washington adventist hospital white oak …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington...

25
E.D. CANOPY WASHINGTON ADVENTIST EMERGENCY KEYPLAN CONTACT: Drawn RTKL Proj No. Scale: 2008 RTKL ASSOCIATES INC. RTKL Associates, Inc., Washington, DC NOT FOR CONSTRUCTION FILE NAME: TIME: 1 Issue Date: Soltesz Engineering, Rockville, MD Parker Rodriguez Inc., Alexandria, VA TLC Engineering, Orlando, FL Perrine Planning & Zoning, Inc., Rockville, MD The Traffic Group, Inc., Baltimore, MD The Walker Group LLC, Bethesda, MD Lerch, Early & Brewer, Bethesda, MD LaSalle Engineering, LLC, Willow Grove, PA NORTH Checked Approved CONSULTANTS: Geoffrey A. Morgan Vice President Washington Adventist Hospital 301.891.5458 2 3 4 5 6 7 8 9 1 2 3 4 5 6 7 8 9 A B C D E F G H J K A B C D E F G H J K CON APPLICATION Washington Adventist Hospital Replacement Project PLUM ORCHARD DRIVE SILVER SPRING, MARYLAND 20904 - OCT 4, 2013 CON SUBMITTAL C:\Users\hmcelroy\Documents\WASHINGTON ADVENTIST_INTERIOR_CENTRAL_E_hmcelroy.rvt 8/8/2014 2:14:21 PM 1" = 40'-0" PROJECT INFORMATION, DRAWING INDEX A-001 Author Checker Approver AUGUST 1, 2014 WASHINGTON ADVENTIST HOSPITAL WHITE OAK CERTIFICATE OF NEED (C.O.N.) SUBMITTAL PROJECT DRAWINGS August 1, 2014 ARCHITECT RTKL ASSOCIATES, INC. WASHINGTON, DC CIVIL ENGINEER SOLTESZ ENGINEERING ROCKVILLE, MD LANDSCAPE ARCHITECT PARKER RODRIGUEZ, INC. ALEXANDRIA, VA M/E/P ENGINEER T.L.C. ENGINEERING ORLANDO, FL Issued Drawing Log No. Date Item Sheet List Sheet Number Sheet Name A-001 PROJECT INFORMATION, DRAWING INDEX A-101 SITE PLAN A-110 CELLAR LEVEL OVERALL PLAN A-110A MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA A A-110B MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA B A-111 LEVEL 1 OVERALL PLAN A-111A MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA A A-111B MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA B A-112 LEVEL 2 OVERALL PLAN A-112A MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA A A-112B MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA B A-113 LEVEL 3 OVERALL PLAN A-113A MAIN HOSPITAL LEVEL 3 FLOOR PLAN AREA A A-113B MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA B A-114 LEVEL 4 OVERALL PLAN A-114A MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA A A-114B MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA B A-115 LEVEL 5 OVERALL PLAN A-115A MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA A A-115B MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA B A-116 MAIN HOSPITAL LEVEL 6 FLOOR PLAN A-117 MAIN HOSPITAL LEVEL 7 FLOOR PLAN A-119 PENTHOUSE AND ROOF PLAN A-200 HOSPITAL EAST AND WEST ELEVATIONS A-201 HOSPITAL NORTH AND SOUTH ELEVATIONS

Upload: others

Post on 30-Jun-2020

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

E.D. CANOPYWAS

HING

TON

ADVE

NTIS

T

EMERGENCY

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

2:1

4:21

PM

1" = 40'-0"

PROJECTINFORMATION,

DRAWING INDEX

A-001

Author

Checker

Approver

AUGUST 1, 2014

WASHINGTON ADVENTIST HOSPITALWHITE OAK

CERTIFICATE OF NEED (C.O.N.) SUBMITTAL

PROJECT DRAWINGSAugust 1, 2014

ARCHITECTRTKL ASSOCIATES, INC.

WASHINGTON, DC

CIVIL ENGINEERSOLTESZ ENGINEERING

ROCKVILLE, MD

LANDSCAPE ARCHITECTPARKER RODRIGUEZ, INC.

ALEXANDRIA, VA

M/E/P ENGINEERT.L.C. ENGINEERING

ORLANDO, FL

Issued Drawing LogNo. Date Item

Sheet ListSheet

Number Sheet Name

A-001 PROJECT INFORMATION, DRAWING INDEXA-101 SITE PLANA-110 CELLAR LEVEL OVERALL PLANA-110A MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA AA-110B MAIN HOSPITAL CELLAR LEVEL FLOOR PLAN - AREA BA-111 LEVEL 1 OVERALL PLANA-111A MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA AA-111B MAIN HOSPITAL LEVEL 1 FLOOR PLAN AREA BA-112 LEVEL 2 OVERALL PLANA-112A MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA AA-112B MAIN HOSPITAL LEVEL 2 FLOOR PLAN AREA BA-113 LEVEL 3 OVERALL PLANA-113A MAIN HOSPITAL LEVEL 3 FLOOR PLAN AREA AA-113B MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA BA-114 LEVEL 4 OVERALL PLANA-114A MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA AA-114B MAIN HOSPITAL LEVEL 4 FLOOR PLAN AREA BA-115 LEVEL 5 OVERALL PLANA-115A MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA AA-115B MAIN HOSPITAL LEVEL 5 FLOOR PLAN AREA BA-116 MAIN HOSPITAL LEVEL 6 FLOOR PLANA-117 MAIN HOSPITAL LEVEL 7 FLOOR PLANA-119 PENTHOUSE AND ROOF PLANA-200 HOSPITAL EAST AND WEST ELEVATIONSA-201 HOSPITAL NORTH AND SOUTH ELEVATIONS

Page 2: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

PRIVATE STREET

FUTUREM.O.B.

SOUTH PARKING

PROPERTY LINE

ENTRANCE DRIVE

MAIN ENTRY

PROPOSED HOSPITALEMERGENCY

ENTRYEMERGENCY DEPT.

STORMWATERRETENTION

FUTURE EXPANSION

LOADING DOCK

FUTURE PARKING GARAGE

FUTURE M.O.B.

STORMWATERRETENTION

FUTUREEXPANSION

AMBULANCEDRIVE

HELIPAD

COOLING TOWERS

GAS FARM

PLUM ORCHARD DRIVE

NORTHPARKING

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:33

PM

1" = 80'-0"

SITE PLAN

A-101

Author

Checker

Approver

AUGUST 1, 2014

1" = 80'-0"1 SITE PLAN

Issued Drawing LogNo. Date Item

Page 3: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

PRO

PUP

UP

UP

UP

12345678910

A

B

C

D

F.5

1112131415161718

H

F

G

E

0.5

B.5

C.5

E.2

C.8

SURGICALSERVICES

(CSS)PHARMACY KITCHEN

LAB

HIM

PATIENT CAREEQUIPMENT

INFORMATIONSYSTEMS

ANATOMICALPATHOLOGY

STAFFFACILITIES

MATERIALSMANAGEMENT

MATERIALSMANAGEMENT

BEDSTORAGE

ENVIRONMENTALSERVICES

PLANT OPERATIONS

ENV.SERV.

ENGINERINGSERVICES

FUTURE EXPANSION

FUTURE M.O.B.

LOADING DOCK

LINE OFBUILDINGABOVE

CENTRAL ENERGYPLANT

ENG.SERV.

