and the delivery of local government services continues to be the subject of significant scrutiny, with demands for the achievement of increased efficiencies and cost effectiveness in the delivering of critical public services. There is continued emphasis towards fundamentally changing the way that the public sector operates with the overall aim to achieve greater public choice, local decision making and greater efficiencies within an overall reduction in real spend.
One of the proposals under ‘Innovation and Entrepreneurship’ is the pursuance of ‘invest to save’ opportunities with a financial return on the investment in transforming activities over an acceptable payback period. Where projects are investigated and found to be financially feasible, as well as providing other significant benefits (e.g. reduced carbon emissions), a business case will be produced and presented for approval initially to the relevant Head of Service/ Assistant Director for the business area and then onto the finance team for consideration/ approval .
Projects of a smaller and medium nature may well have to be funded and justified under the relevant annual revenue business budget.
The Council will continue to identify any other external funding opportunities, including grants which some areas of the Council may benefit from.
4. Water Strategy Financing
38
Water Strategy 2014/15 - 2016/17
To monitor and manage the Council’s water and wastewater usage, data is currently taken from the consolidated billing file (an Excel spreadsheet) received from Anglian Water Business and is manually inputted into the Council’s energy management software: Team Sigma.
Using this data, the Energy Management Unit interrogates the data and produces cost and consumption reports to analyse trends (see Figure 18 for an example of a simple cost report produced for Borough Hall)
Any meter readings received by building managers are also manually entered into the Team Sigma software.
Figure 18: Water bill overview report for Borough Hall from TEAM Sigma
The Energy Management Unit will seek to streamline this process by working with its water supplier and Team Energy to develop electronic billing files compatible with the Team Sigma software. In line with processes already established for electricity and gas consumption data, these files will then enable water data to be electronically uploaded straight into TEAM Sigma.
In order to embed water management throughout the organisation and to make water and wastewater consumption more visible to staff, the Energy Management Unit will seek to roll out a new, free, module within the Team Sigma software: the Energy Viewer. This will allow building managers to log in and easily access their bills and water data, giving them more control over their data and thus usage. This will also enable them to input their meter reads.
The Energy Management Unit will work in partnership with its water supplier to produce a cost and consumption report on an annual basis to monitor progress in achieving its aspirational target, against the baseline period.
5. Data Management
Water bills overview 1 April 2013 to 1 Oct 2014
Key
Water 46.5%
Sewage 52.4%
Maximum Daily Demand (MDD) 1.1%
Cost ex-VAT
46.5%52.4%
1.1%
39
Water Strategy 2014/15 - 2016/17
Strategic ownership and oversight of the Water Strategy will be provided by the Council’s Sustainability Committee. Proposals will be presented to the Committee for approval and Committee members will champion and provide leadership on water management.
Where larger projects require capital investment, an ‘invest to save’ business case will be submitted to both the relevant Head of Service/ Assistant Director and the Finance Team for consideration/ approval.
The Energy Management Unit will work with individual building managers, property services, Anglian Water Business, other Council departments and external companies (where appropriate) to deliver water management projects. Bedford Borough Council staff will be kept updated on work undertaken via existing communication channels, such as ‘Connect’ (internal staff newsletter), ‘My View’ (the Council’s intranet pages) and the Energy Champions scheme.
Progress achieved against the Councils water reduction target and the implementation of this Water Strategy will be reported in the following ways:
• Through the Councils performance management framework: “Delivery of the Water Strategy” (a key performance indicator) and the water saving which results will be reported on an annual basis
• An annual report which details trends in water consumption against the baseline period and provides an overview of projects completed in the respective year will be produced using available billing data (See Data Management)
• Ongoing updates on progress made against the baseline will be reported back to the Sustainability Committee on a regular basis (as appropriate)
6. Programme Management
40
Water Strategy 2014/15 - 2016/17
Whilst the Council is dedicated to reducing its own water consumption, it also strives to lead by example by working with the community and schools in a number of ways to promote water efficiency.
