1 | Irish Water | [Type Document Title]

IW-C

DS

-50

30

-01

Wastewater Infrastructure

Standard Details

Connections and Developer Services

Construction Requirements for Self-Lay Developments December 2017 (Revision 03)

Document IW-CDS-5030-01

Revision Log

Date Details of Revision Revision Author Approver

April 2016 General revisions 01 T’OC M’OD August 2016 General revisions &

drawing added 02 TO’C MO’D

December 2017 General revisions & drawing added

03 TO’C MO’D

IW-CDS-5030-01 Rev. 03 December 2017

Background

Technical Documentation has been developed by Irish Water’s Connections and Developer Services which outlines the requirements for wastewater services infrastructure within developments.

These standard details have been developed to outline to developers Irish Water’s requirements for the provision of wastewater infrastructure that is to be installed in developments and that would be connected to Irish Water’s networks and subsequently vested in Irish Water.

The standard details outline design and construction requirements to ensure consistency in the provision of materials, equipment and workmanship, etc. They also provide the basis for developers’ detailed design proposals for wastewater infrastructure, leading to the provision of infrastructure that is suitable for connection to Irish Water’s networks and easy operation and maintenance of the new infrastructure.

The standard details are based on best practice within the water industry. They take account of the experience of Local Authorities in the provision of these services to new developments. They have been successfully used by Irish Water’s own internal functions for a variety of projects and they are in line with water utility industry norms.

There are 36 No Standard Details dealing with wastewater infrastructure covering all aspects of such infrastructure.

These standard details are accompanied by a Design Risk Assessment (DRA) (document number IW-CDS-5030-02), which outlines the residual health and safety responsibilities of developers and their designers/contractors in the provision of such infrastructure.

The use of the standard details is mandatory in all new Irish Water Connection Agreement Offers issued after 1st June 2016. .

IW-CDS-5030-01 Rev. 03 December 2017

Standard Details for Wastewater Networks Index Sheet

Drawing No. Drawing Title Rev

STD-WW-01 Waste water service connection responsibility 1

STD-WW-02 Typical layout for sewer within new developments 1STD-WW-03 Drain & service connection pipework 1

STD-WW-04 Typical sewer / service pipe connection 1

STD-WW-05 Typical service layout indicating separation distances 1STD-WW-06 Restrictions on wastewater infrastructure adjacent to trees 2

STD-WW-06A Restrictions on new trees/shrubs planting adjacent to sewers 0 STD-WW-07 Trench backfill & bedding 1

STD-WW-08 Concrete bed, haunch & surround to wastewater pipes 0

STD-WW-09 Blockwork manhole (<450mm dia.) 2STD-WW-10 Pre-cast concrete manhole 2

STD-WW-11 In-situ concrete manhole 2

STD-WW-12 Backdrop manholes 2STD-WW-13 Private side inspection chamber 2

STD-WW-14 Thrust blocks for rising mains 1

STD-WW-15 Scour valve chamber (foul rising main <200mm dia.) 2STD-WW-16 Sluice valve details for rising mains ductile iron (D.I.) pipe (<200mm

dia.) (sheet 1 of 2)

3

STD-WW-17 Sluice valve details for rising mains polyethylene (P.E.) pipe (<200mm

dia.) (sheet 2 of 2)

2

STD-WW-18 Air valve chamber (foul rising main <200mm dia.) 2STD-WW-19 Duct chamber 2

STD-WW-20 Emergency overflow structure 1

STD-WW-21 Typical ditch/stream crossing for gravity main (sheet 1 of 2) 1STD-WW-22 Typical ditch/stream crossing for rising main (sheet 2 of 2) 1

STD-WW-23 Typical bridge crossing for rising main (sheet 1 of 2) 1

STD-WW-24 Typical bridge crossing for rising main (sheet 2 of 2) 1STD-WW-25 Security gate & fencing 2

STD-WW-26 Indicative pumping station layout 0STD-WW-27 Flow meter chamber (foul rising main <200mm dia.) 2

STD-WW-28 Indicative submersible pumping station 2

STD-WW-28A Indicative pre-cast concrete submersible pumping station 1 STD-WW-29 Rising main discharge manhole 2

STD-WW-30 Kiosk type 1 pumping station & wet kiosk (sheet 1 of 2) 2

STD-WW-31 Kiosk type 2 + 3 pumping station & wet kiosk (sheet 2 of 2) 2STD-WW-32 Hardstanding area pumping station (permeable & impermeable) 1

STD-WW-33 Lamp bollard & lamp standard 1

STD-WW-34 Vent stack 1

These Standard Details show the acceptable typical details and outline the minimum standards that are required by Irish Water for the provision of wastewater pipes and related infrastructure which are to be connected to the Irish Water Network. They shall be used in conjunction with the associated Design Risk Assessments that have been developed which identify the risks that designers shall take into account in the detailed design of the wastewater pipes and related infrastructure to be connected to the Irish Water Network. The pipes and related infrastructure to be put in place within developments shall comply fully with these Standard Details. Ultimate responsibility (including, but not limited to, any losses, costs, demands, damages, actions, expenses, negligence and claims) for the detailed design, construction and provision of such pipes and related infrastructure shall rest entirely with the Developer, his/her Designer(s), Contractor(s) or other connected party. Irish Water assumes no responsibility for and gives no guarantees, undertakings or warranties in relation to the pipes and related infrastructure to be provided in accordance with these Standard Details. No part of the Standard Details shall be reproduced or transmitted in any form or stored in any retrieval system of any nature without the prior written permission of Irish Water as copyright holder, except as agreed for use. These Standard Details shall be used in conjunction with current Irish Water Codes of Practice, which will take precedence over the Standard Details. These Standard Details may also be used for the installation of wastewater infrastructure for Asset Delivery Works & Capital Project Works Programmes at the discretion of Irish Water.

DEC. 2017

IW-CDS-5030-01 Rev. 03 December 2017

DRAIN

PROPERTY OWNER RESPONSIBILITY

SERVICE CONNECTION

SEWER( IRISH WATER RESPONSIBILITY )

A / B C D

ROADFOOTPATH

PROPERTY BOUNDARY

WITHIN

1m OF

BOUNDARY

INSPECTION CHAMBER

CUSTOMER PROPERTY

VENT STACK

PROPERTY OWNER RESPONSIBILITY

SEE NOTE 2 ON

STD-WW-03

( A ) SEWER IRISH WATER

( B-C ) SERVICE CONNECTION( INCLUDING SADDLE )

INSPECTION CHAMBER

( C-D ) DRAIN

INTERNAL PLUMBING

PROPERTY OWNER

PROPERTY OWNER

PROPERTY OWNER

MAINTENANCE

RESPONSIBILITY

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

CONNECTION RESPONSIBILITY

101

SEPT. 2015

WASTEWATER SERVICE

PROPERTY OWNER

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Note reference addedJMC MODTOC

IW-CDS-5030-01 Rev. 03 December 2017

FOUL

SEW

ERST

ORM

WAT

ER

TELE

COMM

UNIC

ATIO

NS

WAT

ER M

AIN

GAS

MAIN

CABL

E TV

ELEC

TRIC

ITY

BOUN

DARY KE

RBFOOTPATHROAD

TYPICAL LAYOUT OF SERVICES IN FOOTPATH / ROAD

BUILDING

LEGEND

PROPOSED INSPECTION CHAMBER

PROPOSED SEWER

PROPOSED MANHOLE

EXISTING MANHOLE

EXISTING SEWER

1. THE MINIMUM SIZE FOR A GRAVITY FOUL SERVICE CONNECTION SHALL BE 100mm DIAMETER.

2. THE MINIMUM SIZE OF GRAVITY FOUL SEWER SHALL BE 225mm DIAMETER IN GENERAL. GRAVITY SEWERS ON BRANCHES SERVING LESS THAN 20 PROPERTIES MAY BE 150mm DIAMETER SUBJECT TOAGREEMENT WITH IRISH WATER.

3. THE MINIMUM SIZE FOR RISING MAINS SHALL NOT BE LESS THAN 80mm & THE DESIRED MINIMUM SIZE OF RISING MAIN SHALL BE 100mm DIAMETER.

4. EACH PROPERTY SHALL HAVE A SEPARATE WASTE WATER SERVICE CONNECTION. A CONNECTION SHALL NOT BE TAKEN FROM AN EXISTING SERVICE CONNECTION.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

WITHIN NEW DEVELOPMENTS

102

SEPT. 2015

TYPICAL LAYOUT FOR SEWER

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated Note 2JMC MODTOC

IW-CDS-5030-01 Rev. 03 December 2017

VA

RIE

S

PROPERTY OWNER RESPONSIBILITY

PR

OP

ER

TY

BO

UN

DA

RY

45° ANGLE JUNCTION

OR OBLIQUE PIPE SADDLE.

SEE DRAWING STD-WW-04

FOR DETAILS

PROPERTY

OWNER

RESPONSIBILITY

FOR DETAIL OF INSPECTION

CHAMBER SEE DRAWING

STD-WW-13

WITHIN 1000mm

VA

RIE

S

MA

X.150m

m

SEWER

IRISH WATER RESPONSIBILITY

FOOTPATH

ROAD

FOUL SEWER MAIN SURROUND

IN 150mm GRADE C25\30 CONCRETE

AT SERVICE CONNECTIONS

GRANULAR

MATERIAL AS PER BACKFILLING

DRAWING STD-WW-07

CONNECTION PIPE

45° BEND

SLIDING COUPLING

PROPERTY

OWNER

RESPONSIBILITY

DRAIN TO BE INSTALLED

TO RELEVANT BUILDING

REGULATION REQUIREMENTS

(SEE NOTE 2)

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF THE

PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE

CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF PRACTICABLE,

CONSULT WITH IRISH WATER ON ALTERNATIVE LOCATIONS.

3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF

CONNECTION TO A PUBLIC SEWER WITHIN THE CONFINES OF A PRIVATE

BOUNDARY IS A PRIVATE DRAIN AND SHOULD BE CONSTRUCTED IN

ACCORDANCE WITH BUILDING REGULATIONS.

1 : 60

1 : 150 MINIMUM

100

150 TO 225

PIPE SIZE (mm)

GRADIENT

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

DRAIN AND SERVICE CONNECTION PIPEWORK

103

SEPT. 2015

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated NotesJMC MOLTOC

IW-CDS-5030-01 Rev. 03 December 2017

CONNECTION PIPE

SEWER

CROSS-SECTIONAL

VIEW OF SEWER

VIEW IN

DIRECTION OF ARROW A

FLOW

VIEW IN

DIRECTION OF ARROW A

A

CONNECTION PIPE

6

0

°

A

C

C

E

P

T

A

B

L

E

R

A

N

G

E

SEWER

CROSS-SECTIONAL

VIEW OF SEWER

4

5

°

FLOW

APPROVED 45° SADDLE CONNECTION

45° JUNCTION

A

6

0

°

A

C

C

E

P

T

A

B

L

E

R

A

N

G

E

4

5

°

90°

90°

SEE NOTE 7

SEE NOTE 7

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. AS FAR AS PRACTICABLE, JUNCTIONS AND SERVICE CONNECTIONS SHALL

BE BUILT IN FOR ALL PLANNED USERS WHEN THE SEWER IS BEING

CONSTRUCTED. WHERE IT IS NECESSARY TO MAKE A POST-CONSTRUCTION

CONNECTION THE DEVELOPER SHALL BRING THE SEWER TO THE

INSPECTION CHAMBER, INSTALL THE INSPECTION CHAMBER AND SEAL

THE UPSTREAM END UNTIL THE CONNECTION IS REQUIRED.

3. THE VERTICAL ANGLE BETWEEN THE SERVICE CONNECTING PIPE AND

THE HORIZONTAL SHALL BE GREATER THAN 0° AND NOT MORE THAN 60°.

4. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL

INTERNAL DIAMETER OF 300mm DIAMETER OR LESS, CONNECTIONS

SHALL BE MADE USING 45° ANGLE JUNCTIONS.

5. WHERE THE CONNECTION IS BEING MADE TO A SEWER WITH A NOMINAL

INTERNAL DIAMETER GREATER THAN 300mm :

A) IF THE DIAMETER OF THE CONNECTING PIPE IS GREATER THAN

HALF THE DIAMETER OF THE SEWER, AN ACCESS MANHOLE SHALL BE

CONSTRUCTED TO FORM THE CONNECTION POINT; OR,

B) IF THE DIAMETER OF THE CONNECTING PIPE IS LESS THAN OR

EQUAL TO HALF THE DIAMETER OF THE SEWER, THEN THE CONNECTION

SHALL BE MADE USING A PREFORMED SADDLE FITTING WITH A SLOW

BEND BETWEEN THE SADDLE AND THE CONNECTING SEWER/DRAIN .

6. CONNECTIONS MADE WITH SADDLE FITTINGS SHALL BE MADE BY

CUTTING AND SAFELY REMOVING A CORE FROM THE PIPE AND JOINTING

THE SADDLE FITTING TO THE PIPE IN ACCORDANCE WITH THE

MANUFACTURER'S INSTRUCTIONS TO ENSURE A WATERTIGHT JOINT.

THE CONNECTING PIPE SHALL NOT PROTRUDE INTO THE SEWERS.

7. THE USE OF 90° CONNECTIONS TO THE SEWER MAY BE ALLOWED SUBJECT

TO IRISH WATER REVIEW, PROVIDED THE SADDLE OR BRANCH

INCORPORATES A SWEPT TEE CONNECTION TOWARDS THE DIRECTION OF

FLOW.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

CONNECTION

104

SEPT. 2015

TYPICAL SEWER / SERVICE PIPE

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 JMC Updated connection detail & notes MODTOC

IW-CDS-5030-01 Rev. 03 December 2017

FOUL SEWER

TELECOMMUNICATIONS

BUILDING

MIN

IM

UM

1200m

m

3000mm MINIMUM

STORM WATER

ELECTRICITY

WATER MAIN

GAS MAIN

BOUNDARY WALL FOOTPATH

FOUNDATION

KERB

CABLE TV

MIN. 1000mm

ELECTRICAL CORRIDOR( DEPTH AND LAYOUTREQUIREMENTS TO BECONFIRMED WITH SERVICEPROVIDER )

GRASS VERGE

7. THE MINIMUM CLEAR DISTANCE WILL BE INCREASED IF THE SEWER IS GREATER THAN 3m DEEP OR IF THE DIAMETER IS GREATER THAN 375mm. THE MINIMUM CLEAR DISTANCEIN THESE SITUATIONS SHALL BE > DEPTH TO INVERT OR 10 TIMES THE SEWER DIAMETER, WHICH EVER IS GREATER.

8. THE EXTERNAL FACES OF MANHOLE SHALL BE AT LEAST 0.5m FROM KERB LINE.

1. THE SEPARATION DISTANCES OUTLINED ARE MINIMUM REQUIREMENTS.

2. SPECIFIC SEPARATION CLEARANCE DISTANCES IN EXCESS OF THESE MINIMA SHALL BE PROVIDED FOR

SERVICES SUCH AS GAS, ELECTRICITY, FIBRE-OPTIC OR OIL FILLED CABLES AS THE CASE MAY BE.

THE PARTICULAR UTILITY PROVIDERS SHALL BE CONSULTED TO DETERMINE THESE MINIMUM SEPARATION

DISTANCES AND EVIDENCE OF THIS CONSULTATION, WITH THE SPECIFIED SEPARATION DISTANCES,

SHALL BE PROVIDED TO IRISH WATER AT DESIGN STAGE.

4. DETAILED PROPOSALS, INCLUDING WORK METHOD STATEMENTS, INSURANCE CONFIRMATION AND DETAILS OF WORK COMPLETED OF A SIMILAR NATURE MUST

BE SUBMITTED TO IRISH WATER FOR ITS CONSIDERATION BEFORE AGREEMENT WILL ISSUE.ALL SUCH WORKS IN THE VICINITY OF ARTERIAL WATER MAINS AND SEWERS

(MAINS GREATER THAN 400mm) SHALL BE SUBJECT TO WRITTEN AGREEMENT WITH IRISH WATER BEFORE CONSTRUCTION COMMENCES ON SITE. THIS AGREEMENT

SHALL ALSO INCLUDE ANY NECESSARY PROTECTION FOR WATER MAINS.

5. ANY DAMAGE SHALL BE NOTIFIED IMMEDIATELY TO IRISH WATER. THE PERSON WHO CAUSES THE DAMAGE TO A SEWER MAIN OR FITTING WILL BE DEEMED TO HAVE

COMMITTED AN OFFENCE UNDER SECTION 45 OF THE WATER SERVICES ACT 2007.

6. UNDER NO CIRCUMSTANCES WILL IRISH WATER ACCEPT SEWER MAIN INSTALLATIONS UNDER STRUCTURES, EXISTING OR PROPOSED, OR IN CLOSE PROXIMITY TO

ANY EXISTING STRUCTURES OR FEATURES THAT WILL INHIBIT ACCESS FOR POST INSTALLATION MAINTENANCE AND ACCESS.

3. NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN THE FOLLOWING DISTANCES FROM AN EXISTING WATER MAIN OR WASTEWATER RISING MAIN:-

HORIZONTAL

1m AT EITHER SIDE OF AN EXISTING MAIN LESS THAN 200mm IN DIAMETER.

2m AT EITHER SIDE OF AN EXISTING MAIN OF 200mm TO 350mm IN DIAMETER.

5m AT EITHER SIDE OF AN EXISTING MAIN OF 350mm OR GREATER IN DIAMETER.

WHERE DUCTS OR PIPES ARE TO BE LAID CLOSE TO AN EXISTING WATERMAIN OR SEWER IN THE OWNERSHIP OF IRISH WATER,

NOTIFICATION IN WRITING SHALL BE PROVIDED A MINIMUM OF 10 DAYS AHEAD OF ADVANCEMENT OF THE WORK.

NOTIFICATION IN WRITING IS REQUIRED SHOULD WORKS BE WITHIN 1.5m DISTANCE OF A WASTEWATER SEWER.

REQUIREMENTS SHALL ALSO APPLY TO TRIAL HOLES OR SLIT TRENCHES TO LOCATE THE MAIN OR GAIN GROUND INFO DATA.

LARGER DIAMETERS >350mm DISTRIBUTION AND TRUNK MAINS, IRISH WATER MUST BE NOTIFIED AT LEAST 1 MONTH IN ADVANCE.

DEVELOPERS SHALL ALSO COMPLY WITH ANY NOTIFICATION REQUIREMENTS OF OTHER UTILITY PROVIDERS (ESB, GAS MAIN, TELECOMMUNICATION ETC.).

9. WHERE DESIGN DEVIATES FROM TYPICAL DETAILS, THE LAYOUT IS SUBJECT TO REVIEW BY IRISH WATER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

SEPARATION DISTANCES

105

SEPT. 2015

TYPICAL SERVICE LAYOUT INDICATING

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated notesJMC MODTOC

IW-CDS-5030-01 Rev. 03 December 2017

1m1m

NO WORKS PERMITTED

PRECAUTION

AREA

GIRTH x 4

PRECAUTION

AREA

EXCLUSION AREA

GIRTH (CIRCUMFERENCE OF TREE

MEASURED AT 1.5m ABOVE GROUND LEVEL)

EXISTING PLANTING:

PREVENTION MEASURES

REQUIRED IN LINE WITH

LANDSCAPING DESIGN & SPECIAL

PROTECTION REQUIRED. (e.g. BY

USE OF APPROPRIATE BARRIERS,

HIGH PERFORMANCE JOINTS, OR

BY USE OF POLYETHYLENE WITH

WELDED JOINTS). THE LANDSCAPE

DESIGN AND DETAILS OF THE

SPECAIL PROTECTION MEASURES

MUST BE AGREED WITH IRISH

WATER

OUTSIDE RADIUS OF PRECAUTION AREA = 4 x

GIRTH OF TREE

PRECAUTION AREA:

EXCAVATIONS FOR PIPEWORK SHOULD NOT BE

UNDERTAKEN WITHIN THIS AREA, UNLESS AGREED WITH

IRISH WATER.