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:37

PM

1" = 20'-0"

CELLAR LEVELOVERALL PLAN

A-110

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"1 CELLAR LEVEL FLOOR PLAN - OVERALL

Issued Drawing LogNo. Date Item

Page 4: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

UP

UP

UP

7875 SFCORRIDOR

1904 SF

INPATIENTPHARMACY

3472 SFKITCHEN

293 SF

IS SUPPORT(STAGING

7040 SF

CLINICALLABORATORY

461 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

4130 SF

GENERALSTORES

258 SFMAIL ROOM

51 SFSTF TLT

8910

A

B

C

D

F.5

1112131415161718

H

F

G

E

B.5

C.5

E.2

C.8209 SF

OFFICE -CLERICAL

281 SF

RECEIVING/BREAKDOWN

2854 SF

CLEANSTERILE

STORAGE989 SFPREP/ASSEMBLY

48 SFHK

44 SFDETERGENT

53 SFHK

64 SF

CARTWASHER

67 SF

MACH.ROOM

108 SF

MACH.ROOM

428 SF

DRYSTORAGE

119 SF

WALK-INFREEZER

225 SF

WALK-INREFRIG.

115 SF

WALK-INREFRIG.

53 SF

TRASH/EXTRACTOR

71 SF

MACH.ROOM

65 SFHK

261 SF

ROOMSERVICE

274 SFOFFICES

120 SF

CATERINGSTORAGE

70 SFADMIN

90 SFOFFICE

90 SFOFFICE

90 SFOFFICE

90 SFOFFICE

90 SFOFFICE

90 SFOFFICE

119 SF

OFFICE-BUYER

239 SF

RECEIVING/BREAKDOWN 43 SF

WAIT. 127 SFLIBRARY

80 SF

TRASHROOM

86 SF

SOLUTIONSTORAGE

188 SFANTE ROOM

180 SF

STAFFBREAK/

LOCKERS

45 SFSTF TLT

44 SFSTF TLT

TRUCK TRUCK TRUCK LINEN

143 SFELECT

360 SFCLERKS

741 SF

BEDSTORAGE

251 SF

UNIFORMDISTRIBUTION

630 SF

CLEANLINEN

HOLDING

93 SFLINEN MGR

469 SF

FEMALESTAFF

LOCKERS340 SF

MALE STAFFLOCKERS

50 SFWORK AREA122 SF

OFFICE -DIRECTOR

102 SF

OFFICE -SUPV

136 SFBUYERS

427 SF

SHAREDSUPPORTLOUNGE

1829 SF

ANATOMICALPATHOLOGY

1047 SF

MAINTECHNOLOGY

ROOM

91 SFUPS

95 SF

ENTRANCEFACILITY

206 SFHVAC

140 SF

OFFICE -SHARED

175 SF

COMPUTERREPAIR

104 SF

BREAKROOM

80 SFOFFICE 89 SF

OFFICE

128 SF

FILESTORAGE

1397 SFBILLERS

13 SFSCAN

36 SFSCAN

127 SF

SOILEDEQUIP

HOLDING 242 SF

EQUIP.DECONTAM

517 SF

CLEANEQUIP.

HOLDING

223 SF

BREAKROOM

100 SF

OFFICE -MGR

558 SFDISPATCH

73 SFCHEMO

232 SFIV PREP

44 SFVESTSURGICAL

SERVICES (CSS)

PHARMACY KITCHEN

PATIENTCARE

EQUIPMENT

MATERIALSMANAGEMENT

83 SFLOCKERS

60 SFTLT/SHWR65 SF

TLT/SHWR113 SF

LOCKERS

204 SFCORRIDOR

184 SFCORRIDOR

68 SFCORRIDOR

208 SFCORRIDOR

254 SFSTAIR 1

182 SFCORRIDOR

228 SFSTAIR 3

154 SFSTF. TLT

171 SFSTF. TLT34 SF

SHWR

28 SFSHWR 28 SF

SHWR 34 SFSHWR

1387 SF

LOADINGDOCK

146 SFELEC

455 SFMechanical

STAFF FACILITIES

LAB

HIM

INFOSYSTEMS

CLEAN DOCK

FUTURE EXPANSION

FUTURE M.O.B.

MECHANICALMEZZANINEABOVE CEILING

976 SFCSS SOLIED

SHAFTABOVE

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:40

PM

1/16" = 1'-0"

MAIN HOSPITALCELLAR LEVEL

FLOOR PLAN - AREA A

A-110A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 CELLAR LEVEL FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 5: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

PRO

P

UP

UP

3472 SFKITCHEN

241 SF

BODYHOLDING

461 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

4028 SF

CENTRALPLANT

2485 SFMECHANICAL

4130 SF

GENERALSTORES

258 SFMAIL ROOM

12345678910

A

B

C

D

F.5

1112

H

F

G

E

0.5

B.5

C.5

E.2

C.8

136 SFPARX/PS

428 SF

DRYSTORAGE

119 SF

WALK-INFREEZER

225 SF

WALK-INREFRIG.

115 SF

WALK-INREFRIG.

53 SF

TRASH/EXTRACTOR

71 SF

MACH.ROOM

65 SFHK

TRUCK TRUCK TRUCK LINEN

RECYCLE

COMPACTOR

COMPACTOR

143 SFELECT

152 SFDATA

360 SFCLERKS

741 SF

BEDSTORAGE

251 SF

UNIFORMDISTRIBUTION

630 SF

CLEANLINEN

HOLDING

93 SFLINEN MGR

128 SF

FAMILYVIEWING

355 SF

SOILEDLINEN

97 SF

MEDICALWASTE

138 SF

SOILEDCART

HOLDING

108 SFCART WASH

139 SF

CLEAN CARTHOLDING

469 SF

FEMALESTAFF

LOCKERS340 SF

MALE STAFFLOCKERS

138 SFWORKST.

234 SF

EQUIP.RECHARGE

188 SFCONFERENCE

50 SFWORK AREA122 SF

OFFICE -DIRECTOR

102 SF

OFFICE -SUPV

48 SFSTF TLT

734 SF

WATER /FIRE

SERVICE

73 SFRECEPT.

136 SFBUYERS

50 SFSTF TLT 479 SF

BULKSUPPLY

713 SF

EQUIPMENTSTORAGE

122 SF

OFFICE -DIRECTOR

1178 SF

GENERALSHOP &PARTS

STORAGE

99 SFOFFICE

101 SFOFFICE

99 SFOFFICE

99 SFOFFICE

120 SF

OFFICE -DIRECTOR

139 SF

WORKROOM/

RECORDS

71 SFLOCKERS 126 SF

LOCKSMITH

210 SF

ELECTRICWORK SHOP

157 SF

PAINT STOR.& SHOP

69 SF

STFTLT/SHWR

94 SF

RECEPT/WAITING

427 SF

SHAREDSUPPORTLOUNGE

1829 SF

ANATOMICALPATHOLOGY

KITCHEN

ENVIRONMENTALSERVICES

MATERIALSMANAGEMENT

MATERIALSMANAGEMENT

PLANT OPERATIONS

254 SFSTAIR 1

147 SFCORRIDOR

246 SFCORRIDOR

182 SFCORRIDOR

228 SFSTAIR 3

154 SFSTF. TLT

171 SFSTF. TLT34 SF

SHWR

28 SFSHWR 28 SF

SHWR 34 SFSHWR

1387 SF

LOADINGDOCK

450 SF

MED GAS(MANIFOLD)

4001 SFELEC

906 SF

MED GAS(COMP/VAC)

146 SFELEC

110 SFELECT

455 SFMechanical

ENV.SERV.

