1 | Irish Water | [Type Document Title]
IW-C
DS
-50
30
-01
Wastewater Infrastructure
Standard Details
Connections and Developer Services
Construction Requirements for Self-Lay Developments December 2017 (Revision 03)
Document IW-CDS-5030-01
Revision Log
Date Details of Revision Revision Author Approver
April 2016 General revisions 01 T’OC M’OD August 2016 General revisions &
drawing added 02 TO’C MO’D
December 2017 General revisions & drawing added
03 TO’C MO’D
IW-CDS-5030-01 Rev. 03 December 2017
Background
Technical Documentation has been developed by Irish Water’s Connections and Developer Services which outlines the requirements for wastewater services infrastructure within developments.
These standard details have been developed to outline to developers Irish Water’s requirements for the provision of wastewater infrastructure that is to be installed in developments and that would be connected to Irish Water’s networks and subsequently vested in Irish Water.
The standard details outline design and construction requirements to ensure consistency in the provision of materials, equipment and workmanship, etc. They also provide the basis for developers’ detailed design proposals for wastewater infrastructure, leading to the provision of infrastructure that is suitable for connection to Irish Water’s networks and easy operation and maintenance of the new infrastructure.
The standard details are based on best practice within the water industry. They take account of the experience of Local Authorities in the provision of these services to new developments. They have been successfully used by Irish Water’s own internal functions for a variety of projects and they are in line with water utility industry norms.
There are 36 No Standard Details dealing with wastewater infrastructure covering all aspects of such infrastructure.
These standard details are accompanied by a Design Risk Assessment (DRA) (document number IW-CDS-5030-02), which outlines the residual health and safety responsibilities of developers and their designers/contractors in the provision of such infrastructure.
The use of the standard details is mandatory in all new Irish Water Connection Agreement Offers issued after 1st June 2016. .
IW-CDS-5030-01 Rev. 03 December 2017
Standard Details for Wastewater Networks Index Sheet
Drawing No. Drawing Title Rev
STD-WW-01 Waste water service connection responsibility 1
STD-WW-02 Typical layout for sewer within new developments 1STD-WW-03 Drain & service connection pipework 1
STD-WW-04 Typical sewer / service pipe connection 1
STD-WW-05 Typical service layout indicating separation distances 1STD-WW-06 Restrictions on wastewater infrastructure adjacent to trees 2
STD-WW-06A Restrictions on new trees/shrubs planting adjacent to sewers 0 STD-WW-07 Trench backfill & bedding 1
STD-WW-08 Concrete bed, haunch & surround to wastewater pipes 0
STD-WW-09 Blockwork manhole (<450mm dia.) 2STD-WW-10 Pre-cast concrete manhole 2
STD-WW-11 In-situ concrete manhole 2
STD-WW-12 Backdrop manholes 2STD-WW-13 Private side inspection chamber 2
STD-WW-14 Thrust blocks for rising mains 1
STD-WW-15 Scour valve chamber (foul rising main <200mm dia.) 2STD-WW-16 Sluice valve details for rising mains ductile iron (D.I.) pipe (<200mm
dia.) (sheet 1 of 2)
3
STD-WW-17 Sluice valve details for rising mains polyethylene (P.E.) pipe (<200mm
dia.) (sheet 2 of 2)
2
STD-WW-18 Air valve chamber (foul rising main <200mm dia.) 2STD-WW-19 Duct chamber 2
STD-WW-20 Emergency overflow structure 1
STD-WW-21 Typical ditch/stream crossing for gravity main (sheet 1 of 2) 1STD-WW-22 Typical ditch/stream crossing for rising main (sheet 2 of 2) 1
STD-WW-23 Typical bridge crossing for rising main (sheet 1 of 2) 1
STD-WW-24 Typical bridge crossing for rising main (sheet 2 of 2) 1STD-WW-25 Security gate & fencing 2
STD-WW-26 Indicative pumping station layout 0STD-WW-27 Flow meter chamber (foul rising main <200mm dia.) 2
STD-WW-28 Indicative submersible pumping station 2
STD-WW-28A Indicative pre-cast concrete submersible pumping station 1 STD-WW-29 Rising main discharge manhole 2
STD-WW-30 Kiosk type 1 pumping station & wet kiosk (sheet 1 of 2) 2
STD-WW-31 Kiosk type 2 + 3 pumping station & wet kiosk (sheet 2 of 2) 2STD-WW-32 Hardstanding area pumping station (permeable & impermeable) 1
STD-WW-33 Lamp bollard & lamp standard 1
STD-WW-34 Vent stack 1
These Standard Details show the acceptable typical details and outline the minimum standards that are required by Irish Water for the provision of wastewater pipes and related infrastructure which are to be connected to the Irish Water Network. They shall be used in conjunction with the associated Design Risk Assessments that have been developed which identify the risks that designers shall take into account in the detailed design of the wastewater pipes and related infrastructure to be connected to the Irish Water Network. The pipes and related infrastructure to be put in place within developments shall comply fully with these Standard Details. Ultimate responsibility (including, but not limited to, any losses, costs, demands, damages, actions, expenses, negligence and claims) for the detailed design, construction and provision of such pipes and related infrastructure shall rest entirely with the Developer, his/her Designer(s), Contractor(s) or other connected party. Irish Water assumes no responsibility for and gives no guarantees, undertakings or warranties in relation to the pipes and related infrastructure to be provided in accordance with these Standard Details. No part of the Standard Details shall be reproduced or transmitted in any form or stored in any retrieval system of any nature without the prior written permission of Irish Water as copyright holder, except as agreed for use. These Standard Details shall be used in conjunction with current Irish Water Codes of Practice, which will take precedence over the Standard Details. These Standard Details may also be used for the installation of wastewater infrastructure for Asset Delivery Works & Capital Project Works Programmes at the discretion of Irish Water.
DEC. 2017
IW-CDS-5030-01 Rev. 03 December 2017
DRAIN
PROPERTY OWNER RESPONSIBILITY
SERVICE CONNECTION
SEWER( IRISH WATER RESPONSIBILITY )
A / B C D
ROADFOOTPATH
PROPERTY BOUNDARY
WITHIN
1m OF
BOUNDARY
INSPECTION CHAMBER
CUSTOMER PROPERTY
VENT STACK
PROPERTY OWNER RESPONSIBILITY
SEE NOTE 2 ON
STD-WW-03
( A ) SEWER IRISH WATER
( B-C ) SERVICE CONNECTION( INCLUDING SADDLE )
INSPECTION CHAMBER
( C-D ) DRAIN
INTERNAL PLUMBING
PROPERTY OWNER
PROPERTY OWNER
PROPERTY OWNER
MAINTENANCE
RESPONSIBILITY
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
CONNECTION RESPONSIBILITY
101
SEPT. 2015
WASTEWATER SERVICE
PROPERTY OWNER
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Note reference addedJMC MODTOC
IW-CDS-5030-01 Rev. 03 December 2017
FOUL
SEW
ERST
ORM
WAT
ER
TELE
COMM
UNIC
ATIO
NS
WAT
ER M
AIN
GAS
MAIN
CABL
E TV
ELEC
TRIC
ITY
BOUN
DARY KE
RBFOOTPATHROAD
TYPICAL LAYOUT OF SERVICES IN FOOTPATH / ROAD
BUILDING
LEGEND
PROPOSED INSPECTION CHAMBER
PROPOSED SEWER
PROPOSED MANHOLE
EXISTING MANHOLE
EXISTING SEWER
1. THE MINIMUM SIZE FOR A GRAVITY FOUL SERVICE CONNECTION SHALL BE 100mm DIAMETER.
2. THE MINIMUM SIZE OF GRAVITY FOUL SEWER SHALL BE 225mm DIAMETER IN GENERAL. GRAVITY SEWERS ON BRANCHES SERVING LESS THAN 20 PROPERTIES MAY BE 150mm DIAMETER SUBJECT TOAGREEMENT WITH IRISH WATER.
3. THE MINIMUM SIZE FOR RISING MAINS SHALL NOT BE LESS THAN 80mm & THE DESIRED MINIMUM SIZE OF RISING MAIN SHALL BE 100mm DIAMETER.
4. EACH PROPERTY SHALL HAVE A SEPARATE WASTE WATER SERVICE CONNECTION. A CONNECTION SHALL NOT BE TAKEN FROM AN EXISTING SERVICE CONNECTION.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
WITHIN NEW DEVELOPMENTS
102
SEPT. 2015
TYPICAL LAYOUT FOR SEWER
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated Note 2JMC MODTOC
IW-CDS-5030-01 Rev. 03 December 2017
VA
RIE
S
PROPERTY OWNER RESPONSIBILITY
PR
OP
ER
TY
BO
UN
DA
RY
45° ANGLE JUNCTION
OR OBLIQUE PIPE SADDLE.
SEE DRAWING STD-WW-04
FOR DETAILS
PROPERTY
OWNER
RESPONSIBILITY
FOR DETAIL OF INSPECTION
CHAMBER SEE DRAWING
STD-WW-13
WITHIN 1000mm
VA
RIE
S
MA
X.150m
m
SEWER
IRISH WATER RESPONSIBILITY
FOOTPATH
ROAD
FOUL SEWER MAIN SURROUND
IN 150mm GRADE C25\30 CONCRETE
AT SERVICE CONNECTIONS
GRANULAR
MATERIAL AS PER BACKFILLING
DRAWING STD-WW-07
CONNECTION PIPE
45° BEND
SLIDING COUPLING
PROPERTY
OWNER
RESPONSIBILITY
DRAIN TO BE INSTALLED
TO RELEVANT BUILDING
REGULATION REQUIREMENTS
(SEE NOTE 2)
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF THE
PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE
CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF PRACTICABLE,
CONSULT WITH IRISH WATER ON ALTERNATIVE LOCATIONS.
3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF
CONNECTION TO A PUBLIC SEWER WITHIN THE CONFINES OF A PRIVATE
BOUNDARY IS A PRIVATE DRAIN AND SHOULD BE CONSTRUCTED IN
ACCORDANCE WITH BUILDING REGULATIONS.
1 : 60
1 : 150 MINIMUM
100
150 TO 225
PIPE SIZE (mm)
GRADIENT
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
DRAIN AND SERVICE CONNECTION PIPEWORK
103
SEPT. 2015
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated NotesJMC MOLTOC
IW-CDS-5030-01 Rev. 03 December 2017
CONNECTION PIPE
0°
SEWER
CROSS-SECTIONAL
VIEW OF SEWER
VIEW IN
DIRECTION OF ARROW A
FLOW
VIEW IN
DIRECTION OF ARROW A
A
CONNECTION PIPE
0°
6
0
°
A
C
C
E
P
T
A
B
L
E
R
A
N
G
E
SEWER
CROSS-SECTIONAL
VIEW OF SEWER
4
5
°
FLOW
APPROVED 45° SADDLE CONNECTION
45° JUNCTION
A
6
0
°
A
C
C
E
P
T
A
B
L
E
R
A
N
G
E
4
5
°
90°
90°
SEE NOTE 7
SEE NOTE 7
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. AS FAR AS PRACTICABLE, JUNCTIONS AND SERVICE CONNECTIONS SHALL
BE BUILT IN FOR ALL PLANNED USERS WHEN THE SEWER IS BEING
CONSTRUCTED. WHERE IT IS NECESSARY TO MAKE A POST-CONSTRUCTION
CONNECTION THE DEVELOPER SHALL BRING THE SEWER TO THE
INSPECTION CHAMBER, INSTALL THE INSPECTION CHAMBER AND SEAL
THE UPSTREAM END UNTIL THE CONNECTION IS REQUIRED.
3. THE VERTICAL ANGLE BETWEEN THE SERVICE CONNECTING PIPE AND
THE HORIZONTAL SHALL BE GREATER THAN 0° AND NOT MORE THAN 60°.
4. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL
INTERNAL DIAMETER OF 300mm DIAMETER OR LESS, CONNECTIONS
SHALL BE MADE USING 45° ANGLE JUNCTIONS.
5. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL
INTERNAL DIAMETER GREATER THAN 300mm :
A) IF THE DIAMETER OF THE CONNECTING PIPE IS GREATER THAN
HALF THE DIAMETER OF THE SEWER, AN ACCESS MANHOLE SHALL BE
CONSTRUCTED TO FORM THE CONNECTION POINT; OR,
B) IF THE DIAMETER OF THE CONNECTING PIPE IS LESS THAN OR
EQUAL TO HALF THE DIAMETER OF THE SEWER, THEN THE CONNECTION
SHALL BE MADE USING A PREFORMED SADDLE FITTING WITH A SLOW
BEND BETWEEN THE SADDLE AND THE CONNECTING SEWER/DRAIN .
6. CONNECTIONS MADE WITH SADDLE FITTINGS SHALL BE MADE BY
CUTTING AND SAFELY REMOVING A CORE FROM THE PIPE AND JOINTING
THE SADDLE FITTING TO THE PIPE IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS TO ENSURE A WATERTIGHT JOINT.
THE CONNECTING PIPE SHALL NOT PROTRUDE INTO THE SEWERS.
7. THE USE OF 90° CONNECTIONS TO THE SEWER MAY BE ALLOWED SUBJECT
TO IRISH WATER REVIEW, PROVIDED THE SADDLE OR BRANCH
INCORPORATES A SWEPT TEE CONNECTION TOWARDS THE DIRECTION OF
FLOW.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
CONNECTION
104
SEPT. 2015
TYPICAL SEWER / SERVICE PIPE
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 JMC Updated connection detail & notes MODTOC
IW-CDS-5030-01 Rev. 03 December 2017
FOUL SEWER
TELECOMMUNICATIONS
BUILDING
MIN
IM
UM
1200m
m
3000mm MINIMUM
STORM WATER
ELECTRICITY
WATER MAIN
GAS MAIN
BOUNDARY WALL FOOTPATH
FOUNDATION
KERB
CABLE TV
MIN. 1000mm
ELECTRICAL CORRIDOR( DEPTH AND LAYOUTREQUIREMENTS TO BECONFIRMED WITH SERVICEPROVIDER )
GRASS VERGE
7. THE MINIMUM CLEAR DISTANCE WILL BE INCREASED IF THE SEWER IS GREATER THAN 3m DEEP OR IF THE DIAMETER IS GREATER THAN 375mm. THE MINIMUM CLEAR DISTANCEIN THESE SITUATIONS SHALL BE > DEPTH TO INVERT OR 10 TIMES THE SEWER DIAMETER, WHICH EVER IS GREATER.
8. THE EXTERNAL FACES OF MANHOLE SHALL BE AT LEAST 0.5m FROM KERB LINE.
1. THE SEPARATION DISTANCES OUTLINED ARE MINIMUM REQUIREMENTS.
2. SPECIFIC SEPARATION CLEARANCE DISTANCES IN EXCESS OF THESE MINIMA SHALL BE PROVIDED FOR
SERVICES SUCH AS GAS, ELECTRICITY, FIBRE-OPTIC OR OIL FILLED CABLES AS THE CASE MAY BE.
THE PARTICULAR UTILITY PROVIDERS SHALL BE CONSULTED TO DETERMINE THESE MINIMUM SEPARATION
DISTANCES AND EVIDENCE OF THIS CONSULTATION, WITH THE SPECIFIED SEPARATION DISTANCES,
SHALL BE PROVIDED TO IRISH WATER AT DESIGN STAGE.
4. DETAILED PROPOSALS, INCLUDING WORK METHOD STATEMENTS, INSURANCE CONFIRMATION AND DETAILS OF WORK COMPLETED OF A SIMILAR NATURE MUST
BE SUBMITTED TO IRISH WATER FOR ITS CONSIDERATION BEFORE AGREEMENT WILL ISSUE.ALL SUCH WORKS IN THE VICINITY OF ARTERIAL WATER MAINS AND SEWERS
(MAINS GREATER THAN 400mm) SHALL BE SUBJECT TO WRITTEN AGREEMENT WITH IRISH WATER BEFORE CONSTRUCTION COMMENCES ON SITE. THIS AGREEMENT
SHALL ALSO INCLUDE ANY NECESSARY PROTECTION FOR WATER MAINS.
5. ANY DAMAGE SHALL BE NOTIFIED IMMEDIATELY TO IRISH WATER. THE PERSON WHO CAUSES THE DAMAGE TO A SEWER MAIN OR FITTING WILL BE DEEMED TO HAVE
COMMITTED AN OFFENCE UNDER SECTION 45 OF THE WATER SERVICES ACT 2007.
6. UNDER NO CIRCUMSTANCES WILL IRISH WATER ACCEPT SEWER MAIN INSTALLATIONS UNDER STRUCTURES, EXISTING OR PROPOSED, OR IN CLOSE PROXIMITY TO
ANY EXISTING STRUCTURES OR FEATURES THAT WILL INHIBIT ACCESS FOR POST INSTALLATION MAINTENANCE AND ACCESS.
3. NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN THE FOLLOWING DISTANCES FROM AN EXISTING WATER MAIN OR WASTEWATER RISING MAIN:-
HORIZONTAL
1m AT EITHER SIDE OF AN EXISTING MAIN LESS THAN 200mm IN DIAMETER.
2m AT EITHER SIDE OF AN EXISTING MAIN OF 200mm TO 350mm IN DIAMETER.
5m AT EITHER SIDE OF AN EXISTING MAIN OF 350mm OR GREATER IN DIAMETER.
WHERE DUCTS OR PIPES ARE TO BE LAID CLOSE TO AN EXISTING WATERMAIN OR SEWER IN THE OWNERSHIP OF IRISH WATER,
NOTIFICATION IN WRITING SHALL BE PROVIDED A MINIMUM OF 10 DAYS AHEAD OF ADVANCEMENT OF THE WORK.
NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN 1.5m DISTANCE OF A WASTEWATER SEWER.