WORKS WITHIN THE PRECAUTION ZONE MUST BE

SUPERVISED BY A QUALIFIED ARBORIST. WORKS SHALL BE

SUBJECT OF A CLEAR METHOD STATEMENT OUTLINING ALL

WORKS ADJACENT TO THE TREES/SHRUBS WHICH IS TO BE

PREPARED & AGREED IN ADVANCE OF THE WORKS.

MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN

THIS ZONE.

METHOD STATEMENTS:

ALL WORKS SHALL BE CARRIED

OUT IN ACCORDANCE WITH BS 5837 AND INFORMED BY

NJUG VOLUME 4

EXCLUSION AREA:

WORKS IN THIS AREA ARE TO BE AVOIDED, UNLESS

ABSOLUTELY NECESSARY & AGREED WITH IRISH WATER.

EXCAVATIONS FOR PIPEWORK SHOULD NOT BE

UNDERTAKEN WITHIN THIS AREA, UNLESS NECESSARY AND

NO OTHER OPTIONS AVAILABLE. WORKS WITHIN THE

EXCLUSION ZONE MUST BE SUPERVISED BY A QUALIFIED

ARBORIST AND AGREED WITH IRISH WATER. WORKS SHALL

BE SUBJECT OF AN ARBORICULTURAL IMPACT

ASSESSMENT AS PER BS 5837 & A CLEAR METHOD

STATEMENT OUTLINING ALL WORKS ADJACENT TO THE

TREES/SHRUBS IS TO BE PREPARED AND AGREED IN

ADVANCE OF THE WORKS.

MATERIAL, PLANT & SPOIL SHALL NOT BE STORED WITHIN

THIS ZONE.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

INFRASTRUCTURE WORKS

206

SEPT. 2015

ADJACENT TO TREES

RESTRICTIONS ON WASTEWATER

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added new section & notesJMC TOC MOD2 11/'17 Revised to suit ILI recommendationsJMC TOC MOD

IW-CDS-5030-01 Rev. 03 December 2017

SEWER/DRAIN

Examples of Small SIze Amenity Trees

Field Maple,Wild Cherry,Crab Apple, Cobnut, Birch,Elder,Ornamental Pear.

Mountain Ash, Whitebeam,Cockspur Thorn, False Acacia,Hornbeam CV.

Poplar,

Willow.

Examples of Large Growing Species

Examples of Large Conifers & Deciduous Trees

Scots Pine, Black Pine, Cedar, Larch, Lawson's Cypress,Ash, Beech, Sycamore, Horse Chestnut, SweetChestnut, London Plane, Lime, Alder, Elm, Oak

Examples of shrubs and bushes

Holly, Laurel, Rhododendron, Dogwood,Christmas Tree, Magnolia, Fruit bushes, SpindleTree, Guelder rose, Roses

Examples of hedge plants and ground covers including

herbaceous and annuals

Hedge plants and ground covers may be placed over the pipelinePrivet, Blackthorn, Snowberry, Berberis, Heathers, Cotoneaster &Groundcovers, Herbaceous & Annuals

NOTE THAT VALUES REFER TO PLANTING DISTANCESWITHOUT ROOT BARRIERS OR PROTECTION MEASURES

NOTE: RESTRICTIONS RELATE TO INFRASTRUCTURE WITHOUT ROOT INTRUSION PROTECTION.

THUS FOR EXAMPLE:

- FOR A SERVICE LESS THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.5m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.

- FOR A SERVICE GREATER THAN 1 METRE DEEP, THE MINIMUM DISTANCE IS TO BE 1.0m FOR A TREE BETWEEN 300 AND 600mm STEM DIAMETER AT MATURITY.

PLEASE NOTE THAT TABLE A.1. OF BS 5837 (BELOW) IS TO BE USED TO CALCULATE THE ABSOLUTE MIMIMUM DISTANCE BETWEEN NEW TREE PLANTING

FROM THE WASTEWATER INFRASTRUCTURE (THE SERVICES). THE DISTANCE IS REQUIRED TO AVOID DIRECT DAMAGE TO THE INFRASTRUCTURE FROM

FUTURE GROWTH. THE DISTANCE IS A FUNCTION OF THE DEPTH OF THE SERVICES AND THE (FINAL EXPECTED) STEM DIAMETER OF THE TREE AT

MATURITY (i.e. FINAL EXPECTED GROWTH).

DIAGRAM 2: PLANTING DISTANCES FOR DIFFERENT SPECIES

WITHOUT BARRIER PROTECTION

THE DESIGN OF LANDSCAPING SHALL BE UNDERTAKEN IN CONJUNCTION WITH THE DESIGN OF WASTEWATER INFRASTRUCTURE, ETC. THE TREE/BUSH/SHRUB SHALL NOT BE LOCATED

CLOSER TO THE WASTEWATER INFRASTRUCTURE THAN INDICATED ABOVE, EXCEPT WHERE SPECIAL PROTECTION MEASURES ARE PROVIDED. WHERE THERE IS A RISK OF TREE/ROOT

INTRUSION, THE WASTEWATER INFRASTRUCTURE SHALL BE RESISTANT TO TREE ROOT INGRESS (e.g. BY USE OF APPROPRIATE BARRIERS, HIGH PERFORMANCE JOINTS, OR BY USE OF

POLYETHYLENE WITH WELDED JOINTS FOR RISING MAINS). THE LANDSCAPE DESIGN AND DETAILS OF THE SPECIAL PROTECTION MEASURES MUST BE AGREED WITH IRISH WATER

A TREE SHALL NOT BE PLANTED DIRECTLY OVER WASTEWATER INFRASTRUCTURE WHERE EXCAVATION OF THE INFRASTRUCTURE WOULD REQUIRE REMOVAL OF THE TREE UNLESS SUCH

PLANTING IS AGREED WITH IRISH WATER AND IN GENERAL ONLY SHALLOW ROOTING SHRUBS SHALL BE PLANTED CLOSE TO WASTEWATER INFRASTRUCTURE.

PLEASE ENSURE THAT THESE DISTANCES ARE ADHERED TO IN ORDER TO PROTECT THE TREES FROM ANY FUTURE MAINTENANCE. REFERENCE SHOULD ALSO BE MADE TO BS 5837, BS 8545

AND THE NJUG GUIDELINES VOLUME 4 FOR FURTHER INFORMATION.

THE DISTANCES GIVEN IN TABLE A.1. OF BS 5837 MUST BE FURTHER INFORMED BY THE SPECIES & IN DIAGRAM 2 BELOW. DIAGRAM 1 ABOVE

PROVIDES A FLOW CHART TO THE DECISION PROCESS WHILST DIAGRAM 2 BELOW IS TO BE USED TO INFORM THE PLANTING REGIME.

Services

> 1m deep

< 1m deep

Final stem dia. < 300mm Final stem dia. > 600mmFinal stem dia. 300mm to 600mm

--

0.5

1.0

1.5

2.0

3.0

Minimum distance between young trees or new planting & structures, in metres (m)

Outcome

DIAGRAM 1: DECISION FLOW CHART

Decision

Do

Nothing

Are root barriers &/or

protection measures

to be used?

1. Develop detailed design

of the tree planting with

landscape architect.

2. Consult with arborist.

3. Carry out works under

supervision of Irish Water

representative.

1. Plant trees at required

distance (as per step 2).

2. Carry out works under

supervision of Irish Water

representative.

Check STD-W12A for species & size

Depending on the choice of tree

species or shrubs:

1. Establish increased (or

decreased) distance from utility

2. Assume no protection measures

Check Table A.1. of BS 5837. Check

1. Utility depth

2. Final expected stem diameter

- Establish minimum distance from

tree to utility

- Assume no protection measures

Trees required in

proximity to Water

Infrastructure

Main Decision

No Yes

Yes

No

Then

STEP 1 STEP 2 (DIAGRAM 2)

TABLE A.1.

BS 5837

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

RESTRICTIONS ON NEW TREES / SHRUBS

PLANTING ADJACENT TO SEWERS

JUL. 2017

06A 0

No. Date Description0 11/'17 Initial Issue

AppDrn ChkJMC TOC MOD

NOTE: OTHER SPECIES NOT

NAMED TO BE PLANTED TO THE

SAME SPACINGS DEPENDING ON

ROOT FORMATION.

IW-CDS-5030-01 Rev. 03 December 2017

CROSS SECTION IN ROADS

PIPE DIAMETER - 'A'

30

0m

m'C

'

SE

E N

OT

E 2

MINIMUM TRENCH WIDTH - 'B'

ROAD/FOOT PATH SURFACE

CROSS SECTION IN GRASSED AREAS

VA

RIE

S

SE

E N

OT

E 7

'C

'

DEPTH OF

REINSTATED TOPSOIL

TO MATCH EXISTING

PIPE DIAMETER - 'A'

MINIMUM TRENCH WIDTH - 'B'

SE

E N

OT

E 2

BACKFILL REFER TO

NOTE 3 FOR DETAILS

PIPE BEDDING REFER TO

NOTE 5 FOR DETAILS

SELECTED BACKFILL

REFER TO NOTE 4

FOR DETAILS

PIPE BEDDING REFER TO

NOTE 5 FOR DETAILS

GRASSED AREAS

MARKER TAPE REFER

TO NOTE 9 FOR DETAILS

MARKER TAPE REFER

TO NOTE 9 FOR DETAILS

SEE NOTES 11 & 12.

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. THE MINIMUM DEPTH OF COVER FROM THE FINISHED SURFACE TO

THE CROWN OF GRAVITY PIPES WITHOUT PROTECTION SHOULD BE

AS FOLLOWS:

A) GARDENS AND PATHWAYS WITHOUT ANY

POSSIBILITY OF VEHICULAR ACCESS - DEPTH NOT LESS

THAN 0.5 M. (THIS WOULD NORMALLY RELATE TO DRAINS

IN PRIVATE PROPERTY, SHALLOW PIPES OF THIS NATURE

ARE UNDESIRABLE AND SHOULD BE INSTALLED IN

ACCORDANCE WITH THE CURRENT BUILDING REGULATIONS).

B) DRIVEWAYS, PARKING AREAS AND YARDS WITH

HEIGHT RESTRICTIONS TO PREVENT ENTRY BY VEHICLES

WITH A GROSS VEHICLE WEIGHT IN EXCESS OF 7.5

TONNES - DEPTH NOT LESS THAN 0.75 M.

C) DRIVEWAYS, PARKING AREAS AND NARROW

STREETS WITHOUT FOOTWAYS (E.G. MEWS DEVELOPMENTS)

WITH LIMITED ACCESS FOR VEHICLES WITH A GROSS VEHICLE

WEIGHT IN EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 0.9 M.

D) DEPTHS OF SEWERS IN GATED ESTATES SHALL BE SIMILAR TO

THAT OUTLINED ABOVE.

E) AGRICULTURAL LAND AND PUBLIC OPEN SPACE - DEPTH NOT

LESS THAN 0.9 M.

F) OTHER HIGHWAYS AND PARKING AREAS WITH UNRESTRICTED

ACCESS TO VEHICLES WITH A GROSS VEHICLE WEIGHT IN

EXCESS OF 7.5 TONNES - DEPTH NOT LESS THAN 1.2m.

3. CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH THE NATIONAL ROADS

AUTHORITY SPECIFICATION FOR ROAD WORKS IS TO BE USED AS

BACKFILL MATERIAL WHERE THE SEWER MAIN IS LOCATED IN ROADS,

FOOTPATHS OR WHEN THE NEAREST PART OF THE TRENCH IS WITHIN

1m OF THE PAVED EDGE OF THE ROADWAY. CLAUSE 804 / 808 IS TO BE

COMPACTED AS PER CLAUSE 802 OF THE NATIONAL ROADS AUTHORITY

SPECIFICATION FOR ROAD WORKS. CLAUSE 808 IS TO BE USED WITHIN

500mm OF CEMENT BOUND MATERIALS, CONCRETE PAVEMENTS,

CONCRETE STRUCTURES OR CONCRETE PRODUCTS. OTHERWISE CLAUSE

804 MAY BE USED. ALTERNATIVE BACKFILL MATERIAL TO THAT DESCRIBED

ABOVE (CLAUSE 804 OR CLAUSE 808) OF THE PIPE TRENCH WILL ONLY BE

ALLOWED BY IRISH WATER WHERE THE ROADS AUTHORITY IN WHOSE

FUNCTIONAL AREA THE DEVELOPMENT IS LOCATED, PROVIDES WRITTEN

APPROVAL TO THE DEVELOPER TO THE USE SUCH ALTERNATIVE

MATERIAL.

4. SELECTED EXCAVATED MATERIAL MAY BE USED IN GREEN-FIELD

AREAS ABOVE GRANULAR PIPE SURROUND MATERIAL SUBJECT TO

REVIEW BY IRISH WATER.

5. PIPE BEDDING SHALL COMPLY WITH WIS 4-08-02 AND IGN 4-08-01

GRANULAR MATERIAL SHALL BE 14mm TO 5mm GRADED

AGGREGATE OR 10mm SINGLE SIZED AGGREGATE IS EN 13242. CONCRETE

BED, HAUNCH & SURROUND, WHERE REQUIRED, SHALL BE TO STD-WW-08.

6. IN SOFT GROUND CONDITIONS (CBR < 5) THE MATERIAL SHOULD BE

EXCAVATED AND DISPOSED OF IN ACCORDANCE WITH THE WASTE

MANAGEMENT ACT AND CLAUSE 804 / 808 MATERIAL IN ACCORDANCE WITH

THE NATIONAL ROADS AUTHORITY SPECIFICATION FOR ROAD

WORKS SHALL REPLACE THE EXCAVATED MATERIAL, WRAPPED IN

GEO-TEXTILE WRAPPING. ALTERNATIVELY, SPECIAL PIPE SUPPORT

ARRANGEMENTS, INCLUDING PILING ETC. MAY BE REQUIRED WHERE

THE DEPTH OF SOFT MATERIAL IS EXCESSIVE. SUCH ARRANGEMENTS

SHALL BE SUBJECT TO ASSESSMENT BY IRISH WATER BEFORE

ADVANCING WITH THE WORK.

7. IN GREEN FIELD AREAS, TYPE B BACKFILL (SELECTED EXCAVATED

MATERIAL) WILL BE ALLOWED ABOVE THE SIDE HAUNCH GRANULAR

MATERIAL IN THE CASE OF RIGID PIPES. A GRANULAR SURROUND OF

A MINIMUM DEPTH OF 150mm ABOVE THE CROWN OF THE PIPE IS

REQUIRED FOR FLEXIBLE PIPES , AND TYPE B MATERIAL MAY BE USED

AS BACKFILL ABOVE THIS. ALL RISING MAINS IN GREENFIELD AREAS

SHALL HAVE A MINIMUM COVER OF 300mm OF GRANULAR MATERIAL

ABOVE THE EXTERNAL CROWN OF THE PIPE.

8. PIPES SHALL NOT BE SUPPORTED ON STONES, ROCKS OR ANY

HARD OBJECTS AT ANY POINT ALONG THE TRENCH. ROCK SHALL BE

EXCAVATED TO A DEPTH OF 150mm BELOW THE ACTUAL DEPTH OF

THE TRENCH WITH THE VOID FILLED WITH CLAUSE 804 / 808 MATERIAL IN

ACCORDANCE WITH THE NATIONAL ROADS AUTHORITY SPECIFICATION

FOR ROAD WORKS. THE GRANULAR MATERIAL SHALL BE LAID ABOVE

THIS VOID BACKFILL MATERIAL.

9. NON DEGRADABLE MARKER TAPE SHOULD BE INSTALLED AT TOP OF

PIPE BEDDING LAYER. IN THE CASE OF NON METAL PIPE MATERIAL,

THE MARKER TAPE SHOULD INCORPORATE A TRACE WIRE WHICH IS

LINKED TO FITTINGS AND TERMINATED AT THE WASTE WATER PUMPING

STATION AND THE DISCHARGE MANHOLE.

10. TRENCH WIDTHS FOR PIPE SIZES ≤80mm MAY BE <500mm, SUBJECT TO

CONSIDERATION BEING GIVEN TO THE TRENCH DEPTH, HEALTH &

SAFETY & CONSTRUCTION ACCESS REQUIREMENTS.

11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR

MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,

OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

≤100

150 - 450

100

200

PIPE DIAMETER

'A' (mm)

TRENCH WIDTH

'B' (mm)

≤ 80 RISING MAIN

100

150

200

250

300

350

400

450

SEE NOTE 10.

500

600

600

750

750

750

900

900

PIPE DIAMETER

'A' (mm)

DEPTH OF BEDDING

'C' (mm)

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

TRENCH BACKFILL AND BEDDING

107

SEPT. 2015

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated & Added NotesJMC MODTOC

IW-CDS-5030-01 Rev. 03 December 2017

IW-CDS-5030-01 Rev. 03 December 2017

MINIMUM WIDTH OF BENCHING FOR

LANDING AREA TO BE 500mm

1:3 SAND:CEMENT MORTAR

WITH STEEL TROWEL FINISH

AT A 1:30 SLOPE TOWARDS

THE CHANNEL

75mm GRADE C12/15 BLINDING CONCRETE

REINFORCED CONCRETE BASE GRADE C30/37

SECTION A-A

PLAN

FLEXIBLE JOINTFLEXIBLE JOINT

INVERT SHOULD BE FORMED WITH CAST-INSITU

CONCRETE, C25/30 20mm AGGREGATE FINISHED

WITH A 1:3 CEMENT/SAND MORTAR

FLEXIBLE JOINT

Max. 600

FLEXIBLE JOINT

Flow

Max. 600

MANHOLE COVER AND FRAME SHALL COMPLY

TO IS EN 124 AND BS 7903 (ALL CLASS D400

COVERS SHALL HAVE MIN. FRAME DEPTH 100

OR 150mm) MIN. OPE. 600 x 600mm

1200

1760

12

00

17

60

AA

22

5

75mm GRADE C12/15

BLINDING CONCRETE

REINFORCED CONCRETE

BASE GRADE C30/37

SECTION B-B

BENCHING SLOPE TO BE

1:10 TO 1:30

22

5

BB

RELIEVING ARCH FORMED BY 215x103x65

SOLID ENGINEERING BRICK CLASS A OR B.

(RELIEVING ARCHES USED IN BRICK OR BLOCK WORK

MANHOLES EXTEND OVER FULL THICKNESS OF WALLS)

50

50

1: 3 SAND:CEMENT MORTAR WITH STEEL TROWEL

FINISH AT A 1:30 SLOPE TOWARDS THE CHANNEL

20N/mm² CONCRETE BLOCKS

TO COMPLY WITH IS EN 771-3

215 215

21

52

15

ENGINEERING

BRICK WORK LINING

1000mm ABOVE BENCHING

ENGINEERING

BRICK WORK LINING

1000mm ABOVE BENCHING

COVER TO BE SET IN

C50\60 MORTAR

Flow

Flow Flow

22

5

MANHOLE COVER AND FRAME

SHALL COMPLY TO EN 124 AND BS 7903

(ALL CLASS D400 COVERS SHALL HAVE MIN. FRAME

DEPTH 100-150mm) MIN. OPE. 600 x 600mm

1 No. COURSE MIN. / 3 No. COURSES

MAX OF CLASS B ENGINEERING

BRICKS SET IN C50/60 MORTAR

1 No. COURSE MIN.

3 No. COURSES MAX OF CLASS

B ENGINEERING BRICKS SET IN

C50/60 MORTAR

20N/mm² CONCRETE

BLOCKS TO COMPLY

WITH IS EN 771-3

675mm MAX. TO FIRST STEP

675mm MAX. TO FIRST STEP

300 c/c's

MANHOLE STEPS TO COMPLY WITH IS EN 13101,

TYPE D, CLASS 1, GALVANISED MILD STEEL &

PLASTIC ENCAPSULATED.