BODY HOLDING

ENG. SERVICES

STAFF FACILITIES

CLEAN DOCK SOILED DOCK

2836 SF

CENTRALPLANT

MECHANICALMEZZANINEABOVE CEILING

LINE OF BUILDINGABOVE

249 SFSTAIR 2

322 SFCORRIDOR

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:43

PM

1/16" = 1'-0"

MAIN HOSPITALCELLAR LEVEL

FLOOR PLAN - AREA B

A-110B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 CELLAR LEVEL FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 6: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

CO

O

DNUP

DNUP

DN

DN

12345678910

A

B

C

D

F.5

1112131415161718

H

F

G

E

2' -

0"

11' - 0"

0.5

B.5

C.5

E.2

42' -

6"

C.8

PATIENT ACCESSVOLUNTEERS

EMPL. HEALTHHUMAN RESOURCES

INFORMATICS / NURSING ADMIN. / GUEST SERVICES

EXECUTIVE OFFICES

RADIOLOGY

SAFETY/ SECURITY

RADIOLOGY - NUC.MEDICINE

MEDICALSTAFF

EMERGENCY DEPARTMENT

RADIOLOGY

HIM

FUTURE EXPANSION

ENTRY COURTYARD

FUTURE M.O.B.

CENTRAL PLANT ROOF

ENTRY

ENTRY

CLINICAL DECISION/OBSERVATION

GIFT SHOPENTRY

LOBBY

ENTRY

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:47

PM

1" = 20'-0"

LEVEL 1OVERALL PLAN

A-111

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"2 LEVEL 01 OVERALL PLAN

Issued Drawing LogNo. Date Item

Page 7: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN

UP

DN

DN

100 SFOFFICE

6131 SF

CAFETERIA /SERVERY

461 SF

SERVICEELEVATORS

2129 SFLOBBY

275 SFMEDITATION

168 SF

MALEPUBLIC TLT

174 SF

FEMALEPUBLIC TLT

756 SFED WAITING

910

A

B

C

D

F.5

1112131415161718

H

F

G

E

B.5

C.5

E.2

42' -

6"

C.8

365 SFGEN RAD

460 SFR/F

173 SFULTRASOUND

175 SFULTRASOUND

174 SFULTRASOUND

455 SF

GAMMACAMERA

215 SFCONTROL

186 SF

STRESSTEST

210 SFCONTROL

460 SF

GAMMACAMERA

92 SFHOT LAB

114 SFDOSE ADMIN

111 SF

IP DOSEADMIN 116 SF

CONSULT

165 SF

RADIOLOGYRECEPTION/

REGISTR

193 SF

REPORTROOM

131 SFELECT

133 SFDATA

503 SFDINING

174 SF

WORKROOM

223 SFHIM

1066 SFENTRY

201 SF

INFORMATION/ RECEPTION

84 SF

OFFICE - HRASSIST

137 SFELECT

791 SF

BOARDROOM

78 SFWAITING

78 SFRECEPTION

251 SF

OFFICE -PRESIDENT

229 SF

OFFICE - VPOPERATIONS

229 SF

OFFICE -FINANCE

100 SFOFFICE

101 SFOFFICE

119 SFOFFICE

150 SF

OFFICE -DIRECTOR

150 SF

OFFICE -DIRECTOR

71 SFRN MAILBOX

66 SFWAITING

94 SFPANTRY120 SF

OFFICE

100 SF

STFTLT/SHWR

53 SFSTF TLT

81 SFFILE ROOM

83 SF

OFFICE - FINANALYST

84 SF

OFFICE -MARKT &

COMM

126 SF

FILESTORAGE

169 SFWAITING

126 SFEXAM

128 SFEXAM

121 SF

OFFICE -NURSE

208 SFCONFERENCE

83 SF

OFFICE -EMP

RELATIONS62 SF

STF TLT

75 SF

OFFICE -BENE. SP.

219 SFDICTATION

92 SFHIM WAITING

92 SF

HIMCONSULT

66 SFSTF TLT

89 SF

OFFICE -RECRUIT

191 SF

OFFICE -FIN. CLERK

255 SFWAITING

50 SFREGISTR.

50 SFREGISTR.

50 SFREGISTR.

50 SFREGISTR.

66 SF

OFFICE -SCHED.283 SF

OFFICE -DECO

CLERKS

151 SF

VOLUNTEERWORKROOM

63 SF

VOLUNTEERLOCKERS

117 SF

OFFICE -DIRECTOR

105 SF

OFFICE -ASSIST. DIR

23 SFPANTRY

62 SF

RECEPT/ADMIN

21 SFWAITING47 SF

RECEPTION

120 SF

OFFICE -DIR.

PATIENT ACCESSVOLUNTEERS

EMPL. HEALTH HUMAN RESOURCES

INFORMATICS / NURSING ADMIN. / GUEST SERVICES

EXECUTIVE OFFICES

127 SFOFFICE

60 SF

WORKROOM

46 SFPANTRY

88 SF

WORKSTATIONS

188 SF

OFFICE - VPNURSING

189 SF

OFFICE -CMO

170 SF

OFFICE -AVP CLIN.EFFECT.

72 SF

OFFICE - FINANALYST

90 SF

OFFICE -MARKT &

COMM

189 SF

OFFICE - VPBUSINESS

DEV.

50 SFSTF TLT

47 SFSTF TLT

87 SF

OFFICE -PHYS

LIASON

88 SF

OFFICE -PHYS

LIASON

91 SF

WORKSTATIONS

64 SFPANTRY

67 SFWORK AREA

48 SFPAT TLT

55 SFCHANGE

86 SFWAITING

21 SFLOCKERS

108 SF

FIRECOMMAND/CONTROL

105 SF

OPERATIONSBMS

108 SF

COMM-DISPATCH 74 SF

OFFICE -DIRECTOR

506 SF

RADIOLOGYWAITING

RADIOLOGY

SAFETY/ SECURITY

RADIOLOGY - NUC.MEDICINE

MEDICALSTAFF

89 SF

WORKSTATIONS

90 SF

WORKSTATIONS

49 SF

WORKSTATION

55 SFCHANGE

58 SFPAT TLT

48 SFPAT TLT

48 SFPAT TLT

273 SF

RADIOLOGYSTAFF

LOUNGE /LOCKER

78 SF

CLEANSUPPLY

651 SF

TECH WORKAREA

22 SFCLOSET

216 SFSTAIR 4

16 SFCLOSET

497 SFCORRIDOR

3833 SFCORRIDOR

131 SFVESTIBULE

314 SFSTAIR 1

301 SF

PUBLICELEVATORS

101 SFTLT/SHWR

57 SFWAITING

47 SFRECEPT.

26 SFAPPLIC.

HIM

81 SFON-CALL

95 SFON-CALL

FUTURE EXPANSION

399 SFVESTIBULE

ENTRY COURTYARD

FUTURE M.O.B.

99 SF

WORKSTATIONS

1060 SFCORRIDOR

1109 SFCORRIDOR

1373 SFCORRIDOR

136 SFCORRIDOR

380 SFCORRIDOR

126 SFCORRIDOR

62 SFCORRIDOR

231 SFSTAIR 3

251 SFSTAIR 5

117 SFOFFICE

232 SF

OFFICE -V.P.

MEDICALAFFAIRS

91 SFTLT

226 SF

CONFERENCEROOM

194 SFVESTIBULE

150 SFDATA

82 SF

PUBLICLOCKERS

449 SF

PHYSICIANLOUNGE

195 SF

FEMALEPUBLIC TLT

184 SF

MALEPUBLIC TLT

90 SF

OFFICE -RECRUITER

GIFT SHOP

189 SF

RECEIVING /BULK STOR.

141 SFOFFICE

117 SFOFFICE

108 SF

OFFICE -BED

CONTROL

71 SF

OFFICE -SUPV.