REQUIREMENTS SHALL ALSO APPLY TO TRIAL HOLES OR SLIT TRENCHES TO LOCATE THE MAIN OR GAIN GROUND INFO DATA.
LARGER DIAMETERS >350mm DISTRIBUTION AND TRUNK MAINS, IRISH WATER MUST BE NOTIFIED AT LEAST 1 MONTH IN ADVANCE.
DEVELOPERS SHALL ALSO COMPLY WITH ANY NOTIFICATION REQUIREMENTS OF OTHER UTILITY PROVIDERS (ESB, GAS MAIN, TELECOMMUNICATION ETC.).
9. WHERE DESIGN DEVIATES FROM TYPICAL DETAILS, THE LAYOUT IS SUBJECT TO REVIEW BY IRISH WATER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SEPARATION DISTANCES
105
SEPT. 2015
TYPICAL SERVICE LAYOUT INDICATING
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated notesJMC MODTOC
IW-CDS-5030-01 Rev. 03 December 2017
1m1m
NO WORKS PERMITTED
PRECAUTION
AREA
GIRTH x 4
PRECAUTION
AREA
EXCLUSION AREA
GIRTH (CIRCUMFERENCE OF TREE
MEASURED AT 1.5m ABOVE GROUND LEVEL)
EXISTING PLANTING:
PREVENTION MEASURES
REQUIRED IN LINE WITH
LANDSCAPING DESIGN & SPECIAL
PROTECTION REQUIRED. (e.g. BY
USE OF APPROPRIATE BARRIERS,
HIGH PERFORMANCE JOINTS, OR
BY USE OF POLYETHYLENE WITH
WELDED JOINTS). THE LANDSCAPE
DESIGN AND DETAILS OF THE
SPECAIL PROTECTION MEASURES
MUST BE AGREED WITH IRISH
WATER
OUTSIDE RADIUS OF PRECAUTION AREA = 4 x
GIRTH OF TREE
PRECAUTION AREA:
EXCAVATIONS FOR PIPEWORK SHOULD NOT BE
UNDERTAKEN WITHIN THIS AREA, UNLESS AGREED WITH
IRISH WATER.
WORKS WITHIN THE PRECAUTION ZONE MUST BE
SUPERVISED BY A QUALIFIED ARBORIST. WORKS SHALL BE
SUBJECT OF A CLEAR METHOD STATEMENT OUTLINING ALL
WORKS ADJACENT TO THE TREES/SHRUBS WHICH IS TO BE
PREPARED & AGREED IN ADVANCE OF THE WORKS.
MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN
THIS ZONE.
METHOD STATEMENTS:
ALL WORKS SHALL BE CARRIED
OUT IN ACCORDANCE WITH BS 5837 AND INFORMED BY
NJUG VOLUME 4
EXCLUSION AREA:
WORKS IN THIS AREA ARE TO BE AVOIDED, UNLESS
ABSOLUTELY NECESSARY & AGREED WITH IRISH WATER.
EXCAVATIONS FOR PIPEWORK SHOULD NOT BE
UNDERTAKEN WITHIN THIS AREA, UNLESS NECESSARY AND
NO OTHER OPTIONS AVAILABLE. WORKS WITHIN THE
EXCLUSION ZONE MUST BE SUPERVISED BY A QUALIFIED
ARBORIST AND AGREED WITH IRISH WATER. WORKS SHALL
BE SUBJECT OF AN ARBORICULTURAL IMPACT
ASSESSMENT AS PER BS 5837 & A CLEAR METHOD
STATEMENT OUTLINING ALL WORKS ADJACENT TO THE
TREES/SHRUBS IS TO BE PREPARED AND AGREED IN
ADVANCE OF THE WORKS.
MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN
THIS ZONE.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
INFRASTRUCTURE WORKS
206
SEPT. 2015
ADJACENT TO TREES
RESTRICTIONS ON WASTEWATER
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added new section & notesJMC TOC MOD2 11/'17 Revised to suit ILI recommendationsJMC TOC MOD
IW-CDS-5030-01 Rev. 03 December 2017
SEWER/DRAIN
Examples of Small SIze Amenity Trees
Field Maple,Wild Cherry,Crab Apple, Cobnut, Birch,Elder,Ornamental Pear.
Mountain Ash, Whitebeam,Cockspur Thorn, False Acacia,Hornbeam CV.
Poplar,
Willow.
Examples of Large Growing Species
Examples of Large Conifers & Deciduous Trees
Scots Pine, Black Pine, Cedar, Larch, Lawson's Cypress,Ash, Beech, Sycamore, Horse Chestnut, SweetChestnut, London Plane, Lime, Alder, Elm, Oak
Examples of shrubs and bushes
Holly, Laurel, Rhododendron, Dogwood,Christmas Tree, Magnolia, Fruit bushes, SpindleTree, Guelder rose, Roses
Examples of hedge plants and ground covers including
herbaceous and annuals
Hedge plants and ground covers may be placed over the pipelinePrivet, Blackthorn, Snowberry, Berberis, Heathers, Cotoneaster &Groundcovers, Herbaceous & Annuals
NOTE THAT VALUES REFER TO PLANTING DISTANCESWITHOUT ROOT BARRIERS OR PROTECTION MEASURES
NOTE: RESTRICTIONS RELATE TO INFRASTRUCTURE WITHOUT ROOT INTRUSION PROTECTION.
THUS FOR EXAMPLE:
- FOR A SERVICE LESS THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.5m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.
- FOR A SERVICE GREATER THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.0m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.
PLEASE NOTE THAT TABLE A.1. OF BS 5837 (BELOW) IS TO BE USED TO CALCULATE THE ABSOLUTE MIMIMUM DISTANCE BETWEEN NEW TREE PLANTING
FROM THE WASTEWATER INFRASTRUCTURE (THE SERVICES). THE DISTANCE IS REQUIRED TO AVOID DIRECT DAMAGE TO THE INFRASTRUCTURE FROM
FUTURE GROWTH. THE DISTANCE IS A FUNCTION OF THE DEPTH OF THE SERVICES AND THE (FINAL EXPECTED) STEM DIAMETER OF THE TREE AT
MATURITY (i.e. FINAL EXPECTED GROWTH).
DIAGRAM 2: PLANTING DISTANCES FOR DIFFERENT SPECIES
WITHOUT BARRIER PROTECTION
THE DESIGN OF LANDSCAPING SHALL BE UNDERTAKEN IN CONJUNCTION WITH THE DESIGN OF WASTEWATER INFRASTRUCTURE, ETC. THE TREE/BUSH/SHRUB SHALL NOT BE LOCATED
CLOSER TO THE WASTEWATER INFRASTRUCTURE THAN INDICATED ABOVE, EXCEPT WHERE SPECIAL PROTECTION MEASURES ARE PROVIDED. WHERE THERE IS A RISK OF TREE/ROOT
INTRUSION, THE WASTEWATER INFRASTRUCTURE SHALL BE RESISTANT TO TREE ROOT INGRESS (e.g. BY USE OF APPROPRIATE BARRIERS, HIGH PERFORMANCE JOINTS, OR BY USE OF
POLYETHYLENE WITH WELDED JOINTS FOR RISING MAINS). THE LANDSCAPE DESIGN AND DETAILS OF THE SPECIAL PROTECTION MEASURES MUST BE AGREED WITH IRISH WATER
A TREE SHALL NOT BE PLANTED DIRECTLY OVER WASTEWATER INFRASTRUCTURE WHERE EXCAVATION OF THE INFRASTRUCTURE WOULD REQUIRE REMOVAL OF THE TREE UNLESS SUCH
PLANTING IS AGREED WITH IRISH WATER AND IN GENERAL ONLY SHALLOW ROOTING SHRUBS SHALL BE PLANTED CLOSE TO WASTEWATER INFRASTRUCTURE.
PLEASE ENSURE THAT THESE DISTANCES ARE ADHERED TO IN ORDER TO PROTECT THE TREES FROM ANY FUTURE MAINTENANCE. REFERENCE SHOULD ALSO BE MADE TO BS 5837, BS 8545
AND THE NJUG GUIDELINES VOLUME 4 FOR FURTHER INFORMATION.
THE DISTANCES GIVEN IN TABLE A.1. OF BS 5837 MUST BE FURTHER INFORMED BY THE SPECIES & IN DIAGRAM 2 BELOW. DIAGRAM 1 ABOVE
PROVIDES A FLOW CHART TO THE DECISION PROCESS WHILST DIAGRAM 2 BELOW IS TO BE USED TO INFORM THE PLANTING REGIME.
Services
> 1m deep
< 1m deep
Final stem dia. < 300mm Final stem dia. > 600mmFinal stem dia. 300mm to 600mm
--
0.5
1.0
1.5
2.0
3.0
Minimum distance between young trees or new planting & structures, in metres (m)
Outcome
DIAGRAM 1: DECISION FLOW CHART
Decision
Do
Nothing
Are root barriers &/or
protection measures
to be used?
1. Develop detailed design
of the tree planting with
landscape architect.
2. Consult with arborist.
3. Carry out works under
supervision of Irish Water
representative.
1. Plant trees at required
distance (as per step 2).
2. Carry out works under
supervision of Irish Water
representative.
Check STD-W12A for species & size
Depending on the choice of tree
species or shrubs:
1. Establish increased (or
decreased) distance from utility
2. Assume no protection measures
Check Table A.1. of BS 5837. Check
1. Utility depth
2. Final expected stem diameter
- Establish minimum distance from
tree to utility
- Assume no protection measures
Trees required in
proximity to Water
Infrastructure
Main Decision
No Yes
Yes
No
Then
STEP 1 STEP 2 (DIAGRAM 2)
TABLE A.1.
BS 5837
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
RESTRICTIONS ON NEW TREES / SHRUBS
PLANTING ADJACENT TO SEWERS
JUL. 2017
06A 0
No. Date Description0 11/'17 Initial Issue
AppDrn ChkJMC TOC MOD
NOTE: OTHER SPECIES NOT
NAMED TO BE PLANTED TO THE
SAME SPACINGS DEPENDING ON
ROOT FORMATION.
IW-CDS-5030-01 Rev. 03 December 2017
CROSS SECTION IN ROADS
PIPE DIAMETER - 'A'
30
0m
m'C
'
SE
E N
OT
E 2
MINIMUM TRENCH WIDTH - 'B'
ROAD/FOOT PATH SURFACE
CROSS SECTION IN GRASSED AREAS
VA
RIE
S
SE
E N
OT
E 7
'C
'
DEPTH OF
REINSTATED TOPSOIL
TO MATCH EXISTING
PIPE DIAMETER - 'A'
MINIMUM TRENCH WIDTH - 'B'
SE
E N
OT
E 2
BACKFILL REFER TO
NOTE 3 FOR DETAILS
PIPE BEDDING REFER TO
NOTE 5 FOR DETAILS
SELECTED BACKFILL
REFER TO NOTE 4
FOR DETAILS
PIPE BEDDING REFER TO
NOTE 5 FOR DETAILS
GRASSED AREAS
MARKER TAPE REFER
TO NOTE 9 FOR DETAILS
MARKER TAPE REFER
TO NOTE 9 FOR DETAILS
SEE NOTES 11 & 12.
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. THE MINIMUM DEPTH OF COVER FROM THE FINISHED SURFACE TO
THE CROWN OF GRAVITY PIPES WITHOUT PROTECTION SHOULD BE
AS FOLLOWS:
A) GARDENS AND PATHWAYS WITHOUT ANY
POSSIBILITY OF VEHICULAR ACCESS - DEPTH NOT LESS
THAN 0.5 M. (THIS WOULD NORMALLY RELATE TO DRAINS
IN PRIVATE PROPERTY, SHALLOW PIPES OF THIS NATURE
ARE UNDESIRABLE AND SHOULD BE INSTALLED IN
ACCORDANCE WITH THE CURRENT BUILDING REGULATIONS).
B) DRIVEWAYS, PARKING AREAS AND YARDS WITH
HEIGHT RESTRICTIONS TO PREVENT ENTRY BY VEHICLES
WITH A GROSS VEHICLE WEIGHT IN EXCESS OF 7.5
TONNES - DEPTH NOT LESS THAN 0.75 M.
C) DRIVEWAYS, PARKING AREAS AND NARROW
STREETS WITHOUT FOOTWAYS (E.G. MEWS DEVELOPMENTS)
WITH LIMITED ACCESS FOR VEHICLES WITH A GROSS VEHICLE
WEIGHT IN EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 0.9 M.
D) DEPTHS OF SEWERS IN GATED ESTATES SHALL BE SIMILAR TO
THAT OUTLINED ABOVE.
E) AGRICULTURAL LAND AND PUBLIC OPEN SPACE - DEPTH NOT
LESS THAN 0.9 M.
F) OTHER HIGHWAYS AND PARKING AREAS WITH UNRESTRICTED
ACCESS TO VEHICLES WITH A GROSS VEHICLE WEIGHT IN
EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 1.2m.
3. CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH THE NATIONAL ROADS
AUTHORITY SPECIFICATION FOR ROAD WORKS IS TO BE USED AS
BACKFILL MATERIAL WHERE THE SEWER MAIN IS LOCATED IN ROADS,
FOOTPATHS OR WHEN THE NEAREST PART OF THE TRENCH IS WITHIN
1m OF THE PAVED EDGE OF THE ROADWAY. CLAUSE 804 / 808 IS TO BE
COMPACTED AS PER CLAUSE 802 OF THE NATIONAL ROADS AUTHORITY
SPECIFICATION FOR ROAD WORKS. CLAUSE 808 IS TO BE USED WITHIN
500mm OF CEMENT BOUND MATERIALS, CONCRETE PAVEMENTS,
CONCRETE STRUCTURES OR CONCRETE PRODUCTS. OTHERWISE CLAUSE
804 MAY BE USED. ALTERNATIVE BACKFILL MATERIAL TO THAT DESCRIBED
ABOVE (CLAUSE 804 OR CLAUSE 808) OF THE PIPE TRENCH WILL ONLY BE
ALLOWED BY IRISH WATER WHERE THE ROADS AUTHORITY IN WHOSE
FUNCTIONAL AREA THE DEVELOPMENT IS LOCATED, PROVIDES WRITTEN
APPROVAL TO THE DEVELOPER TO THE USE SUCH ALTERNATIVE
MATERIAL.
4. SELECTED EXCAVATED MATERIAL MAY BE USED IN GREEN-FIELD
AREAS ABOVE GRANULAR PIPE SURROUND MATERIAL SUBJECT TO
REVIEW BY IRISH WATER.
5. PIPE BEDDING SHALL COMPLY WITH WIS 4-08-02 AND IGN 4-08-01
GRANULAR MATERIAL SHALL BE 14mm TO 5mm GRADED
AGGREGATE OR 10mm SINGLE SIZED AGGREGATE IS EN 13242. CONCRETE
BED, HAUNCH & SURROUND, WHERE REQUIRED, SHALL BE TO STD-WW-08.
6. IN SOFT GROUND CONDITIONS (CBR < 5) THE MATERIAL SHOULD BE
EXCAVATED AND DISPOSED OF IN ACCORDANCE WITH THE WASTE
MANAGEMENT ACT AND CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH
THE NATIONAL ROADS AUTHORITY SPECIFICATION FOR ROAD
WORKS SHALL REPLACE THE EXCAVATED MATERIAL, WRAPPED IN
GEO-TEXTILE WRAPPING. ALTERNATIVELY, SPECIAL PIPE SUPPORT
ARRANGEMENTS, INCLUDING PILING ETC. MAY BE REQUIRED WHERE
THE DEPTH OF SOFT MATERIAL IS EXCESSIVE. SUCH ARRANGEMENTS
SHALL BE SUBJECT TO ASSESSMENT BY IRISH WATER BEFORE
ADVANCING WITH THE WORK.
7. IN GREEN FIELD AREAS, TYPE B BACKFILL (SELECTED EXCAVATED
MATERIAL) WILL BE ALLOWED ABOVE THE SIDE HAUNCH GRANULAR
MATERIAL IN THE CASE OF RIGID PIPES. A GRANULAR SURROUND OF
A MINIMUM DEPTH OF 150mm ABOVE THE CROWN OF THE PIPE IS
REQUIRED FOR FLEXIBLE PIPES , AND TYPE B MATERIAL MAY BE USED
AS BACKFILL ABOVE THIS. ALL RISING MAINS IN GREENFIELD AREAS
SHALL HAVE A MINIMUM COVER OF 300mm OF GRANULAR MATERIAL
ABOVE THE EXTERNAL CROWN OF THE PIPE.
8. PIPES SHALL NOT BE SUPPORTED ON STONES, ROCKS OR ANY
HARD OBJECTS AT ANY POINT ALONG THE TRENCH. ROCK SHALL BE
EXCAVATED TO A DEPTH OF 150mm BELOW THE ACTUAL DEPTH OF
THE TRENCH WITH THE VOID FILLED WITH CLAUSE 804 / 808 MATERIAL IN
ACCORDANCE WITH THE NATIONAL ROADS AUTHORITY SPECIFICATION
FOR ROAD WORKS. THE GRANULAR MATERIAL SHALL BE LAID ABOVE
THIS VOID BACKFILL MATERIAL.
9. NON DEGRADABLE MARKER TAPE SHOULD BE INSTALLED AT TOP OF
PIPE BEDDING LAYER. IN THE CASE OF NON METAL PIPE MATERIAL,
THE MARKER TAPE SHOULD INCORPORATE A TRACE WIRE WHICH IS
LINKED TO FITTINGS AND TERMINATED AT THE WASTE WATER PUMPING
STATION AND THE DISCHARGE MANHOLE.