7.1 Policy
To embed water efficiency across the organisation, policy documents will be reviewed to ensure they reflect this priority. The Council will specifically seek to develop a policy document (or update an existing policy) to stipulate the use of water efficient fixtures (in new and existing buildings) that meet and/or exceed Building Regulation Standards; ensuring that the most water efficient option is sought. Where extra investment is required to reduce longer term costs, a business case will need to be presented for approval.
7.2 Web Pages
The Council currently has a page on its website specifically promoting water conservation. The Council’s water butt kit special offer is outlined and details on free home water efficiency audits offered by Anglian Water Business, as well as tips on water savings at home, are provided.22
A section of the Council’s website is dedicated to raising awareness of sustainability issues amongst schools in the Borough. The Council will create a page dedicated to water saving for schools and include useful links and advice. A secure area on the website also exists for schools and this too will be updated.
7.3 Promoting Water Butts to Residents in Bedford Borough
The Council have been working with Straight to promote a special offer on Water Butt kits to residents in Bedford since 2010. To date approximately 450 water butts have been sold as part of this offer. It is estimated that around 24,000 of water can be collected from the average residential roof each year.23 These kits are advertised on the Council’s webpage and at any water events the Council holds/attends.
Figure 19: An example of a previous campaign leaflet for the Council’s Water Butt offer
22 www.bedford.gov.uk/environment_and_planning/sustainability/water_conservation.aspx
23 www.bbc.co.uk/gardening/basics/techniques/watering_savingwater1.shtml
7. Leadership and Partnership
41
Water Strategy 2014/15 - 2016/17
7.4 World Water Day / Anglian Water Business Love Every Drop Campaign
Every year the Council holds a stand in the town centre promoting World Water Day. Here the Council promote the water butts offer and also Anglian Water Business’s Love Every Drop and Drop 20 campaigns. The Sustainability Team hand out leaflets, which provide advice on how to save water, and free water saving devices (courtesy of Anglian Water Business) which include shower saves (which reduce the flow of water in non-electric showers) and save-a-flush devices for use in toilet cisterns.
The Council will continue to support these annual campaigns.
Figure 20: World Water Day stand in Bedford 2014
7.5 School Water Efficiency Audits
In 2011 and 2012, the Energy Management Unit promoted Anglian Water Business’s free water efficiency audits to Bedford Borough schools. Around 30 schools benefited from this free service and the majority found they could make simple, no/low cost savings. Recommendations included changing tariffs, installing water saving devices, changing flush times of urinals, installing self-closing taps and/or checking for leaks. Table 8 highlights a number of the schools audited that could save a large amount of money each year by applying the suggested measures.
School Total potential financial savings per year
Springfield Lower school £2,032
Hastingsbury Business & Enterprise College £1,736
Elstow Lower School £1,191
Biddenham Upper £929
Hazeldene Lower £755
Wootton Lower £510
St John Rigby £433
Castle Lower £403
Table 8: WEA’s Schools savings
42
Water Strategy 2014/15 - 2016/17
The Council will continue to work with schools and look at the possibilities of rolling out the Building Managers Handbook as well as any posters produced. The Council will work with Anglian Water Business and the schools to promote water efficiency and work towards a better understanding of Bedford schools water consumption.
7.6 Working in Partnership with Fusion Lifestyle
Built into the contract with the Council is a requirement for Fusion Lifestyle to closely monitor water usage and make efforts to reduce water consumption. The services specification document, which forms part of the contract documentation, requires Fusion to:
• Operate the leisure facilities in an environmentally sensitive and sustainable manner, to reduce energy consumption, reduce water and wastewater consumption.
• Have a clear policy and implement effective operational practices that demonstrably have a positive effect on the environment. This shall be set out in an Environmental Management Method Statement and shall include:
- Proposed approach to energy management (including as appropriate reducing energy consumption, energy conservation and use of renewable energy) - Targets for reducing CO2
emissions - Increasing water efficiency and maximising water recycling opportunities
• Establish an “Environmental and Energy Management Plan” Year. The plan, actions and results will be reviewed by/with the Authority (the Sustainability Team) on a quarterly basis and will include:
- Accurate records of electricity, gas and water consumption for each of the Centres - Maximising energy conservation and benchmarking energy consumption - Carbon management - Maximising water use reduction and recycling opportunities
The Council will continue to monitor progress through Fusion Lifestyle’s Environmental and Energy Management Plan and monthly utility reports.