52 SF?

39 SFPANTRY

45 SF

STFTLT

519 SF

GIFTSHOP

60 SF

OFFICE -SUPV.

124 SF

OFFICE -DIR.

176 SFINTERPRETERS

86 SF

OFFICE -DIRECTOR

296 SF

GUESTLOUNGE

75 SF

OFFICERECRUIT.

121 SF

OFFICE -DIRECT.

84 SF

OFFICE -SUPV.39 SF

PANTRY71 SF

ADMIN.

192 SF?

360 SF?

666 SFCORRIDOR

ENTRY

ENTRY

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:4

9:50

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 1 FLOOR PLAN

AREA A

A-111A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 1 FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 8: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DNUP

DN

6131 SF

CAFETERIA /SERVERY

461 SF

SERVICEELEVATORS

2129 SFLOBBY

127 SFEXAM

275 SFMEDITATION

168 SF

MALEPUBLIC TLT

174 SF

FEMALEPUBLIC TLT

756 SFED WAITING

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

141 SF

SECUREEXAM

128 SF

TRIAGE /EXAM

231 SF

SUB-WAIT

133 SF

TRIAGE /EXAM

130 SFDECONTAM

91 SFEMS

12345678910

A

B

C

D

F.5

111213

H

F

G

E

2' -

0"

11' - 0"

0.5

B.5

C.5

E.2

C.8

68 SFPAT TLT

240 SFRESUS.

245 SFRESUS.

127 SFEXAM

127 SFEXAM

127 SFEXAM

126 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

261 SF

EQUIP.STOR.

146 SFDATA126 SF

EXAM

126 SFEXAM

127 SFEXAM

127 SFEXAM

147 SFELECT

58 SFPAT TLT

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SFEXAM

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION 68 SF

PAT TLT

128 SF

CLINICALDECISION

68 SFPAT TLT

491 SFMRI

420 SFCT

136 SF

CLINICALDECISION

110 SF

CLEANSUPPLY

127 SF

CLINICALDECISION

87 SF

SOILEDHOLDING

354 SFGEN RAD

467 SFR/F365 SF

GEN RAD

460 SFR/F

173 SFULTRASOUND

475 SFCT

175 SFULTRASOUND

174 SFULTRASOUND

382 SF

ED STAFFLOUNGE

128 SFEXAM

122 SF

TRIAGENURSE

211 SFLAB91 SF

OFFICE

455 SF

GAMMACAMERA

215 SFCONTROL

186 SF

STRESSTEST

210 SFCONTROL

460 SF

GAMMACAMERA

92 SFHOT LAB

114 SFDOSE ADMIN

111 SF

IP DOSEADMIN

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION

127 SF

CLINICALDECISION

126 SF

CLINICALDECISION

261 SFEQUIP STOR

205 SFMED

81 SFPAT TLT

68 SFPAT TLT

59 SFPAT TLT

55 SFPAT TLT

96 SFCHARTING

96 SFCHARTING55 SF

MED

27 SFNOURISH

107 SFVESTIBULE

127 SFEXAM

127 SFEXAM

125 SF

CLEANSUPPLY

109 SF

SOILEDUTILITY

261 SFCHARTING

182 SFCHARTING

264 SF

PHYSICIANWORK AREA

152 SF

CLEANSUPPLY

133 SF

SOILEDUTILITY

305 SFCHARTING

213 SFCHARTING 28 SF

MED199 SFCHART

348 SF

RECEPTION /REGISTRATION

116 SFCONSULT

68 SFPAT TLT

165 SF

RADIOLOGYRECEPTION/

REGISTR

193 SF

REPORTROOM

131 SFELECT

1066 SFENTRY

201 SF

INFORMATION/ RECEPTION

137 SFELECT

126 SF

EQUIP.STORAGE

48 SFPAT TLT

55 SFCHANGE

86 SFWAITING

21 SFLOCKERS

108 SF

FIRECOMMAND/CONTROL

105 SF

OPERATIONSBMS

108 SF

COMM-DISPATCH 74 SF

OFFICE -DIRECTOR

506 SF

RADIOLOGYWAITING

RADIOLOGY

SAFETY/ SECURITY

RADIOLOGY - NUC.MEDICINE

55 SFCHANGE

58 SFPAT TLT

48 SFPAT TLT

48 SFPAT TLT

273 SF

RADIOLOGYSTAFF

LOUNGE /LOCKER

219 SFREADING

78 SF

CLEANSUPPLY

66 SF

SOILEDHOLDING48 SF

STF TLT

41 SFCHANGE

56 SFCHANGE

78 SFEQUIP

195 SFCONTROL

46 SFCHANGE

46 SFCHANGE

48 SFPAT TLT

48 SFPAT TLT

651 SF

TECH WORKAREA

120 SF

PATIENTHOLDING

35 SFCASHIER

93 SFOFFICE

67 SFADMIN117 SF

OFFICE -DIRECTOR

3833 SFCORRIDOR

314 SFSTAIR 1

301 SF

PUBLICELEVATORS

262 SFVESTIBULE

187 SF

ZONE IIPATIENT

PREP

57 SFPAT TLT

101 SFTLT/SHWR

51 SFLOCKERS

164 SFEQUIP

55 SFCHANGE

410 SF

ZONE IIICONTROL

38 SF

WHEELCHAIRSTOR.

EMERGENCY DEPARTMENT

RADIOLOGY

81 SFON-CALL

95 SFON-CALL

141 SF

SECUREEXAM

28 SFALCOVE

52 SF

PAT.TLT 87 SF

CHARTING

59 SFSECURITY

399 SFVESTIBULE

CENTRAL PLANT ROOF

ENTRY

ENTRY

FUTUREEXPANSION NORTH

AMBULANCE ENTRY / PARKING

1373 SFCORRIDOR

1000 SFCORRIDOR

5498 SFCORRIDOR

2665 SFCORRIDOR

252 SFCORRIDOR

1117 SFCORRIDOR

210 SFCORRIDOR

136 SFCORRIDOR

201 SFCORRIDOR

97 SFCORRIDOR

62 SFCORRIDOR

230 SFSTAIR 2

231 SFSTAIR 3

150 SFDATA

CLINICAL DECISION/OBSERVATION

195 SF

FEMALEPUBLIC TLT

184 SF

MALEPUBLIC TLT

519 SF

GIFTSHOP

176 SFINTERPRETERS

86 SF

OFFICE -DIRECTOR

296 SF

GUESTLOUNGE

192 SF?

ENTRY

CANOPY ABOVE

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

7:36

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 1 FLOOR PLAN

AREA B

A-111B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 1 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 9: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DNUP

DN UP

12345678910

A

B

C

D

F.5

111213

13

1415161718

H

F

G

E16' - 5 1/4"

14' - 10 1/2"

0.5

B.5

C.5

2' - 8"

29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0"

2' - 0"

E.2

C.8

PRE/POST SURGERYPACU

CRITICAL CARE UNIT

RESPIRATORY CARE

SURGICAL SUITE

FUTURE EXPANSION

FUTURE M.O.B.

CENTRAL PLANT BELOW

ROOF BELOW

CANOPY BELOW

OPEN TO BELOW

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:00

PM

1" = 20'-0"

LEVEL 2OVERALL PLAN

A-112

Author

Checker

Approver

AUGUST 1, 2014 1" = 20'-0"2 LEVEL 2 - OVERALL PLAN

Issued Drawing LogNo. Date Item

Page 10: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN UP

1800 SF

CLEANCORE

91 SFSOIL

461 SF

SERVICEELEVATORS

94 SFOFFICE

75 SFHALLWAY

319 SF

STAFFLOUNGE /LOCKERS

600 SFOR

600 SFOR

564 SF

EQUIPMENTSTORAGE

600 SFOR

600 SFOR

654 SFOR

650 SFCARDIAC OR

652 SFCARDIAC OR

685 SFHYBRID OR

118 SFCONTROL

793 SF

STAFFLOUNGE

133 SF

OFFICERN

MGR.