10. TRENCH WIDTHS FOR PIPE SIZES ≤80mm MAY BE <500mm, SUBJECT TO
CONSIDERATION BEING GIVEN TO THE TRENCH DEPTH, HEALTH &
SAFETY & CONSTRUCTION ACCESS REQUIREMENTS.
11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,
OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
≤100
150 - 450
100
200
PIPE DIAMETER
'A' (mm)
TRENCH WIDTH
'B' (mm)
≤ 80 RISING MAIN
100
150
200
250
300
350
400
450
SEE NOTE 10.
500
600
600
750
750
750
900
900
PIPE DIAMETER
'A' (mm)
DEPTH OF BEDDING
'C' (mm)
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
TRENCH BACKFILL AND BEDDING
107
SEPT. 2015
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated & Added NotesJMC MODTOC
IW-CDS-5030-01 Rev. 03 December 2017
MINIMUM WIDTH OF BENCHING FOR
LANDING AREA TO BE 500mm
1:3 SAND:CEMENT MORTAR
WITH STEEL TROWEL FINISH
AT A 1:30 SLOPE TOWARDS
THE CHANNEL
75mm GRADE C12/15 BLINDING CONCRETE
REINFORCED CONCRETE BASE GRADE C30/37
SECTION A-A
PLAN
FLEXIBLE JOINTFLEXIBLE JOINT
INVERT SHOULD BE FORMED WITH CAST-INSITU
CONCRETE, C25/30 20mm AGGREGATE FINISHED
WITH A 1:3 CEMENT/SAND MORTAR
FLEXIBLE JOINT
Max. 600
FLEXIBLE JOINT
Flow
Max. 600
MANHOLE COVER AND FRAME SHALL COMPLY
TO IS EN 124 AND BS 7903 (ALL CLASS D400
COVERS SHALL HAVE MIN. FRAME DEPTH 100
OR 150mm) MIN. OPE. 600 x 600mm
1200
1760
12
00
17
60
AA
22
5
75mm GRADE C12/15
BLINDING CONCRETE
REINFORCED CONCRETE
BASE GRADE C30/37
SECTION B-B
BENCHING SLOPE TO BE
1:10 TO 1:30
22
5
BB
RELIEVING ARCH FORMED BY 215x103x65
SOLID ENGINEERING BRICK CLASS A OR B.
(RELIEVING ARCHES USED IN BRICK OR BLOCK WORK
MANHOLES EXTEND OVER FULL THICKNESS OF WALLS)
50
50
1: 3 SAND:CEMENT MORTAR WITH STEEL TROWEL
FINISH AT A 1:30 SLOPE TOWARDS THE CHANNEL
20N/mm² CONCRETE BLOCKS
TO COMPLY WITH IS EN 771-3
215 215
21
52
15
ENGINEERING
BRICK WORK LINING
1000mm ABOVE BENCHING
ENGINEERING
BRICK WORK LINING
1000mm ABOVE BENCHING
COVER TO BE SET IN
C50\60 MORTAR
Flow
Flow Flow
22
5
MANHOLE COVER AND FRAME
SHALL COMPLY TO EN 124 AND BS 7903
(ALL CLASS D400 COVERS SHALL HAVE MIN. FRAME
DEPTH 100-150mm) MIN. OPE. 600 x 600mm
1 No. COURSE MIN. / 3 No. COURSES
MAX OF CLASS B ENGINEERING
BRICKS SET IN C50/60 MORTAR
1 No. COURSE MIN.
3 No. COURSES MAX OF CLASS
B ENGINEERING BRICKS SET IN
C50/60 MORTAR
20N/mm² CONCRETE
BLOCKS TO COMPLY
WITH IS EN 771-3
675mm MAX. TO FIRST STEP
675mm MAX. TO FIRST STEP
300 c/c's
MANHOLE STEPS TO COMPLY WITH IS EN 13101,
TYPE D, CLASS 1, GALVANISED MILD STEEL &
PLASTIC ENCAPSULATED.
120
MANHOLE
COVER &
MIN. OPE. 600
x 600mm
ROCKER PIPE
(SEE TABLE OVER)
ROCKER PIPE
(SEE TABLE OVER)
ROCKER PIPE
(SEE TABLE OVER)
ROCKER PIPE
(SEE TABLE OVER)
FINISHED GROUND LEVEL
SEE NOTES 10, 11 & 12.
COVER TO BE SET IN
C50\60 MORTAR
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added steps & revisedJMC TOC access ope & cover notes MOD
2 11/'17 Added rocker pipe table,JMC added & updated notesTOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. SOLID BLOCKWORK TO BE OF HIGH STRENGTH (20N/mm²) TO IS EN 771.
3. MAXIMUM DEPTH OF BLOCK WORK MANHOLE IS 1.20m (THE USE OF BLOCK
WORK IN DEEPER MANHOLES WILL BE CONSIDERED BUT SUCH USE WILL
REQUIRE DETAILED STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER
REVIEW).
4. WALLS TO BE FLUSH POINTED AND NOT PLASTERED INTERNALLY, INTERNAL
LINING OF ENGINEERING BRICK TO IS EN 771-1 TO A HEIGHT OF 1m ABOVE
BENCHING. ENGINEERING BRICK TO BE BONDED TO BLOCKWORK USING
ENGLISH GARDEN WALL BOND.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS FOR ROOF AND BASE
SLABS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER
FOR REVIEW. MANHOLE ROOFS SHALL CONSIST OF A REINFORCED CONCRETE
SLAB OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED
PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER
REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
6. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW FROM IRISH WATER.
7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
GREEN AREAS.
8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON
GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES
BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
10. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'SREQUIREMENTS.
11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
BLOCKWORK MANHOLE (< 450mm DIA.)
209
SEPT. 2015
600
1000
150 TO 600
GREATER THAN 600 TO 750
PIPE DIAMETER
(mm)
ROCKER PIPE LENGTH
ROCKER PIPE
LENGTH (mm)
1250GREATER THAN 750
IW-CDS-5030-01 Rev. 03 December 2017
Min
.
325
PIPE JOINT WITH CHANNEL TO BE
LOCATED MINIMUM 100mm INSIDE
FACE OF MANHOLE
MINIMUM WIDTH OF BENCHING FOR
LANDING AREA TO BE 500mm
150mm GRADE C16/20 IN-SITU
CONCRETE SURROUND
REFER TO TABLE FOR
PC RING DIAMETER
FLEXIBLE JOINTFLEXIBLE JOINT
ROCKER PIPE
(SEE TABLE BELOW)
A
A
22
5
CONSTRUCTION JOINT
BOTTOM PRECAST SECTION
TO BE BUILT INTO BASE
CONCRETE MINIMUM 75 mm
150mm GRADE C16/20
IN-SITU CONCRETE
SURROUND
1: 3 CEMENT:SAND MORTAR WITH
STEEL TROWEL FINISH AT A 1:30
SLOPE TOWARDS THE CHANNEL
PRECAST CONCRETE
MANHOLE RINGS TO
IS 420 IN CONJUNCTION
WITH IS EN 1917 : 2004
MIN
. 5
0
MA
X. 3
00
DISTANCE BETWEEN TOP
OF PIPE & UNDERSIDE OF
PRECAST SECTION TO BE
MIN. 50mm TO MAX. 300mm
TO BARREL OF PIPE
75mm GRADE C12/15
BLINDING CONCRETE
INVERT SHOULD BE
FORMED WITH CAST
IN-SITU CONCRETE
C25/30 20mm AGGREGATE
FINISHED WITH A 1:3
CEMENT SAND MORTAR
REFER TO TABLE FOR
PRE-CAST RING DIAMETER
SELF CLEANING TOE HOLES TO BE
PROVIDED WHERE CHANNEL
EXCEEDS 600mm WIDE
ELASTOMETRIC JOINT SEAL
TO EN 681
1 No. COURSE MIN.
3 No. COURSES MAX
OF CLASS B
ENGINEERING BRICKS
SET IN C50/60 MORTAR
Max. 600 Max. 600
Flow
REINFORCED CONCRETE
BASE GRADE C30/37
STAINLESS STEEL CHAIN IN "DOWN"
POSITION SECURED TO RESTRAINING
HOOK, WHEN CHAMBER IS OCCUPIED
WHERE THE PIPE DIAMETER IS 450mm
OR MORE
MANHOLE COVER AND FRAME SHALL
COMPLY TO IS EN 124 AND BS 7903 (ALL
CLASS D400 COVERS SHALL HAVE MIN.
FRAME DEPTH 100-150mm) MIN. OPE.
600x600mm
SECTION A-A
PLAN
ROCKER PIPE
(SEE TABLE BELOW)
COVER TO BE SET
IN C50\60 MORTAR
FIRST RING SUNK INTO
IN-SITU CONCRETE BASE
Flow
22
5
MIN. 600
675mm MAX. TO FIRST STEP
MANHOLE STEPS TO COMPLY WITH IS
EN 13101, TYPE D, CLASS 1,
GALVANISED MILD STEEL & PLASTIC
ENCAPSULATED. STEPS ARE REQUIRED
IN MANHOLES UP TO A GROUND TO PIPE
SOFFIT DEPTH OF LESS THAN 3.0m.
MANHOLE LADDERS ARE REQUIRED
FOR MANHOLES WITH A DEPTH IN
EXCESS OF 3.0m & ARE TO COMPLY
WITH IS EN 14396.
300 c/c's
FINISHED GROUND LEVEL
SEE NOTES 12, 13 & 14.
22
5
MIN. 600
675mm MAX. TO
FIRST LADDER
RUNG
FGL
MANHOLE DETAIL > 3m & < 6m
GROUND TO SOFFIT DEPTH
900mm MIN. CLEAR
ACCESS BEHIND
LADDER
1200mm SHAFT Ø
20
00
M
IN
.
PCC REDUCING SLAB
(NOTE: ON MANHOLES <1.5mØ, REDUCING SLAB NOT TO
BE USED & PCC RINGS TO CONTINUE UP TO COVER SLAB)
COVER SLAB
LADDERS IN
MANHOLES TO
COMPLY WITH
IS EN 14396
120
150 TO C OF
STRINGER
L
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added steps & revised JMC TOC access ope & cover notes MOD
2 11/'17Added rocker pipe table,
JMC deep manhole detail, added & updated notes
TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF
IS EN 1917 AND BS 5911-PART 3.
3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF
3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM
SIZE.
4. APPROVED PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING
CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND
COMPLYING WITH BS 5911-PART 4 2002.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED
BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
6. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED
STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.
7. MANHOLE ROOFS SHALL CONSIST OF A RE-INFORCED CONCRETE SLAB
OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY,
APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT
TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
8. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
9. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
GREEN AREAS.
10. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW
BY IRISH WATER.
11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.
13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,
OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
15. IF DEPTH FROM GROUND TO PIPE SOFFIT IS GREATER THAN 6m DEEP, A SITE SPECIFIC
ENGINEERED SOLUTION FOR ACCESS SHALL BE PROVIDED.
16. PROPRIETARY WATERTIGHT PCC MANHOLE RING SYSTEMS WITH A WALL THICKNESS >
125mm, & A WATER TIGHT JOINT SEALING SYSTEM, MAY BE USED WITHOUT CONCRETE
SURROUND, SUBJECT TO THE GROUND WATER LEVEL AT THE MANHOLE BEING LOW, &
SUBJECT TO REVIEW BY IRISH WATER.
1200
1350
LESS THAN 375
375 TO 450
DIAMETER OF LARGEST PIPE IN
MANHOLE (mm)
MINIMUM MANHOLE DIAMETERS
INTERNAL DIAMETER OF
MANHOLE (mm)
1500500 TO 750
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
PRE-CAST CONCRETE MANHOLE
210
SEPT. 2015
600
1000
150 TO 600
GREATER THAN 600 TO 750
PIPE DIAMETER (mm)
ROCKER PIPE LENGTH
ROCKER PIPE LENGTH (mm)
1250GREATER THAN 750
IW-CDS-5030-01 Rev. 03 December 2017
22
5
D
32
5
225
D
22
5
225
22
5
50
22
5
A
A
MIN. 600
MIN
. 6
00
1: 3 CEMENT:SAND MORTAR WITH
STEEL TROWEL FINISH AT A SLOPE
OF 1:30 TOWARDS THE CHANNEL
25x25mm
CHAMFER
INVERT SHOULD BE FORMED
WITH CAST IN-SITU CONCRETE
C25/30 20mm AGGREGATE
FINISHED WITH A 1:3 CEMENT
SAND MORTAR
75mm GRADE C12/15
BLINDING CONCRETE
1 No. COURSE MIN.
3 No. COURSES MAX OF CLASS B
ENGINEERING BRICKS SET IN
C50/60 MORTAR
MIN. 600mm x
600mm
SQUARE OPE
SECTION A-A
PLAN
ROOF PLAN
MANHOLE COVER AND FRAME SHALL COMPLY TO IS EN
124 AND BS 7903 (ALL CLASS D400 COVERS SHALL
HAVE MIN. FRAME DEPTH 100-150mm) MIN. OPE.
600x600mm
STAINLESS STEEL CHAIN IN
"DOWN" POSITION SECURED
TO RESTRAINING HOOK,
WHEN CHAMBER IS OCCUPIED
WHERE THE PIPE DIAMETER IS
450mm OR MORE
COVER TO BE SET
IN C50\60 MORTAR
Flow Flow
MIN. 600
CONCRETE GRADE
C30/37 IN ROOF,
WALLS AND BASE
675mm MAX.
TO FIRST STEP
120
300 c/c's
MANHOLE STEPS TO COMPLY WITH IS
EN 13101, TYPE D, CLASS 1, GALVANISED
MILD STEEL & PLASTIC ENCAPSULATED.
STEPS ARE REQUIRED IN MANHOLES
WITH A GROUND TO PIPE SOFFIT DEPTH
OF LESS THAN 3m. MANHOLE LADDERS
ARE REQUIRED FOR MANHOLES WITH A
DEPTH IN EXCESS OF 3.0m & ARE TO
COMPLY WITH IS EN 14396.
ROCKER PIPE
(SEE TABLE BELOW)
ROCKER PIPE
(SEE TABLE BELOW)
FINISHED GROUND LEVEL
SEE NOTES 9, 10 & 11.
Max. 600
Max. 600
675mm MAX. TO
FIRST LADDER
RUNG
FGL
MANHOLE DETAIL > 3m & < 6m
GROUND TO PIPE SOFFIT DEPTH
1200mm SHAFT
230
REDUCING SLAB
(NOTE: ON MANHOLES <1.5m SHAFT DIMENSION, REDUCING
SLAB NOT TO BE USED & SHAFT TO CONTINUE UP TO COVER
SLAB)
COVER SLAB
22
5
MIN. 600
900mm MIN. CLEAR
ACCESS BEHIND
LADDER
20
00
M
IN
.
LADDERS IN
MANHOLES TO
COMPLY WITH
IS EN 14396
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added steps & revised JMC TOC access ope & cover notes MOD
2 11/'17Added rocker pipe table,
JMC deep manhole detail,added & updated notes.
TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. IN-SITU MANHOLES TO HAVE A MINIMUM WALL AND FLOOR THICKNESS OF
225mm FOR MANHOLE DEPTHS UP TO 3.0m AND 300mm OR MORE WHEN THE
MANHOLE DEPTH EXCEEDS 3.0m.
3. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDED BY THE
DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. MANHOLE
ROOFS SHALL CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm DESIGNED TO
CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED PRE-CAST
CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER
APPROVAL AND COMPLIANCE WITH BS 5911 PART 4: 2002.
4. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED
STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.
5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
GREEN AREAS.
7. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON
GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI-FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
9. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.
10. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
11. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
12. IF DEPTH FROM GROUND TO PIPE SOFFIT EXCEEDS 6m, A SITE SPECIFIC ENGINEERED
SOLUTION FOR ACCESS SHALL BE PROVIDED.
1200
1350
LESS THAN 375
375 TO 450
DIAMETER OF LARGEST PIPE IN
MANHOLE (mm)
MINIMUM MANHOLE DIMENSION ''D''
INTERNAL DIMENSION OF
MANHOLE (mm)
1500500 TO 750
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
IN-SITU CONCRETE MANHOLE
211
SEPT. 2015
600
1000
150 TO 600
GREATER THAN 600 TO 750
PIPE DIAMETER
(mm)
ROCKER PIPE LENGTH
ROCKER PIPE
LENGTH (mm)
1250GREATER THAN 750
IW-CDS-5030-01 Rev. 03 December 2017
45° BEND
150mm GRADE C25\30CONCRETE SURROUND
90° BEND
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 900 AND LESS THAN 1700mm500mm - 900mm DIA. (INCL.) DROP GREATER THAN 1300mm AND LESS THAN 2300mm
STOPPER
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 1700mm500mm - 900mm DIA. (INCL.) DROP GREATER THAN 2300mm
150mm - 450mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 900m500mm - 900mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 1300mm
TYPE No. 1
TYPE No. 2
TYPE No. 3
STOPPER
STOPPER
90° BEND
45° BEND
150mm GRADE C25\30CONCRETE SURROUND
150mm GRADE C25\30CONCRETE SURROUND
150
150
Y - JUNCTION
Y - JUNCTION
TEE JUNCTION
CHAIN
CHAIN
CHAIN
225mm GRADE C25\30CONCRETE SURROUND
225mm GRADE C25\30CONCRETE SURROUND
225mm GRADE C25\30CONCRETE SURROUND
HEAVY DUTY COVER AND FRAMED400 (TO SUIT 150mm OPE.)
150mm DIA. PVC PIPE
150mm CONCRETESURROUND
HEAVY DUTY COVER AND FRAMED400 (TO SUIT 150mm OPE.)
150mm DIA. PVC PIPE
150mm CONCRETESURROUND
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added stepsJMC TOC MOD2 11/'17 Updated notesJMC TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. RODDING EYE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY
DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL
BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO
REVIEW BY IRISH WATER.
3. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
5. MANHOLE DETAILS TO BE IN ACCORDANCE WITH STD-WW-09, 10 AND 11
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
BACKDROP MANHOLES
212
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
600mm
600
PRECAST UNITS(REFER TO NOTE 7.)
100
600
100
SECTION
FLOOR PLAN
INSPECTION CHAMBER
(PRECAST CONCRETE CONSTRUCTION)
600mm
225mm PRECAST BASE OR225mm IN-SITU CONCRETE C25/30
PIPES BUILT INTO CHAMBERWALL ORJOINT FORMED WITHWATERTIGHT SEALS
REFER TO DRAWINGSTD-WW-07 FORBACKFILL ANDBEDDING DETAILS
600
MINIMUM INTERNALDIMENSIONS 600mmDIAMETER OR 600mm x 600mm
COVER TO BE SET AS PERMANUFACTURER'SSPECIFICATION
SEALED MANHOLE COVERTO SUIT IS EN 124 LOADINGMINIMUM 600mm x 600mmCLEAR OPENING
215 600 215
215
600
215
SECTION
FLOOR PLAN
INSPECTION CHAMBER
(BLOCK WORK CONSTRUCTION)
215 THICK 20 N/mm² CONCRETE BLOCK WORKIN ACCORDANCE WITH IS EN 771-3
600
215 THICK 20 N/mm²CONCRETE BLOCK WORKIN ACCORDANCE WITHIS EN 771-3
FLOW FLOW
FLOWFLOW
FLOWFLOW
FLOW FLOW
PRECAST UNITS(REFER TO NOTE 7.)
MINIMUMINTERNAL DIMENSIONS600mm DIAMETEROR 600mm x 600mm
PIPES BUILT INTO CHAMBERWALL OR JOINT FORMEDWITH WATERTIGHT SEALS
SEALED MANHOLE COVERTO SUIT IS EN 124 LOADINGMINIMUM 600mm x 600mmCLEAR OPENING
COVER TO BE SET AS PERMANUFACTURER'SSPECIFICATION
225mm PRECAST BASE OR225mm IN-SITU CONCRETE C25/30
REFER TO DRAWINGSTD-WW-07 FORBACKFILL ANDBEDDING DETAILS
1 No. COURSE MIN.3 No. COURSES MAXOF CLASS B ENGINEERING BRICKS
1 No. COURSE MIN.3 No. COURSES MAXOF CLASS B ENGINEERING BRICKS
100
BENCHING
BENCHING
50mm CROSS FALL
50mm CROSSFALL
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added Cl. 808 to note 8JMC TOC MOD2 11/'17 Updated notesJMC TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF
THE PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE
CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF
PRACTICABLE, CONSULT WITH IRISH WATER ON ALTERNATIVE
LOCATIONS.
3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF
CONNECTION TO A PUBLIC SEWER IS A PRIVATE DRAIN AND SHOULD BE
CONSTRUCTED IN ACCORDANCE WITH THE BUILDING REGULATIONS.
4. ACCESS POINTS SHOULD BE LOCATED SO THAT THEY ARE ACCESSIBLE
AND APPARENT TO THE MAINTAINER AT ALL TIMES FOR USE. THEY
SHOULD AVOID REAR GARDENS OR ENCLOSED LOCATIONS AND THEY
SHOULD NEVER BE OVERLAIN WITH SURFACE DRESSING, TOPSOIL, ETC.
5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS
IN GREEN AREAS.
7. PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,
SUBJECT TO REVIEW BY IRISH WATER.
8. CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm
COMPACTED CLAUSE 804 OR CLAUSE 808 MATERIAL AS PER STD-WW-07.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
PRIVATE SIDE INSPECTION CHAMBER
213
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
No.
Date
Desc
riptio
n0
09/'1
5Ini
tial Is
sue
App
SLDr
nCh
kJM
CTO
C
111
/'17
JMC
MOD
TOC
Anti-t
orque
supp
ort no
te & t
hrust
flange
adde
d & no
te 6 u
pdate
d
DIM
EN
SIO
NS
60
0
50
0
50
10
*
40
90
26
00
35
0
40
0
45
0
29
80
34
00
30
0
25
0
20
90
17
30
27
10
*
22
10
13
80
11
30
70
0
57
0
10
00
10
00
14
10
72
0
16
10
18
40
82
0
94
0
11
30
94
0
58
0
48
0
50
03
60
42
0
47
0
75
0
90
0
30
0
24
0
38
0
32
0
NO
M.
(m
m)
DIA
.
70
01
00
20
0
15
0
14
00
11
35
A
38
01
90
75
0
62
0
38
0
32
0
BC
20
01
00
19
0
16
0
30
0
22
5
DE
19
00
17
50
16
00
15
00
13
50
12
00
10
50
35
50
*
28
90
15
00
14
00
23
50
22
00
23
30
21
10
18
40
14
80
12
10
10
50
13
00
12
00
95
0
80
0
17
00
20
00
18
50
15
00
13
50
15
00
13
50
10
50
12
50
11
50
95
0
85
0
95
0
75
0
60
0
J
98
0
76
0
51
03
50
65
0
45
0
FG
75
0
11
50
95
0
H
40
0
70
0
60
0
K
12
B
AR
T
O 1
5 B
AR
T
ES
T P
RE
SS
UR
E
H, J or K
C
E
E
A/2
E
H, J, or K
50 MIN.
E
50 MIN.
150
E
A/2
50 MIN.
E
50 MIN.
50 M
IN
.
300300
E
50 M
IN
.
300
50 MIN.
B/2
B/2
G/2 G/2
C/2
C/2
D/2
D/2
F/2 F/2
E
(A
or B
)/2
(A
or B
)/2
1
0
0
0
N
T
S
1000
NTS
G/2 G/2
F/2 F/2
F/2 F/2
E
G/2 G/2
E
3
0
0
300
H, J, or K
NO
TE
:
H F
OR
45 D
EG
RE
E B
EN
D J
FO
R 22.5 D
EG
RE
E B
EN
D K
FO
R 11.25 D
EG
RE
E B
EN
D
F/2 F/2
ST
EE
L
AN
CH
OR
ST
RA
PS
22
00
19
50
16
30
14
00
11
50
85
0
75
0
60
0
51
0
33
0
60
0
50
0
41
00
35
90
45
0
40
0
35
0
30
0
25
0
21
00
30
00
25
50
15
80
13
50
NO
M.
20
0
15
0
10
0
(m
m)
DIA
.
60
0
11
50
95
0
A
99
0
11
20
57
0
50
0
85
0
80
0
57
0
83
0
70
0
45
0
38
0
29
04
50
35
0
42
0
50
0
68
0
22
0
20
0
32
0
30
0
14
00
12
00
28
80
25
40
21
00
19
50
17
00
16
00
14
50
10
00
10
50
11
00
18
00
21
30
95
0
80
0
11
10
97
0
15
50
12
00
17
00
18
00
12
50
14
50
13
00
12
00
11
00
10
00
13
00
12
50
90
0
11
50
10
00
85
0
75
0
< 1
2 B
AR
T
ES
T P
RE
SS
UR
E
DIM
EN
SIO
NS
16
0
31
0
26
0
BC
80
20
0
16
0
13
0
30
0
22
5
DE
39
03
50
65
0
45
0
79
0
66
0
FG
70
06
00
10
50
90
0
90
0
75
0
HJ
40
0
70
0
60
0
K
63
70
*
43
40
*
38
10
35
10
29
30
23
00
19
60
60
0
50
0
35
0
40
0
45
0
30
0
25
0
10
00
10
00
10
00
10
00
75
0
50
0
35
0
17
60
12
10
34
50
*
23
80
89
0
61
0
11
60
97
0
83
0
64
0
54
0
15
80
22
70
19
00
12
00
10
60
41
0
58
0
19
0*
32
0
27
0
45
00
*
37
00
15
00
14
00
24
00
22
50
29
70
24
90
20
70
16
30
13
70
12
00
13
50
13
00
11
00
90
0
18
50
21
50
20
00
16
50
14
50
16
50
12
50
NO
M.
75
01
00
20
0
15
0
(m
m)
DIA
.
A
32
0
25
0
22
0
E
DIM
EN
SIO
NS
45
0
35
0
20
54
00
89
0
70
0
BC
10
0
23
0
18
0
D
11
70
89
0
53
04
00
70
0
50
0
F
80
0
12
50
10
00
GH
20
50
17
50
16
50
14
00
11
50
15
00
16
00
17
00
12
50
13
50
13
00
11
50
10
50
90
0
40
06
50
10
00
85
0
80
0
65
0
JK
15
B
AR
T
O 1
8 B
AR
T
ES
T P
RE
SS
UR
E
DN
DN
x 2
100
200
DN
/ 2
200
100
DN
/ 2
CR
OS
S - S
EC
TIO
N
LO
NG
IT
UD
IN
AL
S
EC
TIO
N
RIS
IN
G
MA
IN
PIP
E S
UP
PO
RT
D
ET
AILS
F
OR
IN
CLIN
ED
S
LO
PE
S, F
OR
P
IP
E
GR
AD
IE
NT
>
10° T
O H
OR
IZ
ON
TA
L.
SU
PP
OR
TS
P
LA
CE
D A
T M
AX
. 5
ME
TE
R IN
TE
RV
ALS
C
EN
TR
E T
O
CE
NT
RE
A
LO
NG
P
IP
E W
HE
RE
P
IP
E
IS
O
N S
LO
PE
. M
IN
. 1 S
UP
PO
RT
RE
QU
IR
ED
F
OR
P
IP
E
LE
NG
TH
>
3 M
ET
ER
S IN
S
LO
PE
.
45
D
EG
RE
E B
EN
D
90
D
EG
RE
E B
EN
D
22
.5
D
EG
RE
E B
EN
D1
1.2
5 D
EG
RE
E B
EN
D
EL
EV
AT
IO
N
EL
EV
AT
IO
N
PL
AN
CO
NC
AV
E B
EN
D
PL
AN
CO
NV
EX
B
EN
D
TE
E
SE
CT
IO
NA
L E
LE
VA
TIO
N F
OR
B
EN
D O
R T
EE
EL
EV
AT
IO
N
PL
AN
EL
EV
AT
IO
N
PL
AN
DE
AD
E
ND
PIP
E S
UP
PO
RT
D
ET
AILS
F
OR
IN
CLIN
ED
S
LO
PE
S
BE
ND
W
IT
H E
XT
EN
SIO
N P
IE
CE
S
TE
E W
IT
H E
XT
EN
SIO
N P
IE
CE
S
TA
PE
R
HO
RIZ
ON
TA
L B
EN
DS
VE
RT
IC
AL B
EN
DS
DE
AD
E
ND
G/2
300
300
SE
CT
IO
N
500
G/2
TR
EN
CH
BO
TT
OM
PL
AN
TH
RU
ST
B
LO
CK
F
OR
S
LU
IC
E V
ALV
E / G
AT
E V
ALV
E
FO
R V
ALV
E B
OX
A
RR
AN
GE
ME
NT
TH
RU
ST
FLA
NG
E
500
300
SU
RF
AC
E B
OX
RO
AD
S
UR
FA
CE
VARIES
ST
AIN
LE
SS
ST
EE
L S
TR
AP
S
25x25m
m C
HA
MF
ER
GR
AD
E C
25 / 30
MA
SS
C
ON
CR
ET
E
SU
PP
OR
T B
LO
CK
DO
WE
L B
AR
S
FLE
XIB
LE
C
OM
PR
ES
SIB
LE
FILLE
R M
AT
ER
IA
L
ST
AIN
LE
SS
S
TE
EL
AN
CH
OR
B
OLT
S
G/2
300
300
SE
CT
IO
N
G/2
TR
EN
CH
BO
TT
OM
PL
AN
CO
LLA
R
500
300
RO
AD
S
UR
FA
CE
VARIES
DI
PE
DI
PE
TH
RU
ST
B
LO
CK
F
OR
D
UC
TILE
IR
ON
T
O P
OLY
ET
HY
LE
NE
C
HA
NG
E O
VE
R
CO
NC
RE
TE
PLIN
TH
PIP
E P
LIN
TH
S
UP
PO
RT
(A
BO
VE
G
RO
UN
D)
PIPETRENCH
PIPETRENCH
RE
IN
FO
RC
EM
EN
T
TO
D
EV
ELO
PE
R'S
DE
TA
ILS
VARIES (MIN. 300 + O.D.)
2
TIT
LE
NOT
TO
SCAL
E
ST
D-W
W-
DR
AW
IN
G N
o.
SC
ALE
RE
V
DA
TE
RE
FE
R T
O IN
DE
X S
HE
ET
F
OR
N
OT
ES
R
EG
AR
DIN
G D
ES
IG
N R
ES
PO
NS
IB
ILIT
Y &
R
IS
K A
SS
ES
SM
EN
T
ST
AN
DA
RD
DE
TA
ILS
- W
AS
TE
WA
TE
R
14
1
SE
PT
. 2015
TH
RU
ST
B
LO
CK
S
FO
R R
IS
IN
G M
AIN
S
AN
TI-T
OR
QU
E
SU
PP
OR
T
DN x 2.5
DN
x 2.5
VARIES
100
200
100
VA
RIE
S
VA
RIE
S
2
0
0
W
A
T
E
R
M
A
I
N
GR
OU
ND
SU
RF
AC
E
PR
OF
ILE
TH
RU
ST
FLA
NG
E
1.AL
L DIM
ENSI
ONS
IN M
ILLIM
ETRE
S (m
m) U
NLES
S NO
TED
OTHE
RWIS
E.2.
CONC
RETE
THR
UST
BLOC
KS (A
NCHO
RAGE
) SHA
LL B
E PO
SITI
ONED
SYMM
ETRI
CALL
Y W
ITH
RESP
ECT
TO T
HE C
ONNE
CTIN
G PI
PE &
BEN
DS.
3.TR
ENCH
DIM
ENSI
ONS
: REF
ER T
O DR
AWIN
G No
's. S
TD-W
W-0
7.4.
THRU
ST B
LOCK
S SH
ALL B
EAR
ON U
NDIS
TURB
ED S
OIL.
IF F
OR A
NY R
EASO
N TH
EY C
ANNO
T TH
EN T
HE D
EVEL
OPER
SHA
LLNO
TIFY
IRIS
H W
ATER
IMME
DIAT
ELY
WIT
H A
PROP
OSED
SOL
UTIO
N.5.
THRU
ST B
LOCK
REI
NFOR
CEME
NT R
EQUI
RES
SPEC
IFIC
DES
IGN.
6.FO
R TE
ST P
RESS
URES
GRE
ATER
THA
N 18
BAR
, THR
UST
BLOC
KDE
SIGN
IS T
O BE
SUB
MITT
ED T
O IR
ISH
WAT
ER F
OR R
EVIE
W.
7.TH
RUST
BLO
CKS
ARE
DESI
GNED
FOR
FOR
AN
AVER
AGE
BEAR
ING
PRES
SURE
OF
100 K
N/m
(TYP
ICAL
FOR
SOF
T CL
AY) F
OR O
THER
COND
ITIO
NS. A
CTUA
L DIM
ENSI
ONS
MAY
BE A
LTER
ED O
N IN
STRU
CTIO
NSFR
OM IR
ISH
WAT
ER.
8.CO
NCRE
TE IN
THR
UST
BLOC
KS S
HALL
BE
GRAD
E C2
0/25 I
N AC
CORD
ANCE
WIT
H IS
EN
206.
9.CO
MPRE
SSIB
LE F
ILLER
FOR
CON
CRET
E PR
OTEC
TION
TO
BE IN
ACCO
RDAN
CE W
ITH
BS E
N 62
2-1 A
ND B
S EN
622-
4. BI
TUMI
NOUS
MATE
RIAL
SHA
LL N
OT B
E PU
T IN
CON
TACT
WIT
H PL
ASTI
C PI
PES.
THE
THIC
KNES
S OF
COM
PRES
SIBL
E FI
LLER
FOR
MAI
NS <
450m
m IN
DIAM
ETER
IS T
O BE
18mm
.10
.CON
CRET
E TH
RUST
BLO
CKS
FOR
POLY
ETHY
LENE
PIP
E TO
COM
PLY
WIT
H TH
E MA
NUFA
CTUR
ER'S
REQ
UIRE
MENT
S.
TA
BL
E O
F D
IM
EN
SIO
NS
F
OR
S
TE
EP
LY
IN
CL
IN
ED
P
IP
EL
IN
ES
GR
AD
IE
NT
SP
AC
IN
G
1 IN
2 & S
TEEP
ER
BELO
W 1
IN 2
TO 1
IN 4
1 IN
4 TO
1 IN
5
1 IN
5 TO
1 IN
6
5.5m
11.0m
16.6m
22.0m
IW-CDS-5030-01 Rev. 03 December 2017
D.I. SLUICE VALVE
200
SECTION A-A
300
PLAN (DUCTILE IRON RISING MAIN)
D.I. SLUICE VALVE
150
FLEXIBLE JOINT
BLIND SCOUR CHAMBER TOTO BE EMPTIED BY VACUUMTANKER
D.I. RISING MAIN
75mm CONCRETE GRADEC12/15 BLINDING
500
DEPT
H TO
SUI
T
PRECAST CONCRETEROOF SLAB
300
200
300400300200
200
1350 DIA.
400 x 400 x 200mmDEEP SUMP
300
SECTION B-B
SCOUR CHAMBER ROOF PLAN
MIN. 600
A
FLEXIBLE JOINT
D.I. RISING MAIN
ALL FLANGEDLEVEL INVERT TEE
A
B B
ALL FLANGEDLEVEL INVERT TEE
ALL FLANGED LEVEL INVERT TEE
PLAN (POLYETHYLENE RISING MAIN)
FUSION WELD
STUB FLANGEWITH BACKING RING
FUSION WELD
STUB FLANGEWITH BACKING RING
P.E. RISING MAIN P.E. RISING MAIN
REINFORCED CONCRETEBASE SLAB C30 / 37
D.I. PIPE(TO SCOUR CHAMBER)
225
COVERS TO BE SETIN C50\60 MORTAR
D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE( LENGTH CUT TO SUIT)
LONG BODYFLEXIBLE JOINT
HEAVY DUTY COVER AND FRAME,TO COMPLY TO ISEN 124 & BS 7903, STAMPED '' ScV '', CLASS D400 (TOSUIT MIN. 600mm SQ. OPE). ALL CLASS D400 COVERSSHALL HAVE MINIMUM FRAME DEPTH 100-150mm.