120

MANHOLE

COVER &

MIN. OPE. 600

x 600mm

ROCKER PIPE

(SEE TABLE OVER)

ROCKER PIPE

(SEE TABLE OVER)

ROCKER PIPE

(SEE TABLE OVER)

ROCKER PIPE

(SEE TABLE OVER)

FINISHED GROUND LEVEL

SEE NOTES 10, 11 & 12.

COVER TO BE SET IN

C50\60 MORTAR

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added steps & revisedJMC TOC access ope & cover notes MOD

2 11/'17 Added rocker pipe table,JMC added & updated notesTOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. SOLID BLOCKWORK TO BE OF HIGH STRENGTH (20N/mm²) TO IS EN 771.

3. MAXIMUM DEPTH OF BLOCK WORK MANHOLE IS 1.20m (THE USE OF BLOCK

WORK IN DEEPER MANHOLES WILL BE CONSIDERED BUT SUCH USE WILL

REQUIRE DETAILED STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER

REVIEW).

4. WALLS TO BE FLUSH POINTED AND NOT PLASTERED INTERNALLY, INTERNAL

LINING OF ENGINEERING BRICK TO IS EN 771-1 TO A HEIGHT OF 1m ABOVE

BENCHING. ENGINEERING BRICK TO BE BONDED TO BLOCKWORK USING

ENGLISH GARDEN WALL BOND.

5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS FOR ROOF AND BASE

SLABS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER

FOR REVIEW. MANHOLE ROOFS SHALL CONSIST OF A REINFORCED CONCRETE

SLAB OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm

DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED

PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER

REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.

6. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS SUBJECT TO REVIEW FROM IRISH WATER.

7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN

GREEN AREAS.

8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON

GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES

BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

10. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'SREQUIREMENTS.

11. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

12. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR

MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR

TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

BLOCKWORK MANHOLE (< 450mm DIA.)

209

SEPT. 2015

600

1000

150 TO 600

GREATER THAN 600 TO 750

PIPE DIAMETER

(mm)

ROCKER PIPE LENGTH

ROCKER PIPE

LENGTH (mm)

1250GREATER THAN 750

IW-CDS-5030-01 Rev. 03 December 2017

Min

.

325

PIPE JOINT WITH CHANNEL TO BE

LOCATED MINIMUM 100mm INSIDE

FACE OF MANHOLE

MINIMUM WIDTH OF BENCHING FOR

LANDING AREA TO BE 500mm

150mm GRADE C16/20 IN-SITU

CONCRETE SURROUND

REFER TO TABLE FOR

PC RING DIAMETER

FLEXIBLE JOINTFLEXIBLE JOINT

ROCKER PIPE

(SEE TABLE BELOW)

A

A

22

5

CONSTRUCTION JOINT

BOTTOM PRECAST SECTION

TO BE BUILT INTO BASE

CONCRETE MINIMUM 75 mm

150mm GRADE C16/20

IN-SITU CONCRETE

SURROUND

1: 3 CEMENT:SAND MORTAR WITH

STEEL TROWEL FINISH AT A 1:30

SLOPE TOWARDS THE CHANNEL

PRECAST CONCRETE

MANHOLE RINGS TO

IS 420 IN CONJUNCTION

WITH IS EN 1917 : 2004

MIN

. 5

0

MA

X. 3

00

DISTANCE BETWEEN TOP

OF PIPE & UNDERSIDE OF

PRECAST SECTION TO BE

MIN. 50mm TO MAX. 300mm

TO BARREL OF PIPE

75mm GRADE C12/15

BLINDING CONCRETE

INVERT SHOULD BE

FORMED WITH CAST

IN-SITU CONCRETE

C25/30 20mm AGGREGATE

FINISHED WITH A 1:3

CEMENT SAND MORTAR

REFER TO TABLE FOR

PRE-CAST RING DIAMETER

SELF CLEANING TOE HOLES TO BE

PROVIDED WHERE CHANNEL

EXCEEDS 600mm WIDE

ELASTOMETRIC JOINT SEAL

TO EN 681

1 No. COURSE MIN.

3 No. COURSES MAX

OF CLASS B

ENGINEERING BRICKS

SET IN C50/60 MORTAR

Max. 600 Max. 600

Flow

REINFORCED CONCRETE

BASE GRADE C30/37

STAINLESS STEEL CHAIN IN "DOWN"

POSITION SECURED TO RESTRAINING

HOOK, WHEN CHAMBER IS OCCUPIED

WHERE THE PIPE DIAMETER IS 450mm

OR MORE

MANHOLE COVER AND FRAME SHALL

COMPLY TO IS EN 124 AND BS 7903 (ALL

CLASS D400 COVERS SHALL HAVE MIN.

FRAME DEPTH 100-150mm) MIN. OPE.

600x600mm

SECTION A-A

PLAN

ROCKER PIPE

(SEE TABLE BELOW)

COVER TO BE SET

IN C50\60 MORTAR

FIRST RING SUNK INTO

IN-SITU CONCRETE BASE

Flow

22

5

MIN. 600

675mm MAX. TO FIRST STEP

MANHOLE STEPS TO COMPLY WITH IS

EN 13101, TYPE D, CLASS 1,

GALVANISED MILD STEEL & PLASTIC

ENCAPSULATED. STEPS ARE REQUIRED

IN MANHOLES UP TO A GROUND TO PIPE

SOFFIT DEPTH OF LESS THAN 3.0m.

MANHOLE LADDERS ARE REQUIRED

FOR MANHOLES WITH A DEPTH IN

EXCESS OF 3.0m & ARE TO COMPLY

WITH IS EN 14396.

300 c/c's

FINISHED GROUND LEVEL

SEE NOTES 12, 13 & 14.

22

5

MIN. 600

675mm MAX. TO

FIRST LADDER

RUNG

FGL

MANHOLE DETAIL > 3m & < 6m

GROUND TO SOFFIT DEPTH

900mm MIN. CLEAR

ACCESS BEHIND

LADDER

1200mm SHAFT Ø

20

00

M

IN

.

PCC REDUCING SLAB

(NOTE: ON MANHOLES <1.5mØ, REDUCING SLAB NOT TO

BE USED & PCC RINGS TO CONTINUE UP TO COVER SLAB)

COVER SLAB

LADDERS IN

MANHOLES TO

COMPLY WITH

IS EN 14396

120

150 TO C OF

STRINGER

L

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added steps & revised JMC TOC access ope & cover notes MOD

2 11/'17Added rocker pipe table,

JMC deep manhole detail, added & updated notes

TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF

IS EN 1917 AND BS 5911-PART 3.

3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF

3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM

SIZE.

4. APPROVED PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING

CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND

COMPLYING WITH BS 5911-PART 4 2002.

5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED

BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

6. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED

STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.

7. MANHOLE ROOFS SHALL CONSIST OF A RE-INFORCED CONCRETE SLAB

OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm

DESIGNED TO CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY,

APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT

TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.

8. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

9. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN

GREEN AREAS.

10. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED

ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION

MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW

BY IRISH WATER.

11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.

13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR

MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT,

OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

15. IF DEPTH FROM GROUND TO PIPE SOFFIT IS GREATER THAN 6m DEEP, A SITE SPECIFIC

ENGINEERED SOLUTION FOR ACCESS SHALL BE PROVIDED.

16. PROPRIETARY WATERTIGHT PCC MANHOLE RING SYSTEMS WITH A WALL THICKNESS >

125mm, & A WATER TIGHT JOINT SEALING SYSTEM, MAY BE USED WITHOUT CONCRETE

SURROUND, SUBJECT TO THE GROUND WATER LEVEL AT THE MANHOLE BEING LOW, &

SUBJECT TO REVIEW BY IRISH WATER.

1200

1350

LESS THAN 375

375 TO 450

DIAMETER OF LARGEST PIPE IN

MANHOLE (mm)

MINIMUM MANHOLE DIAMETERS

INTERNAL DIAMETER OF

MANHOLE (mm)

1500500 TO 750

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

PRE-CAST CONCRETE MANHOLE

210

SEPT. 2015

600

1000

150 TO 600

GREATER THAN 600 TO 750

PIPE DIAMETER (mm)

ROCKER PIPE LENGTH

ROCKER PIPE LENGTH (mm)

1250GREATER THAN 750

IW-CDS-5030-01 Rev. 03 December 2017

22

5

D

32

5

225

D

22

5

225

22

5

50

22

5

A

A

MIN. 600

MIN

. 6

00

1: 3 CEMENT:SAND MORTAR WITH

STEEL TROWEL FINISH AT A SLOPE

OF 1:30 TOWARDS THE CHANNEL

25x25mm

CHAMFER

INVERT SHOULD BE FORMED

WITH CAST IN-SITU CONCRETE

C25/30 20mm AGGREGATE

FINISHED WITH A 1:3 CEMENT

SAND MORTAR

75mm GRADE C12/15

BLINDING CONCRETE

1 No. COURSE MIN.

3 No. COURSES MAX OF CLASS B

ENGINEERING BRICKS SET IN

C50/60 MORTAR

MIN. 600mm x

600mm

SQUARE OPE

SECTION A-A

PLAN

ROOF PLAN

MANHOLE COVER AND FRAME SHALL COMPLY TO IS EN

124 AND BS 7903 (ALL CLASS D400 COVERS SHALL

HAVE MIN. FRAME DEPTH 100-150mm) MIN. OPE.

600x600mm

STAINLESS STEEL CHAIN IN

"DOWN" POSITION SECURED

TO RESTRAINING HOOK,

WHEN CHAMBER IS OCCUPIED

WHERE THE PIPE DIAMETER IS

450mm OR MORE

COVER TO BE SET

IN C50\60 MORTAR

Flow Flow

MIN. 600

CONCRETE GRADE

C30/37 IN ROOF,

WALLS AND BASE

675mm MAX.

TO FIRST STEP

120

300 c/c's

MANHOLE STEPS TO COMPLY WITH IS

EN 13101, TYPE D, CLASS 1, GALVANISED

MILD STEEL & PLASTIC ENCAPSULATED.

STEPS ARE REQUIRED IN MANHOLES

WITH A GROUND TO PIPE SOFFIT DEPTH

OF LESS THAN 3m. MANHOLE LADDERS

ARE REQUIRED FOR MANHOLES WITH A

DEPTH IN EXCESS OF 3.0m & ARE TO

COMPLY WITH IS EN 14396.

ROCKER PIPE

(SEE TABLE BELOW)

ROCKER PIPE

(SEE TABLE BELOW)

FINISHED GROUND LEVEL

SEE NOTES 9, 10 & 11.

Max. 600

Max. 600

675mm MAX. TO

FIRST LADDER

RUNG

FGL

MANHOLE DETAIL > 3m & < 6m

GROUND TO PIPE SOFFIT DEPTH

1200mm SHAFT

230

REDUCING SLAB

(NOTE: ON MANHOLES <1.5m SHAFT DIMENSION, REDUCING

SLAB NOT TO BE USED & SHAFT TO CONTINUE UP TO COVER

SLAB)

COVER SLAB

22

5

MIN. 600

900mm MIN. CLEAR

ACCESS BEHIND

LADDER

20

00

M

IN

.

LADDERS IN

MANHOLES TO

COMPLY WITH

IS EN 14396

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added steps & revised JMC TOC access ope & cover notes MOD

2 11/'17Added rocker pipe table,

JMC deep manhole detail,added & updated notes.

TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. IN-SITU MANHOLES TO HAVE A MINIMUM WALL AND FLOOR THICKNESS OF

225mm FOR MANHOLE DEPTHS UP TO 3.0m AND 300mm OR MORE WHEN THE

MANHOLE DEPTH EXCEEDS 3.0m.

3. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDED BY THE

DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. MANHOLE

ROOFS SHALL CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU

CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm DESIGNED TO

CARRY ALL LIVE AND DEAD LOADS. ALTERNATIVELY, APPROVED PRE-CAST

CONCRETE ROOF SLABS MAY BE USED SUBJECT TO IRISH WATER

APPROVAL AND COMPLIANCE WITH BS 5911 PART 4: 2002.

4. MANHOLES GREATER THAN 3m IN DEPTH WILL REQUIRE A DETAILED

STRUCTURAL DESIGN AND BE SUBJECT TO IRISH WATER REVIEW.

5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN

GREEN AREAS.

7. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON

GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI-FLOATATION

MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH

WATER.

8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

9. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.

10. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

11. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR

MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR

TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

12. IF DEPTH FROM GROUND TO PIPE SOFFIT EXCEEDS 6m, A SITE SPECIFIC ENGINEERED

SOLUTION FOR ACCESS SHALL BE PROVIDED.

1200

1350

LESS THAN 375

375 TO 450

DIAMETER OF LARGEST PIPE IN

MANHOLE (mm)

MINIMUM MANHOLE DIMENSION ''D''

INTERNAL DIMENSION OF

MANHOLE (mm)

1500500 TO 750

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

IN-SITU CONCRETE MANHOLE

211

SEPT. 2015

600

1000

150 TO 600

GREATER THAN 600 TO 750

PIPE DIAMETER

(mm)

ROCKER PIPE LENGTH

ROCKER PIPE

LENGTH (mm)

1250GREATER THAN 750

IW-CDS-5030-01 Rev. 03 December 2017

45° BEND

150mm GRADE C25\30CONCRETE SURROUND

90° BEND

150mm - 450mm DIA. (INCL.) DROP GREATER THAN 900 AND LESS THAN 1700mm500mm - 900mm DIA. (INCL.) DROP GREATER THAN 1300mm AND LESS THAN 2300mm

STOPPER

150mm - 450mm DIA. (INCL.) DROP GREATER THAN 1700mm500mm - 900mm DIA. (INCL.) DROP GREATER THAN 2300mm

150mm - 450mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 900m500mm - 900mm DIA. (INCL.) DROP GREATER THAN 600mm AND LESS THAN 1300mm

TYPE No. 1

TYPE No. 2

TYPE No. 3

STOPPER

STOPPER

90° BEND

45° BEND

150mm GRADE C25\30CONCRETE SURROUND

150mm GRADE C25\30CONCRETE SURROUND

150

150

Y - JUNCTION

Y - JUNCTION

TEE JUNCTION

CHAIN

CHAIN

CHAIN

225mm GRADE C25\30CONCRETE SURROUND

225mm GRADE C25\30CONCRETE SURROUND

225mm GRADE C25\30CONCRETE SURROUND

HEAVY DUTY COVER AND FRAMED400 (TO SUIT 150mm OPE.)

150mm DIA. PVC PIPE

150mm CONCRETESURROUND

HEAVY DUTY COVER AND FRAMED400 (TO SUIT 150mm OPE.)

150mm DIA. PVC PIPE

150mm CONCRETESURROUND

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added stepsJMC TOC MOD2 11/'17 Updated notesJMC TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. RODDING EYE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY

DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL

BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO

REVIEW BY IRISH WATER.

3. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED

ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION

MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH

WATER.

4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

5. MANHOLE DETAILS TO BE IN ACCORDANCE WITH STD-WW-09, 10 AND 11

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

BACKDROP MANHOLES

212

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

600mm

600

PRECAST UNITS(REFER TO NOTE 7.)

100

600

100

SECTION

FLOOR PLAN

INSPECTION CHAMBER

(PRECAST CONCRETE CONSTRUCTION)

600mm

225mm PRECAST BASE OR225mm IN-SITU CONCRETE C25/30

PIPES BUILT INTO CHAMBERWALL ORJOINT FORMED WITHWATERTIGHT SEALS

REFER TO DRAWINGSTD-WW-07 FORBACKFILL ANDBEDDING DETAILS

600

MINIMUM INTERNALDIMENSIONS 600mmDIAMETER OR 600mm x 600mm

COVER TO BE SET AS PERMANUFACTURER'SSPECIFICATION

SEALED MANHOLE COVERTO SUIT IS EN 124 LOADINGMINIMUM 600mm x 600mmCLEAR OPENING

215 600 215

215

600

215

SECTION

FLOOR PLAN

INSPECTION CHAMBER

(BLOCK WORK CONSTRUCTION)

215 THICK 20 N/mm² CONCRETE BLOCK WORKIN ACCORDANCE WITH IS EN 771-3

600

215 THICK 20 N/mm²CONCRETE BLOCK WORKIN ACCORDANCE WITHIS EN 771-3

FLOW FLOW

FLOWFLOW

FLOWFLOW

FLOW FLOW

PRECAST UNITS(REFER TO NOTE 7.)

MINIMUMINTERNAL DIMENSIONS600mm DIAMETEROR 600mm x 600mm

PIPES BUILT INTO CHAMBERWALL OR JOINT FORMEDWITH WATERTIGHT SEALS

SEALED MANHOLE COVERTO SUIT IS EN 124 LOADINGMINIMUM 600mm x 600mmCLEAR OPENING

COVER TO BE SET AS PERMANUFACTURER'SSPECIFICATION

225mm PRECAST BASE OR225mm IN-SITU CONCRETE C25/30

REFER TO DRAWINGSTD-WW-07 FORBACKFILL ANDBEDDING DETAILS

1 No. COURSE MIN.3 No. COURSES MAXOF CLASS B ENGINEERING BRICKS

1 No. COURSE MIN.3 No. COURSES MAXOF CLASS B ENGINEERING BRICKS

100

BENCHING

BENCHING

50mm CROSS FALL

50mm CROSSFALL

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added Cl. 808 to note 8JMC TOC MOD2 11/'17 Updated notesJMC TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. AN INSPECTION CHAMBER SHOULD BE LOCATED AT OR WITHIN 1m OF

THE PROPERTY BOUNDARY AT THE UPSTREAM END OF EACH SERVICE

CONNECTION ON THE PRIVATE SIDE OF THE CURTILAGE, IF

PRACTICABLE, CONSULT WITH IRISH WATER ON ALTERNATIVE

LOCATIONS.

3. ANY PIPE AND ASSOCIATED ACCESS UPSTREAM OF THE POINT OF

CONNECTION TO A PUBLIC SEWER IS A PRIVATE DRAIN AND SHOULD BE

CONSTRUCTED IN ACCORDANCE WITH THE BUILDING REGULATIONS.

4. ACCESS POINTS SHOULD BE LOCATED SO THAT THEY ARE ACCESSIBLE

AND APPARENT TO THE MAINTAINER AT ALL TIMES FOR USE. THEY

SHOULD AVOID REAR GARDENS OR ENCLOSED LOCATIONS AND THEY

SHOULD NEVER BE OVERLAIN WITH SURFACE DRESSING, TOPSOIL, ETC.

5. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS

IN GREEN AREAS.

7. PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,

SUBJECT TO REVIEW BY IRISH WATER.

8. CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm

COMPACTED CLAUSE 804 OR CLAUSE 808 MATERIAL AS PER STD-WW-07.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

PRIVATE SIDE INSPECTION CHAMBER

213

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

No.