153 SFDATA

126 SFPUMP ROOM

115 SF

PERFUSIONISTWORKROOM

181 SF

HYBRID OREQUIPMENT

181 SF

ANESTHSIAWORKROOM

427 SF

CLEANEQUIPMENT

HOLD

301 SF

PUBLICELEVATORS

8910

A

B

C

D

F.5

111213

13

1415161718

H

F

G

E16' - 5 1/4"

14' - 10 1/2"

B.5

C.5

2' - 8"

29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0" 29' - 0"

2' - 0"

E.2

C.8

105 SFPACU 5

105 SFPACU 6

105 SFPACU 7

105 SFPACU 8

105 SFPACU 9

116 SF4

114 SF3

116 SF2

115 SF1

104 SFCLEAN

42 SFSTF TLT

113 SF

PHYS.DICT.

109 SFPACU 2

114 SFPACU 3

108 SFPACU 4 160 SF

22109 SF

21111 SF

20106 SF

19

247 SF

STAFFLOUNGE

120 SFCONSULT

114 SFCONSULT

104 SFPACU 1080 SF

PACU 11101 SF

PACU 12

105 SF18

110 SF17

109 SF16

114 SF6

114 SF7

114 SF8

114 SF9

117 SFSOIL

124 SFELECT.

80 SF

SCOPEWASH

80 SF

CLEANSCOPE

388 SFENDOSCOPY

388 SFENDOSCOPY

53 SFMED

70 SFOFFICE

77 SFOFFICE 165 SF

LEADTHERAPIST

126 SFDECONTAM

111 SF

STAFFROOM56 SF

LOCKERS56 SF

STF TLT

135 SF

MULTI-PURPOSE

ROOM

12 SFALCOVE

12 SFALCOVE

140 SFELECT

52 SFTLT

51 SFTLT

2013 SF

FAMILYWAITING

159 SFRECEPTION

68 SFOFFICE

110 SFOFFICE

112 SFOFFICE

52 SFADMIN ASST

80 SFOFFICE

80 SFOFFICE188 SF

RECEPT /WAIT

157 SFREGISTRATION

158 SF

REGISTRATIONWORKROOM

244 SF

PHYSICIANSLOUNGE

572 SF

FEMALESTAFF

LOCKERS450 SF

MALE STAFFLOCKERS

120 SF

SCRUBDISPENSING

169 SF

FEMALEPUBLIC TLT

169 SF

MALEPUBLIC TLT 253 SF

FAMILYWAITING

314 SFSTAIR 1

PRE/POST SURGERYPACU

84 SFOFFICE

84 SFOFFICE

RESPIRATORY CARE

SURGICAL SUITE

40 SFSCRUB

40 SFSCRUB

23 SFSCRUB

34 SFSCRUB

112 SF

OFFICE-SUPPLY

MGR.

22 SFSCRUB

53 SFSCRUB

52 SFALCOVE

52 SFALCOVE

52 SFALCOVE

52 SFALCOVE

52 SFALCOVE

FUTURE EXPANSION

FUTURE M.O.B.OPEN TO BELOW

285 SFALCOVE

125 SFPACU 13

194 SFPACU 1

1179 SFCORRIDOR

1849 SFCORRIDOR

227 SFCORR

1641 SFCORRIDOR

3783 SFCORRIDOR

156 SFCORRIDOR

216 SFSTAIR 4

228 SFSTAIR 3

193 SF

NURSESTATION

201 SF

NURSESTATION317 SF

CORRIDOR43 SFPAT TLT

308 SF

NURSESTATION

2104 SFCORRIDOR

460 SF

SOILEDCARTS

502 SFCYSTO

219 SF

EQUIPMENTSTORAGE

211 SFELECT.

97 SF

SHAREDON-CALL

104 SF

SHAREDON-CALL 45 SF

TLT

327 SFTEAM ROOM

297 SF

SHAREDOFFICE -

CASEMANAGEMENT

60 SF

RESOURCECENTER

118 SF

CONSULTROOM

220 SF

EQUIPMENTSTORAGE

113 SF10

119 SF11

114 SF12

118 SF13

84 SF

PATTLT

114 SF5

71 SF

PATTLT

125 SF15

119 SF14

227 SF

MINORPROCEDURE

130 SFCLEAN

88 SF

OFFICECOORD.

127 SFSOIL

102 SFMED

150 SFCLEAN

67 SF

PATTLT

67 SF

PATTLT38 SF

ALCOVE 222 SF

NURSESTATION

112 SF

ORCONTROL

58 SFHK

190 SFCORRIDOR

522 SFCORRIDOR

402 SF

EQUIPMENTSTORAGE

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:04

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 2 FLOOR PLAN

AREA A

A-112A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 2 FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 11: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DNUP

461 SF

SERVICEELEVATORS

94 SFOFFICE

75 SFHALLWAY

283 SFICU 02 272 SF

ICU 03

293 SFICU 04 311 SF

ICU 05329 SFICU 06

271 SFICU 07 283 SF

ICU 08

283 SFICU 09 272 SF

ICU 10

290 SFICU 12

296 SFICU 13

272 SFICU 19283 SF

ICU 21271 SFICU 22

329 SFICU 23311 SF

ICU 24293 SFICU 25

272 SFICU 26

283 SFICU 27

283 SFICU 28

283 SFICU 01

319 SF

STAFFLOUNGE /LOCKERS

793 SF

STAFFLOUNGE

133 SF

OFFICERN

MGR.

153 SFDATA

181 SF

ANESTHSIAWORKROOM

293 SFICU 11

283 SFICU 20

427 SF

CLEANEQUIPMENT

HOLD

301 SF

PUBLICELEVATORS

12345678910

A

B

C

D

F.5

1112

H

F

G

E16' - 5 1/4"

14' - 10 1/2"

0.5

B.5

C.5

2' - 8"

29' - 0"

E.2

C.8

117 SFSOIL

124 SFELECT.

80 SF

SCOPEWASH

80 SF

CLEANSCOPE

388 SFENDOSCOPY

70 SFOFFICE

77 SFOFFICE 165 SF

LEADTHERAPIST

126 SFDECONTAM

111 SF

STAFFROOM56 SF

LOCKERS56 SF

STF TLT

135 SF

MULTI-PURPOSE

ROOM

12 SFALCOVE

12 SFALCOVE

140 SFELECT

137 SFELECT

144 SF

CLEANSUPPLY

297 SF

EQUIPMENTSTORAGE

124 SF

PHYSICIANWORKROOM

34 SFHK

42 SFSTF TLT

81 SFMED

59 SFNOURISH

135 SF

SOILEDUTILITY

51 SFTLT

159 SFRECEPTION

68 SFOFFICE

110 SFOFFICE

112 SFOFFICE

52 SFADMIN ASST

80 SFOFFICE

80 SFOFFICE188 SF

RECEPT /WAIT

157 SFREGISTRATION

158 SF

REGISTRATIONWORKROOM

244 SF

PHYSICIANSLOUNGE

572 SF

FEMALESTAFF

LOCKERS450 SF

MALE STAFFLOCKERS

120 SF

SCRUBDISPENSING

169 SF

FEMALEPUBLIC TLT

169 SF

MALEPUBLIC TLT 253 SF

FAMILYWAITING

133 SFANTE ROOM

131 SFANTE ROOM

314 SFSTAIR 1

319 SF

CHARTINGSTATION

84 SFOFFICE

84 SFOFFICE 124 SF

SOILEDUTILITY318 SF

CHARTING150 SFDATA

169 SF

CLEANSUPPLY

76 SFMEDICATION

61 SFNOURISH

14 SFALCOVE

14 SFALCOVE

CRITICAL CARE UNIT

RESPIRATORY CARE

112 SF

OFFICE-SUPPLY

MGR.