7.7 Sharing Best Practise
Wherever possible, the Council actively seeks to share best practise with other local authorities, organisations and individuals to share expertise and lessons learnt. The Council will continue to raise awareness of the successes and challenges of implementing this Water Strategy through local and regional networks, case studies and other means available.
43
Water Strategy 2014/15 - 2016/17
Appendix C summarises all actions implemented by the Council to date.
The following action plan details the projects which will be investigated/implemented through the delivery of this Water Strategy.
Action Project Lead Completion Date
Estimated level of cost to implement
Estimated level of cost saving
Site(s) affected
Building Managers Handbook
Produce a building managers handbook to demonstrate best practice in water management, efficiency and reduction
Energy Management Unit in partnership with Anglian Water Business
February 2015
Low Low Multiple
Create posters to encourage water efficiency and water saving tips (to be distributed to building managers)
Energy Management Unit in partnership with Anglian Water Business
February 2015
Create site audit checklist to enable building managers to review current assets and metering arrangements
Energy Management Unit in partnership with Anglian Water Business
February 2015
Launch the building managers handbook and supporting resources
Energy Management Unit in partnership with Anglian Water Business
March 2015
Site Checklist
Produce and distribute a site checklist for water fixtures and metering (this will form part of the building managers handbook)
Energy Management Unit
March 2015 Low
Low – Medium
Multiple
Complete the site checklist and return to the Energy Management Unit
Building Managers March 2015 Low
Collate information from the site checklist. Review opportunities and seek to implement any appropriate measures
Energy Management Unit and Building managers
April 2015
Low – MediumIf a meter on site cannot be located,
the Energy Management Unit will work with Anglian Water Business to conduct site surveys
Energy Management Unit , Building Managers and Anglian Water Business
April 2015
Plot meter locations on GIS, drawing upon information already held and information learned from the site checklist
Energy Management Unit , GIS Team
April 2015 Low
Explore opportunities to incorporate a site checklist within existing processes e.g. workplace inspections
Energy Management Unit
Ongoing Low
8. Water Strategy Action Plan
44
Water Strategy 2014/15 - 2016/17
Action Project Lead Completion Date
Estimated level of cost to implement
Estimated level of cost saving
Site(s) affected
Regular Meter Reads
Complete and record meter readings on a monthly basis
Site managers / appointed staff
Ongoing action- monthly
Low Low Multiple
Submit monthly meter readings to Anglian Water Business and the Energy Management Unit
Site managers / appointed staff
Ongoing action- monthly
Input meter readings into Team Sigma
Energy Management Unit
Ongoing action- monthly
Energy Team to work with Team Energy to develop a method of uploading water data into Team Sigma; making recording and monitoring water usage quicker and easier
Energy Management Unit
2015
Training
Complete initial training for building managers at the launch event for the building manager’s handbook
Energy Management Unit in partnership with Anglian Water Business
March 2015
Low Low MultipleArrange and carry out talks or training sessions on water efficiency as required
Energy Management Unit
Ongoing action - as required
Look into the possibility of an e-learning course on My View (intranet) for staff to complete to raise water awareness and update intranet pages
Energy Management Unit / ICT
May 2015
Water Efficiency Audits
Identify sites which have yet to have a WEA completed, or those that should be revisited
Energy Management Unit
January 2015
Low
Low
Multiple
Commission WEAs where appropriate Energy Management Unit /Anglian Water Business
February 2015 Low
Assess recommendations from completed WEAs and seek to implement opportunities
Energy Management Unit
March 2015 Low - Medium
45
Water Strategy 2014/15 - 2016/17
Action Project Lead Completion Date
Estimated level of cost to implement
Estimated level of cost saving
Site(s) affected
Allotments and Parks
Identify the needs of parks and allotments, how the water is currently used and if any measures have already been implemented to date
Energy Management Unit / Parks, Allotments
March 2015
Low
Low
Allotments and Parks
Investigate potential measures to implement at parks and/or allotments, including changes to the current planting regime rain water harvesting and improved watering practises
Energy Management Unit / Parks, Allotments
March/April 2015
Implement proposed measures Energy Management Unit /Parks/Allotments
May 2015 Low – Medium
Borough Hall Taps