Date

Desc

riptio

n0

09/'1

5Ini

tial Is

sue

App

SLDr

nCh

kJM

CTO

C

111

/'17

JMC

MOD

TOC

Anti-t

orque

supp

ort no

te & t

hrust

flange

adde

d & no

te 6 u

pdate

d

DIM

EN

SIO

NS

60

0

50

0

50

10

*

40

90

26

00

35

0

40

0

45

0

29

80

34

00

30

0

25

0

20

90

17

30

27

10

*

22

10

13

80

11

30

70

0

57

0

10

00

10

00

14

10

72

0

16

10

18

40

82

0

94

0

11

30

94

0

58

0

48

0

50

03

60

42

0

47

0

75

0

90

0

30

0

24

0

38

0

32

0

NO

M.

(m

m)

DIA

.

70

01

00

20

0

15

0

14

00

11

35

A

38

01

90

75

0

62

0

38

0

32

0

BC

20

01

00

19

0

16

0

30

0

22

5

DE

19

00

17

50

16

00

15

00

13

50

12

00

10

50

35

50

*

28

90

15

00

14

00

23

50

22

00

23

30

21

10

18

40

14

80

12

10

10

50

13

00

12

00

95

0

80

0

17

00

20

00

18

50

15

00

13

50

15

00

13

50

10

50

12

50

11

50

95

0

85

0

95

0

75

0

60

0

J

98

0

76

0

51

03

50

65

0

45

0

FG

75

0

11

50

95

0

H

40

0

70

0

60

0

K

12

B

AR

T

O 1

5 B

AR

T

ES

T P

RE

SS

UR

E

H, J or K

C

E

E

A/2

E

H, J, or K

50 MIN.

E

50 MIN.

150

E

A/2

50 MIN.

E

50 MIN.

50 M

IN

.

300300

E

50 M

IN

.

300

50 MIN.

B/2

B/2

G/2 G/2

C/2

C/2

D/2

D/2

F/2 F/2

E

(A

or B

)/2

(A

or B

)/2

1

0

0

0

N

T

S

1000

NTS

G/2 G/2

F/2 F/2

F/2 F/2

E

G/2 G/2

E

3

0

0

300

H, J, or K

NO

TE

:

H F

OR

45 D

EG

RE

E B

EN

D J

FO

R 22.5 D

EG

RE

E B

EN

D K

FO

R 11.25 D

EG

RE

E B

EN

D

F/2 F/2

ST

EE

L

AN

CH

OR

ST

RA

PS

22

00

19

50

16

30

14

00

11

50

85

0

75

0

60

0

51

0

33

0

60

0

50

0

41

00

35

90

45

0

40

0

35

0

30

0

25

0

21

00

30

00

25

50

15

80

13

50

NO

M.

20

0

15

0

10

0

(m

m)

DIA

.

60

0

11

50

95

0

A

99

0

11

20

57

0

50

0

85

0

80

0

57

0

83

0

70

0

45

0

38

0

29

04

50

35

0

42

0

50

0

68

0

22

0

20

0

32

0

30

0

14

00

12

00

28

80

25

40

21

00

19

50

17

00

16

00

14

50

10

00

10

50

11

00

18

00

21

30

95

0

80

0

11

10

97

0

15

50

12

00

17

00

18

00

12

50

14

50

13

00

12

00

11

00

10

00

13

00

12

50

90

0

11

50

10

00

85

0

75

0

< 1

2 B

AR

T

ES

T P

RE

SS

UR

E

DIM

EN

SIO

NS

16

0

31

0

26

0

BC

80

20

0

16

0

13

0

30

0

22

5

DE

39

03

50

65

0

45

0

79

0

66

0

FG

70

06

00

10

50

90

0

90

0

75

0

HJ

40

0

70

0

60

0

K

63

70

*

43

40

*

38

10

35

10

29

30

23

00

19

60

60

0

50

0

35

0

40

0

45

0

30

0

25

0

10

00

10

00

10

00

10

00

75

0

50

0

35

0

17

60

12

10

34

50

*

23

80

89

0

61

0

11

60

97

0

83

0

64

0

54

0

15

80

22

70

19

00

12

00

10

60

41

0

58

0

19

0*

32

0

27

0

45

00

*

37

00

15

00

14

00

24

00

22

50

29

70

24

90

20

70

16

30

13

70

12

00

13

50

13

00

11

00

90

0

18

50

21

50

20

00

16

50

14

50

16

50

12

50

NO

M.

75

01

00

20

0

15

0

(m

m)

DIA

.

A

32

0

25

0

22

0

E

DIM

EN

SIO

NS

45

0

35

0

20

54

00

89

0

70

0

BC

10

0

23

0

18

0

D

11

70

89

0

53

04

00

70

0

50

0

F

80

0

12

50

10

00

GH

20

50

17

50

16

50

14

00

11

50

15

00

16

00

17

00

12

50

13

50

13

00

11

50

10

50

90

0

40

06

50

10

00

85

0

80

0

65

0

JK

15

B

AR

T

O 1

8 B

AR

T

ES

T P

RE

SS

UR

E

DN

DN

x 2

100

200

DN

/ 2

200

100

DN

/ 2

CR

OS

S - S

EC

TIO

N

LO

NG

IT

UD

IN

AL

S

EC

TIO

N

RIS

IN

G

MA

IN

PIP

E S

UP

PO

RT

D

ET

AILS

F

OR

IN

CLIN

ED

S

LO

PE

S, F

OR

P

IP

E

GR

AD

IE

NT

>

10° T

O H

OR

IZ

ON

TA

L.

SU

PP

OR

TS

P

LA

CE

D A

T M

AX

. 5

ME

TE

R IN

TE

RV

ALS

C

EN

TR

E T

O

CE

NT

RE

A

LO

NG

P

IP

E W

HE

RE

P

IP

E

IS

O

N S

LO

PE

. M

IN

. 1 S

UP

PO

RT

RE

QU

IR

ED

F

OR

P

IP

E

LE

NG

TH

>

3 M

ET

ER

S IN

S

LO

PE

.

45

D

EG

RE

E B

EN

D

90

D

EG

RE

E B

EN

D

22

.5

D

EG

RE

E B

EN

D1

1.2

5 D

EG

RE

E B

EN

D

EL

EV

AT

IO

N

EL

EV

AT

IO

N

PL

AN

CO

NC

AV

E B

EN

D

PL

AN

CO

NV

EX

B

EN

D

TE

E

SE

CT

IO

NA

L E

LE

VA

TIO

N F

OR

B

EN

D O

R T

EE

EL

EV

AT

IO

N

PL

AN

EL

EV

AT

IO

N

PL

AN

DE

AD

E

ND

PIP

E S

UP

PO

RT

D

ET

AILS

F

OR

IN

CLIN

ED

S

LO

PE

S

BE

ND

W

IT

H E

XT

EN

SIO

N P

IE

CE

S

TE

E W

IT

H E

XT

EN

SIO

N P

IE

CE

S

TA

PE

R

HO

RIZ

ON

TA

L B

EN

DS

VE

RT

IC

AL B

EN

DS

DE

AD

E

ND

G/2

300

300

SE

CT

IO

N

500

G/2

TR

EN

CH

BO

TT

OM

PL

AN

TH

RU

ST

B

LO

CK

F

OR

S

LU

IC

E V

ALV

E / G

AT

E V

ALV

E

FO

R V

ALV

E B

OX

A

RR

AN

GE

ME

NT

TH

RU

ST

FLA

NG

E

500

300

SU

RF

AC

E B

OX

RO

AD

S

UR

FA

CE

VARIES

ST

AIN

LE

SS

ST

EE

L S

TR

AP

S

25x25m

m C

HA

MF

ER

GR

AD

E C

25 / 30

MA

SS

C

ON

CR

ET

E

SU

PP

OR

T B

LO

CK

DO

WE

L B

AR

S

FLE

XIB

LE

C

OM

PR

ES

SIB

LE

FILLE

R M

AT

ER

IA

L

ST

AIN

LE

SS

S

TE

EL

AN

CH

OR

B

OLT

S

G/2

300

300

SE

CT

IO

N

G/2

TR

EN

CH

BO

TT

OM

PL

AN

CO

LLA

R

500

300

RO

AD

S

UR

FA

CE

VARIES

DI

PE

DI

PE

TH

RU

ST

B

LO

CK

F

OR

D

UC

TILE

IR

ON

T

O P

OLY

ET

HY

LE

NE

C

HA

NG

E O

VE

R

CO

NC

RE

TE

PLIN

TH

PIP

E P

LIN

TH

S

UP

PO

RT

(A

BO

VE

G

RO

UN

D)

PIPETRENCH

PIPETRENCH

RE

IN

FO

RC

EM

EN

T

TO

D

EV

ELO

PE

R'S

DE

TA

ILS

VARIES (MIN. 300 + O.D.)

2

TIT

LE

NOT

TO

SCAL

E

ST

D-W

W-

DR

AW

IN

G N

o.

SC

ALE

RE

V

DA

TE

RE

FE

R T

O IN

DE

X S

HE

ET

F

OR

N

OT

ES

R

EG

AR

DIN

G D

ES

IG

N R

ES

PO

NS

IB

ILIT

Y &

R

IS

K A

SS

ES

SM

EN

T

ST

AN

DA

RD

DE

TA

ILS

- W

AS

TE

WA

TE

R

14

1

SE

PT

. 2015

TH

RU

ST

B

LO

CK

S

FO

R R

IS

IN

G M

AIN

S

AN

TI-T

OR

QU

E

SU

PP

OR

T

DN x 2.5

DN

x 2.5

VARIES

100

200

100

VA

RIE

S

VA

RIE

S

2

0

0

W

A

T

E

R

M

A

I

N

GR

OU

ND

SU

RF

AC

E

PR

OF

ILE

TH

RU

ST

FLA

NG

E

1.AL

L DIM

ENSI

ONS

IN M

ILLIM

ETRE

S (m

m) U

NLES

S NO

TED

OTHE

RWIS

E.2.

CONC

RETE

THR

UST

BLOC

KS (A

NCHO

RAGE

) SHA

LL B

E PO

SITI

ONED

SYMM

ETRI

CALL

Y W

ITH

RESP

ECT

TO T

HE C

ONNE

CTIN

G PI

PE &

BEN

DS.

3.TR

ENCH

DIM

ENSI

ONS

: REF

ER T

O DR

AWIN

G No

's. S

TD-W

W-0

7.4.

THRU

ST B

LOCK

S SH

ALL B

EAR

ON U

NDIS

TURB

ED S

OIL.

IF F

OR A

NY R

EASO

N TH

EY C

ANNO

T TH

EN T

HE D

EVEL

OPER

SHA

LLNO

TIFY

IRIS

H W

ATER

IMME

DIAT

ELY

WIT

H A

PROP

OSED

SOL

UTIO

N.5.

THRU

ST B

LOCK

REI

NFOR

CEME

NT R

EQUI

RES

SPEC

IFIC

DES

IGN.

6.FO

R TE

ST P

RESS

URES

GRE

ATER

THA

N 18

BAR

, THR

UST

BLOC

KDE

SIGN

IS T

O BE

SUB

MITT

ED T

O IR

ISH

WAT

ER F

OR R

EVIE

W.

7.TH

RUST

BLO

CKS

ARE

DESI

GNED

FOR

FOR

AN

AVER

AGE

BEAR

ING

PRES

SURE

OF

100 K

N/m

(TYP

ICAL

FOR

SOF

T CL

AY) F

OR O

THER

COND

ITIO

NS. A

CTUA

L DIM

ENSI

ONS

MAY

BE A

LTER

ED O

N IN

STRU

CTIO

NSFR

OM IR

ISH

WAT

ER.

8.CO

NCRE

TE IN

THR

UST

BLOC

KS S

HALL

BE

GRAD

E C2

0/25 I

N AC

CORD

ANCE

WIT

H IS

EN

206.

9.CO

MPRE

SSIB

LE F

ILLER

FOR

CON

CRET

E PR

OTEC

TION

TO

BE IN

ACCO

RDAN

CE W

ITH

BS E

N 62

2-1 A

ND B

S EN

622-

4. BI

TUMI

NOUS

MATE

RIAL

SHA

LL N

OT B

E PU

T IN

CON

TACT

WIT

H PL

ASTI

C PI

PES.

THE

THIC

KNES

S OF

COM

PRES

SIBL

E FI

LLER

FOR

MAI

NS <

450m

m IN

DIAM

ETER

IS T

O BE

18mm

.10

.CON

CRET

E TH

RUST

BLO

CKS

FOR

POLY

ETHY

LENE

PIP

E TO

COM

PLY

WIT

H TH

E MA

NUFA

CTUR

ER'S

REQ

UIRE

MENT

S.

TA

BL

E O

F D

IM

EN

SIO

NS

F

OR

S

TE

EP

LY

IN

CL

IN

ED

P

IP

EL

IN

ES

GR

AD

IE

NT

SP

AC

IN

G

1 IN

2 & S

TEEP

ER

BELO

W 1

IN 2

TO 1

IN 4

1 IN

4 TO

1 IN

5

1 IN

5 TO

1 IN

6

5.5m

11.0m

16.6m

22.0m

IW-CDS-5030-01 Rev. 03 December 2017

D.I. SLUICE VALVE

200

SECTION A-A

300

PLAN (DUCTILE IRON RISING MAIN)

D.I. SLUICE VALVE

150

FLEXIBLE JOINT

BLIND SCOUR CHAMBER TOTO BE EMPTIED BY VACUUMTANKER

D.I. RISING MAIN

75mm CONCRETE GRADEC12/15 BLINDING

500

DEPT

H TO

SUI

T

PRECAST CONCRETEROOF SLAB

300

200

300400300200

200

1350 DIA.

400 x 400 x 200mmDEEP SUMP

300

SECTION B-B

SCOUR CHAMBER ROOF PLAN

MIN. 600

A

FLEXIBLE JOINT

D.I. RISING MAIN

ALL FLANGEDLEVEL INVERT TEE

A

B B

ALL FLANGEDLEVEL INVERT TEE

ALL FLANGED LEVEL INVERT TEE

PLAN (POLYETHYLENE RISING MAIN)

FUSION WELD

STUB FLANGEWITH BACKING RING

FUSION WELD

STUB FLANGEWITH BACKING RING

P.E. RISING MAIN P.E. RISING MAIN

REINFORCED CONCRETEBASE SLAB C30 / 37

D.I. PIPE(TO SCOUR CHAMBER)

225

COVERS TO BE SETIN C50\60 MORTAR

D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE( LENGTH CUT TO SUIT)

LONG BODYFLEXIBLE JOINT

HEAVY DUTY COVER AND FRAME,TO COMPLY TO ISEN 124 & BS 7903, STAMPED '' ScV '', CLASS D400 (TOSUIT MIN. 600mm SQ. OPE). ALL CLASS D400 COVERSSHALL HAVE MINIMUM FRAME DEPTH 100-150mm.

DISMANTLING JOINT DISMANTLING JOINT

D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17

D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17 DISMANTLING JOINTDISMANTLING JOINT

300

PRECAST CONSTRUCTIONAS PER STD-WW-10

LONG BODYFLANGE ADAPTER

D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE( LENGTH CUT TO SUIT)

400 x 400 x 200mmDEEP SUMP

REINFORCED CONCRETEBASE SLAB C30/ 37

LONG BODYFLEXIBLE JOINT

D.I. SLUICE VALVESEE DRAWINGSTD-WW-16/17

D.I. SLUICE VALVE SEE DRAWINGSTD-WW-16/17

LONG BODY FLANGE ADAPTER

VALVE SPINDLE COVER

LONG BODYFLANGE ADAPTER

1 No. COURSE MIN.3 No. COURSES MAXOF CLASS BENGINEERING BRICKSSET IN C50/60 MORTAR

PRECAST CONSTRUCTIONAS PER STD-WW-10

HEAVY DUTY COVER AND FRAME,TO COMPLY TO IS EN 124 & BS 7903,STAMPED '' ScV '', CLASS D400 (TO SUIT MIN. 600mm SQ. OPE)ALL CLASS D400 COVERS SHALL HAVE MINIMUM FRAME DEPTH 100-150mm.

D.I. PLAIN ENDED PIPE( LENGTH CUT TO SUIT)

D.I. PLAIN ENDED PIPE( LENGTH CUT TO SUIT)

FLANGED PLAIN ENDEDDI PIPE (LENGTH 500mm)

FLANGED PLAIN ENDEDDI PIPE (LENGTH 500mm)

MANHOLE STEPS TO COMPLY WITHIS EN 13101, TYPE D, CLASS 1,GALVANISED MILD STEEL &PLASTIC ENCAPSULATED.

FINISHED GROUND LEVEL

SEE NOTES 12, 13 & 14.

HEAVY DUTYCOVER & FRAME

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16Added steps, revised note

JMC TOC 2, dims, cover & ope notes. MOD

2 11/'17 Revised & added notesJMC TOC MOD

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. VALVE SURFACE BOX TO BE IN ACCORDANCE WITH IS 261 OR BS 5834. SCOUR CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS EN

124 RATING D400. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE

REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKING.4. SCOUR CHAMBER TO BE IN ACCORDANCE WITH BS EN 1992-3.5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW. ROOF SLABS SHALL BE

DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUMTHICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911 Part 4.

6. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES ATSTEEP SLOPES.

7. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.8. ANTI CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.10. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION MEASURES BE

REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.12. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.13. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

14. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT,

TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

FOUL RISING MAIN (< 200mm DIA.)

215

SEPT. 2015

SCOUR VALVE CHAMBER

80 80

DIAMETER OF

RISING MAIN (mm)

DIAMETER OF

SCOUR (mm)

100 to 200 100

IW-CDS-5030-01 Rev. 03 December 2017

10

01

00

100 100

28

0

FLANGED SLUICE VALVE

EXTENSION SPINDLE

FLOOR PLAN

ROOF PLAN

445

50

50

50 50

FINISHED GROUND LEVEL

REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS

15

0

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB

445

10

0

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB CONCRETE ROOF SLAB

C30 / 37 REINFORCED SLAB

ROOF PLAN

SLUICE VALVE CHAMBER

(PRECAST CONCRETE CONSTRUCTION)

28

0

445

DUCTILE IRON(D.I.) PIPE

60

0

600

15

0

M

IN

.

PRECAST CONCRETE UNITS(REFER TO NOTE 5.)

DISMANTLING JOINT

PRECASTCONCRETE UNITS(REFER TO NOTE 5.)

HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)

HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)

15

0

28

0

445 200200

20

02

00

PLINTH DETAIL

IN GRASS AREAS

1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR

SECTION

LO

CA

LL

Y

FLANGED / PLAIN ENDEDPIPE CUT TO SUIT

LONG BODY

FLEXIBLE

COUPLING

FLANGED / PLAIN ENDEDPIPE CUT TO SUIT

EXTENSION SPINDLEREFER TO STD- W- 13FOR BEDDING& BACKFILLINGDETAILS

DUCTILE IRON(D.I.) PIPE

15

0

215mm THICK 20N/mm²CONCRETE BLOCKWORKIN ACCORDANCE WITHIS EN 771-3

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB

30

0

M

AX

.

445

10

0

COVER TO BE SETIN C50\60 MORTAR

SECTION

15

0

FINISHED GROUND LEVEL

FLANGEDSLUICE VALVE

15

0

M

IN

.