52 SFALCOVE

CENTRAL PLANT BELOW

ROOF BELOW

CANOPY BELOW

OPEN TO BELOW

290 SFICU 14

286 SFICU 15

296 SFICU 16290 SF

ICU 17293 SFICU 18

317 SF

EQUIPMENTSTORAGE

1179 SFCORRIDOR

1849 SFCORRIDOR

227 SFCORR

212 SF

CHARTINGSTATION

156 SFCORRIDOR

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

26 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

278 SFSTAIR 2

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

26 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

23 SFTLT

228 SFSTAIR 3

40 SFALCOVE

97 SF

SHAREDON-CALL

104 SF

SHAREDON-CALL 45 SF

TLT

327 SFTEAM ROOM

297 SF

SHAREDOFFICE -

CASEMANAGEMENT

60 SF

RESOURCECENTER

118 SF

CONSULTROOM

220 SF

EQUIPMENTSTORAGE

130 SFCLEAN

88 SF

OFFICECOORD.

2261 SFCORRIDOR

2604 SFCORRIDOR

522 SFCORRIDOR

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:07

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 2 FLOOR PLAN

AREA B

A-112B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 2 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 12: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN

DN UP

12345678910

A

B

C

D

F.5

1112131415161718

H

F

G

E

0.5

B.5

C.5

E.2

C.8

PATIENT CARE SERVICES(TELEMETRY)

HEART CENTER

FUTURE EXPANSION

FUTURE M.O.B.

SHELL SPACE

MECH.

CATH LAB SUITES

PREP/RECOV

CARDIOLOGYWAITING

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:11

PM

1" = 20'-0"

LEVEL 3OVERALL PLAN

A-113

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"2 LEVEL 3 - OVERALL PLAN

Issued Drawing LogNo. Date Item

Page 13: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN UP

462 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

103 SF

SCHEDULECLERKS

211 SF

PATIENTROOM

211 SF

PATIENTROOM76 SF

ON-CALL

213 SFWAITING

8910

A

B

C

D

F.5

1112131415161718

H

F

G

E

B.5

C.5

E.2

C.8

100 SFMEDICATION

84 SF

PHYS. DICT/PACS

437 SFCHARTING163 SF

ELECT.

108 SFCONSULT

56 SF

RESOURCECENTER

168 SFECHO

151 SFECG/HOLTER

169 SFECHO

168 SFECHO

163 SFECHO

131 SFECG

218 SFECG/STRESS

107 SFOFFICE 128 SF

WAITING

48 SFPAT TLT

169 SFPUBLIC TLT

169 SFPUBLIC TLT

90 SF

CLEANSUPPLY

180 SFREADING

138 SFDATA

229 SF

TECH WORKROOM

169 SF

PATIENTHOLDING

314 SFSTAIR 1

34 SFPAT TLT

228 SFSTAIR

117 SF

OFFICE - EDDIRECTOR

117 SF

OFFICE -CATH

DIRECTOR79 SFCOPY/ FILE

45 SFRECEPT

43 SFBILLER

856 SFCORRIDOR

HEART CENTER

FUTURE EXPANSION

FUTURE M.O.B.

SHELL SPACE

MECH.

CATH LAB SUITES

PREP/RECOV

CARDIOLOGYWAITING

245 SF

SHAREDOFFICE -

CASEMANAGEMENT

31 SFWAIT

1207 SFCORRIDOR

223 SFCORRIDOR

216 SFSTAIR 4

272 SFSTAIR 5

913 SF

CLEANSUPPLY

91 SFOFFICE

107 SFOFFICE

140 SFOFFICE

86 SF

PATTLT

103 SFEQUIP

133 SFCONTROL

590 SFCATH LAB

105 SFEQUIP

134 SFCONTROL

567 SFCATH LAB

32 SFSCRUB

105 SFEQUIP

134 SFCONTROL

567 SFCATH LAB

94 SFEQUIP

120 SFCONTROL

589 SFCATH LAB

457 SF

STAFFLOUNGE

444 SF

STAFFLOCKERS

118 SFSTAFF TLTS

215 SF

STAFFLOCKERS

118 SFSTAFF TLTS

53 SFSHWR

48 SFSHWR

31 SFSCRUB

32 SFSCRUB

32 SFSCRUB

202 SFREADING

158 SF

SOILEDUTILITY

32 SFSCRUB

559 SFEP LAB

371 SFTILT TABLE

136 SFCONTROL

559 SFEP LAB

136 SFCONTROL

108 SFEQUIP

108 SFEQUIP

104 SF

SOILEDHOLD

111 SF5

110 SF4

119 SF3

110 SF2

112 SF1 101 SF

14

167 SF

CLEANSUPPLY /

MED

103 SF6

103 SF7

106 SF8

106 SF9

104 SF10

113 SF11

105 SF12

112 SF13

36 SFVEST.

58 SFVEST.

56 SFVEST.

39 SFVEST.

46 SFHK

108 SFALCOVE

32 SFSCRUB

40 SFNOURISHMENT

179 SF

NURSESTATION

163 SF

NURSESTATION

131 SFELECT

62 SF

PATTLT

348 SF

RADIALLOUNGE

226 SFECG/STRESS

107 SFOFFICE

151 SFRECEPTION

35 SFHK

265 SF

MULTI-PURPOSE

ROOM

50 SFPAT TLT 34 SF

PAT TLT

98 SFON-CALL

155 SFCONSULT

128 SFHALLWAY

257 SF

RECEPTION /REGISTRATION

2337 SFCORRIDOR

1515 SFCORRIDOR

378 SFCORRIDOR

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:13

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 3 FLOOR PLAN

AREA A

A-113A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 14: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN

462 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

103 SF

SCHEDULECLERKS

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM76 SF

ON-CALL

213 SFWAITING 211 SF

PATIENTROOM

12345678910

A

B

C

D

F.5

1112

H

F

G

E

0.5

B.5

C.5

E.2

C.8

100 SFMEDICATION

84 SF

PHYS. DICT/PACS

437 SFCHARTING163 SF

ELECT.