DISMANTLING JOINT DISMANTLING JOINT
D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17
D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17 DISMANTLING JOINTDISMANTLING JOINT
300
PRECAST CONSTRUCTIONAS PER STD-WW-10
LONG BODYFLANGE ADAPTER
D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE( LENGTH CUT TO SUIT)
400 x 400 x 200mmDEEP SUMP
REINFORCED CONCRETEBASE SLAB C30/ 37
LONG BODYFLEXIBLE JOINT
D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17
D.I. SLUICE VALVE SEE DRAWINGSTD-WW-16/17
LONG BODY FLANGE ADAPTER
VALVE SPINDLE COVER
LONG BODYFLANGE ADAPTER
1 No. COURSE MIN.3 No. COURSES MAXOF CLASS BENGINEERING BRICKSSET IN C50/60 MORTAR
PRECAST CONSTRUCTIONAS PER STD-WW-10
HEAVY DUTY COVER AND FRAME,TO COMPLY TO IS EN 124 & BS 7903,STAMPED '' ScV '', CLASS D400 (TO SUIT MIN. 600mm SQ. OPE)ALL CLASS D400 COVERS SHALL HAVE MINIMUM FRAME DEPTH 100-150mm.
D.I. PLAIN ENDED PIPE( LENGTH CUT TO SUIT)
D.I. PLAIN ENDED PIPE( LENGTH CUT TO SUIT)
FLANGED PLAIN ENDEDDI PIPE (LENGTH 500mm)
FLANGED PLAIN ENDEDDI PIPE (LENGTH 500mm)
MANHOLE STEPS TO COMPLY WITHIS EN 13101, TYPE D, CLASS 1,GALVANISED MILD STEEL &PLASTIC ENCAPSULATED.
FINISHED GROUND LEVEL
SEE NOTES 12, 13 & 14.
HEAVY DUTYCOVER & FRAME
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16Added steps, revised note
JMC TOC 2, dims, cover & ope notes. MOD
2 11/'17 Revised & added notesJMC TOC MOD
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. VALVE SURFACE BOX TO BE IN ACCORDANCE WITH IS 261 OR BS 5834. SCOUR CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS EN
124 RATING D400. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE
REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKING.4. SCOUR CHAMBER TO BE IN ACCORDANCE WITH BS EN 1992-3.5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. ROOF SLABS SHALL BE
DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUMTHICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911 Part 4.
6. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES ATSTEEP SLOPES.
7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.8. ANTI CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.10. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES BE
REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT,
TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
FOUL RISING MAIN (< 200mm DIA.)
215
SEPT. 2015
SCOUR VALVE CHAMBER
80 80
DIAMETER OF
RISING MAIN (mm)
DIAMETER OF
SCOUR (mm)
100 to 200 100
IW-CDS-5030-01 Rev. 03 December 2017
10
01
00
100 100
28
0
FLANGED SLUICE VALVE
EXTENSION SPINDLE
FLOOR PLAN
ROOF PLAN
445
50
50
50 50
FINISHED GROUND LEVEL
REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS
15
0
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB
445
10
0
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB CONCRETE ROOF SLAB
C30 / 37 REINFORCED SLAB
ROOF PLAN
SLUICE VALVE CHAMBER
(PRECAST CONCRETE CONSTRUCTION)
28
0
445
DUCTILE IRON(D.I.) PIPE
60
0
600
15
0
M
IN
.
PRECAST CONCRETE UNITS(REFER TO NOTE 5.)
DISMANTLING JOINT
PRECASTCONCRETE UNITS(REFER TO NOTE 5.)
HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)
HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)
15
0
28
0
445 200200
20
02
00
PLINTH DETAIL
IN GRASS AREAS
1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR
SECTION
LO
CA
LL
Y
FLANGED / PLAIN ENDEDPIPE CUT TO SUIT
LONG BODY
FLEXIBLE
COUPLING
FLANGED / PLAIN ENDEDPIPE CUT TO SUIT
EXTENSION SPINDLEREFER TO STD- W- 13FOR BEDDING& BACKFILLINGDETAILS
DUCTILE IRON(D.I.) PIPE
15
0
215mm THICK 20N/mm²CONCRETE BLOCKWORKIN ACCORDANCE WITHIS EN 771-3
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB
30
0
M
AX
.
445
10
0
COVER TO BE SETIN C50\60 MORTAR
SECTION
15
0
FINISHED GROUND LEVEL
FLANGEDSLUICE VALVE
15
0
M
IN
.
DISMANTLING JOINT
LO
CA
LL
Y
LONG BODY
FLEXIBLE
COUPLING
LONG BODY
FLEXIBLE
COUPLING
FLANGED / PLAIN ENDEDPIPE CUT TO SUIT
FLANGED / PLAIN ENDEDPIPE CUT TO SUIT
C25\30 PRECASTCONCRETE BEARINGSLAB
CONCRETE ANTI-TORQUE SUPPORT
THRUSTFLANGE
215 21550 50
FLOOR PLAN
SLUICE VALVE CHAMBER
(BLOCKWORK CONSTRUCTION)
600
215mm THICK 20N/mm²CONCRETE BLOCKWORKIN ACCORDANCE WITHIS EN 771-3
21
52
15
50
50
60
0
THRUSTFLANGE
C25\30 PRECASTCONCRETE BEARINGSLAB
CONCRETE ANTI-TORQUESUPPORT
BULL NOSEFINISH
SEE NOTES 15, 16& 17.
FO
R M
IN
. D
EP
TH
O
F C
OV
ER
RE
FE
R T
O N
OT
E 2 O
N S
TD
-W
W-07
COVER TO BE SETIN C50\60 MORTAR
30
0
M
AX
.
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 04/'16 Flexible couplings shownJMC TOC MOD2 08/'16 Revised note 6 (Cl. 808)JMC TOC MOD3 11/'17 Revised & Added NotesJMC TOC MOD
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
DUCTILE IRON (D.I.) PIPE (< 200mm DIA.)
316
SEPT. 2015
(Sheet 1 of 2)
SLUICE VALVE DETAILS FOR RISING MAINS
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE REQUIREMENTS OF IS EN
1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,
SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE,GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE
SUBJECT TO REVIEW BY IRISH WATER.14. ALL THRUST FLANGES TO BE ADEQUATELY RESTRAINED BY THRUST BLOCKS AS PER DRAWING No. STD-WW-14. THRUST BLOCKS NOT SHOWN FOR CLARITY.15. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.16. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
17. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
IW-CDS-5030-01 Rev. 03 December 2017
100
100
100 100
280
SECTION
FLANGED SLUICE VALVE
EXTENSION SPINDLE
FLOOR PLAN
ROOF PLAN
445
50
50
50 50
FINISHED GROUND LEVEL
REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS
150CONCRETE ROOF SLAB
C30 / 37 REINFORCED SLAB
300
M
AX
.
445
100
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB
215
215
215 215
FLANGEDSLUICE VALVE
EXTENSION SPINDLE
50
50
50 50
FINISHED GROUND LEVEL
REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS
150
215mm THICK 20 N/mm² CONCRETEBLOCKWORK IN ACCORDANCEWITH IS EN 771-3
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB
445
100
CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB
215mm THICK 20 N/mm² CONCRETEBLOCKWORK IN ACCORDANCEWITH IS EN 771-3
FLOOR PLAN
ROOF PLAN
SLUICE VALVE CHAMBER
(PRECAST CONCRETE CONSTRUCTION)
SLUICE VALVE CHAMBER
(BLOCKWORK CONSTRUCTION)
280
445
SECTION
POLYETHYLENE(P.E.) PIPE
FUSION WELD
STUB FLANGEWITH BACKING RING
POLYETHYLENE(P.E.) PIPE
FUSION WELDSTUB FLANGEWITH BACKING RING
600
600
COVERS TO BE SETIN C50\60 MORTAR
600
600
150
M
IN
.
150
M
IN
.
C25\30 PRECASTCONCRETE BEARINGSLAB
PRECAST CONCRETE UNITS(REFER TO NOTE 5.)
DISMANTLING JOINT
FUSION WELDSTUB FLANGEWITH BACKING RING
DISMANTLING JOINT
PRECASTCONCRETE UNITS(REFER TO NOTE 5.)
HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)
HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)
150
150
280
445 200200
200
200
PLINTH DETAIL
300
M
AX
.
1 No. COURSE MIN.3 No. COURSES MAX.OFCLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR
LO
CA
LLY
LO
CA
LLY
CONCRETE ANTI-TORQUE SUPPORTCONCRETE ANTI-TORQUE SUPPORT
BULL NOSEFINISH
SEE NOTES 14, 15& 16.
FO
R M
IN
. D
EP
TH
O
F C
OV
ER
RE
FE
R T
O N
OT
E 2
O
N S
TD
-W
W-0
7
C25\30 PRECASTCONCRETE BEARING SLAB
COVERS TO BE SETIN C50\60 MORTAR
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Revised note 6 (Cl. 808)JMC TOC MOD2 11/'17 Revised & Added NotesJMC TOC MOD
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
POLYETHYLENE (P.E.) PIPE (< 200mm DIA.)
217
SEPT. 2015
(Sheet 2 of 2)
SLUICE VALVE DETAILS FOR RISING MAINS
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE
SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY
WITH THE REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED
CHAMBER UNITS MAY ALSO BE USED, SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, &CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CASTCONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND
PIPES AT STEEP SLOPES.12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE
REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF
TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
IW-CDS-5030-01 Rev. 03 December 2017
250
1500
CONCRETE CASTIN-SITU CRADLE
SECTION
D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)
THRUST FLANGE
FLOOR PLAN
SUMP 400mm x 400mm
x 200mm DEEP
ROOF PLAN
300
MIN.
250 1500250
400
2000
15
00
25
0
20
00
400
400
30
0
MIN
.
75mm CONCRETEBLINDING C12 / 15
250
30
0
MIN
.
25
0
400
30
0
22
5
2000
20
00
300
MIN.
900 SQ.
HEAVY DUTY COVER AND FRAME,CLASS D400 (TO SUIT 900 SQ. OPE)
CAST-IN RECESSED LIFTING EYES
CONCRETE ROOF SLABC30/37 REINFORCED SLAB
AIRVALVE
DISMANTLING JOINT
LONG BODYFLEXIBLE JOINT
LONG BODYFLEXIBLE JOINT
D.I. FLANGEDPLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)
ROCKER PIPE ROCKER PIPE
DUCT TO VENT
STACK IN SENSITIVE AREAS
SEE DRAWING STD-WW-34
HEAVY DUTY COVER ANDFRAME SHALL COMPLY WITH ISEN 124 AND BS 7903, CLASSD400 (TO SUIT 900 SQ. OPE)
CONCRETE ROOF SLABC30/37 REINFORCED SLAB
COVERS TO BESET IN C50\60MORTAR
FLOW FLOW
FLOW FLOW
400
PE DI
PE TO DI DETAIL
1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR
WATER TIGHT SEAL
1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR
CONCRETE GRADE C30/37 INROOF, WALLS AND BASE
D.I. TEE WITH80mm FLANGE BRANCH
ISOLATING VALVE
22
5 M
IN
.
FINISHED GROUND LEVEL
SEE NOTES 14, 15 & 16.
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Revised note 5 & cover notesJMC TOC MOD2 11/'17 Revised & added notesJMC TOC MOD
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
(FOUL RISING MAIN < 200mm DIA.)
218
SEPT. 2015
AIR VALVE CHAMBER
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS AND ODOUR
UNIT MAY BE REQUIRED DEPENDING ON LOCATION.
3. ISOLATING VALVE TO BE IN ACCORDANCE WITH IS EN 1074-2.
4. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT
TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.
5. DOUBLE AIR VALVE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY VENTILATED METAL COVER TO IS EN 124 RATING D400.
COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
7. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS,
DEAD ENDS AND PIPES AT STEEP SLOPES.
8. PRE-CAST UNITS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
9. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.
10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
12. ALL PE PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 12201: 2011.
13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI
FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM
& SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
IW-CDS-5030-01 Rev. 03 December 2017
COVER & FRAME(CLASS D400), IN ACCORDANCE WITHIS EN124 AND BS7903
CONCRETE GRADEC 30/37
CABLE DUCTS
MIN
IM
UM
600m
m225
225 225900
900
225
225
SECTION A - A SECTION B - B
PLAN
B
A A
75mm BLINDINGGRADE C12/15 CONCRETE
GROUND SURFACE GROUND SURFACE
1350
1350
CABLE DUCT
B
225 225900
1350
225 225900
1350
CABLE DUCT
CABL
E DU
CT
CONCRETE GRADEC 30/37
CABLE DUCTS
COVER TO BE SETIN C50\60 MORTAR
75
75
75
75
150
150
COVER & FRAME(CLASS D400), IN ACCORDANCE WITHIS EN124 AND BS7903
CABLE DUCTS
SECTION C - C
GROUND SURFACE
75
75
200
C C
60
0 m
m M
IN
.
CO
VE
R
TO
D
UC
TS
APPROVED MARKER TAPES
200
APPROVED SAND
REFER TO DRG. No.STD-WW-07 FORBACKFILL DETAILS
75mm BLINDINGGRADE C12/15 CONCRETE
75mm DIA. PVC DRAINTO NEAREST SURFACEWATER OUTLET FITTEDWITH NON-RETURN VALVE
TRENCH WIDTH TO BE MIN. 500mm
AND DEPENDENT ON
DUCT NUMBERS
COVER TO BE SETIN C50\60 MORTAR
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Revised notes to coverJMC TOC MOD2 11/'17 Revised notesJMC TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THEDEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
3. DUCT ARRANGEMENT MAY VARY DEPENDING ON REQUIREMENTS.
4. CABLE DUCTS TO BE IN ACCORDANCE WITH BS 4460 AND BS EN 1401. DUCTS FOR ESBUSE TO BE IN ACCORDANCE WITH ESB SPECIFICATION.
5. PROPRIETARY DUCT CHAMBER MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
6. LONG RADIUS BENDS MAY BE USED FOR CHANGES IN DIRECTION OF UP TO 45°DUCT CHAMBERS SHALL BE PROVIDED FOR ALL BENDS GREATER THAN 45°.
7. DUCT CHAMBERS TO BE LOCATED AT 50m INTERVALS MAXIMUM.
8. APPROPRIATE MARKER TAPE SHALL BE LAID 200mm ABOVE THE EXTERNAL CROWNOF THE DUCT AND SHOULD INCORPORATE REINFORCED TRACING WIRE.
TRACING WIRES SHALL BE CONNECTED ACROSS CHAMBERS.ELECTRICAL MARKER TAPE TO BE USED IN ACCORDANCE WITH ESB SPECIFICATION.
9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASEDON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATIONMEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS/ROPES, TO ALLOW THE PULL THROUGHOF CABLES.
12. CABLE DUCT INTERFACE WITH CHAMBER WALL TO BE SEALED TO PREVENT INGRESS OFGROUNDWATER TO CHAMBER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
DUCT CHAMBER
219
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
SIDE WALL SLOPES TO MATCHEXISTING EMBANKMENT
1000
PIPE
DIA
.+
450
225
225
TO M
ATCH
DEVE
LOPM
ENT
225
150
225
300
1000
225
SIZE AS SPECIFIED IN CONTRACT
PUDDLE FLANGE
FLEXIBLE COUPLINGS
DUCK BILLCHECK VALVE
WATER LEVEL
ORIGINAL BED LEVEL
75 BLINDING C12/15
CONCRETE GRADE C 30/37
EXISTING EMBANKMENT
PUDDLE FLANGE
ROCKER PIPE
1
2
2
1
ROCKER PIPE
SECTION
PLAN
FLEXIBLE COUPLINGS
SLOPE 1:50
HANDRAILING MAY BE REQUIRED TODESIGNERS RISK ASSESSMENT
BANK
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Notes revisedJMC MODTOC
1. ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE.
2. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDEDBY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
3. FULL FINAL DETAIL MUST BE REVIEWED BY IRISH WATER AND RELEVANTREGULATORY AUTHORITIES.
4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
5. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANKTO BE SUBJECT TO AGREEMENT WITH RELEVANT AUTHORITY &IRISH WATER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
EMERGENCY OVERFLOW STRUCTURE
120
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
BED OF STREAM
SECTION
PLAN
FULL CONCRETE SURROUND GRADE C 25/30.
O.D
. +
300m
m
FULL CONCRETE
SURROUND
GRADE C25/30
FOR DETAILS SEE
DRAWING STD-WW-08
2x DIAMETER
OR 1000mm MAX.
DUCTILE IRON GRAVITY SEWER
M.H.
FLEXIBLE JOINT
5000mm5000mm
5000mm
SEE DRAWING
STD-WW-10 AND
STD-WW-11
FOR MANHOLE
DETAILS
SEE DRAWING
STD-WW-10 AND
STD-WW-11
FOR MANHOLE
DETAILS
M.H.
M.H.M.H.
