Wastewater Treatment Plant Resita, Romania Strabag SRL, Direction IF Environmental Service area Contract value Project duration Wastewater treatment (protected) - Project description: ISPA-Project for the complete demolition of the existing WWTP Resita and reconstruc- tion and the extension of the WWTP (~ 125,000 PE) incl.: New construction of the mechanical treatment stage New construction of the intermediate pumping station New construction of the two-stage-acti- vated-sludge process New construction of the aeration tanks as cascade denitrification tanks New construction of the final sedimenta- tion New construction of 2 digesters with 1,550 m³ volume each and a central mixer New construction of a combined heat and power plant (CHP) with a total capacity of 1 MWel. New construction of the sludge drainage Reconstruction of the existing preliminary sedimentation to a stormwater retention tank Further project data: Renovation measures during ongoing operation Working language: English Purpose: Modernization of the mechanical treat- ment stage Anaerobic sludge treatment and biogas utilization Our services: Basic Design Preparation of approval documents ac- cording to Romanian law Detail Design Planning of structural framework accord- ing to Romanian regulations Assistance in start-up Client benefits: General planner Modern WWTP with biological treatment (AB technology)

Upload: truonghanh

Post on 19-Mar-2018

221 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Wastewater Treatment Plant Resita, Romania - HPC AG · PDF fileWastewater Treatment Plant Resita, Romania Strabag SRL, Direction IF Environmental Service area Contract value Project

Wastewater Treatment Plant Resita, Romania

Strabag SRL, Direction IF Environmental

Service area Contract value Project duration

Wastewater treatment (protected) -

Project description:

ISPA-Project for the complete demolition of the existing WWTP Resita and reconstruc-tion and the extension of the WWTP (~ 125,000 PE) incl.:

• New construction of the mechanical treatment stage

• New construction of the intermediate pumping station

• New construction of the two-stage-acti-vated-sludge process

• New construction of the aeration tanks as cascade denitrification tanks

• New construction of the final sedimenta-tion

• New construction of 2 digesters with 1,550 m³ volume each and a central mixer

• New construction of a combined heat and power plant (CHP) with a total capacity of 1 MWel.

• New construction of the sludge drainage

• Reconstruction of the existing preliminary sedimentation to a stormwater retention tank

Further project data:

• Renovation measures during ongoing operation

• Working language: English

Purpose:

• Modernization of the mechanical treat-ment stage

• Anaerobic sludge treatment and biogas utilization

Our services:

• Basic Design

• Preparation of approval documents ac-cording to Romanian law

• Detail Design

• Planning of structural framework accord-ing to Romanian regulations

• Assistance in start-up

Client benefits:

• General planner

• Modern WWTP with biological treatment (AB technology)