Investigate the number of turn taps in Borough Hall and conduct a flow test on the taps. Complete a desktop assessment to determine the best solution
Energy Management Unit / Facilities manager
January 2015 Low
Low - Medium
Borough Hall
Implement project to upgrade current push taps in Borough Hall
Energy Management Unit / Facilities manager
February 2015 Medium
Foam Soap
Complete a desktop assessment to ascertain the current costs associated with liquid soap and the potential savings associated with utilising foam soap. Develop a business case (if appropriate) and agree proposals
Energy Management Unit /Facility Managers
February 2015 Low
Low - Medium
Multiple
Implement foam soap at Council sites (if appropriate)
Energy Management Unit
April 2015 Medium
Waterless Urinals
Installation of a sub meter at Allhallows Multi Storey Car Park Toilets to monitor water consumed by the urinals
Design Services January 2015
Low
Low - Medium
Allhallows MSCP
Complete a trial of a waterless urinal system at Allhallows Multi Storey Car Park Toilets and analyse results
Energy Management Unit
March/April 2015
No Cost
MultipleComplete a business case to roll out waterless urinals to other Bedford Borough Council sites (if appropriate)
Energy Management Unit
April 2015 Low
Implement waterless urinals (if / where appropriate)
Energy Management Unit
June 2015 Medium
46
Water Strategy 2014/15 - 2016/17
Action Project Lead Completion Date
Estimated level of cost to implement
Estimated level of cost saving
Site(s) affected
Improvements to Borough Hall Canteen
Investigate the feasibility of changing the dishwasher in Borough Hall canteen to a newer, more efficient model
Energy Management Unit
January 2015 Low
Low - Medium
Borough Hall
Conduct a flow test on the taps in Borough Hall canteen and complete a desktop assessment to investigate the benefits of fitting flow regulators or tap aerators to the kitchen taps
Property Services / Energy Management Unit
December 2014
Low
Investigate if the rinsing device in Borough Hall canteen is being used efficiently and/or could be upgraded to a more efficient model
Energy Management Unit
January 2015 Low
Implement any appropriate projects in Borough Hall canteen
Property Services April 2015 Medium
Vehicle Repair Depot
Install 2 sub-meters at the Vehicle Repair Depot (one on the existing vehicle wash down area and one on the vehicle fill area) and complete a water mass balance study
Site Manager /Property Services / Energy Management Unit / Anglian Water Business
January/ February 2015
Low
Low - Medium
Vehicle Repair Depot
Identify and implement no/low cost measures at the Vehicle Repair Depot
Energy Management Unit / Site manager / Anglian Water Business/Property Services
February 2015 Low
Investigate the feasibility of grey water recycling and rain watering harvesting at the Vehicle Repair Depot and build and present a business case for approval (if appropriate)
Site Manager/Energy Management Unit / Anglian Water Business
April 2015 Low - Medium
Medium - High
Implement water recycling project(s) at the Vehicle Repair Depot (if appropriate)
Site Manager / Energy Management Unit
June 2015 High
47
Water Strategy 2014/15 - 2016/17
Action Project Lead Completion Date
Estimated level of cost to implement
Estimated level of cost saving
Site(s) affected
Data Management
Work with Anglian Water Business and TEAM Energy to develop electronic billing files compatible with TEAM Sigma software
Energy Management Unit
Ongoing
Low Low Multiple
Roll out the Team Sigma Energy Viewer to building managers
Energy Management Unit
June 2015Low Low Multiple
Programme Management
Produce an annual report which details trends in water consumption
Energy Management Unit
OngoingLow Low Multiple
Raise staff awareness (e.g. Connect, My View, Energy Champions)
Sustainability Unit OngoingLow Low Multiple
Leadership and Partnership
Develop a policy document to stipulate water efficient practices
Energy Management Unit / Design Services
June 2015Low
Low - Medium
Multiple
Update the Council and school webpages
Energy Management Unit
February 2015Low Low Multiple
Continue to support initiatives to raise water efficiency awareness in the community
Sustainability Team
OngoingLow
Community Initiative
Community
Provide ongoing support to schools to become more water efficient e.g. roll out building managers handbook
Energy Management Unit
OngoingLow
Community Initiative
Schools
Work in partnership with Fusion Lifestyle to reduce consumption in leisure sites
Energy Management Unit / Design Team
OngoingLow
Community Initiative
Leisure sites
48
Water Strategy 2014/15 - 2016/17
8.1 Summary of Actions to Follow Up from Previous Water Efficiency AuditsA number of recommendations identified through previous water efficiency audits have yet to be taken forward by our sites. Table 9 summarises a series of actions which will be followed up and investigated.