BA
NK
E
DG
E
BA
NK
E
DG
E
500m
m M
IN
. O
R T
O R
EQ
UIR
EM
EN
TS
O
F
RE
LE
VA
NT
A
UT
HO
RIT
Y
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated pipe depth dimensionJMC MODTOC
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.
3. TWO FLEXIBLE JOINTS SHALL BE PROVIDED WITHIN A DISTANCE OF 1000mm OR 2xDIAMETER OF PIPE (WHICHEVER IS THE GREATER) FROM BOTH ENDS OF CONCRETESURROUND.
4. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
5. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
6. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THE BANK EDGE TO ALLOWFOR FUTURE ACCESS.
7. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANK TO BE SUBJECT TOAGREEMENT WITH RELEVANT AUTHORITY & IRISH WATER.
8. PIPE BETWEEN MANHOLES AT DITCH / STREAM CROSSING TO BE DUCTILE IRON.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
FOR GRAVITY MAIN
121
SEPT. 2015
(Sheet 1 of 2)
TYPICAL DITCH / STREAM CROSSING
IW-CDS-5030-01 Rev. 03 December 2017
BED OF STREAM
CONCRETE SURROUND GRADE C 25/30.
FOR DETAILS SEE DRAWING STD-WW-08
SECTION
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING
300
CONCRETE SURROUND GRADE C 25/30.
FOR DETAILS SEE DRAWING STD-WW-08
O.D
. +
300m
m
REFER TO NOTE 3
FOR BENDS
POLYETHYLENE
PIPEWORK
O.D
. +
300m
m
300
FOR THRUST BLOCK DETAILS
REFER TO STD-WW-14
FOR THRUST BLOCK DETAILS
REFER TO STD-WW-14
POLYETHYLENE PIPEWORK
STUB FLANGE WITH
BACKING RING FOR
DI/PE CONNECTION
FOR SCOUR VALVE / CHAMBER
DETAILS REFER TO STD-WW-15
FUSION
WELD
5000mm5000mm
PLAN
STUB FLANGE WITH
BACKING RING FOR
DI/PE CONNECTION
FUSION
WELD
300
300300 300
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING
FOR SCOUR VALVE /
CHAMBER DETAILS
REFER TO STD-WW-15
DI / PE PIPE
SEE NOTE 11
DI / PE PIPE
SEE NOTE 11
BA
NK
E
DG
E
BA
NK
E
DG
E
SCOUR CHAMBER
FLEXIBLE
COUPLING
500m
m M
IN
. O
R T
O R
EQ
UIR
EM
EN
TS
O
F
RE
LE
VA
NT
A
UT
HO
RIT
Y
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 JMCUpdated pipe depth dimension ¬e 10 revised MODTOC
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.
3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THELONGITUDINAL SECTION DRAWING.
4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINEDUSING BUTT FUSION WELDING.
5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETINGHAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEINGCAST INTO CONCRETE.
6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.
7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.
8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITHIS EN 12201 : 2011.
9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THEBANK EDGE TO ALLOW FOR FUTURE ACCESS. MANHOLE LOCATIONSMUST BE REVIEWED BY IRISH WATER & READILY ACCESSIBLE BY ALLOPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUMTANKER.
11. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON ORPOLYETHYLENE. PIPEWORK AT CROSSING TO BE PE IN BOTH CASES.
12. BACKFILL AND REINSTATEMENT OF RIVER BED AND BANK TO BESUBJECT TO AGREEMENT WITH RELEVANT REGULATORY AUTHORITIES
& IRISH WATER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
FOR RISING MAIN
122
SEPT. 2015
(Sheet 2 of 2)
TYPICAL DITCH / STREAM CROSSING
IW-CDS-5030-01 Rev. 03 December 2017
ROAD LEVEL
SECTION
CONCRETE SURROUND
GRADE C 25/30.
SEE DRAWING STD-WW-10
FLEXIBLE
JOINT
DUCTILE IRON
PIPEWORK
FOR SCOUR VALVE /
CHAMBER DETAILS
REFER TO STD-WW-15
FOR SCOUR VALVE /
CHAMBER DETAILS
REFER TO STD-WW-15
PLAN
KIOSK
(600 HIGH x 450 WIDE
x 300 DEEP)
AIR VALVE
CONCRETE PLINTH
(150 HIGH x 600 LONG
x 450 WIDE)
POLYETHYLENE
SERVICE PIPE
(32mm DIA. P.E.)
TAPPING POINT TO
BE LOCATED AT
HIGH POINT
32mm DIA. P.E. PIPE
KIOSK
(SEE NOTES 7, 8 & 9)
AIR VALVE
EXPOSED PIPEWORK
TO BE INSULATED
USING PIPE LAGGING
BRIDGE PARAPET
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
A
A
FLEXIBLE JOINT
TAPPING WITH TRANSITION
90° ELBOW (MALE)
DUCTILE IRON
RISING MAIN
150
15
0
150
15
0
SOCKET OUTLINE
32mm O.D.
P.E. PIPE
SECTION A - A
(AIR VALVE CONNECTION)
BRIDGE PARAPET
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Notes 5 & 14 revisedJMC MODTOC
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. AT BRIDGE CROSSING DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.
3. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.
4. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THE LONGITUDINAL SECTIONDRAWING.
5. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO WHETHER A DUPLICATERISING MAIN IS TO BE PROVIDED THROUGH THE BRIDGE CROSSING.IF NECESSARY THE DEVELOPER WILL SUBMIT A DESIGN TO IRISH WATER FOR REVIEW.
6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES ATE STEEP SLOPES.
7. THE QUALITY OF THE KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:
A) A THERMAL TRANSMITTANCE OF 1.5W PER m² K.B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO
CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING30 MINUTES.
8. KIOSK (MIN. 600 HIGH x 450 WIDE x 300mm DEEP) TO BE CONSTRUCTED FROM THERMOSETTING U.V. &WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED STEEL (MIN. 4mmTHICKNESS) TO BS EN 1461. STAINLESS STEEL OR NON-METALLIC MATERIALS, SUCH AS GLASSREINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY INSEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER. COLOUR TO BE HOLLYGREEN BS 4800 14 C 39, TO HAVE HINGED, LOCKABLE ACCESS DOOR (HINGES AND LOCKS TO BESTAINLESS STEEL).
9. THE KIOSK SHALL BE LOCATED OFF THE FOOTPATH SO AS NOT TO IMPEDE PEDESTRIANSAND POSITIONED SO AS TO FACILITATE SAFE ACCESS FOR MAINTENANCE PERSONNEL.
10. KIOSK TO BE FITTED WITH A VENT STACK TO MANUFACTURERS DETAIL IN SENSITIVE AREAS.
11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
12. IN INSENSITIVE AREAS A VENT STACK IS NOT REQUIRED. LOUVRE VENT TO BE PROVIDED IN KIOSK.
13. DETAIL FOR RISING MAIN FOR PE PIPEWORK TO BE AS PER THIS DETAIL. BRIDGE CROSSINGPIPEWORK TO BE DUCTILE IRON IN BOTH CASES.
14. THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISH WATER & READILYACCESSIBLE BY ALL OPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUM TANKER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
BRIDGE CROSSING FOR RISING MAIN
123
SEPT. 2015
(Sheet 1 of 2)
TYPICAL
IW-CDS-5030-01 Rev. 03 December 2017
300
BED OF
STREAM
CONCRETE SURROUND
GRADE C 25/30. FOR DETAILS
SEE DRAWING STD-WW-08
SECTION
PLAN
BRIDGE PARAPET
O.D
. C
OL
LA
R +
3
00
mm
ROAD
REFER TO NOTE 3
FOR BENDS
POLYETHYLENE
PIPEWORK
300
O.D
. C
OL
LA
R +
3
00
mm
FOR THRUST BLOCK
DETAILS REFER
TO STD-WW-14
FUSION
WELD
FOR SCOUR VALVE / CHAMBER
DETAILS REFER TO STD-WW-15
5000mm
300
300
STUB FLANGE WITH
BACKING RING
FUSION
WELD
STUB FLANGE WITH
BACKING RING
300300
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING
FOR AIR VALVE / CHAMBER
DETAILS REFER TO STD-WW-18
AIR VALVE TO BE LOCATED
BOTH SIDES OF CROSSING
FOR SCOUR VALVE /
CHAMBER DETAILS
REFER TO STD-WW-15
5000mm
BA
NK
E
DG
E
BA
NK
E
DG
E
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
POLYETHYLENE
OR DUCTILE IRON
PIPEWORK
FLEXIBLE
JOINT
50
0m
m M
IN
. O
R T
O R
EQ
UIR
EM
EN
TS
O
F
RE
LE
VA
NT
A
UT
HO
RIT
Y
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 JMCUpdated pipe depth dimension &revised notes MODTOC
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.
3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THELONGITUDINAL SECTION DRAWING.
4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINEDUSING BUTT FUSION WELDING.
5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETINGHAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEINGCAST INTO CONCRETE.
6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.
7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.
8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITHIS EN 12201 : 2011.
9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.
10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THEBANK EDGE TO ALLOW FOR FUTURE ACCESS.
11. BACKFILL AND REINSTATEMENT REQUIREMENTS OF THE RIVER BEDAND BANK IS SUBJECT TO AGREEMENT WITH RELEVANT REGULATORY
AUTHORITIES & IRISH WATER.
12. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO WHETHER A DUPLICATE RISING MAIN IS TO BE PROVIDED THROUGH THE BRIDGE CROSSING. IF NECESSARY THE DEVELOPER WILL SUBMIT A DESIGN TO IRISH WATER FOR REVIEW.
13. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON ORPOLYETHYLENE. PIPE AT CROSSING POINT TO BE PE IN BOTH CASES
14.THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISHWATER & READILY ACCESSIBLE BY ALL OPERATION & MAINTENANCEEQUIPMENT, INCLUDING A VACUUM TANKER.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
BRIDGE CROSSING FOR RISING MAIN
124
SEPT. 2015
(Sheet 2 of 2)
TYPICAL
IW-CDS-5030-01 Rev. 03 December 2017
GATES & PIERS - ELEVATION
OUTSIDE
LOCKABLE
SLIPBOLT
RSA
SLAMPLATE
DROPBOLTS
RHS FRAME
GATES & PIERS - PLAN
4000 mm MINIMUM
75mm CONCRETE
BLINDING, GRADE C12/15
METAL PILLARS
METAL PILLARS
FIN. GROUND LEVEL
FENCE PILLAR SPACING AS PER
MANUFACTURERS SPECIFICATION
PVC INSERT CAP
V-BEAM
REINFORCING PROFILE
PANEL - ELEVATION
FOUNDATION DETAIL
TO MANUFACTURERS
SPECIFICATION
ENTRANCE GATE DETAILS
B
A
FOUNDATION DETAIL
TO MANUFACTURERS
SPECIFICATION
FOUNDATION DETAIL
TO MANUFACTURERS
SPECIFICATION
FOUNDATION DETAIL
TO MANUFACTURERS
SPECIFICATION
GRADE C30/37
CONCRETE IN BASE
2400
2400
FENCE PILLARS
75 CONCRETE
BLINDING, GRADE C12/15
GRADE C30/37
CONCRETE IN BASE
125mm WIDE x 150mm DEEP
CONCRETE SILL UNDER
FENCE TO IRISH WATER'S
REQUIREMENTS (ENHANCED
+ SECURITY RATING ONLY)
ANTI-CLIMB FEATURES
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Revised notes & tableJMC TOC MOD2 11/'17 Fencing table updatedJMC TOC MOD
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SECURITY GATE AND FENCING
225
SEPT. 2015
SECURITY
RATING
MESH SPACING
A x B
BASIC + 150 x 50
BAR THICKNESS
Type: 868 5mm
Type: 868 4mm50 x 50ENHANCED +
1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. SECURITY FENCING SHALL COMPRISE 2.4m HIGH, CORROSION RESISTANT MILD STEELFENCING, GALVANISED AND PLASTIC COATED FINISHED, WITH SIMILAR TYPE ACCESSGATES.
3. THE ACCESS GATES SHALL BE OF SUFFICIENT WIDTH TO ACCOMMODATE MAINTENANCEVEHICLES, TANKERS, ETC. THE SECURITY GATES SHALL BE PROVIDED WITH SLIDE BOLTS,SHOOTING BOLTS AND PADLOCKS. IF OPENING OUTWARDS, THE ACCESS GATES SHALL BESET BACK FROM PARKING AND ACCESS AREAS BY THE WIDTH OF THE LEAF OF THE GATE.
4. BOLTS - UNLESS TAMPER RESISTANT FIXINGS ARE USED, ALL BOLTS TO THE ACCESSGATES & FENCING SHALL BE BURRED OVER.
5. GATE HINGES SHALL BE DESIGNED SO THAT IT IS IMPOSSIBLE TO REMOVE THE GATE BYLIFTING WHEN IT IS IN A CLOSED & LOCKED POSITION. DROP BOLTS SHALL BE FITTED TOEACH GATE LEAF IN SUCH A WAY THAT THEY CANNOT BE REMOVED BUT ALLOW THE GATETO BE SECURED IN BOTH THE OPEN & CLOSED POSITION.
6. THE SECURITY RATING SHALL BE EITHER BASIC +, ENHANCED OR ENHANCED +. THE FENCESTANDARD WILL BE BASED ON THE SECURITY RATING OF THE SITE & IS TO BE AGREEDWITH IRISH WATER.
7. CORNER BRACING AND POST DETAIL TO MANUFACTURER'S SPECIFICATION.
8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
9. ALL FENCE MATERIALS AND WORKMANSHIP TO BE IN ACCORDANCE WITH IS EN 1722-14 :2006.
10. DIMENSIONS OF GATE PILLARS, GATE FRAME, FENCE PILLARS, FENCE RUNNERS,DIAGONALS, ETC. TO BE TO MANUFACTURER'S SPECIFICATION.
11. FENCE/GATE DESIGN AND DETAILS TO BE PROVIDED TO IRISH WATER FOR REVIEW/VETTING BEFORE MANUFACTURE.
12. PEDESTRIAN GATE SHALL BE PROVIDED IF DEEMED NECESSARY BY IRISH WATER.
13. COLOUR TO BE HOLLY GREEN 14 C 39 IN ACCORDANCE WITH BS 4800:2011.
14. A 125mm WIDE x 150mm DEEP CONCRETE SILL GRADE C20/25 CONCRETE SHALL BEPROVIDED TO IRISH WATER'S REQUIREMENTS (ENHANCED + SECURITY RATING ONLY).
HEIGHT
2.4m
2.4m
ENHANCED 150 x 50 Type: 868 5mm 2.4m
ADDITIONAL
FEATURES
ANTI-CLIMB
ANTI-CLIMB
ANTI-CLIMB &ANTI-BURROW
IW-CDS-5030-01 Rev. 03 December 2017
CO
NT
RO
L
KIO
SK
PR
EC
AS
T K
ER
B
1:50 F
ALL
TO
S
UM
P
2.4m
H
IG
H P
LA
ST
IC
C
OA
TE
D
WE
LD
ED
M
ES
H F
EN
CE
WE
T
KIO
SK
WA
TE
R
ME
TE
R
CH
AM
BE
R
IN
LE
T
MA
NH
OLE
HA
RD
S
TA
ND
IN
G
AR
EA
GA
TE
S T
O
OP
EN
IN
WA
RD
S
PE
RM
EA
BLE
A
RE
A W
IT
H
AP
PR
OP
RIA
TE
W
EE
D B
AR
RIE
R
RE
FE
R T
O S
TD
-W
W-32
FO
OT
PA
TH
GR
AS
S V
ER
GE
SE
WE
R
2.4m
H
IG
H P
LA
ST
IC
C
OA
TE
D
WE
LD
ED
M
ES
H F
EN
CE
PO
WE
R
RIS
IN
G M
AIN
SEWER
RISING MAIN
MA
NH
OLE
4000
AP
PR
OX
. 12000m
m
APPROX. 8000mm
TA
NK
ER
IM
PE
RM
EA
BLE
HA
RD
S
TA
ND
IN
G
PE
DE
ST
RIA
N
AC
CE
SS
G
AT
E
(IF
D
EE
ME
D N
EC
ES
SA
RY
)
EM
ER
GE
NC
Y
OV
ER
FLO
W
PIP
E
(IF
A
PP
RO
VE
D)
EM
ER
GE
NC
Y
OV
ER
FLO
W
OR
B
ALA
NC
E
ST
OR
AG
E
WE
T
WE
LL
VA
LV
E
CH
AM
BE
R
1.
AL
L D
IM
EN
SIO
NS
A
RE
IN
M
IL
LIM
ET
RE
S (m
m) U
NL
ES
S N
OT
ED
O
TH
ER
WIS
E.
2.
TY
PE
1
P
UM
PIN
G S
TA
TIO
NS
T
O B
E L
OC
AT
ED
N
O C
LO
SE
R T
HA
N
5.0
M
ET
RE
S T
O A
P
RO
PE
RT
Y B
OU
ND
AR
Y.
3.
TY
PE
2
P
UM
PIN
G S
TA
TIO
NS
T
O B
E L
OC
AT
ED
N
O C
LO
SE
R T
HA
N
10
.0
M
ET
RE
S T
O A
P
RO
PE
RT
Y B
OU
ND
AR
Y.
4.
TY
PE
3
P
UM
PIN
G S
TA
TIO
NS
T
O B
E L
OC
AT
ED
N
O C
LO
SE
R T
HA
N
15
.0
M
ET
RE
S T
O A
P
RO
PE
RT
Y B
OU
ND
AR
Y.
5.
TH
ER
E S
HA
LL
B
E A
C
LE
AR
O
PE
NIN
G IN
F
RO
NT
O
F T
HE
G
AT
ES
T
O
EN
SU
RE
A
DE
QU
AT
E A
CC
ES
S.
