waste management 2015 pdf
TRANSCRIPT
2015
WASTE MANAGEMENT AT NORTH MARA GOLD PLANT
TO NORTH MARA ENVIRONMENTAL MANAGEMENT
CC
FROM
METALLURGICAL TEAM
GULAMALI BAYA
SUBJECT GOLD PLANT WASTE MANAGEMENT REPORT
DATE 25TH
JUNE, 2015
PROJECT TITLE: Waste Management at Gold Plant
INTRODUCTION
“Waste” is a general term for material which currently has little or no economic value. The
material (water, solids, and gases) left behind after the ore has been processed to remove the gold
material, are considered to be waste materials in Gold Plant.
Therefore, The type, amount, and properties of gold plant waste produced at our processing plant
is due to the process technology used, due to this reasons we have focused to manage waste
produced by the plant in order to deal with the large volumes of waste produced and to prevent
the release of contaminates into the environment.
TYPES OF GOLD PLANT WASTE
Solid Waste – Mainly rocks/ Scrap Metals / Domestics Wastes/ Hydrocarbons wastes:
Hydrocarbons waste- plastic, rubbers, reagent bags etc.
Scrap metals waste – Used liners, steel ball, steel plates, empty
drums etc.
Domestic wastes- food stuff, paper & filter paper, wood etc.
Rocks waste include particulate matter (dust)
Liquid waste - Mainly slurry/ water/ Tailings/ Chemicals
Tailings are finely ground rock and mineral waste products of
Gold plant processing operations. Tailings can also contain
leftover processing chemicals, and are usually deposited in the
form of water-based slurry into tailings ponds TSF
(sedimentation lagoons enclosed by dams built to capture and
store the tailings).
Process water is the kind of water which contains cyanide and
other chemicals produced after decantation process takes place
at the TSF, its pumped back to the mill.
Chemicals like HCL, H2SO4, Flocculants etc.
WASTE GENERATED IN THE GOLD PLANT
Description Quantity Kg/day Kg/week Kg/ month Tonnes/year
Solid waste Rubber
Plastic
21 150 630 7.56
5 35 150 1.80
Scraps Metal
Food stuff
200 1400 1550 18.6
22 154 660 7.92
Wood, paper 9 80 570 6.84
MANAGEMENT OF GOLD PLANT WASTE
Tailing management, Because tailings are composed of fine particles (sand, silt, and
clay-sized material), and often have a high water content (process water- water with
cyanide), they have been particularly troublesome to manage, pumped into tailings
ponds on site for decantation process and then recycle water back to the processing
plant. Although there have been a number of incidents where the dams securing
tailings ponds have been breached, we have been learning from the enquiries into
tailing dam failures, and we have improved tailings dam design and execution.
Scraps metals, like used steel balls are placed in the safe place for sorting process,
then the qualified one which have wearied well are recycled back to the mill depending
on diameter. Others which have rough surface are combined with Used liners, steel
plates and empty drums taken out of the plant by means of trucks.
Hydrocarbon and domestic waste are collected by means of movable plastic drum
taken to the incinerator to change into other forms prior to the environment.
Particulate matter (dust), are controlled by means of electrostatic precipitator
(environmental control technology) capable of removing up to 99.7% of dust and
fumes.