389 SF

CLEANSUPPLY 223 SF

SOILEDUTILITY

48 SFHK

151 SFDATA89 SF

OFFICE

108 SFCONSULT

381 SF

EQUIP.STORAGE 438 SF

CHARTING98 SFMED

84 SF

PHYS. DICT /PACS

248 SF

CLEANSUPPLY

196 SF

SOILEDUTILITY 161 SF

ELECT

89 SFOFFICE

56 SF

RESOURCECENTER

168 SFECHO

151 SFECG/HOLTER

169 SFECHO

168 SFECHO

163 SFECHO

131 SFECG

218 SFECG/STRESS

107 SFOFFICE 128 SF

WAITING

48 SFPAT TLT

210 SF

PATIENTROOM

260 SF

PATIENTROOM

210 SF

PATIENTROOM

262 SF

PATIENTROOM

169 SFPUBLIC TLT

169 SFPUBLIC TLT

90 SF

CLEANSUPPLY

180 SFREADING

138 SFDATA

229 SF

TECH WORKROOM

169 SF

PATIENTHOLDING

314 SFSTAIR 1

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT34 SF

PAT TLT50 SFPAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT

228 SFSTAIR

117 SF

OFFICE - EDDIRECTOR

117 SF

OFFICE -CATH

DIRECTOR79 SFCOPY/ FILE

45 SFRECEPT

43 SFBILLER

246 SF

STAFFLOUNGE

68 SFSTF LOCKER

52 SFALCOVE

51 SFALCOVE

2467 SFCORRIDOR

856 SFCORRIDOR

PATIENT CARE SERVICES(TELEMETRY)

HEART CENTER

234 SF

PATIENTROOM

251 SF

PATIENTROOM

233 SF

PATIENTROOM

248 SF

PATIENTROOM

245 SF

SHAREDOFFICE -

CASEMANAGEMENT

281 SFTEAM ROOM98 SF

EQROOM

31 SFWAIT

2774 SFCORRIDOR

255 SFSTAIR 2

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

45 SFPAT TLT

1207 SFCORRIDOR

223 SFCORRIDOR

444 SF

STAFFLOCKERS

118 SFSTAFF TLTS

48 SFSHWR

39 SFVEST.

226 SFECG/STRESS

107 SFOFFICE

151 SFRECEPTION

35 SFHK

265 SF

MULTI-PURPOSE

ROOM

50 SFPAT TLT 34 SF

PAT TLT

98 SFON-CALL

155 SFCONSULT

128 SFHALLWAY

78 SFNOURISH

53 SFSTAFF TLT.

257 SF

RECEPTION /REGISTRATION

378 SFCORRIDOR

49 SFSTAFF TLT.

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:17

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 3 FLOOR PLAN

- AREA B

A-113B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 3 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 15: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN

12345678910

A

B

C

D

F.5

1112131415161718

H

F

G

E

C.5

2' -

11"

10' - 11"

E.2

C.8

MATERNITY(ANTE/POST PARTUM)

FUTURE M.O.B.

C-SECTION

PUBLICWAITINGTRIAGE

ROOF

1 2 3

LABOR AND DELIVERY

(4 ROOMS)

MED/SURG PATIENT ROOMS

(11 ROOMS)

POST PARTUM PATIENT ROOMS

(7 ROOMS)

POST PARTUM PATIENT ROOMS

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:20

PM

1" = 20'-0"

LEVEL 4OVERALL PLAN

A-114

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"2 LEVEL 4 - OVERALL PLAN

Issued Drawing LogNo. Date Item

Page 16: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

DN

458 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

8910

A

B

C

D

F.5

1112131415161718

H

F

G

E

C.5

10' - 11"

E.2

C.8

169 SFPUBLIC TLT

169 SFPUBLIC TLT

100 SFMED

84 SFPHYS DICT

89 SFTLT/ SHWR

165 SFELECT

437 SFCHARTING

314 SFSTAIR 1

644 SF

FAMILYWAITING

225 SFSTAIR

103 SFON-CALL

98 SFON-CALL

91 SFON-CALL

103 SFTLT / SHWR

115 SFON-CALL

98 SFON-CALL

94 SFON-CALL

218 SF

MULTI-PURPOSE

ROOM

FUTURE M.O.B.

C-SECTION

PUBLICWAITINGTRIAGE

ROOF

272 SFTEAM ROOM

398 SFLDR

394 SFLDR

392 SFLDR

236 SF

CLEANSUPPLY

261 SF

EQUIP.STORAGE

164 SFELECT

387 SFLDR

387 SFLDR

166 SF

NURSESTATION

86 SFNOURISH.

386 SFLDR

188 SF

STAFFLOUNGE

73 SFOFFICE

97 SFOFFICE

105 SFSOIL HOLD

485 SFC-SECTION

450 SFC-SECTION

218 SF

FEMALELOCKER

99 SF

MALELOCKER

130 SF

TLTSHOWER

123 SF

CLEANSUPPLY

50 SFPAT TLT

117 SFMED

1 2 3

12 SFALC

70 SF

ANESTHESIAWORKROOM

102 SFDATA

32 SFHK

LABOR AND DELIVERY

105 SFMED

61 SFHK

101 SF

CLEANSUPPLY

84 SFSOIL HOLD 173 SF

CONSULT/BEREAVEMENT

178 SFEXAM

392 SFLDR

117 SF

SOILEDHOLDING

694 SFCORRIDOR

3186 SFCORRIDOR

549 SFCORRIDOR

807 SFWAITING

168 SFRECEPTION

117 SF

NURSESTATION

303 SF

NURSESTATION

272 SFCORRIDOR

216 SFSTAIR 4

268 SFSTAIR 5

34 SFPAT TLT

34 SFPAT TLT

34 SFPAT TLT

34 SFPAT TLT

91 SFCORRIDOR

97 SFCORRIDOR

279 SFCORRIDOR

288 SF

PRE/ POSTPROCEDURE

154 SFEXAM

159 SFEXAM

159 SFEXAM

154 SFEXAM

67 SF

TLTSHOWER

212 SFSUB-STERILE

110 SFSCRUB

71 SFSTF TLT

112 SFMED

54 SF

PHYS.DICT.

162 SF

EQUIP.STOR.

128 SFCORRIDOR

425 SFCORRIDOR

34 SFPAT TLT

34 SFPAT TLT

34 SFPAT TLT

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:22

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 4 FLOOR PLAN

AREA A

A-114A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 4 FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 17: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

458 SF

SERVICEELEVATORS

301 SF

PUBLICELEVATORS

212 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

181 SFLACTATION

211 SF

PATIENTROOM

213 SF

PATIENTROOM

213 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

374 SF

RESPITENURSERY

211 SF

PATIENTROOM

211 SF

PATIENTROOM

12345678910

A

B

C

D

F.5

1112

H

F

G

E

C.5

2' -

11"

10' - 11"

E.2

C.8

169 SFPUBLIC TLT

169 SFPUBLIC TLT

100 SFMED

84 SFPHYS DICT 240 SF

CLEANSUPPLY

180 SF

SOILEDUTILITY

100 SFOFFICE

75 SFHK

54 SFSTF TLT

261 SF

STAFFLOUNGE /LOCKERS

203 SFDATA

89 SFTLT/ SHWR

212 SF

PATIENTROOM

212 SF

PATIENTROOM

64 SFMED

72 SF

CLEANSUPPLY

66 SF

SOILEDUTILITY

35 SFGOWN

285 SF

EQUIPSTORAGE

164 SF

SOILEDHOLDING

2029 SF

CONTINUINGCARE

NURSERY

199 SF

GOWN /WORK AREA

165 SFELECT

437 SFCHARTING

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

256 SFSTAIR 2

314 SFSTAIR 1

644 SF

FAMILYWAITING

225 SFSTAIR

51 SFALCOVE

100 SFOFFICE 232 SF

WORK AREA139 SFELECT

389 SFCHARTING

103 SFMEDS

103 SFON-CALL

98 SFON-CALL

91 SFON-CALL

103 SFTLT / SHWR

115 SFON-CALL

98 SFON-CALL

94 SFON-CALL

218 SF

MULTI-PURPOSE

ROOM

MATERNITY(ANTE/POST PARTUM)