6.
TH
IS
D
ET
AIL
IS
IN
DIC
AT
IV
E O
NL
Y A
ND
T
HE
D
EV
EL
OP
ER
S
HA
LL
S
UB
MIT
A
S
IT
E
SP
EC
IF
IC
L
AY
OU
T T
O IR
IS
H W
AT
ER
F
OR
R
EV
IE
W.
7.
KIO
SK
S T
O S
TD
-W
W-3
0 A
ND
S
TD
-W
W-3
1.
8.
FE
NC
E A
ND
G
AT
E T
O S
TD
-W
W-2
5.
9.
RE
FE
R T
O S
TD
-W
W-3
2 F
OR
P
ER
ME
AB
LE
, IM
PE
RM
EA
BL
E R
OA
DW
AY
A
ND
HA
RD
ST
AN
DIN
G A
RE
A D
ET
AIL
.
10
.IN
DIC
AT
IV
E L
AY
OU
T R
EL
AT
ES
T
O S
MA
LL
P
UM
PIN
G S
TA
TIO
NS
A
S P
ER
TY
PE
1
, T
YP
E 2
&
T
YP
E 3
IN
T
HE
IR
IS
H W
AT
ER
C
OD
E O
F P
RA
CT
IC
E F
OR
WA
ST
EW
AT
ER
IN
FR
AS
TR
UC
TU
RE
.
11
.L
AM
P S
TA
ND
AR
D &
L
AM
P B
OL
LA
RD
L
OC
AT
IO
NS
T
O B
E S
IT
E S
PE
CIF
IC
&
T
O
IR
IS
H W
AT
ER
A
GR
EE
ME
NT
. R
EF
ER
T
O S
TD
-W
W-3
3 F
OR
D
ET
AIL
S.
TIT
LE
NOT
TO
SCAL
E
ST
D-W
W-
DR
AW
IN
G N
o.
SC
ALE
RE
V
DA
TE
RE
FE
R T
O IN
DE
X S
HE
ET
F
OR
N
OT
ES
R
EG
AR
DIN
G D
ES
IG
N R
ES
PO
NS
IB
ILIT
Y &
R
IS
K A
SS
ES
SM
EN
T
ST
AN
DA
RD
DE
TA
ILS
- W
AS
TE
WA
TE
R
26
0
SE
PT
. 2015
IN
DIC
AT
IV
E P
UM
PIN
G S
TA
TIO
N S
IT
E LA
YO
UT
No.
Date
Desc
riptio
n0
09/'1
5Ini
tial Is
sue
App
SLDr
nCh
kJM
CTO
C
IW-CDS-5030-01 Rev. 03 December 2017
M
250
1500
SECTION
THRUST FLANGE
FLOOR PLAN
SUMP 400mm x 400mm
x 200mm DEEP
ROOF PLAN
300
MIN.
250 1500250
400
2000
15
00
25
0
20
00
400
30
0
MIN
.
250
30
0
MIN
.
25
0
400
30
0
22
5
2000
20
00
300
MIN.
CAST-IN RECESSED LIFTING EYES
CONCRETE ROOF SLABC30 / 37 REINFORCED CONCRETE SLAB
HEAVY DUTY COVER AND FRAME,CLASS D400 TO IS EN 124 (TOSUIT 900 SQ. OPE)
CABLE DUCTS TO BE INSTALLED WITH DRAWCORDS. SEE DRAWING STD-WW-30/31
M
FLOW
LONG BODYFLEXIBLE JOINT
LONG BODYFLEXIBLE JOINT
DISMANTLING JOINT
ROCKER PIPE ROCKER PIPE
D.I. FLANGEDPLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)
CONCRETE CASTIN-SITU CRADLE 75mm CONCRETE
BLINDING C12/15
900 SQ.
FLOW
FLOW FLOW
CABLE DUCTS TO BE INSTALLED WITH DRAW CORDSSEE DRAWING STD-WW-30/31
HEAVY DUTY COVER AND FRAME,CLASS D400 TO IS EN 124 (TOSUIT 900 SQ. OPE)
1 No. MIN.3 No. COURSES MAX.OF CLASS BENGINEERING BRICKWORKSET IN C50/60 MORTAR
1 No. MIN. / 3 No. COURSES MAX.OF CLASSB ENGINEERING BRICKWORK SET INC50/60 MORTAR
WATER TIGHT SEAL
WATER TIGHT SEAL
C30/37 CONCRETE TOWALLS AND BASE
400
PE DI
PE TO DI DETAIL
100mm DIA. uPVC DRAINFROM FLOW METER CHAMBER TO VALVE CHAMBER.
D.I. FLANGED PLAINENDED PIPE WITH THRUSTFLANGE (CUT TO SUIT)
MANHOLE STEPS TOCOMPLY WITH IS EN 13101,TYPE D, CLASS 1,GALVANISED MILD STEEL &PLASTIC ENCAPSULATED.
67
5 (M
AX
.)
CONCRETE ROOF SLABC30/37 REINFORCEDSLAB
COVERS TO BE SETIN C50\60 MORTAR
FINISHED GROUND LEVELSEE NOTES 11, 12 & 13.
FO
R M
IN
. D
EP
TH
O
F C
OV
ER
RE
FE
R T
O N
OT
E 2
O
N
ST
D-W
W-0
7
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 notes & note 3JMC TOC Added steps, revised cover MOD
2 11/'17 Revised & added notesJMC TOC MODDRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
FLOW METER CHAMBER
227
SEPT. 2015
(FOUL RISING MAIN <200mm DIA.)
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH
WATER FOR REVIEW. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A
REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.
ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER APPROVAL, & COMPLIANCE
WITH BS 5911, Part 4.
3. METER CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVER TO IS EN 124 RATING D400. COVERS
AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
4. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.
5. PRECAST UNITS COMPLETED WITH RUBBER SEALING GASKET BETWEEN UNITS, COMPLYING WITH THE REQUIREMENTS OF IS EN 1917 AND BS5911-PART 3, COMPLETE WITH 150mm CONCRETE SURROUND MAY BE USED AS AN ACCEPTABLE ALTERNATIVE. CONCRETE SURROUND TO BEGRADE C16/20 IN ACCORDANCE WITH IS EN 206.
6. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598. PE PIPES AND FITTINGS TO BE IN
ACCORDANCE WITH IS EN 12201:2011.
7. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.
8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE.
SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
9. FLOW METERS REQUIRE A MINIMUM LENGTH OF PIPE ON EACH SIDE OF THE VALVE TO BE COMPLETELY FREE OF
FITTINGS, VALVES, REDUCER ETC. AS PER THE MANUFACTURERS INSTRUCTIONS.
10. ALL CONCRETE TO BE IN ACCORDANCEWITH IS EN 206.
11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT.
OF TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
IW-CDS-5030-01 Rev. 03 December 2017
A A
INCOMING FOUL
SEWER
RISING MAIN
APPROPRIATE DAVIT
FOR PUMP REMOVAL
(SUBJECT TO REVIEW
BY IRISH WATER)
MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE
OR SIZE TO MATCH CAPACITY OF INCOMING SEWER
IF ALLOWED.
INCOMING FOUL SEWER (I.L. TO BE LOCATED
ABOVE THE CUT-IN LEVEL OF THE PUMPS).
Ø100 PIPE FROM
WASH DOWN
3 No. 150 DIA. CABLE OPES
( WATER TIGHT SEAL )
3No.150 DIA.
CABLE OPES
Ø100 PIPE FROM
WASH DOWN
LIFTING DAVIT & SOCKET
ROOF PLAN
A A
SECTION A-A
PLAN
150 DIA.
CABLE OPE
150 DIA. CABLE OPE
ULTRA SONIC SENSOR
2500 M
IN
IM
UM
1800 MINIMUM 1800 MINIMUM 1000 MINIMUM
MECHANICAL
OVERFLOW SCREEN
FLAP VALVE
VALVE CHAMBER
DRAIN 80mm DIA
DUCTILE IRON
100mm
MAX.
FLAP VALVE 80 mm DIA.
DUCTILE IRON DRAIN
100mm DIA. uPVC DRAIN
FROM FLOW METER
CHAMBER TO VALVE
CHAMBER.
HIGH
LEVEL
VENT
LOW LEVEL
VENT
PROPOSED INLET
BAFFLE PLATE
ASSIST LIFT ACCESS COVER
WITH SAFETY GRID
AND INCORPORATED
HAND RAILS
BAUER FITTING ON
GATE VALVE ON TEE
TO ALLOW EMPTYING
OF THE RISING MAIN
GATE VALVE
NON RETURN
VALVE
BAUER FITTING ON
GATE VALVE ON TEE
TO ALLOW EMPTYING
OF THE RISING MAIN
SEALED DUCTS
EMERGENCY OVERFLOW (IF
APPROVED) AND/OR 24 HOUR
STORAGE TO BE PROVIDED
75mm BLINDING
GRADE C12/15
GRADE C30/37
CONCRETE TO WALLS,
BASE AND ROOF
VENT
PIPES
10
00
35
0
100mm SURFACE BOX
MECHANICAL
OVERFLOW
SCREEN
MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE
OR SIZE TO MATCH CAPACITY OF INCOMING SEWER
IF ALLOWED.
EMERGENCY OVERFLOW (IF
APPROVED) AND/OR 24 HOUR
STORAGE TO BE PROVIDED
CONC. THRUST BLOCK
TO BEND (REFER TO
DRG. No. STD-WW-14
FOR DETAILS)
CONC. THRUST BLOCK
TO BEND (REFER TO
DRG. No. STD-WW-14
FOR DETAILS)
REFER TO DRG. No.
STD-WW-09 FOR
DETAILS TO STEP IRONS
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16Revised note 4, incoming
JMC TOC sewer note & added thrustblock & step irons to valvechamber
MOD
2 11/'17 JMC Revised notes 2,4,9 & 11 MODTOC
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER
TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER
INFRASTRUCTURE .
3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE
WITH IS EN 598.
4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW
BY IRISH WATER. REFER TO DRG. No. WW-28A FOR DETAILS.
5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.
6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.
7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL
MINIMUM 1400 x 800mm.
8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m
SHALL CONFORM TO BS 9124.
9. WALL THICKNESS AND REINFORCEMENT SHALL BE SELECTED BASED ON
SITE SPECIFIC DESIGN AND SHALL BE SUBJECT TO REVIEW BY IRISH
WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS &
DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU
CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.
ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT
TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4
10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE
SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR RECURRENCE.
THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION.
THE FINISHED SLAB LEVEL SHALL BE POSITIONED ABOVE THE 1:100 YEAR
FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER
RESISTANT AND POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.
11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH
WATER.
12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT
A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.
14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.
15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL
BE PROVIDED AT THE PUMPING STATION.
16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL
FROM THE RELEVANT REGULATORY AUTHORITIES.
17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.
18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER
TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE FOR
WASTEWATER INFRASTRUCTURE.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
INDICATIVE SUBMERSIBLE PUMPING STATION
228
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
PROPOSED INLET
BAFFLE PLATE
PRECAST CONCRETE
MANHOLE RINGS TO IS
420 IN CONJUNCTION
WITH IS EN 1917 : 2004
75mm GRADE C12/15
BLINDING CONCRETE
WATER RESISTANT
JOINTS TO IS EN 1992
REINFORCED CONCRETE
BASE GRADE C30/37
SECTION A-A
PLAN
30
0
Ø100 PIPE FROM
WASH DOWN
2 No.150 Ø
CABLE OPES
ULTRA SONIC
SENSOR
FLAP VALVE ON VALVE CHAMBER
DRAIN 80mmØ DUCTILE IRON TO
DISCHARGE ABOVE PUMP CUT-IN
LEVEL (AS PER PUMP SUPPLIER'S
RECOMMENDATIONS)
100mm
MAX.
HIGH
LEVEL
VENT
SEALED DUCTS
BOTTOM PRECAST SECTION TO BE
BUILT INTO BASE CONCRETE
MINIMUM 75mm
FIRST RING BUILT INTO
IN-SITU CONCRETE BASE
CONSTRUCTION
JOINT
MIN. 150mm GRADE
C20/25 IN-SITU
CONCRETE
SURROUND
LOW
LEVEL
VENT
MIN. 150mm GRADE
C20/25 IN-SITU CONCRETE
SURROUND
INCOMING
FOUL SEWER
APPROPRIATE LIFTING
DAVIT & SOCKET FOR
PUMP REMOVAL
(SUBJECT TO REVIEW
BY IRISH WATER)
100mm DIA. uPVC DRAIN
FROM FLOW METER
CHAMBER TO VALVE
CHAMBER.
MALE BAUER FITTING ON
GATE VALVE ON TEE TO
ALLOW EMPTYING OF
THE RISING MAIN
SPIGOT
PIPE
A
RISING MAIN
150 DIA.
CABLE OPE
150 DIA.
CABLE OPE
25
00
M
IN
IM
UM
1800 MINIMUM
1800 (MIN.)
TO SUIT PUMP INSTALLATION
GATE VALVE
NON RETURN
VALVE
BAUER FITTING ON
GATE VALVE ON TEE
TO ALLOW EMPTYING
OF THE RISING MAIN
10
00
35
0
150 DIA.
CABLE OPE
EMERGENCY OVERFLOW (IF
APPROVED) AND/OR 24 HOUR
STORAGE TO BE PROVIDED
FLAP VALVE TO VALVE
CHAMBER DRAIN
80mmØ DUCTILE IRON
STAINLESS STEEL
OVERFLOW BAFFLE
PLATE
A
FLANGE
ADAPTOR
60
00
mm
M
AX
.
PUMPING STATION VALVE CHAMBER
FLEXIBLE
COUPLINGS
150
START OF
BENCHING
BENCHING 45°
MIN. SLOPE
GRADE C30/37
CONCRETETO IS 206 TO
WALLS, BASE AND ROOF
GL
100mmØ PIPE
FROM WASHDOWN
AREA
VENTS
LIFTING
DAVIT
SOCKET
LIFT ASSISTED COVER
WITH SAFETY GRID &
INCORPORATED
HANDRAILS
LIFT ASSISTED
COVER
CORBEL
INCOMING FOUL SEWER
(I.L. TO BE LOCATED
ABOVE THE CUT-IN LEVEL
OF THE PUMPS).
VALVE CHAMBER MAY BE
CONSTRUCTED WITH PRE-CAST
CONCRETE UNITS OF A SIZE TO
ACCOMMODATE THE FITTINGS
SHOWN (MIN. 1800mmØ).
CONC. THRUST BLOCK
TO BEND (REFER TO
DRG. No. STD-WW-14
FOR DETAILS)
CONC. THRUST BLOCK
TO BEND (REFER TO
DRG. No. STD-WW-14
FOR DETAILS)
REFER TO DRG. No.
STD-WW-09 FOR
DETAILS TO STEP IRONS
No. Date Description0 08/'16 Initial Issue
AppDrn ChkJMC TOC MOD
1 11/'17 Revised notes 2,4,9 & 11JMC TOC MOD
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
SUBMERSIBLE PUMPING STATION
128A
JUL. 2016
INDICATIVE PRE-CAST CONCRETE
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER
INFRASTRUCTURE .
3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.
4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.
5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.
6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.
7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL MINIMUM 1400 x 800mm.
8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m SHALL CONFORM TO BS 9124.
9. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF IS EN 1917 AND BS 5911-PART 3. ROOF SLABS SHALL BE DESIGNED
TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH
A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, &
COMPLIANCE WITH BS 5911, Part 4.
10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR
RECURRENCE. THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHALL BE
POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND
POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.
11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD
ANTI-FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.
12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.
14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.
15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL BE PROVIDED AT THE PUMPING STATION.
16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL FROM THE RELEVANT REGULATORY AUTHORITIES.
17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.
18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE
FOR WASTEWATER INFRASTRUCTURE.
IW-CDS-5030-01 Rev. 03 December 2017
PIPE JOINT WITH CHANNEL TO BE
LOCATED MINIMUM 100mm INSIDE
FACE OF MANHOLE
MINIMUM WIDTH OF BENCHING FOR
LANDING AREA TO BE 500mm
150mm GRADE C16/20 IN-SITU
CONCRETE SURROUND
FLEXIBLE JOINT
A
A
25
0
ALL PRECAST CHAMBER RINGS TO BE REINFORCED
BOTTOM PRECAST SECTION TO BE BUILT INTO BASE
CONCRETE MINIMUM 75 mm
150mm GRADE C16/20 IN-SITU
CONCRETE SURROUND
BENCHING CONCRETE GRADE C25/30 FINISHED
WITH A 1:3 CEMENT SAND MORTAR
PRECAST CONCRETE MANHOLE RINGS TO IS 420
IN CONJUNCTION WITH IS EN 1917: 2004
75mm GRADE C12/15 BLINDING CONCRETE
REFER TO TABLE FOR
PRE-CAST RING DIAMETER
ELASTOMERIC JOINTSEAL TO EN 681
1 No. MIN.,
3 No. MAX. OF CLASS B
ENGINEERING BRICK
SET IN C50/60 MORTAR
Max. 600
REINFORCED CONCRETE BASE GRADE C30/37
MANHOLE COVER AND FRAME SHALL
COMPLY TO IS EN 124 AND BS 7903
(ALL CLASS D400 COVERS SHALL HAVE
MIN. FRAME DEPTH 100-150mm) MIN.
OPE. 600 x 600mm
SECTION A-A
PLAN
COVER TO BE SET
IN GRADE C50\60
MORTAR
Flow
22
5
MIN. 600
100mm Ø PIPE TO VENT STACK
Flow
SLO
PE
1:1
0
500
SEALED JOINT
SLO
PE
1:1
0
WATER TIGHT SEAL
REFER TO TABLE FOR
PC RING DIAMETER
50
0
COVER TO BE SEALED & LOCKABLE
ROCKER PIPE
(SEE TABLE BELOW)
FINISHED GROUND LEVEL
SEE NOTES 11, 12 & 13.
