1
Pathway to Zero Waste Workshop 12 November 2010
Waste Data and
LDF Preparation
Trevor BrownPrincipal Planning Officer
![Page 2: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/2.jpg)
2
Waste Core Strategy - Purpose
• Identify waste capacity requirement• Plan for a period of at least 15 years • Identify a strategy for site identification• Set a policy framework for development
management
![Page 3: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/3.jpg)
3
Waste Core Strategy - Aims
• Self-sufficiency (as far as possible)
• Accommodate neighbouring needs
(where necessary)
• Identify how special needs should be met
![Page 4: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/4.jpg)
4
Waste Core Strategy - Process
• Establish (most) reliable base data
• Estimate future levels of waste
• Decide on how to manage the waste
• Establish existing waste capacity
• Develop strategy– for deficiency in waste capacity– for surplus in waste capacity
![Page 5: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/5.jpg)
5
Waste Core Strategy - ProcessC & I WasteCurrent 630,000 tpaEstimate 690,000 tpa
AimRecycle 70%Treat 25%Landfill 5%
ExistingRecycle 40%Treat 0%Landfill 60%
Develop StrategyRecycle requirement 189,000 tpaTreatment requirement 157,500 tpaLandfill surplus ???
![Page 6: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/6.jpg)
6
Waste Data: base data
• MSW: local authorities
• C&I: survey / E.A. data
• CDE: survey / E.A. data
• Haz : E.A. data
![Page 7: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/7.jpg)
7
Waste Data: Growth Rates
• Current trends
• Population/employment projections
• Waste targets on reduction
• Behaviour change
Get a Consultant??
![Page 8: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/8.jpg)
8
Waste Data: Managing the waste
• European / National targets
• Regional Spatial Strategy (revoked)
• New focus on Localism– Municipal waste strategy– Recycling/composting/landfill diversion aims– Approach to self-sufficiency– Stakeholder consultation
![Page 9: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/9.jpg)
9
Waste Data: Existing Capacity
• Average annual throughput?
• E.A. Licensed capacity limit?
• Planning condition limit?
• Site size?
• Waste market / operator opinion?
• PPS10 Guide: ‘maximum amount a site can take in annually’
![Page 10: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/10.jpg)
10
Waste Data: how important?
• Berkshire Waste Core Strategy
• Submission to SoS
• EiP adjourned“…….if the base data of existing waste management facilities is incorrect, the requirements for additional waste management capacity….may be incorrect”
- Waste Core Strategy withdrawn
![Page 11: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/11.jpg)
11
Oxon: Waste Site Profile (content)
• Facility identification
• Contact Details
• Operator Aspiration
• E.A. data (throughput, capacity etc)
• Planning history
• Preliminary planning assessment
![Page 12: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/12.jpg)
12
Oxon: Waste Site Profile (process)
• Call for sites form
• Prepare draft profile
• Discuss Operator
• Finalise profile
• Monitor
![Page 13: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/13.jpg)
13
Oxon: Waste Site Profile (stats)
• Summer 2008 commencement
• 110 waste sites
• 149 separate facilities
• 87 site nominations
• 60% operator returns
• 36 completed profiles (to date)
![Page 14: Waste Data and LDF Preparation - Trevor Brown](https://reader031.vdocuments.site/reader031/viewer/2022013100/5457ad0caf79593e108b6d05/html5/thumbnails/14.jpg)
14
Waste Data and the LDF
Thank you
Questions?