DISMANTLING JOINT

LO

CA

LL

Y

LONG BODY

FLEXIBLE

COUPLING

LONG BODY

FLEXIBLE

COUPLING

FLANGED / PLAIN ENDEDPIPE CUT TO SUIT

FLANGED / PLAIN ENDEDPIPE CUT TO SUIT

C25\30 PRECASTCONCRETE BEARINGSLAB

CONCRETE ANTI-TORQUE SUPPORT

THRUSTFLANGE

215 21550 50

FLOOR PLAN

SLUICE VALVE CHAMBER

(BLOCKWORK CONSTRUCTION)

600

215mm THICK 20N/mm²CONCRETE BLOCKWORKIN ACCORDANCE WITHIS EN 771-3

21

52

15

50

50

60

0

THRUSTFLANGE

C25\30 PRECASTCONCRETE BEARINGSLAB

CONCRETE ANTI-TORQUESUPPORT

BULL NOSEFINISH

SEE NOTES 15, 16& 17.

FO

R M

IN

. D

EP

TH

O

F C

OV

ER

RE

FE

R T

O N

OT

E 2 O

N S

TD

-W

W-07

COVER TO BE SETIN C50\60 MORTAR

30

0

M

AX

.

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 04/'16 Flexible couplings shownJMC TOC MOD2 08/'16 Revised note 6 (Cl. 808)JMC TOC MOD3 11/'17 Revised & Added NotesJMC TOC MOD

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

DUCTILE IRON (D.I.) PIPE (< 200mm DIA.)

316

SEPT. 2015

(Sheet 1 of 2)

SLUICE VALVE DETAILS FOR RISING MAINS

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY WITH THE REQUIREMENTS OF IS EN

1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED CHAMBER UNITS MAY ALSO BE USED,

SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE,GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.

6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE

SUBJECT TO REVIEW BY IRISH WATER.14. ALL THRUST FLANGES TO BE ADEQUATELY RESTRAINED BY THRUST BLOCKS AS PER DRAWING No. STD-WW-14. THRUST BLOCKS NOT SHOWN FOR CLARITY.15. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.16. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

17. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR

TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

IW-CDS-5030-01 Rev. 03 December 2017

100

100

100 100

280

SECTION

FLANGED SLUICE VALVE

EXTENSION SPINDLE

FLOOR PLAN

ROOF PLAN

445

50

50

50 50

FINISHED GROUND LEVEL

REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS

150CONCRETE ROOF SLAB

C30 / 37 REINFORCED SLAB

300

M

AX

.

445

100

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB

215

215

215 215

FLANGEDSLUICE VALVE

EXTENSION SPINDLE

50

50

50 50

FINISHED GROUND LEVEL

REFER TO STD-WW-07FOR BEDDING ANDBACKFILLING DETAILS

150

215mm THICK 20 N/mm² CONCRETEBLOCKWORK IN ACCORDANCEWITH IS EN 771-3

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB

445

100

CONCRETE ROOF SLABC30 / 37 REINFORCED SLAB

215mm THICK 20 N/mm² CONCRETEBLOCKWORK IN ACCORDANCEWITH IS EN 771-3

FLOOR PLAN

ROOF PLAN

SLUICE VALVE CHAMBER

(PRECAST CONCRETE CONSTRUCTION)

SLUICE VALVE CHAMBER

(BLOCKWORK CONSTRUCTION)

280

445

SECTION

POLYETHYLENE(P.E.) PIPE

FUSION WELD

STUB FLANGEWITH BACKING RING

POLYETHYLENE(P.E.) PIPE

FUSION WELDSTUB FLANGEWITH BACKING RING

600

600

COVERS TO BE SETIN C50\60 MORTAR

600

600

150

M

IN

.

150

M

IN

.

C25\30 PRECASTCONCRETE BEARINGSLAB

PRECAST CONCRETE UNITS(REFER TO NOTE 5.)

DISMANTLING JOINT

FUSION WELDSTUB FLANGEWITH BACKING RING

DISMANTLING JOINT

PRECASTCONCRETE UNITS(REFER TO NOTE 5.)

HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)

HEAVY DUTY COVERAND FRAME, CLASS D400(TO SUIT 445 x 280 OPE)

150

150

280

445 200200

200

200

PLINTH DETAIL

300

M

AX

.

1 No. COURSE MIN.3 No. COURSES MAX.OFCLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR

LO

CA

LLY

LO

CA

LLY

CONCRETE ANTI-TORQUE SUPPORTCONCRETE ANTI-TORQUE SUPPORT

BULL NOSEFINISH

SEE NOTES 14, 15& 16.

FO

R M

IN

. D

EP

TH

O

F C

OV

ER

RE

FE

R T

O N

OT

E 2

O

N S

TD

-W

W-0

7

C25\30 PRECASTCONCRETE BEARING SLAB

COVERS TO BE SETIN C50\60 MORTAR

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Revised note 6 (Cl. 808)JMC TOC MOD2 11/'17 Revised & Added NotesJMC TOC MOD

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

POLYETHYLENE (P.E.) PIPE (< 200mm DIA.)

217

SEPT. 2015

(Sheet 2 of 2)

SLUICE VALVE DETAILS FOR RISING MAINS

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. SLUICE VALVE CHAMBERS SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVERS TO IS 261 AND BS 5834. COVER AND FRAME SHALL BE

SUITABLE FOR ROAD AND TRAFFIC CONDITIONS AND IS SUBJECT TO REVIEW BY IRISH WATER.3. SLUICE VALVES SHALL BE DOUBLE FLANGED WITH DUCTILE IRON RESILIENT SEAL GATE VALVES, SUITABLE FOR USE IN RISING MAINS. THEY SHALL COMPLY

WITH THE REQUIREMENTS OF IS EN 1074 AND THEY SHALL HAVE THE APPROPRIATE CE MARKINGS.4. ALL SLUICE VALVES SHALL BE CLOCKWISE CLOSING.5. VALVE CHAMBER TO BE CONSTRUCTED OF PRECAST CONCRETE UNITS OR HIGH DENSITY BLOCKWORK. ALTERNATIVELY PROPRIETARY PREFABRICATED

CHAMBER UNITS MAY ALSO BE USED, SUBJECT TO REVIEW BY IRISH WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, &CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 150mm. ALTERNATIVELY, PRE-CASTCONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.

6. CONCRETE CHAMBERS SHALL BE SURROUNDED BY A MINIMUM OF 150mm COMPACTED CLAUSE 808 MATERIAL AS PER STD-WW-07.7. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.8. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.9. PE PIPES TO BE IN ACCORDANCE WITH IS EN 12201 : 2011.10. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.11. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS, DEAD ENDS AND

PIPES AT STEEP SLOPES.12. ANTI-CORROSION TAPE TO BE PROVIDED AROUND BURIED FLANGES.13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE SHOULD ANTI FLOATATION MEASURES BE

REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF

TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

IW-CDS-5030-01 Rev. 03 December 2017

250

1500

CONCRETE CASTIN-SITU CRADLE

SECTION

D.I. FLANGED PLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)

THRUST FLANGE

FLOOR PLAN

SUMP 400mm x 400mm

x 200mm DEEP

ROOF PLAN

300

MIN.

250 1500250

400

2000

15

00

25

0

20

00

400

400

30

0

MIN

.

75mm CONCRETEBLINDING C12 / 15

250

30

0

MIN

.

25

0

400

30

0

22

5

2000

20

00

300

MIN.

900 SQ.

HEAVY DUTY COVER AND FRAME,CLASS D400 (TO SUIT 900 SQ. OPE)

CAST-IN RECESSED LIFTING EYES

CONCRETE ROOF SLABC30/37 REINFORCED SLAB

AIRVALVE

DISMANTLING JOINT

LONG BODYFLEXIBLE JOINT

LONG BODYFLEXIBLE JOINT

D.I. FLANGEDPLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)

ROCKER PIPE ROCKER PIPE

DUCT TO VENT

STACK IN SENSITIVE AREAS

SEE DRAWING STD-WW-34

HEAVY DUTY COVER ANDFRAME SHALL COMPLY WITH ISEN 124 AND BS 7903, CLASSD400 (TO SUIT 900 SQ. OPE)

CONCRETE ROOF SLABC30/37 REINFORCED SLAB

COVERS TO BESET IN C50\60MORTAR

FLOW FLOW

FLOW FLOW

400

PE DI

PE TO DI DETAIL

1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR

WATER TIGHT SEAL

1 No. COURSE MIN.3 No. COURSES MAX.OF CLASS B ENGINEERING BRICKSSET IN C50/60 MORTAR

CONCRETE GRADE C30/37 INROOF, WALLS AND BASE

D.I. TEE WITH80mm FLANGE BRANCH

ISOLATING VALVE

22

5 M

IN

.

FINISHED GROUND LEVEL

SEE NOTES 14, 15 & 16.

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Revised note 5 & cover notesJMC TOC MOD2 11/'17 Revised & added notesJMC TOC MOD

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

(FOUL RISING MAIN < 200mm DIA.)

218

SEPT. 2015

AIR VALVE CHAMBER

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS AND ODOUR

UNIT MAY BE REQUIRED DEPENDING ON LOCATION.

3. ISOLATING VALVE TO BE IN ACCORDANCE WITH IS EN 1074-2.

4. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU

CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT

TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4.

5. DOUBLE AIR VALVE CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY VENTILATED METAL COVER TO IS EN 124 RATING D400.

COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

6. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.

7. THRUST BLOCKS (NOT SHOWN ON DRAWING), TO BE PROVIDED AS PER STANDARD DRAWING STD-WW-14 AT ALL TEES, BENDS, TAPERS,

DEAD ENDS AND PIPES AT STEEP SLOPES.

8. PRE-CAST UNITS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.

9. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.

10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

11. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.

12. ALL PE PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 12201: 2011.

13. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI

FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

14. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.15. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

16. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM

& SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

IW-CDS-5030-01 Rev. 03 December 2017

COVER & FRAME(CLASS D400), IN ACCORDANCE WITHIS EN124 AND BS7903

CONCRETE GRADEC 30/37

CABLE DUCTS

MIN

IM

UM

600m

m225

225 225900

900

225

225

SECTION A - A SECTION B - B

PLAN

B

A A

75mm BLINDINGGRADE C12/15 CONCRETE

GROUND SURFACE GROUND SURFACE

1350

1350

CABLE DUCT

B

225 225900

1350

225 225900

1350

CABLE DUCT

CABL

E DU

CT

CONCRETE GRADEC 30/37

CABLE DUCTS

COVER TO BE SETIN C50\60 MORTAR

75

75

75

75

150

150

COVER & FRAME(CLASS D400), IN ACCORDANCE WITHIS EN124 AND BS7903

CABLE DUCTS

SECTION C - C

GROUND SURFACE

75

75

200

C C

60

0 m

m M

IN

.

CO

VE

R

TO

D

UC

TS

APPROVED MARKER TAPES

200

APPROVED SAND

REFER TO DRG. No.STD-WW-07 FORBACKFILL DETAILS

75mm BLINDINGGRADE C12/15 CONCRETE

75mm DIA. PVC DRAINTO NEAREST SURFACEWATER OUTLET FITTEDWITH NON-RETURN VALVE

TRENCH WIDTH TO BE MIN. 500mm

AND DEPENDENT ON

DUCT NUMBERS

COVER TO BE SETIN C50\60 MORTAR

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Revised notes to coverJMC TOC MOD2 11/'17 Revised notesJMC TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY THEDEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

3. DUCT ARRANGEMENT MAY VARY DEPENDING ON REQUIREMENTS.

4. CABLE DUCTS TO BE IN ACCORDANCE WITH BS 4460 AND BS EN 1401. DUCTS FOR ESBUSE TO BE IN ACCORDANCE WITH ESB SPECIFICATION.

5. PROPRIETARY DUCT CHAMBER MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.

6. LONG RADIUS BENDS MAY BE USED FOR CHANGES IN DIRECTION OF UP TO 45°DUCT CHAMBERS SHALL BE PROVIDED FOR ALL BENDS GREATER THAN 45°.

7. DUCT CHAMBERS TO BE LOCATED AT 50m INTERVALS MAXIMUM.

8. APPROPRIATE MARKER TAPE SHALL BE LAID 200mm ABOVE THE EXTERNAL CROWNOF THE DUCT AND SHOULD INCORPORATE REINFORCED TRACING WIRE.

TRACING WIRES SHALL BE CONNECTED ACROSS CHAMBERS.ELECTRICAL MARKER TAPE TO BE USED IN ACCORDANCE WITH ESB SPECIFICATION.

9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASEDON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATIONMEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

11. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS/ROPES, TO ALLOW THE PULL THROUGHOF CABLES.

12. CABLE DUCT INTERFACE WITH CHAMBER WALL TO BE SEALED TO PREVENT INGRESS OFGROUNDWATER TO CHAMBER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

DUCT CHAMBER

219

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

SIDE WALL SLOPES TO MATCHEXISTING EMBANKMENT

1000

PIPE

DIA

.+

450

225

225

TO M

ATCH

DEVE

LOPM

ENT

225

150

225

300

1000

225

SIZE AS SPECIFIED IN CONTRACT

PUDDLE FLANGE

FLEXIBLE COUPLINGS

DUCK BILLCHECK VALVE

WATER LEVEL

ORIGINAL BED LEVEL

75 BLINDING C12/15

CONCRETE GRADE C 30/37

EXISTING EMBANKMENT

PUDDLE FLANGE

ROCKER PIPE

1

2

2

1

ROCKER PIPE

SECTION

PLAN

FLEXIBLE COUPLINGS

SLOPE 1:50

HANDRAILING MAY BE REQUIRED TODESIGNERS RISK ASSESSMENT

BANK

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Notes revisedJMC MODTOC

1. ALL DIMENSIONS IN MILLIMETRES UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN & REINFORCEMENT DETAILS TO BE PROVIDEDBY THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

3. FULL FINAL DETAIL MUST BE REVIEWED BY IRISH WATER AND RELEVANTREGULATORY AUTHORITIES.

4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

5. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANKTO BE SUBJECT TO AGREEMENT WITH RELEVANT AUTHORITY &IRISH WATER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

EMERGENCY OVERFLOW STRUCTURE

120

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

BED OF STREAM

SECTION

PLAN

FULL CONCRETE SURROUND GRADE C 25/30.

O.D

. +

300m

m

FULL CONCRETE

SURROUND

GRADE C25/30

FOR DETAILS SEE

DRAWING STD-WW-08

2x DIAMETER

OR 1000mm MAX.

DUCTILE IRON GRAVITY SEWER

M.H.

FLEXIBLE JOINT

5000mm5000mm

5000mm

SEE DRAWING

STD-WW-10 AND

STD-WW-11

FOR MANHOLE

DETAILS

SEE DRAWING

STD-WW-10 AND

STD-WW-11

FOR MANHOLE

DETAILS

M.H.

M.H.M.H.

BA

NK

E

DG

E

BA

NK

E

DG

E

500m

m M

IN

. O

R T

O R

EQ

UIR

EM

EN

TS

O

F

RE

LE

VA

NT

A

UT

HO

RIT

Y

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated pipe depth dimensionJMC MODTOC

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. TWO FLEXIBLE JOINTS SHALL BE PROVIDED WITHIN A DISTANCE OF 1000mm OR 2xDIAMETER OF PIPE (WHICHEVER IS THE GREATER) FROM BOTH ENDS OF CONCRETESURROUND.

4. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.

5. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

6. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THE BANK EDGE TO ALLOWFOR FUTURE ACCESS.

7. BACKFILL AND REINSTATEMENT OF THE RIVER BED AND BANK TO BE SUBJECT TOAGREEMENT WITH RELEVANT AUTHORITY & IRISH WATER.

8. PIPE BETWEEN MANHOLES AT DITCH / STREAM CROSSING TO BE DUCTILE IRON.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

FOR GRAVITY MAIN

121

SEPT. 2015

(Sheet 1 of 2)

TYPICAL DITCH / STREAM CROSSING

IW-CDS-5030-01 Rev. 03 December 2017

BED OF STREAM

CONCRETE SURROUND GRADE C 25/30.

FOR DETAILS SEE DRAWING STD-WW-08

SECTION

FOR AIR VALVE / CHAMBER

DETAILS REFER TO STD-WW-18

AIR VALVE TO BE LOCATED

BOTH SIDES OF CROSSING

300

CONCRETE SURROUND GRADE C 25/30.

FOR DETAILS SEE DRAWING STD-WW-08

O.D

. +

300m

m

REFER TO NOTE 3

FOR BENDS

POLYETHYLENE

PIPEWORK

O.D

. +

300m

m

300

FOR THRUST BLOCK DETAILS

REFER TO STD-WW-14

FOR THRUST BLOCK DETAILS

REFER TO STD-WW-14

POLYETHYLENE PIPEWORK

STUB FLANGE WITH

BACKING RING FOR

DI/PE CONNECTION

FOR SCOUR VALVE / CHAMBER

DETAILS REFER TO STD-WW-15

FUSION

WELD

5000mm5000mm

PLAN

STUB FLANGE WITH

BACKING RING FOR

DI/PE CONNECTION

FUSION

WELD

300

300300 300

FOR AIR VALVE / CHAMBER

DETAILS REFER TO STD-WW-18

AIR VALVE TO BE LOCATED

BOTH SIDES OF CROSSING

FOR SCOUR VALVE /

CHAMBER DETAILS

REFER TO STD-WW-15

DI / PE PIPE

SEE NOTE 11

DI / PE PIPE

SEE NOTE 11

BA

NK

E

DG

E

BA

NK

E

DG

E

SCOUR CHAMBER

FLEXIBLE

COUPLING

500m

m M

IN

. O

R T

O R

EQ

UIR

EM

EN

TS

O

F

RE

LE

VA

NT

A

UT

HO

RIT

Y

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 JMCUpdated pipe depth dimension &note 10 revised MODTOC

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THELONGITUDINAL SECTION DRAWING.

4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINEDUSING BUTT FUSION WELDING.

5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETINGHAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEINGCAST INTO CONCRETE.

6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.

7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.

8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITHIS EN 12201 : 2011.

9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THEBANK EDGE TO ALLOW FOR FUTURE ACCESS. MANHOLE LOCATIONSMUST BE REVIEWED BY IRISH WATER & READILY ACCESSIBLE BY ALLOPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUMTANKER.

11. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON ORPOLYETHYLENE. PIPEWORK AT CROSSING TO BE PE IN BOTH CASES.

12. BACKFILL AND REINSTATEMENT OF RIVER BED AND BANK TO BESUBJECT TO AGREEMENT WITH RELEVANT REGULATORY AUTHORITIES

& IRISH WATER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

FOR RISING MAIN

122

SEPT. 2015

(Sheet 2 of 2)

TYPICAL DITCH / STREAM CROSSING

IW-CDS-5030-01 Rev. 03 December 2017

ROAD LEVEL

SECTION

CONCRETE SURROUND

GRADE C 25/30.

SEE DRAWING STD-WW-10

FLEXIBLE

JOINT

DUCTILE IRON

PIPEWORK

FOR SCOUR VALVE /

CHAMBER DETAILS

REFER TO STD-WW-15

FOR SCOUR VALVE /

CHAMBER DETAILS

REFER TO STD-WW-15

PLAN

KIOSK

(600 HIGH x 450 WIDE

x 300 DEEP)

AIR VALVE

CONCRETE PLINTH

(150 HIGH x 600 LONG

x 450 WIDE)

POLYETHYLENE

SERVICE PIPE

(32mm DIA. P.E.)