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
access ope dim.1 08/'16 Revised cover note & JMC TOC MOD
2 11/'17 Added rocker pipe table,JMC added & updated notes.TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF
IS EN 1917 AND BS 5911-PART 3.
3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF
3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM SIZE.
4. PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING
CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND
COMPLYING WITH BS 5911-PART 4 2002.
5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY
THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
6. MANHOLE ROOFS SHOULD CONSIST OF A REINFORCED CONCRETE SLAB
OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm
DESIGNED TO CARRY ALL LIVE AND DEAD LOADS, ALTERNATIVELY,
APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT
TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.
7. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC
CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.
8. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN
GREEN AREAS.
9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED
ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION
MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY
IRISH WATER.
10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.
12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.
13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR
MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR
TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.
1200
1350
LESS THAN 375
375 TO 450
DIAMETER OF LARGEST PIPE IN
MANHOLE (mm)
MINIMUM MANHOLE DIAMETERS
INTERNAL DIAMETER OF
MANHOLE (mm)
1500500 TO 700
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
DISCHARGE MANHOLE
229
SEPT. 2015
RISING MAIN
600
1000
150 TO 600
GREATER THAN 600 TO 750
PIPE DIAMETER
(mm)
ROCKER PIPE LENGTH
ROCKER PIPE
LENGTH (mm)
1250GREATER THAN 750
IW-CDS-5030-01 Rev. 03 December 2017
REMOVABLE
WATER - TIGHT
CAP ON PVC DUCT
PVC DUCTING WITH
DRAW - CORD
MIN. 1200
MIN
. 1
20
0
MIN. 1200
MIN. 600
30
0
WET KIOSK
1500600
MIN. 600
MIN
. 1
20
0
150
600
900
1500
150150
MIN.1200
FRONT ELEVATION(WET KIOSK)
CROSS SECTION(WET KIOSK)
WET KIOSK
HEAVY DUTYSTEEL HINGES
RECESSDOUBLEDOORS
PLAN
450mm THICKCONCRETEPLINTHGRADE C25/ 30
150
MIN. 300
MIN
. 1
20
0
150 150
75mm THICKCONCRETEBLINDINGGRADE C12/15
450mm THICKCONCRETEPLINTHGRADE C25/ 30
60
0
MIN
. 1
80
0
150 150
450mm THICKCONCRETEPLINTHGRADE C25/ 30
FRONT ELEVATION(CONTROL KIOSK)
TELEMETRYKIOSK
SLOW BEND
REMOVABLE
WATER - TIGHT
CAP ON PVC DUCT
150150
CONTROL KIOSK
REFER TOSTD-WW-19 FORDUCT CHAMBER DETAILS
CROSS SECTION(TELEMETRY KIOSK)
PLAN
45
0
15
0
15
0
15
0
75mm THICKCONCRETEBLINDINGGRADE C12/15
75mm THICKCONCRETEBLINDINGGRADE C12/15
75mm THICKCONCRETEBLINDINGGRADE C12/15
15
0
45
0
MIN
. 1
80
0
HIGH LEVEL VENTILATIONON OTHER SIDE
LOW LEVEL VENTILATION
POWER INDUCT
45
0
45
0
SLOPED ROOF
NOTE:ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAYVARY TO SUIT THE KIOSK REQUIREMENT.
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 Added note 5 (kiosk doors)JMC TOC MOD2 11/'17 Updated note 9JMC TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. KIOSKS TO BE CONSTRUCTED FROM THERMOSETTING U.V. & WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICKNESS) TO BS EN 1461. STAINLESS STEEL OR
NON-METALLIC MATERIALS, SUCH AS GLASS REINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY IN SEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER.3. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.4. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:
A) A THERMAL TRANSMITTANCE OF 1.5W PER m²KB) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.C) AN IP RATING OF IP65 OR EQUIVALENT.
5. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWOLEAVES OR LEAF & FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.
6. KIOSK TO BE BOLTED TO THE PLINTH THROUGH A BOTTOM FLANGE WITH GALVANISED MILD STEEL OR STAINLESS STEEL ANCHOR BOLTS.7. THE BOTTOM FLANGE SHALL BE SEATED ON A NEOPRENE GASKET AND SEALED WITH MASTIC.8. REAR WALL SHALL BE REINFORCED WITH STAINLESS STEEL SECTIONS TO WHICH A MARINE PLY WOOD , 18mm THICK BOARD IS FIXED.9. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.10. TELEMETRY DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.11. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.12. THE ROOF OF THE KIOSK SHALL BE REMOVABLE (BOLTS) TO FACILITATE BACKBOARD REMOVAL.13. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.14. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.15. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.16. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED
SLAB LEVEL SHOULD BE POSITIONED ABOVE THE 1:100 YEARS FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.17. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
AND WET KIOSK
230
SEPT. 2015
(Sheet 1 of 2)
KIOSK TYPE 1 PUMPING STATION
IW-CDS-5030-01 Rev. 03 December 2017
1370
21
00
REMOVABLE
WATER - TIGHT
CAP ON PVC DUCT
PVC DUCTING WITH
DRAW - CORD
15
85
1800
600
30
0
WET KIOSK
2100600
600
12
00
150
600
900
2100
150
1800
FRONT ELEVATION(WET KIOSK)
CROSS SECTION(WET KIOSK)
WET KIOSK
HEAVY DUTYSTEEL HINGES
HOT DIPPED POWDERCOATED MILD STEELGALVANISED DOORS TO BS729
PLAN
450mm THICKCONCRETEPLINTHGRADE C25/ 30
150
300
12
00
150 150
75mm THICKCONCRETEBLINDINGGRADE C12/15
450mm THICKCONCRETEPLINTHGRADE C25/ 30
60
0
900
24
00
150 150
450mm THICKCONCRETEPLINTHGRADE C25/ 30
FRONT ELEVATION(CONTROL KIOSK)
215mm CONCRETE BLOCKS INACCORDANCE WITH IS EN 771-3COMPLETEWITH INTERNAL ANDEXTERNAL RENDER
HIGH LEVEL VENTILATIONON OTHER SIDE(LOUVRED GRILLE)
SLOW BEND
REMOVABLE
WATER - TIGHT
CAP ON PVC DUCT
150150
CONTROL KIOSK
REFER TOSTD-WW-19 FORDUCT CHAMBER DETAILS
CROSS SECTION(TELEMETRY KIOSK)
PLAN
45
0
15
0
15
0
75mm THICKCONCRETEBLINDINGGRADE C12/15
75mm THICKCONCRETEBLINDINGGRADE C12/15
75mm THICKCONCRETEBLINDINGGRADE C12/15
15
0
45
0
150
15
0
24
00
15
0
LOW LEVEL VENTILATION(LOUVRED GRILLE)
150mm REINFORCEDCONCRETE ROOF SLABTO GRADE C30/37WITH WEATHER PROOFASPHALT FINISH
POWER INDUCT
45
0
45
0
215 215
21
5
NOTE:ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAYVARY TO SUIT THE KIOSK REQUIREMENT.
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 08/'16 added note 3 (kiosk doors)JMC TOC MOD2 11/'17 Updated note 6JMC TOC MOD
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. CONTROL KIOSK TO BE CONSTRUCTED FROM 215mm THICK CONCRETE BLOCKS IN ACCORDANCE WITH IS EN 771-3, WITH SMOOTH RENDER FINISH INTERNALLY AND EXTERNALLY. WET KIOSK TO BE CONSTRUCTED FROM THERMOSETTING U.V. &
WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICK) TO BS EN 1461. ALTERNATIVE MATERIAL, STAINLESS STEEL IN HARSH ENVIRONMENTS, NON-METALLIC (GRP, POLYESTER, ETC.)MAY BE ALLOWED FOR WET KIOSK SUBJECT TO AGREEMENT WITH IRISH WATER.
3. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWO LEAVES OR LEAF &FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.
4. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.5. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:
A) A THERMAL TRANSMITTANCE OF 1.5W PER m²K.B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION), EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.C) AN IP RATING OF IP65 OR EQUIVALENT.
6. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.7. CABLE DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.8. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.9. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.11. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.12. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHOULD
BE POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.13. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
AND WET KIOSK
231
SEPT. 2015
(Sheet 2 of 2)
KIOSK TYPE 2 + 3 PUMPING STATION
IW-CDS-5030-01 Rev. 03 December 2017
4000mm
100mm OF DENSE BITUMEN MACADAM
(14mm AGGREGATE)
1:40 FALL
PRECAST KERB
500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07
WITH 75mm REGULATING COURSE
CROSS SECTION
OF MACADAM SURFACE
4000mm
1:40 FALL
CROSS SECTION
CONCRETE SLAB
200mm THICK REINFORCED
CONCRETE GRADE C35/45
500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07
PRECAST KERB
CONCRETE C25/30
CONCRETE C25/30
CLAUSE 804
GEOTEXTILE
WEED BARRIER
75mm THICKNESS OF
10mm SINGLE SIZED
AGGREGATE
PERMEABLE AREA
40
0m
m7
5m
m
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated notes 2 & 3JMC MODTOC
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. REGULATING COURSE TO BE REVIEWED BY IRISH WATER.
3. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY
THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.
5. PRECAST KERBS TO BE IN ACCORDANCE WITH IS EN 1340:2003.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
HARDSTANDING AREA PUMPING STATION
132
SEPT. 2015
(PERMEABLE AND IMPERMEABLE)
IW-CDS-5030-01 Rev. 03 December 2017
SECTION
PLAN
100mm DIA. DUCT100mm DIA. T.PIECE
MIN. 100 DIA. CABLE DUCT
200
LAMP BOLLARD
CONCRETE GRADE C30/37
ARMOURED CABLING TO DUCT
100
300
300
LAMP BOLLARD
4000 O
R 5000 A
S S
PE
CIF
IE
D
LAMP STANDARD
SHAFT
INSPECTION DOOR 610 x 108
CABLE ENTRY SLOT 152 x 76
75 BLINDING
150 DIA. CABLE DUCT
470
CONCRETE GRADE C30/37
600
GROUND LEVEL
LAMP BOLLARD
SECTION
510
600
305
762
600
PLAN
CONCRETE GRADE C30/37
LAMP STANDARD
600 x 450 CABLE JUNCTION BOX(SIMILAR TO DUCT CHAMBERDETAIL ON DRG. No. STD-WW-19)
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated notes 2 & 3JMC MODTOC
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. LAMP BOLLARD TO BE REVIEWED BY IRISH WATER.
3. LAMP STANDARD TO BE REVIEWED BY IRISH WATER.
4. ELECTRICAL DUCTING TO BE IN ACCORDANCE WITH ESB SPECIFICATION.
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
LAMP BOLLARD & LAMP STANDARD
133
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
150Ø VENT PIPE
80
0
7.6
00
90
0
900
12
00
7600mm HIGH 150Ø
GALVANISED STEEL
DECORATIVE VENT
SHAFT WITH
PROTECTIVE GRILL
VENT DETAIL
CONCRETE C30/37
No. Date Description0 09/'15 Initial Issue
AppSL
Drn ChkJMC TOC
1 11/'17 Updated note 2JMC MODTOC
1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.
2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY
THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.
3. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206
DRAWING No.
SCALE
TITLE REV
DATE
STANDARD DETAILS - WASTEWATER NOT TO SCALE
STD-WW-
REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT
VENT STACK
134
SEPT. 2015
IW-CDS-5030-01 Rev. 03 December 2017
ST
AN
DA
RD
DE
TA
ILS
FO
R W
AS
TE
WA
TE
R N
ET
WO
RK
S:
RE
VIS
ION
LO
G –
03
(1
st
Dec.
20
17
)
DR
G N
o.
DR
AW
ING
TIT
LE
M
AT
ER
IAL
CH
AN
GE
E
DIT
OR
IAL
CH
AN
GE
R
EV
CO
MM
EN
TS
ST
D-W
W-0
1
WASTE WATER SERVICE CONNECTION RESPONSIBILITY
Added note reference
1
Drawing revised
ST
D-W
W-0
2TYPICAL LAYOUT FOR SEWER WITHIN NEW DEVELOPMENTS
Updated Note 2
1
Drawing revised
ST
D-W
W-0
3DRAIN & SERVICE CONNECTION PIPEWORK
Updated notes
1
Drawing revised
ST
D-W
W-0
4TYPICAL SEWER / SERVICE PIPE CONNECTION
Updated connection detail
Updated notes
1
Drawing revised
ST
D-W
W-0
5TYPICAL SERVICE LAYOUT INDICATING SEPARATION DISTANCES
Updated notes
1
Drawing revised
ST
D-W
W-0
6RESTRICTIONS ON WASTEWATER INFRASTRUCTURE WORKS ADJACENT TO
TREES
Revised to suit ILI recommendations
2
Drawing revised
ST
D-W
W-0
6A
RESTRICTIONS ON NEW TREES/SHRUBS PLANTING ADJACENT TO SEWERS
0
New Drawing
ST
D-W
W-0
7TRENCH BACKFILL & BEDDING
Updated & added Notes
1
Drawing revised
ST
D-W
W-0
8CONCRETE BED, HAUNCH & SURROUND TO WASTEWATER PIPES
0
No change
ST
D-W
W-0
9
BLOCKWORK MANHOLE (<450mm DIA.)
Added rocker pipe table
Updated & added Notes
2
Drawing revised
ST
D-W
W-1
0PRE-CAST CONCRETE MANHOLE
Added rocker pipe table & deep
manhole detail
Updated & added Notes
2
Drawing revised
ST
D-W
W-1
1
IN-SITU CONCRETE MANHOLE
Added rocker pipe table & deep
manhole detail
Updated & added Notes
2
Drawing revised
ST
D-W
W-1
2BACKDROP MANHOLES
Updated notes
2
Drawing revised
ST
D-W
W-1
3PRIVATE SIDE INSPECTION CHAMBER
Updated notes
2
Drawing revised
ST
D-W
W-1
4THRUST BLOCKS FOR RISING MAINS
Anti-torque support note & thrust flange
added
Note 6 updated
1
Drawing revised
ST
D-W
W-1
5SCOUR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.)
Revised & added notes
2
Drawing revised
ST
D-W
W-1
6SLUICE VALVE DETAILS FOR RISING MAINS DUCTILE IRON (D.I.) PIPE (<200mm
DIA.) (Sheet 1 of 2)
Revised & added notes
3
Drawing revised
ST
D-W
W-1
7
SLUICE VALVE DETAILS FOR RISING MAINS POLYETHYLENE (P.E.) PIPE
(<200mm DIA.) (Sheet 2 of 2)
Revised & added notes
2
Drawing revised
ST
D-W
W-1
8AIR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.)
Revised & added notes
2
Drawing revised
ST
D-W
W-1
9DUCT CHAMBER
Revised notes
2
Drawing revised
ST
D-W
W-2
0EMERGENCY OVERFLOW STRUCTURE
Notes revised
1
Drawing revised
ST
D-W
W-2
1TYPICAL DITCH/STREAM CROSSING FOR GRAVITY MAIN (Sheet 1 of 2)
Updated pipe depth dim
ension
1
Drawing revised
ST
D-W
W-2
2TYPICAL DITCH/STREAM CROSSING FOR RISING MAIN (Sheet 2 of 2)
Updated pipe depth dim
ension
Note 10 revised
1
Drawing revised
ST
D-W
W-2
3TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 1 of 2)
Notes 5 & 14 revised
1
Drawing revised
ST
D-W
W-2
4TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 2 of 2)
Updated pipe depth dim
ension
Revised notes 12 & 14
1
Drawing revised
ST
D-W
W-2
5
SECURITY GATE & FENCING
Fencing table updated
2
Drawing revised
ST
D-W
W-2
6INDICATIVE PUMPING STATION LAYOUT
0
No change
ST
D-W
W-2
7FLOW METER CHAMBER (FOUL RISING MAIN <200mm DIA.)
Revised & added notes
2
Drawing revised
ST
D-W
W-2
8INDICATIVE SUBMERSIBLE PUMPING STATION
Revised notes 2,4,9 & 11
Revised notes
2
Drawing revised
ST
D-W
W-2
8A
INDICATIVE PRE-CAST CONCRETE SUBMERSIBLE PUMPING STATION
Revised notes 2,4,9 & 11
Revised notes
1
Drawing revised
ST
D-W
W-2
9RISING MAIN DISCHARGE MANHOLE
Added rocker pipe table
Updated & added Notes
2
Drawing revised
ST
D-W
W-3
0KIOSK TYPE 1 PUMPING STATION & WET KIOSK (Sheet 1 of 2)
Updated note 9
2
Drawing revised
ST
D-W
W-3
1KIOSK TYPE 2 + 3 PUMPING STATION & WET KIOSK (Sheet 2 of 2)
Updated note 6
2
Drawing revised
ST
D-W
W-3
2HARDSTANDING AREA PUMPING STATION (PERMEABLE & IMPERMEABLE)
Updated notes 2 & 3
1
Drawing revised
ST
D-W
W-3
3LAMP BOLLARD & LAMP STANDARD
Updated notes 2 & 3
1
Drawing revised
ST
D-W
W-3
4VENT STACK
Updated note 2
1
Drawing revised
/ INDEX SHEET
Inclusion of STD-W
W-06A
Drawing revisions updated
Nov 2017 Drawing revisions updated
/ Design Risk Assessment for Wastewater Standard Details
Inclusion of STD-W
W-06A
General Amendments
v4.01 Document revised
IW-CDS-5030-01 Rev. 03 December 2017