Site (date of WEA) Recommendation Action Completed by
Foster Hill Cemetery (2012) Ensure that all urinals flush no more than three times per hour
Investigate the flush regime of the urinals and make suggested improvements
March 2015
Norse Road Cemetery (2012) Install one automatic flushing device to the urinal and ensure that all urinals flush no more than three times per hour
Investigate the flush regime of the urinals and make suggested improvements
Install water saving devices in 20 WC cisterns
Investigate the feasibility of installing these devices.
Bedford Central Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
Investigate the flow rate of the taps and the type of taps. Install appropriate measures
Kempston Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
Investigate the flow rate of the taps and the type of taps. Install appropriate measures
Wootton Library (2012) Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
Investigate the flow rate of the taps and the type of taps. Install appropriate measures
Putnoe Library (2012) Install water saving devices in WC cisterns
Investigate the feasibility of installing these devices
Parkside House (2010) Install water saving devices in WC cisterns
Investigate the feasibility of installing these devices
Conduit Road Day Centre (2010)
It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this.
Investigate leak on site
George Beal House (2010) Install water saving devices in WC cisterns
Investigate the feasibility of installing these devices
Table 9: Summary of actions to follow up from previous water efficiency audits
49
Water Strategy 2014/15 - 2016/17
Site Location Recommendation Year ImplementedFoster Hill Cemetery (2012)
All toilet cisterns
Install water saving devices in 20 WC cisterns Fitted 2012Make regular checks to ensure none of the WC cisterns are overflowing
Ongoing
Male toilets Ensure that all urinals flush no more than three times per hour To investigateSite Ensuring taps, hoses and similar devices are not left running
when in useOngoing Behaviour Change
Norse Road Cemetery (2012)
All toilet cisterns
Install water saving devices in 20 WC cisterns To investigateMake regular checks to ensure none of the WC cisterns are overflowing
Ongoing Behaviour Change
Male toilets Install one automatic flushing device to the urinal and ensure that all urinals flush no more than three times per hour
To investigate
Site Ensuring taps, hoses and similar devices are not left running when in use
Ongoing Behaviour Change
Bedford Central Library (2012)
Site Read revenue meters on a monthly basis Ongoing Behaviour Change
Toilet washbasins
Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
To investigate
Putnoe Library (2012)
All toilet cisterns
Install water saving devices in WC cisterns To investigate
Kempston Library (2012)
Site Read revenue both meters on a monthly basis Ongoing Behaviour Change
Toilet washbasins
Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
To investigate
Wootton Library (2012)
Site Read revenue meters on a monthly basis Ongoing Behaviour Change
Toilet washbasins
Decrease the flow rate from the taps on the washbasins by installing a service valve and regulating the flow to around 7 litres per minute
To investigate
Parkside House (2010)
All toilet cisterns
Install water saving devices in WC cisterns To investigate
Site Ensuring taps, hoses and similar devices are not left running when in use
Ongoing Behaviour Change
Conduit Road Day Centre (2010)
Site It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this
To investigate
Kempston Centre (2010)
Site Read the revenue meter on a monthly basis Ongoing Behaviour Change
All toilet cisterns
Install water saving devices in WC cisterns Installed
George Beal House (2010)
Site Read the revenue meter on a monthly basis Ongoing Behaviour Change
All toilet cisterns
Install water saving devices in WC cisterns To investigate
Site It is possible that there is an underground leak at the site. The site should conduct a ‘soundness test’ to determine this
Resolved 2012
Huddleston Way Day Centre (2010)
Site Ensuring taps, hoses and similar devices are not left running when in use
Ongoing Behaviour Change
Appendix A - Summary of Water Efficiency Audits Recommendations
Any actions are incorporated into Table 9.