TAPPING POINT TO

BE LOCATED AT

HIGH POINT

32mm DIA. P.E. PIPE

KIOSK

(SEE NOTES 7, 8 & 9)

AIR VALVE

EXPOSED PIPEWORK

TO BE INSULATED

USING PIPE LAGGING

BRIDGE PARAPET

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

A

A

FLEXIBLE JOINT

TAPPING WITH TRANSITION

90° ELBOW (MALE)

DUCTILE IRON

RISING MAIN

150

15

0

150

15

0

SOCKET OUTLINE

32mm O.D.

P.E. PIPE

SECTION A - A

(AIR VALVE CONNECTION)

BRIDGE PARAPET

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Notes 5 & 14 revisedJMC MODTOC

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. AT BRIDGE CROSSING DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.

3. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

4. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THE LONGITUDINAL SECTIONDRAWING.

5. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO WHETHER A DUPLICATERISING MAIN IS TO BE PROVIDED THROUGH THE BRIDGE CROSSING.IF NECESSARY THE DEVELOPER WILL SUBMIT A DESIGN TO IRISH WATER FOR REVIEW.

6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES ATE STEEP SLOPES.

7. THE QUALITY OF THE KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:

A) A THERMAL TRANSMITTANCE OF 1.5W PER m² K.B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO

CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING30 MINUTES.

8. KIOSK (MIN. 600 HIGH x 450 WIDE x 300mm DEEP) TO BE CONSTRUCTED FROM THERMOSETTING U.V. &WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED STEEL (MIN. 4mmTHICKNESS) TO BS EN 1461. STAINLESS STEEL OR NON-METALLIC MATERIALS, SUCH AS GLASSREINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY INSEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER. COLOUR TO BE HOLLYGREEN BS 4800 14 C 39, TO HAVE HINGED, LOCKABLE ACCESS DOOR (HINGES AND LOCKS TO BESTAINLESS STEEL).

9. THE KIOSK SHALL BE LOCATED OFF THE FOOTPATH SO AS NOT TO IMPEDE PEDESTRIANSAND POSITIONED SO AS TO FACILITATE SAFE ACCESS FOR MAINTENANCE PERSONNEL.

10. KIOSK TO BE FITTED WITH A VENT STACK TO MANUFACTURERS DETAIL IN SENSITIVE AREAS.

11. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

12. IN INSENSITIVE AREAS A VENT STACK IS NOT REQUIRED. LOUVRE VENT TO BE PROVIDED IN KIOSK.

13. DETAIL FOR RISING MAIN FOR PE PIPEWORK TO BE AS PER THIS DETAIL. BRIDGE CROSSINGPIPEWORK TO BE DUCTILE IRON IN BOTH CASES.

14. THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISH WATER & READILYACCESSIBLE BY ALL OPERATION & MAINTENANCE EQUIPMENT, INCLUDING A VACUUM TANKER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

BRIDGE CROSSING FOR RISING MAIN

123

SEPT. 2015

(Sheet 1 of 2)

TYPICAL

IW-CDS-5030-01 Rev. 03 December 2017

300

BED OF

STREAM

CONCRETE SURROUND

GRADE C 25/30. FOR DETAILS

SEE DRAWING STD-WW-08

SECTION

PLAN

BRIDGE PARAPET

O.D

. C

OL

LA

R +

3

00

mm

ROAD

REFER TO NOTE 3

FOR BENDS

POLYETHYLENE

PIPEWORK

300

O.D

. C

OL

LA

R +

3

00

mm

FOR THRUST BLOCK

DETAILS REFER

TO STD-WW-14

FUSION

WELD

FOR SCOUR VALVE / CHAMBER

DETAILS REFER TO STD-WW-15

5000mm

300

300

STUB FLANGE WITH

BACKING RING

FUSION

WELD

STUB FLANGE WITH

BACKING RING

300300

FOR AIR VALVE / CHAMBER

DETAILS REFER TO STD-WW-18

AIR VALVE TO BE LOCATED

BOTH SIDES OF CROSSING

FOR AIR VALVE / CHAMBER

DETAILS REFER TO STD-WW-18

AIR VALVE TO BE LOCATED

BOTH SIDES OF CROSSING

FOR SCOUR VALVE /

CHAMBER DETAILS

REFER TO STD-WW-15

5000mm

BA

NK

E

DG

E

BA

NK

E

DG

E

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

POLYETHYLENE

OR DUCTILE IRON

PIPEWORK

FLEXIBLE

JOINT

50

0m

m M

IN

. O

R T

O R

EQ

UIR

EM

EN

TS

O

F

RE

LE

VA

NT

A

UT

HO

RIT

Y

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 JMCUpdated pipe depth dimension &revised notes MODTOC

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. O.D. REFERS TO OUTSIDE DIAMETER OF PIPES OR COLLARS.

3. BENDS AT RESPECTIVE CROSSINGS SHALL BE INDICATED ON THELONGITUDINAL SECTION DRAWING.

4. PIPEWORK THROUGH CROSSING TO BE POLYETHYLENE & JOINEDUSING BUTT FUSION WELDING.

5. POLYETHYLENE PIPES SHALL BE WRAPPED IN PLASTIC SHEETINGHAVING A COMPOSITION IN ACCORDANCE WITH BS 6076 BEFORE BEINGCAST INTO CONCRETE.

6. THRUST BLOCKS TO BE PROVIDED AS PER STD-WW-14 AT ALL TEES,BENDS, TAPERS, DEAD ENDS AND PIPES AT STEEP SLOPES.

7. ALL DUCTILE IRON PIPEWORK AND FITTINGS TO BE IN ACCORDANCEWITH IS EN 598.

8. ALL PE PIPEWORK AND FITTINGS TO BE IN ACCORDANCE WITHIS EN 12201 : 2011.

9. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206 : 2013.

10. ALL MANHOLES TO BE LOCATED A MINIMUM OF 5000mm FROM THEBANK EDGE TO ALLOW FOR FUTURE ACCESS.

11. BACKFILL AND REINSTATEMENT REQUIREMENTS OF THE RIVER BEDAND BANK IS SUBJECT TO AGREEMENT WITH RELEVANT REGULATORY

AUTHORITIES & IRISH WATER.

12. THE DEVELOPER IS TO SEEK ADVICE FROM IRISH WATER AS TO WHETHER A DUPLICATE RISING MAIN IS TO BE PROVIDED THROUGH THE BRIDGE CROSSING. IF NECESSARY THE DEVELOPER WILL SUBMIT A DESIGN TO IRISH WATER FOR REVIEW.

13. PIPEWORK OF RISING MAIN CAN BE EITHER DUCTILE IRON ORPOLYETHYLENE. PIPE AT CROSSING POINT TO BE PE IN BOTH CASES

14.THE LOCATION OF THE SCOUR CHAMBER MUST BE REVIEWED BY IRISHWATER & READILY ACCESSIBLE BY ALL OPERATION & MAINTENANCEEQUIPMENT, INCLUDING A VACUUM TANKER.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

BRIDGE CROSSING FOR RISING MAIN

124

SEPT. 2015

(Sheet 2 of 2)

TYPICAL

IW-CDS-5030-01 Rev. 03 December 2017

GATES & PIERS - ELEVATION

OUTSIDE

LOCKABLE

SLIPBOLT

RSA

SLAMPLATE

DROPBOLTS

RHS FRAME

GATES & PIERS - PLAN

4000 mm MINIMUM

75mm CONCRETE

BLINDING, GRADE C12/15

METAL PILLARS

METAL PILLARS

FIN. GROUND LEVEL

FENCE PILLAR SPACING AS PER

MANUFACTURERS SPECIFICATION

PVC INSERT CAP

V-BEAM

REINFORCING PROFILE

PANEL - ELEVATION

FOUNDATION DETAIL

TO MANUFACTURERS

SPECIFICATION

ENTRANCE GATE DETAILS

B

A

FOUNDATION DETAIL

TO MANUFACTURERS

SPECIFICATION

FOUNDATION DETAIL

TO MANUFACTURERS

SPECIFICATION

FOUNDATION DETAIL

TO MANUFACTURERS

SPECIFICATION

GRADE C30/37

CONCRETE IN BASE

2400

2400

FENCE PILLARS

75 CONCRETE

BLINDING, GRADE C12/15

GRADE C30/37

CONCRETE IN BASE

125mm WIDE x 150mm DEEP

CONCRETE SILL UNDER

FENCE TO IRISH WATER'S

REQUIREMENTS (ENHANCED

+ SECURITY RATING ONLY)

ANTI-CLIMB FEATURES

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Revised notes & tableJMC TOC MOD2 11/'17 Fencing table updatedJMC TOC MOD

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

SECURITY GATE AND FENCING

225

SEPT. 2015

SECURITY

RATING

MESH SPACING

A x B

BASIC + 150 x 50

BAR THICKNESS

Type: 868 5mm

Type: 868 4mm50 x 50ENHANCED +

1. ALL DIMENSIONS IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. SECURITY FENCING SHALL COMPRISE 2.4m HIGH, CORROSION RESISTANT MILD STEELFENCING, GALVANISED AND PLASTIC COATED FINISHED, WITH SIMILAR TYPE ACCESSGATES.

3. THE ACCESS GATES SHALL BE OF SUFFICIENT WIDTH TO ACCOMMODATE MAINTENANCEVEHICLES, TANKERS, ETC. THE SECURITY GATES SHALL BE PROVIDED WITH SLIDE BOLTS,SHOOTING BOLTS AND PADLOCKS. IF OPENING OUTWARDS, THE ACCESS GATES SHALL BESET BACK FROM PARKING AND ACCESS AREAS BY THE WIDTH OF THE LEAF OF THE GATE.

4. BOLTS - UNLESS TAMPER RESISTANT FIXINGS ARE USED, ALL BOLTS TO THE ACCESSGATES & FENCING SHALL BE BURRED OVER.

5. GATE HINGES SHALL BE DESIGNED SO THAT IT IS IMPOSSIBLE TO REMOVE THE GATE BYLIFTING WHEN IT IS IN A CLOSED & LOCKED POSITION. DROP BOLTS SHALL BE FITTED TOEACH GATE LEAF IN SUCH A WAY THAT THEY CANNOT BE REMOVED BUT ALLOW THE GATETO BE SECURED IN BOTH THE OPEN & CLOSED POSITION.

6. THE SECURITY RATING SHALL BE EITHER BASIC +, ENHANCED OR ENHANCED +. THE FENCESTANDARD WILL BE BASED ON THE SECURITY RATING OF THE SITE & IS TO BE AGREEDWITH IRISH WATER.

7. CORNER BRACING AND POST DETAIL TO MANUFACTURER'S SPECIFICATION.

8. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

9. ALL FENCE MATERIALS AND WORKMANSHIP TO BE IN ACCORDANCE WITH IS EN 1722-14 :2006.

10. DIMENSIONS OF GATE PILLARS, GATE FRAME, FENCE PILLARS, FENCE RUNNERS,DIAGONALS, ETC. TO BE TO MANUFACTURER'S SPECIFICATION.

11. FENCE/GATE DESIGN AND DETAILS TO BE PROVIDED TO IRISH WATER FOR REVIEW/VETTING BEFORE MANUFACTURE.

12. PEDESTRIAN GATE SHALL BE PROVIDED IF DEEMED NECESSARY BY IRISH WATER.

13. COLOUR TO BE HOLLY GREEN 14 C 39 IN ACCORDANCE WITH BS 4800:2011.

14. A 125mm WIDE x 150mm DEEP CONCRETE SILL GRADE C20/25 CONCRETE SHALL BEPROVIDED TO IRISH WATER'S REQUIREMENTS (ENHANCED + SECURITY RATING ONLY).

HEIGHT

2.4m

2.4m

ENHANCED 150 x 50 Type: 868 5mm 2.4m

ADDITIONAL

FEATURES

ANTI-CLIMB

ANTI-CLIMB

ANTI-CLIMB &ANTI-BURROW

IW-CDS-5030-01 Rev. 03 December 2017

CO

NT

RO

L

KIO

SK

PR

EC

AS

T K

ER

B

1:50 F

ALL

TO

S

UM

P

2.4m

H

IG

H P

LA

ST

IC

C

OA

TE

D

WE

LD

ED

M

ES

H F

EN

CE

WE

T

KIO

SK

WA

TE

R

ME

TE

R

CH

AM

BE

R

IN

LE

T

MA

NH

OLE

HA

RD

S

TA

ND

IN

G

AR

EA

GA

TE

S T

O

OP

EN

IN

WA

RD

S

PE

RM

EA

BLE

A

RE

A W

IT

H

AP

PR

OP

RIA

TE

W

EE

D B

AR

RIE

R

RE

FE

R T

O S

TD

-W

W-32

FO

OT

PA

TH

GR

AS

S V

ER

GE

SE

WE

R

2.4m

H

IG

H P

LA

ST

IC

C

OA

TE

D

WE

LD

ED

M

ES

H F

EN

CE

PO

WE

R

RIS

IN

G M

AIN

SEWER

RISING MAIN

MA

NH

OLE

4000

AP

PR

OX

. 12000m

m

APPROX. 8000mm

TA

NK

ER

IM

PE

RM

EA

BLE

HA

RD

S

TA

ND

IN

G

PE

DE

ST

RIA

N

AC

CE

SS

G

AT

E

(IF

D

EE

ME

D N

EC

ES

SA

RY

)

EM

ER

GE

NC

Y

OV

ER

FLO

W

PIP

E

(IF

A

PP

RO

VE

D)

EM

ER

GE

NC

Y

OV

ER

FLO

W

OR

B

ALA

NC

E

ST

OR

AG

E

WE

T

WE

LL

VA

LV

E

CH

AM

BE

R

1.

AL

L D

IM

EN

SIO

NS

A

RE

IN

M

IL

LIM

ET

RE

S (m

m) U

NL

ES

S N

OT

ED

O

TH

ER

WIS

E.

2.

TY

PE

1

P

UM

PIN

G S

TA

TIO

NS

T

O B

E L

OC

AT

ED

N

O C

LO

SE

R T

HA

N

5.0

M

ET

RE

S T

O A

P

RO

PE

RT

Y B

OU

ND

AR

Y.

3.

TY

PE

2

P

UM

PIN

G S

TA

TIO

NS

T

O B

E L

OC

AT

ED

N

O C

LO

SE

R T

HA

N

10

.0

M

ET

RE

S T

O A

P

RO

PE

RT

Y B

OU

ND

AR

Y.

4.

TY

PE

3

P

UM

PIN

G S

TA

TIO

NS

T

O B

E L

OC

AT

ED

N

O C

LO

SE

R T

HA

N

15

.0

M

ET

RE

S T

O A

P

RO

PE

RT

Y B

OU

ND

AR

Y.

5.

TH

ER

E S

HA

LL

B

E A

C

LE

AR

O

PE

NIN

G IN

F

RO

NT

O

F T

HE

G

AT

ES

T

O

EN

SU

RE

A

DE

QU

AT

E A

CC

ES

S.

6.

TH

IS

D

ET

AIL

IS

IN

DIC

AT

IV

E O

NL

Y A

ND

T

HE

D

EV

EL

OP

ER

S

HA

LL

S

UB

MIT

A

S

IT

E

SP

EC

IF

IC

L

AY

OU

T T

O IR

IS

H W

AT

ER

F

OR

R

EV

IE

W.

7.

KIO

SK

S T

O S

TD

-W

W-3

0 A

ND

S

TD

-W

W-3

1.

8.

FE

NC

E A

ND

G

AT

E T

O S

TD

-W

W-2

5.

9.

RE

FE

R T

O S

TD

-W

W-3

2 F

OR

P

ER

ME

AB

LE

, IM

PE

RM

EA

BL

E R

OA

DW

AY

A

ND

HA

RD

ST

AN

DIN

G A

RE

A D

ET

AIL

.

10

.IN

DIC

AT

IV

E L

AY

OU

T R

EL

AT

ES

T

O S

MA

LL

P

UM

PIN

G S

TA

TIO

NS

A

S P

ER

TY

PE

1

, T

YP

E 2

&

T

YP

E 3

IN

T

HE

IR

IS

H W

AT

ER

C

OD

E O

F P

RA

CT

IC

E F

OR

WA

ST

EW

AT

ER

IN

FR

AS

TR

UC

TU

RE

.

11

.L

AM

P S

TA

ND

AR

D &

L

AM

P B

OL

LA

RD

L

OC

AT

IO

NS

T

O B

E S

IT

E S

PE

CIF

IC

&

T

O

IR

IS

H W

AT

ER

A

GR

EE

ME

NT

. R

EF

ER

T

O S

TD

-W

W-3

3 F

OR

D

ET

AIL

S.

TIT

LE

NOT

TO

SCAL

E

ST

D-W

W-

DR

AW

IN

G N

o.

SC

ALE

RE

V

DA

TE

RE

FE

R T

O IN

DE

X S

HE

ET

F

OR

N

OT

ES

R

EG

AR

DIN

G D

ES

IG

N R

ES

PO

NS

IB

ILIT

Y &

R

IS

K A

SS

ES

SM

EN

T

ST

AN

DA

RD

DE

TA

ILS

- W

AS

TE

WA

TE

R

26

0

SE

PT

. 2015

IN

DIC

AT

IV

E P

UM

PIN

G S

TA

TIO

N S

IT

E LA

YO

UT

No.

Date

Desc

riptio

n0

09/'1

5Ini

tial Is

sue

App

SLDr

nCh

kJM

CTO

C

IW-CDS-5030-01 Rev. 03 December 2017

M

250

1500

SECTION

THRUST FLANGE

FLOOR PLAN

SUMP 400mm x 400mm

x 200mm DEEP

ROOF PLAN

300

MIN.

250 1500250

400

2000

15

00

25

0

20

00

400

30

0

MIN

.

250

30

0

MIN

.

25

0

400

30

0

22

5

2000

20

00

300

MIN.

CAST-IN RECESSED LIFTING EYES

CONCRETE ROOF SLABC30 / 37 REINFORCED CONCRETE SLAB

HEAVY DUTY COVER AND FRAME,CLASS D400 TO IS EN 124 (TOSUIT 900 SQ. OPE)

CABLE DUCTS TO BE INSTALLED WITH DRAWCORDS. SEE DRAWING STD-WW-30/31

M

FLOW

LONG BODYFLEXIBLE JOINT

LONG BODYFLEXIBLE JOINT

DISMANTLING JOINT

ROCKER PIPE ROCKER PIPE

D.I. FLANGEDPLAIN ENDED PIPEWITH THRUST FLANGE(CUT TO SUIT)

CONCRETE CASTIN-SITU CRADLE 75mm CONCRETE

BLINDING C12/15

900 SQ.

FLOW

FLOW FLOW

CABLE DUCTS TO BE INSTALLED WITH DRAW CORDSSEE DRAWING STD-WW-30/31

HEAVY DUTY COVER AND FRAME,CLASS D400 TO IS EN 124 (TOSUIT 900 SQ. OPE)

1 No. MIN.3 No. COURSES MAX.OF CLASS BENGINEERING BRICKWORKSET IN C50/60 MORTAR

1 No. MIN. / 3 No. COURSES MAX.OF CLASSB ENGINEERING BRICKWORK SET INC50/60 MORTAR

WATER TIGHT SEAL

WATER TIGHT SEAL

C30/37 CONCRETE TOWALLS AND BASE

400

PE DI

PE TO DI DETAIL

100mm DIA. uPVC DRAINFROM FLOW METER CHAMBER TO VALVE CHAMBER.

D.I. FLANGED PLAINENDED PIPE WITH THRUSTFLANGE (CUT TO SUIT)

MANHOLE STEPS TOCOMPLY WITH IS EN 13101,TYPE D, CLASS 1,GALVANISED MILD STEEL &PLASTIC ENCAPSULATED.

67

5 (M

AX

.)

CONCRETE ROOF SLABC30/37 REINFORCEDSLAB

COVERS TO BE SETIN C50\60 MORTAR

FINISHED GROUND LEVELSEE NOTES 11, 12 & 13.

FO

R M

IN

. D

EP

TH

O

F C

OV

ER

RE

FE

R T

O N

OT

E 2

O

N

ST

D-W

W-0

7

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 notes & note 3JMC TOC Added steps, revised cover MOD

2 11/'17 Revised & added notesJMC TOC MODDRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

FLOW METER CHAMBER

227

SEPT. 2015

(FOUL RISING MAIN <200mm DIA.)

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY THE DEVELOPER AND SUBMITTED TO IRISH

WATER FOR REVIEW. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A

REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.

ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER APPROVAL, & COMPLIANCE

WITH BS 5911, Part 4.

3. METER CHAMBER SHALL BE COVERED WITH APPROVED HEAVY DUTY METAL COVER TO IS EN 124 RATING D400. COVERS

AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

4. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN GREEN AREAS.

5. PRECAST UNITS COMPLETED WITH RUBBER SEALING GASKET BETWEEN UNITS, COMPLYING WITH THE REQUIREMENTS OF IS EN 1917 AND BS5911-PART 3, COMPLETE WITH 150mm CONCRETE SURROUND MAY BE USED AS AN ACCEPTABLE ALTERNATIVE. CONCRETE SURROUND TO BEGRADE C16/20 IN ACCORDANCE WITH IS EN 206.

6. DUCTILE IRON PIPES AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598. PE PIPES AND FITTINGS TO BE IN

ACCORDANCE WITH IS EN 12201:2011.

7. ANTI CORROSION TAPE TO BE PROVIDED AROUND ALL BURIED FLANGES.

8. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE.

SHOULD ANTI FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

9. FLOW METERS REQUIRE A MINIMUM LENGTH OF PIPE ON EACH SIDE OF THE VALVE TO BE COMPLETELY FREE OF

FITTINGS, VALVES, REDUCER ETC. AS PER THE MANUFACTURERS INSTRUCTIONS.

10. ALL CONCRETE TO BE IN ACCORDANCEWITH IS EN 206.

11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROAD AUTHORITY'S REQUIREMENTS.12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT.

OF TRANSPORT, TOURISM & SPORT, OR TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

IW-CDS-5030-01 Rev. 03 December 2017

A A

INCOMING FOUL

SEWER

RISING MAIN

APPROPRIATE DAVIT

FOR PUMP REMOVAL

(SUBJECT TO REVIEW

BY IRISH WATER)

MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE

OR SIZE TO MATCH CAPACITY OF INCOMING SEWER

IF ALLOWED.

INCOMING FOUL SEWER (I.L. TO BE LOCATED

ABOVE THE CUT-IN LEVEL OF THE PUMPS).

Ø100 PIPE FROM

WASH DOWN

3 No. 150 DIA. CABLE OPES

( WATER TIGHT SEAL )

3No.150 DIA.

CABLE OPES

Ø100 PIPE FROM

WASH DOWN

LIFTING DAVIT & SOCKET

ROOF PLAN

A A

SECTION A-A

PLAN

150 DIA.

CABLE OPE

150 DIA. CABLE OPE

ULTRA SONIC SENSOR

2500 M

IN

IM

UM

1800 MINIMUM 1800 MINIMUM 1000 MINIMUM

MECHANICAL

OVERFLOW SCREEN

FLAP VALVE

VALVE CHAMBER

DRAIN 80mm DIA

DUCTILE IRON

100mm

MAX.

FLAP VALVE 80 mm DIA.

DUCTILE IRON DRAIN

100mm DIA. uPVC DRAIN

FROM FLOW METER

CHAMBER TO VALVE

CHAMBER.

HIGH

LEVEL

VENT

LOW LEVEL

VENT

PROPOSED INLET

BAFFLE PLATE

ASSIST LIFT ACCESS COVER

WITH SAFETY GRID

AND INCORPORATED

HAND RAILS

BAUER FITTING ON

GATE VALVE ON TEE

TO ALLOW EMPTYING

OF THE RISING MAIN

GATE VALVE

NON RETURN

VALVE

BAUER FITTING ON

GATE VALVE ON TEE

TO ALLOW EMPTYING

OF THE RISING MAIN

SEALED DUCTS

EMERGENCY OVERFLOW (IF

APPROVED) AND/OR 24 HOUR

STORAGE TO BE PROVIDED

75mm BLINDING

GRADE C12/15

GRADE C30/37

CONCRETE TO WALLS,

BASE AND ROOF

VENT

PIPES

10

00

35

0

100mm SURFACE BOX

MECHANICAL

OVERFLOW

SCREEN

MINIMUM 225mm DIA. EMERGENCY OVERFLOW PIPE

OR SIZE TO MATCH CAPACITY OF INCOMING SEWER

IF ALLOWED.

EMERGENCY OVERFLOW (IF

APPROVED) AND/OR 24 HOUR

STORAGE TO BE PROVIDED

CONC. THRUST BLOCK

TO BEND (REFER TO

DRG. No. STD-WW-14

FOR DETAILS)

CONC. THRUST BLOCK

TO BEND (REFER TO

DRG. No. STD-WW-14

FOR DETAILS)

REFER TO DRG. No.

STD-WW-09 FOR

DETAILS TO STEP IRONS

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16Revised note 4, incoming

JMC TOC sewer note & added thrustblock & step irons to valvechamber

MOD

2 11/'17 JMC Revised notes 2,4,9 & 11 MODTOC

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER

TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER

INFRASTRUCTURE .

3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE

WITH IS EN 598.

4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW

BY IRISH WATER. REFER TO DRG. No. WW-28A FOR DETAILS.

5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.

6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.

7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL

MINIMUM 1400 x 800mm.

8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m

SHALL CONFORM TO BS 9124.

9. WALL THICKNESS AND REINFORCEMENT SHALL BE SELECTED BASED ON

SITE SPECIFIC DESIGN AND SHALL BE SUBJECT TO REVIEW BY IRISH

WATER. ROOF SLABS SHALL BE DESIGNED TO CARRY ALL LIVE LOADS &

DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU

CONCRETE, GRADE C30/37, WITH A MINIMUM THICKNESS OF 225mm.

ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT

TO IRISH WATER REVIEW, & COMPLIANCE WITH BS 5911, Part 4

10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE

SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR RECURRENCE.

THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION.

THE FINISHED SLAB LEVEL SHALL BE POSITIONED ABOVE THE 1:100 YEAR

FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER

RESISTANT AND POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.

11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED

ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION

MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH

WATER.

12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT

A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.

14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.

15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL

BE PROVIDED AT THE PUMPING STATION.

16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL

FROM THE RELEVANT REGULATORY AUTHORITIES.

17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.

18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER

TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE FOR

WASTEWATER INFRASTRUCTURE.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

INDICATIVE SUBMERSIBLE PUMPING STATION

228

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

PROPOSED INLET

BAFFLE PLATE

PRECAST CONCRETE

MANHOLE RINGS TO IS

420 IN CONJUNCTION

WITH IS EN 1917 : 2004

75mm GRADE C12/15

BLINDING CONCRETE

WATER RESISTANT

JOINTS TO IS EN 1992

REINFORCED CONCRETE

BASE GRADE C30/37

SECTION A-A

PLAN

30

0

Ø100 PIPE FROM

WASH DOWN

2 No.150 Ø

CABLE OPES

ULTRA SONIC

SENSOR

FLAP VALVE ON VALVE CHAMBER

DRAIN 80mmØ DUCTILE IRON TO

DISCHARGE ABOVE PUMP CUT-IN

LEVEL (AS PER PUMP SUPPLIER'S

RECOMMENDATIONS)

100mm

MAX.

HIGH

LEVEL

VENT

SEALED DUCTS

BOTTOM PRECAST SECTION TO BE

BUILT INTO BASE CONCRETE

MINIMUM 75mm

FIRST RING BUILT INTO

IN-SITU CONCRETE BASE

CONSTRUCTION

JOINT

MIN. 150mm GRADE

C20/25 IN-SITU

CONCRETE

SURROUND

LOW

LEVEL

VENT

MIN. 150mm GRADE

C20/25 IN-SITU CONCRETE

SURROUND

INCOMING

FOUL SEWER

APPROPRIATE LIFTING

DAVIT & SOCKET FOR

PUMP REMOVAL

(SUBJECT TO REVIEW

BY IRISH WATER)

100mm DIA. uPVC DRAIN

FROM FLOW METER

CHAMBER TO VALVE

CHAMBER.

MALE BAUER FITTING ON

GATE VALVE ON TEE TO

ALLOW EMPTYING OF

THE RISING MAIN

SPIGOT

PIPE

A

RISING MAIN

150 DIA.

CABLE OPE

150 DIA.

CABLE OPE

25

00

M

IN

IM

UM

1800 MINIMUM

1800 (MIN.)

TO SUIT PUMP INSTALLATION

GATE VALVE

NON RETURN

VALVE

BAUER FITTING ON

GATE VALVE ON TEE

TO ALLOW EMPTYING

OF THE RISING MAIN

10

00

35

0

150 DIA.

CABLE OPE

EMERGENCY OVERFLOW (IF

APPROVED) AND/OR 24 HOUR

STORAGE TO BE PROVIDED

FLAP VALVE TO VALVE

CHAMBER DRAIN

80mmØ DUCTILE IRON

STAINLESS STEEL

OVERFLOW BAFFLE

PLATE

A

FLANGE

ADAPTOR

60

00

mm

M

AX

.

PUMPING STATION VALVE CHAMBER

FLEXIBLE

COUPLINGS

150

START OF

BENCHING

BENCHING 45°

MIN. SLOPE

GRADE C30/37

CONCRETETO IS 206 TO

WALLS, BASE AND ROOF

GL

100mmØ PIPE

FROM WASHDOWN

AREA

VENTS

LIFTING

DAVIT

SOCKET

LIFT ASSISTED COVER

WITH SAFETY GRID &

INCORPORATED

HANDRAILS

LIFT ASSISTED

COVER

CORBEL

INCOMING FOUL SEWER

(I.L. TO BE LOCATED

ABOVE THE CUT-IN LEVEL

OF THE PUMPS).

VALVE CHAMBER MAY BE

CONSTRUCTED WITH PRE-CAST

CONCRETE UNITS OF A SIZE TO

ACCOMMODATE THE FITTINGS

SHOWN (MIN. 1800mmØ).

CONC. THRUST BLOCK

TO BEND (REFER TO

DRG. No. STD-WW-14

FOR DETAILS)

CONC. THRUST BLOCK

TO BEND (REFER TO

DRG. No. STD-WW-14

FOR DETAILS)

REFER TO DRG. No.

STD-WW-09 FOR

DETAILS TO STEP IRONS

No. Date Description0 08/'16 Initial Issue

AppDrn ChkJMC TOC MOD

1 11/'17 Revised notes 2,4,9 & 11JMC TOC MOD

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

SUBMERSIBLE PUMPING STATION

128A

JUL. 2016

INDICATIVE PRE-CAST CONCRETE

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. PUMPS SHALL BE INSTALLED TO IRISH WATER REQUIREMENTS. REFER TO PART 5 OF THE CODE OF PRACTICE FOR WASTEWATER

INFRASTRUCTURE .

3. ALL DUCTILE IRON PIPE WORK AND FITTINGS TO BE IN ACCORDANCE WITH IS EN 598.

4. PRE-CAST CONCRETE CHAMBERS MAY BE USED SUBJECT TO REVIEW BY IRISH WATER.

5. ALL GATE VALVES TO BE CLOCKWISE CLOSING.

6. WET WELL TO BE IN ACCORDANCE WITH BS EN 1992-3.

7. COVERS TO BE SIZED TO ALLOW ADEQUATE SPACE FOR PUMP REMOVAL MINIMUM 1400 x 800mm.

8. CHAMBER ACCESS COVERS WITH A CLEAR OPENING EXCEEDING 1m SHALL CONFORM TO BS 9124.

9. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF IS EN 1917 AND BS 5911-PART 3. ROOF SLABS SHALL BE DESIGNED

TO CARRY ALL LIVE LOADS & DEAD LOADS, & CONSIST OF A REINFORCED CONCRETE SLAB OF IN-SITU CONCRETE, GRADE C30/37, WITH

A MINIMUM THICKNESS OF 225mm. ALTERNATIVELY, PRE-CAST CONCRETE ROOFS MAY BE USED, SUBJECT TO IRISH WATER REVIEW, &

COMPLIANCE WITH BS 5911, Part 4.

10. THE PUMPING STATION SHOULD NOT BE LOCATED IN AREAS THAT ARE SUSCEPTIBLE TO FLOODING AT MORE THAN A 1:30 YEAR

RECURRENCE. THE PUMPING STATION FACILITY SHALL BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHALL BE

POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND

POSITIONED ABOVE 1:200 YEAR FLOOD LEVEL.

11. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED ON GROUND CONDITIONS WITHIN THE SITE. SHOULD

ANTI-FLOATATION MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY IRISH WATER.

12. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

13. THIS DRAWING IS INDICATIVE ONLY AND THE DEVELOPER SHALL SUBMIT A SITE SPECIFIC LAYOUT TO IRISH WATER FOR REVIEW.

14. VENTILATION STACK TO BE PROVIDED IN SENSITIVE AREAS.

15. A 24 HOUR STORAGE CAPACITY BASED ON DRY WEATHER FLOW, SHALL BE PROVIDED AT THE PUMPING STATION.

16. EMERGENCY OVERFLOW MAY BE PROVIDED SUBJECT TO APPROVAL FROM THE RELEVANT REGULATORY AUTHORITIES.

17. SURGE EQUIPMENT TO BE PROVIDED IF DEEMED NECESSARY.

18. INDICATIVE LAYOUT RELATES TO SMALL PUMPING STATIONS AS PER TYPE 1, TYPE 2 & TYPE 3 IN THE IRISH WATER CODE OF PRACTICE

FOR WASTEWATER INFRASTRUCTURE.

IW-CDS-5030-01 Rev. 03 December 2017

PIPE JOINT WITH CHANNEL TO BE

LOCATED MINIMUM 100mm INSIDE

FACE OF MANHOLE

MINIMUM WIDTH OF BENCHING FOR

LANDING AREA TO BE 500mm

150mm GRADE C16/20 IN-SITU

CONCRETE SURROUND

FLEXIBLE JOINT

A

A

25

0

ALL PRECAST CHAMBER RINGS TO BE REINFORCED

BOTTOM PRECAST SECTION TO BE BUILT INTO BASE

CONCRETE MINIMUM 75 mm

150mm GRADE C16/20 IN-SITU

CONCRETE SURROUND

BENCHING CONCRETE GRADE C25/30 FINISHED

WITH A 1:3 CEMENT SAND MORTAR

PRECAST CONCRETE MANHOLE RINGS TO IS 420

IN CONJUNCTION WITH IS EN 1917: 2004

75mm GRADE C12/15 BLINDING CONCRETE

REFER TO TABLE FOR

PRE-CAST RING DIAMETER

ELASTOMERIC JOINTSEAL TO EN 681

1 No. MIN.,

3 No. MAX. OF CLASS B

ENGINEERING BRICK

SET IN C50/60 MORTAR

Max. 600

REINFORCED CONCRETE BASE GRADE C30/37

MANHOLE COVER AND FRAME SHALL

COMPLY TO IS EN 124 AND BS 7903

(ALL CLASS D400 COVERS SHALL HAVE

MIN. FRAME DEPTH 100-150mm) MIN.

OPE. 600 x 600mm

SECTION A-A

PLAN

COVER TO BE SET

IN GRADE C50\60

MORTAR

Flow

22

5

MIN. 600

100mm Ø PIPE TO VENT STACK

Flow

SLO

PE

1:1

0

500

SEALED JOINT

SLO

PE

1:1

0

WATER TIGHT SEAL

REFER TO TABLE FOR

PC RING DIAMETER

50

0

COVER TO BE SEALED & LOCKABLE

ROCKER PIPE

(SEE TABLE BELOW)

FINISHED GROUND LEVEL

SEE NOTES 11, 12 & 13.

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

access ope dim.1 08/'16 Revised cover note & JMC TOC MOD

2 11/'17 Added rocker pipe table,JMC added & updated notes.TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. PRE-CAST MANHOLES UNITS: COMPLYING WITH REQUIREMENTS OF

IS EN 1917 AND BS 5911-PART 3.

3. THICKER MANHOLE BASES REQUIRED FOR SEWERS IN EXCESS OF

3m DEEP WHERE THE SIZE IS GREATER THAN THE STANDARD MINIMUM SIZE.

4. PRE-CAST CONCRETE BASES MAY BE USED INCORPORATING

CHANNELS, BENCHING ETC. SUBJECT TO IRISH WATER REVIEW AND

COMPLYING WITH BS 5911-PART 4 2002.

5. STRUCTURAL DESIGN AND REINFORCEMENT DETAILS TO BE PROVIDED BY

THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

6. MANHOLE ROOFS SHOULD CONSIST OF A REINFORCED CONCRETE SLAB

OF IN-SITU CONCRETE, C30/37, WITH A MINIMUM THICKNESS OF 225mm

DESIGNED TO CARRY ALL LIVE AND DEAD LOADS, ALTERNATIVELY,

APPROVED PRE-CAST CONCRETE ROOF SLABS MAY BE USED SUBJECT

TO IRISH WATER REVIEW AND COMPLIANCE WITH BS 5911 PART 4: 2002.

7. COVERS AND FRAMES SHALL BE SUITABLE FOR ROAD AND TRAFFIC

CONDITIONS SUBJECT TO REVIEW BY IRISH WATER.

8. 200mm ALL AROUND, 100mm DEEP CONCRETE PLINTH AROUND COVERS IN

GREEN AREAS.

9. ALL CHAMBERS TO BE CHECKED FOR UPLIFT BY THE DEVELOPER BASED

ON GROUND CONDITIONS WITHIN THE SITE. SHOULD ANTI FLOATATION

MEASURES BE REQUIRED THEY SHALL BE SUBJECT TO REVIEW BY

IRISH WATER.

10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

11. ANY SPECIAL ROAD REINSTATEMENT AROUND COVER & FRAME SHALL BE TO ROADAUTHORITY'S REQUIREMENTS.

12. NEW ROAD CONSTRUCTION & SURFACE FINISH TO BE TO ROAD AUTHORITY REQUIREMENTS.

13. EXISTING ROAD REINSTATEMENT TO COMPLY WITH CURRENT VERSION OF "GUIDELINES FOR

MANAGING OPENINGS IN PUBLIC ROADS" BY THE DEPT. OF TRANSPORT, TOURISM & SPORT, OR

TRANSPORT INFRASTRUCTURE IRELAND REQUIREMENTS.