50
Water Strategy 2014/15 - 2016/17
Site Name Current Tariff
Site Consumption m3
Proposed Tariff
Potential Financial Saving Total
91 Bromham Road - Foxgloves Domestic 751 Orange £151.68
Allen Park Sports Pavilion Orange 67 Green £73.35
Bedford Park Cricket Pavilion Green 2,010 Orange £152.44
Bedford Social Centre / Conduit Road Day Centre Green 857 Orange £60.08
Bunyan Centre Green 4,756 Orange £715.58
Corn Exchange Green 969 Orange £78.91
CSD Offices, Barkers Lane Green 1,012 Orange £86.14
George Beal House Green 1,441 Orange £158.26
Kempston Centre Green 854 Orange £59.57
Lurke Street MSCP Orange 62 Green £73.58
Mowsbury Golf Course Blue 3,729 Orange £201.00
Priory Street Bowl Pavilion Orange 24 Green £79.97
Southfields Community Centre Green 682 Orange £30.66
Sunflower House Green 685 Orange £31.16
The Higgins Bedford
Green 1,421 Orange £154.90
Hillgrounds Changing Rooms Green 1,283 Orange £131.70
Cricket Pitches Bedford Park Orange 63 Green £37.61
56 Singer Way Orange 0 Green £84.00
Mill Meadows Domestic 832 Orange £146.15
Appendix B - Full Tariff Optimisation table
51
Water Strategy 2014/15 - 2016/17
Site Action Implemented in
Borough Hall Percussion taps installed 2008/2009
Day centres and Borough Hall Water Efficiency Audits 2010
Borough Hall Kettles removed 2010/2011
Priory Country Park Rain Water Harvesting Installed 2011
Leisure centres, libraries, the crematorium and the cemetery
Water Efficiency Audits 2012
The Higgins Bedford Rain Water Harvesting Installed 2012/13
Robinson Pool Leak fixed 2013
Oasis Pool Smart meter installed 2013
All sites Tariff optimisation 2013
Various Public Conveniences Modernisation programme closed down PC’s and removed APCs
2013
Allhallows MSCP PC Public Convenience full refurbishment, sensor taps, WC and urinals
2013/2014
Lurke Street MSCP PC Public Convenience refurbishment. Dual flush toilets
2014
Robinson Pool Smart Meter installed 2014
Borough Hall Water Efficiency Audit 2014
Borough Hall Fixed leaking WCs and urinals 2014
The Higgins Bedford Water Efficiency Audit 2014
The Higgins Bedford Installed save-a-flush devices 2014
The Higgins Bedford Repaired leaking cistern 2014
The Higgins Bedford Reduced the flow of cold and hot taps to 7.5 litres /minute
2014
Hillgrounds Changing Rooms Overflowing cistern and purging water cylinders repaired
2014
Borough Hall Smart Meter installed 2014
All sites Consolidated billing 2014
Appendix C - Summary of what actions have been achieved to date
52
Water Strategy 2014/15 - 2016/17
53
Water Strategy 2014/15 - 2016/17
ENV124_14 [email protected] www.bedford.gov.uk
01234 718286
Sustainability Team
Borough Hall
Cauldwell Street
Bedford
MK42 9AP
www.bedford.gov.uk