1200

1350

LESS THAN 375

375 TO 450

DIAMETER OF LARGEST PIPE IN

MANHOLE (mm)

MINIMUM MANHOLE DIAMETERS

INTERNAL DIAMETER OF

MANHOLE (mm)

1500500 TO 700

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

DISCHARGE MANHOLE

229

SEPT. 2015

RISING MAIN

600

1000

150 TO 600

GREATER THAN 600 TO 750

PIPE DIAMETER

(mm)

ROCKER PIPE LENGTH

ROCKER PIPE

LENGTH (mm)

1250GREATER THAN 750

IW-CDS-5030-01 Rev. 03 December 2017

REMOVABLE

WATER - TIGHT

CAP ON PVC DUCT

PVC DUCTING WITH

DRAW - CORD

MIN. 1200

MIN

. 1

20

0

MIN. 1200

MIN. 600

30

0

WET KIOSK

1500600

MIN. 600

MIN

. 1

20

0

150

600

900

1500

150150

MIN.1200

FRONT ELEVATION(WET KIOSK)

CROSS SECTION(WET KIOSK)

WET KIOSK

HEAVY DUTYSTEEL HINGES

RECESSDOUBLEDOORS

PLAN

450mm THICKCONCRETEPLINTHGRADE C25/ 30

150

MIN. 300

MIN

. 1

20

0

150 150

75mm THICKCONCRETEBLINDINGGRADE C12/15

450mm THICKCONCRETEPLINTHGRADE C25/ 30

60

0

MIN

. 1

80

0

150 150

450mm THICKCONCRETEPLINTHGRADE C25/ 30

FRONT ELEVATION(CONTROL KIOSK)

TELEMETRYKIOSK

SLOW BEND

REMOVABLE

WATER - TIGHT

CAP ON PVC DUCT

150150

CONTROL KIOSK

REFER TOSTD-WW-19 FORDUCT CHAMBER DETAILS

CROSS SECTION(TELEMETRY KIOSK)

PLAN

45

0

15

0

15

0

15

0

75mm THICKCONCRETEBLINDINGGRADE C12/15

75mm THICKCONCRETEBLINDINGGRADE C12/15

75mm THICKCONCRETEBLINDINGGRADE C12/15

15

0

45

0

MIN

. 1

80

0

HIGH LEVEL VENTILATIONON OTHER SIDE

LOW LEVEL VENTILATION

POWER INDUCT

45

0

45

0

SLOPED ROOF

NOTE:ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAYVARY TO SUIT THE KIOSK REQUIREMENT.

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 Added note 5 (kiosk doors)JMC TOC MOD2 11/'17 Updated note 9JMC TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. KIOSKS TO BE CONSTRUCTED FROM THERMOSETTING U.V. & WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICKNESS) TO BS EN 1461. STAINLESS STEEL OR

NON-METALLIC MATERIALS, SUCH AS GLASS REINFORCED PLASTIC (GRP), MAY BE USED AS AN ALTERNATIVE KIOSK MATERIAL, PARTICULARLY IN SEVERE ENVIRONMENTS, SUBJECT TO AGREEMENT WITH IRISH WATER.3. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.4. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:

A) A THERMAL TRANSMITTANCE OF 1.5W PER m²KB) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION) EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.C) AN IP RATING OF IP65 OR EQUIVALENT.

5. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWOLEAVES OR LEAF & FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.

6. KIOSK TO BE BOLTED TO THE PLINTH THROUGH A BOTTOM FLANGE WITH GALVANISED MILD STEEL OR STAINLESS STEEL ANCHOR BOLTS.7. THE BOTTOM FLANGE SHALL BE SEATED ON A NEOPRENE GASKET AND SEALED WITH MASTIC.8. REAR WALL SHALL BE REINFORCED WITH STAINLESS STEEL SECTIONS TO WHICH A MARINE PLY WOOD , 18mm THICK BOARD IS FIXED.9. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.10. TELEMETRY DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.11. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.12. THE ROOF OF THE KIOSK SHALL BE REMOVABLE (BOLTS) TO FACILITATE BACKBOARD REMOVAL.13. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.14. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.15. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.16. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED

SLAB LEVEL SHOULD BE POSITIONED ABOVE THE 1:100 YEARS FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.17. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

AND WET KIOSK

230

SEPT. 2015

(Sheet 1 of 2)

KIOSK TYPE 1 PUMPING STATION

IW-CDS-5030-01 Rev. 03 December 2017

1370

21

00

REMOVABLE

WATER - TIGHT

CAP ON PVC DUCT

PVC DUCTING WITH

DRAW - CORD

15

85

1800

600

30

0

WET KIOSK

2100600

600

12

00

150

600

900

2100

150

1800

FRONT ELEVATION(WET KIOSK)

CROSS SECTION(WET KIOSK)

WET KIOSK

HEAVY DUTYSTEEL HINGES

HOT DIPPED POWDERCOATED MILD STEELGALVANISED DOORS TO BS729

PLAN

450mm THICKCONCRETEPLINTHGRADE C25/ 30

150

300

12

00

150 150

75mm THICKCONCRETEBLINDINGGRADE C12/15

450mm THICKCONCRETEPLINTHGRADE C25/ 30

60

0

900

24

00

150 150

450mm THICKCONCRETEPLINTHGRADE C25/ 30

FRONT ELEVATION(CONTROL KIOSK)

215mm CONCRETE BLOCKS INACCORDANCE WITH IS EN 771-3COMPLETEWITH INTERNAL ANDEXTERNAL RENDER

HIGH LEVEL VENTILATIONON OTHER SIDE(LOUVRED GRILLE)

SLOW BEND

REMOVABLE

WATER - TIGHT

CAP ON PVC DUCT

150150

CONTROL KIOSK

REFER TOSTD-WW-19 FORDUCT CHAMBER DETAILS

CROSS SECTION(TELEMETRY KIOSK)

PLAN

45

0

15

0

15

0

75mm THICKCONCRETEBLINDINGGRADE C12/15

75mm THICKCONCRETEBLINDINGGRADE C12/15

75mm THICKCONCRETEBLINDINGGRADE C12/15

15

0

45

0

150

15

0

24

00

15

0

LOW LEVEL VENTILATION(LOUVRED GRILLE)

150mm REINFORCEDCONCRETE ROOF SLABTO GRADE C30/37WITH WEATHER PROOFASPHALT FINISH

POWER INDUCT

45

0

45

0

215 215

21

5

NOTE:ALL KIOSK DIMENSIONS ARE MINIMUM DIMENSIONS & MAYVARY TO SUIT THE KIOSK REQUIREMENT.

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 08/'16 added note 3 (kiosk doors)JMC TOC MOD2 11/'17 Updated note 6JMC TOC MOD

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.2. CONTROL KIOSK TO BE CONSTRUCTED FROM 215mm THICK CONCRETE BLOCKS IN ACCORDANCE WITH IS EN 771-3, WITH SMOOTH RENDER FINISH INTERNALLY AND EXTERNALLY. WET KIOSK TO BE CONSTRUCTED FROM THERMOSETTING U.V. &

WEATHER RESISTANT PLASTIC POWDER COATED & HOT DIPPED GALVANISED MILD STEEL PLATE (MINIMUM 4mm THICK) TO BS EN 1461. ALTERNATIVE MATERIAL, STAINLESS STEEL IN HARSH ENVIRONMENTS, NON-METALLIC (GRP, POLYESTER, ETC.)MAY BE ALLOWED FOR WET KIOSK SUBJECT TO AGREEMENT WITH IRISH WATER.

3. KIOSK TO HAVE SINGLE OR DOUBLE STEEL/GRP DOORS WITH MULTIPLE LOCKS TO LPS 1175 SR4 OR EN 1627. MINIMUM DOUBLE LOCKS WITH BOLTS THAT ENGAGE INTO THE SILL & HEADER AS WELL AS BETWEEN THE TWO LEAVES OR LEAF &FRAME. LEADING EDGE OF LEAVES TO HAVE EITHER REBATED EDGES OR FITTED WITH ASTRAGALS.

4. COLOUR TO BE HOLLY GREEN BS 4800 14 C39. INTERIOR FINISH TO BE WHITE UNLESS APPROVED BY IRISH WATER.5. THE QUALITY OF KIOSK CONSTRUCTION SHALL ENSURE THAT THE FOLLOWING IS ACHIEVED:

A) A THERMAL TRANSMITTANCE OF 1.5W PER m²K.B) A FIRE RESISTANCE (RETENTION OF STABILITY, INTEGRITY AND INSULATION), EQUIVALENT TO CLASS 2 OF BS 476, WHEN TESTED IN ACCORDANCE WITH BS 476 FOR A PERIOD EXCEEDING 30 MINUTES.C) AN IP RATING OF IP65 OR EQUIVALENT.

6. THE DEVELOPER SHALL BE RESPONSIBLE FOR THE ULTIMATE SIZING OF THE KIOSK TO ENSURE ADEQUATE SPACE REQUIREMENTS.7. CABLE DUCTING TO BE IN ACCORDANCE WITH BS 4660 AND BS EN 1401.8. ELECTRICAL REQUIREMENTS TO BE IN ACCORDANCE WITH ESB SPECIFICATION.9. ALL EXPOSED PIPEWORK TO BE ADEQUATELY INSULATED WITH PIPE LAGGING.10. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.11. WATER TIGHT SEALS ARE TO BE PROVIDED WHERE DUCTING ENTERS DUCT CHAMBERS AND KIOSKS. ALL DUCTING TO BE INSTALLED WITH DRAW CORDS.12. THE KIOSK SHALL NOT BE LOCATED IN AREAS THAT ARE SUSCEPTABLE TO FLOODING AT A FREQUENCY OF MORE THAN 1:30 YEARS RECURRENCE. THE KIOSK FACILITY SHOULD BE DESIGNED FOR INUNDATION. THE FINISHED SLAB LEVEL SHOULD

BE POSITIONED ABOVE THE 1:100 YEAR FLOOD LEVEL. ALL ELECTRICAL CONTROL EQUIPMENT SHALL BE WATER RESISTANT AND POSITIONED ABOVE THE 1:200 YEAR FLOOD LEVEL.13. ALL DIMENSIONS ARE MINIMUM DIMENSIONS AND MAY VARY TO SUIT THE KIOSK REQUIREMENT.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

AND WET KIOSK

231

SEPT. 2015

(Sheet 2 of 2)

KIOSK TYPE 2 + 3 PUMPING STATION

IW-CDS-5030-01 Rev. 03 December 2017

4000mm

100mm OF DENSE BITUMEN MACADAM

(14mm AGGREGATE)

1:40 FALL

PRECAST KERB

500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07

WITH 75mm REGULATING COURSE

CROSS SECTION

OF MACADAM SURFACE

4000mm

1:40 FALL

CROSS SECTION

CONCRETE SLAB

200mm THICK REINFORCED

CONCRETE GRADE C35/45

500mm DEEP CLAUSE 804 MATERIAL COMPACTED AS PER STD-WW-07

PRECAST KERB

CONCRETE C25/30

CONCRETE C25/30

CLAUSE 804

GEOTEXTILE

WEED BARRIER

75mm THICKNESS OF

10mm SINGLE SIZED

AGGREGATE

PERMEABLE AREA

40

0m

m7

5m

m

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated notes 2 & 3JMC MODTOC

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. REGULATING COURSE TO BE REVIEWED BY IRISH WATER.

3. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY

THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

4. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206.

5. PRECAST KERBS TO BE IN ACCORDANCE WITH IS EN 1340:2003.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

HARDSTANDING AREA PUMPING STATION

132

SEPT. 2015

(PERMEABLE AND IMPERMEABLE)

IW-CDS-5030-01 Rev. 03 December 2017

SECTION

PLAN

100mm DIA. DUCT100mm DIA. T.PIECE

MIN. 100 DIA. CABLE DUCT

200

LAMP BOLLARD

CONCRETE GRADE C30/37

ARMOURED CABLING TO DUCT

100

300

300

LAMP BOLLARD

4000 O

R 5000 A

S S

PE

CIF

IE

D

LAMP STANDARD

SHAFT

INSPECTION DOOR 610 x 108

CABLE ENTRY SLOT 152 x 76

75 BLINDING

150 DIA. CABLE DUCT

470

CONCRETE GRADE C30/37

600

GROUND LEVEL

LAMP BOLLARD

SECTION

510

600

305

762

600

PLAN

CONCRETE GRADE C30/37

LAMP STANDARD

600 x 450 CABLE JUNCTION BOX(SIMILAR TO DUCT CHAMBERDETAIL ON DRG. No. STD-WW-19)

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated notes 2 & 3JMC MODTOC

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. LAMP BOLLARD TO BE REVIEWED BY IRISH WATER.

3. LAMP STANDARD TO BE REVIEWED BY IRISH WATER.

4. ELECTRICAL DUCTING TO BE IN ACCORDANCE WITH ESB SPECIFICATION.

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

LAMP BOLLARD & LAMP STANDARD

133

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

150Ø VENT PIPE

80

0

7.6

00

90

0

900

12

00

7600mm HIGH 150Ø

GALVANISED STEEL

DECORATIVE VENT

SHAFT WITH

PROTECTIVE GRILL

VENT DETAIL

CONCRETE C30/37

No. Date Description0 09/'15 Initial Issue

AppSL

Drn ChkJMC TOC

1 11/'17 Updated note 2JMC MODTOC

1. ALL DIMENSIONS ARE IN MILLIMETRES (mm) UNLESS NOTED OTHERWISE.

2. STRUCTURAL DESIGN AND REINFORCEMENT DETAIL TO BE PROVIDED BY

THE DEVELOPER AND SUBMITTED TO IRISH WATER FOR REVIEW.

3. ALL CONCRETE TO BE IN ACCORDANCE WITH IS EN 206

DRAWING No.

SCALE

TITLE REV

DATE

STANDARD DETAILS - WASTEWATER NOT TO SCALE

STD-WW-

REFER TO INDEX SHEET FOR NOTES REGARDING DESIGN RESPONSIBILITY & RISK ASSESSMENT

VENT STACK

134

SEPT. 2015

IW-CDS-5030-01 Rev. 03 December 2017

ST

AN

DA

RD

DE

TA

ILS

FO

R W

AS

TE

WA

TE

R N

ET

WO

RK

S:

RE

VIS

ION

LO

G –

03

(1

st

Dec.

20

17

)

DR

G N

o.

DR

AW

ING

TIT

LE

M

AT

ER

IAL

CH

AN

GE

E

DIT

OR

IAL

CH

AN

GE

R

EV

CO

MM

EN

TS

ST

D-W

W-0

1

WASTE WATER SERVICE CONNECTION RESPONSIBILITY

Added note reference

1

Drawing revised

ST

D-W

W-0

2TYPICAL LAYOUT FOR SEWER WITHIN NEW DEVELOPMENTS

Updated Note 2

1

Drawing revised

ST

D-W

W-0

3DRAIN & SERVICE CONNECTION PIPEWORK

Updated notes

1

Drawing revised

ST

D-W

W-0

4TYPICAL SEWER / SERVICE PIPE CONNECTION

Updated connection detail

Updated notes

1

Drawing revised

ST

D-W

W-0

5TYPICAL SERVICE LAYOUT INDICATING SEPARATION DISTANCES

Updated notes

1

Drawing revised

ST

D-W

W-0

6RESTRICTIONS ON WASTEWATER INFRASTRUCTURE WORKS ADJACENT TO

TREES

Revised to suit ILI recommendations

2

Drawing revised

ST

D-W

W-0

6A

RESTRICTIONS ON NEW TREES/SHRUBS PLANTING ADJACENT TO SEWERS

0

New Drawing

ST

D-W

W-0

7TRENCH BACKFILL & BEDDING

Updated & added Notes

1

Drawing revised

ST

D-W

W-0

8CONCRETE BED, HAUNCH & SURROUND TO WASTEWATER PIPES

0

No change

ST

D-W

W-0

9

BLOCKWORK MANHOLE (<450mm DIA.)

Added rocker pipe table

Updated & added Notes

2

Drawing revised

ST

D-W

W-1

0PRE-CAST CONCRETE MANHOLE

Added rocker pipe table & deep

manhole detail

Updated & added Notes

2

Drawing revised

ST

D-W

W-1

1

IN-SITU CONCRETE MANHOLE

Added rocker pipe table & deep

manhole detail

Updated & added Notes

2

Drawing revised

ST

D-W

W-1

2BACKDROP MANHOLES

Updated notes

2

Drawing revised

ST

D-W

W-1

3PRIVATE SIDE INSPECTION CHAMBER

Updated notes

2

Drawing revised

ST

D-W

W-1

4THRUST BLOCKS FOR RISING MAINS

Anti-torque support note & thrust flange

added

Note 6 updated

1

Drawing revised

ST

D-W

W-1

5SCOUR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.)

Revised & added notes

2

Drawing revised

ST

D-W

W-1

6SLUICE VALVE DETAILS FOR RISING MAINS DUCTILE IRON (D.I.) PIPE (<200mm

DIA.) (Sheet 1 of 2)

Revised & added notes

3

Drawing revised

ST

D-W

W-1

7

SLUICE VALVE DETAILS FOR RISING MAINS POLYETHYLENE (P.E.) PIPE

(<200mm DIA.) (Sheet 2 of 2)

Revised & added notes

2

Drawing revised

ST

D-W

W-1

8AIR VALVE CHAMBER (FOUL RISING MAIN <200mm DIA.)

Revised & added notes

2

Drawing revised

ST

D-W

W-1

9DUCT CHAMBER

Revised notes

2

Drawing revised

ST

D-W

W-2

0EMERGENCY OVERFLOW STRUCTURE

Notes revised

1

Drawing revised

ST

D-W

W-2

1TYPICAL DITCH/STREAM CROSSING FOR GRAVITY MAIN (Sheet 1 of 2)

Updated pipe depth dim

ension

1

Drawing revised

ST

D-W

W-2

2TYPICAL DITCH/STREAM CROSSING FOR RISING MAIN (Sheet 2 of 2)

Updated pipe depth dim

ension

Note 10 revised

1

Drawing revised

ST

D-W

W-2

3TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 1 of 2)

Notes 5 & 14 revised

1

Drawing revised

ST

D-W

W-2

4TYPICAL BRIDGE CROSSING FOR RISING MAIN (Sheet 2 of 2)

Updated pipe depth dim

ension

Revised notes 12 & 14

1

Drawing revised

ST

D-W

W-2

5

SECURITY GATE & FENCING

Fencing table updated

2

Drawing revised

ST

D-W

W-2

6INDICATIVE PUMPING STATION LAYOUT

0

No change

ST

D-W

W-2

7FLOW METER CHAMBER (FOUL RISING MAIN <200mm DIA.)

Revised & added notes

2

Drawing revised

ST

D-W

W-2

8INDICATIVE SUBMERSIBLE PUMPING STATION

Revised notes 2,4,9 & 11

Revised notes

2

Drawing revised

ST

D-W

W-2

8A

INDICATIVE PRE-CAST CONCRETE SUBMERSIBLE PUMPING STATION

Revised notes 2,4,9 & 11

Revised notes

1

Drawing revised

ST

D-W

W-2

9RISING MAIN DISCHARGE MANHOLE

Added rocker pipe table

Updated & added Notes

2

Drawing revised

ST

D-W

W-3

0KIOSK TYPE 1 PUMPING STATION & WET KIOSK (Sheet 1 of 2)

Updated note 9

2

Drawing revised

ST

D-W

W-3

1KIOSK TYPE 2 + 3 PUMPING STATION & WET KIOSK (Sheet 2 of 2)

Updated note 6

2

Drawing revised

ST

D-W

W-3

2HARDSTANDING AREA PUMPING STATION (PERMEABLE & IMPERMEABLE)

Updated notes 2 & 3

1

Drawing revised

ST

D-W

W-3

3LAMP BOLLARD & LAMP STANDARD

Updated notes 2 & 3

1

Drawing revised

ST

D-W

W-3

4VENT STACK

Updated note 2

1

Drawing revised

/ INDEX SHEET

Inclusion of STD-W

W-06A

Drawing revisions updated

Nov 2017 Drawing revisions updated

/ Design Risk Assessment for Wastewater Standard Details

Inclusion of STD-W

W-06A

General Amendments

v4.01 Document revised

IW-CDS-5030-01 Rev. 03 December 2017