C-SECTION

PUBLICWAITING

253 SF

SHAREDOFFICE -

CASEMANAGEMENT

272 SFTEAM ROOM

211 SF

PATIENTROOM

233 SF

PATIENTROOM

248 SF

PATIENTROOM

34 SFPAT TLT

50 SFPAT TLT

50 SFPAT TLT

258 SF

PATIENTROOM

62 SFHK

69 SFSTF TLT

210 SF

CLEANSUPPLY

264 SFISOLATION

204 SFEXAM

131 SF

HEARINGTESTING

93 SFPHYS DICT

485 SFC-SECTION

450 SFC-SECTION

218 SF

FEMALELOCKER

99 SF

MALELOCKER

117 SFMED

1 2 3

12 SFALC

70 SF

ANESTHESIAWORKROOM

102 SFDATA

32 SFHK

101 SF

CLEANSUPPLY

84 SFSOIL HOLD 173 SF

CONSULT/BEREAVEMENT

117 SF

SOILEDHOLDING

694 SFCORRIDOR

1517 SFCORRIDOR

2034 SFCORRIDOR

809 SFCORRIDOR

3186 SFCORRIDOR

549 SFCORRIDOR

807 SFWAITING

168 SFRECEPTION

117 SF

NURSESTATION

272 SFCORRIDOR

34 SFPAT TLT

50 SFPAT TLT

91 SFCORRIDOR

97 SFCORRIDOR

279 SFCORRIDOR

288 SF

PRE/ POSTPROCEDURE

159 SFEXAM

67 SF

TLTSHOWER

212 SFSUB-STERILE

110 SFSCRUB

110 SFNOURISHMENT

272 SF

EQUIP.STORAGE

162 SF

EQUIP.STOR.

(4 ROOMS)

MED/SURG PATIENT ROOMS

(11 ROOMS)

POST PARTUM PATIENT ROOMS

(7 ROOMS)

POST PARTUM PATIENT ROOMS

425 SFCORRIDOR

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:25

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 4 FLOOR PLAN

AREA B

A-114B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 4 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 18: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

12345678910

A

B

C

1112131415161718

H

F

G

E

INPATIENT PM&R

PATIENT CARE SERVICES(MED-SURG)

FUTURE M.O.B.

ROOF BELOW

ROOF

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

10' 20' 40'

1" = 20' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:28

PM

1" = 20'-0"

LEVEL 5OVERALL PLAN

A-115

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"2 LEVEL 5 - OVERALL PLAN

Issued Drawing LogNo. Date Item

Page 19: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

677 SF

SERVICEELEVATORS

80 SFON-CALL

301 SF

PUBLICELEVATORS

438 SFCONFERENCE

211 SF

PATIENTROOM

211 SF

PATIENTROOM

250 SF

SHAREDOFFICE

209 SFWAITING

8910

A

B

C

1112131415161718

H

F

G

E

84 SFPHYS DICT

100 SFMED

437 SFCHARTING

108 SFCONSULT

50 SF

RESEARCHCENTER

163 SFELECT

720 SFOPEN GYM

34 SFPAT TLT

314 SFSTAIR 1

498 SFHYDROTHERAPY

153 SFSTORAGE

254 SFCHARTING

85 SFADL TLT

INPATIENT PM&R

169 SF

MALEPUBLIC TLT

169 SF

FEMALEPUBLIC TLT

88 SFON-CALL

77 SFON-CALL

79 SFTLT/ SHWR

79 SFTLT/ SHWR

89 SFON-CALL

88 SFON-CALL

82 SFON-CALL

FUTURE M.O.B.

ROOF BELOW

256 SF

MULTI-PURPOSE

ROOM

ROOF

863 SFCORRIDOR

358 SFCORRIDOR

100 SFCORRIDOR

101 SFCORRIDOR

34 SFPAT TLT

347 SFCORRIDOR

250 SF

SHAREOFFICE -

CASEMANAGEMENT

256 SF

SHAREDOFFICE -

HOSPITALISTS

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

AA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:30

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 5 FLOOR PLAN

AREA A

A-115A

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 5 FLOOR PLAN - AREA A

Issued Drawing LogNo. Date Item

Page 20: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

677 SF

SERVICEELEVATORS

80 SFON-CALL

301 SF

PUBLICELEVATORS

438 SFCONFERENCE

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

262 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

250 SF

SHAREDOFFICE

209 SFWAITING

12345678910

A

B

C

1112

H

F

G

E

84 SFPHYS DICT

389 SF

CLEANSUPPLY

223 SF

SOILEDUTILITY

89 SFOFFICE

89 SFOFFICE

380 SF

EQUIPMENTSTORAGE

246 SF

STAFFLOUNGE

151 SFDATA

48 SFHK

98 SFMED

248 SF

CLEANSUPPLY

203 SF

SOILEDUTILITY

154 SFELECT

100 SFMED

438 SFCHARTING

84 SFPHYS DICT

437 SFCHARTING

108 SFCONSULT

50 SF

RESEARCHCENTER

163 SFELECT

720 SFOPEN GYM

34 SFPAT TLT

44 SFPAT TLT 34 SF

PAT TLT34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT

50 SFPAT TLT

50 SFPAT TLT34 SF

PAT TLT34 SF

PAT TLT34 SF

PAT TLT

50 SFPAT TLT

314 SFSTAIR 1

498 SFHYDROTHERAPY

153 SFSTORAGE

254 SFCHARTING

85 SFADL TLT

INPATIENT PM&R

169 SF

MALEPUBLIC TLT

169 SF

FEMALEPUBLIC TLT

88 SFON-CALL

77 SFON-CALL

79 SFTLT/ SHWR

79 SFTLT/ SHWR

89 SFON-CALL

88 SFON-CALL

82 SFON-CALL

68 SF

STAFFLOCKERS

52 SFALCOVE

51 SFALCOVE

PATIENT CARE SERVICES(MED-SURG)

262 SF

PATIENTROOM

234 SF

PATIENTROOM

248 SF

PATIENTROOM

34 SFPAT TLT

45 SFPAT TLT

50 SFPAT TLT

251 SF

PATIENTROOM

234 SF

PATIENTROOM

275 SFTEAM ROOM

256 SF

MULTI-PURPOSE

ROOM

94 SF

EQROOM

2785 SFCORRIDOR

2467 SFCORRIDOR

863 SFCORRIDOR

358 SFCORRIDOR

100 SFCORRIDOR

101 SFCORRIDOR

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

45 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

347 SFCORRIDOR

255 SFSTAIR 2

50 SFSTAFF TLT

53 SFSTF TLT

79 SFNOURISH

250 SF

SHAREOFFICE -

CASEMANAGEMENT

256 SF

SHAREDOFFICE -

HOSPITALISTS

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:33

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 5 FLOOR PLAN

AREA B

A-115B

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 5 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 21: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

677 SF

SERVICEELEVATORS

111 SF

TREATMENTBAY

921 SF

CLINICALENGINEERING

301 SF

PUBLICELEVATORS

387 SF

CONFERENCEROOM

256 SF

MULTIPURPOSEROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

262 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

518 SF

STAFFTRAINING

ROOM208 SFWAITING

123456789101112

H

F

G

E

0.5

169 SF

FEMALEPUBLIC TLT

167 SF

MALEPUBLIC TLT

100 SFMED

84 SFPHYS DICT

163 SFELECT

389 SF

CLEANSUPPLY

223 SF

SOILEDUTILITY

89 SFOFFICE 380 SF

EQUIPSTORAGE

246 SF

STAFFLOUNGE

151 SFDATA

48 SFHK

98 SFMED

248 SF

CLEANSUPPLY

203 SF

SOILEDUTILITY 155 SF

ELECT

437 SFCHARTING

438 SFCHARTING

84 SFPHYS DICT

89 SFOFFICE

108 SFCONSULT

50 SF

RESOURCECENTER

314 SFSTAIR 1

844 SFCORRIDOR

2467 SFCORRIDOR

367 SFCORRIDOR

34 SFPAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT

50 SFPAT TLT34 SF

PAT TLT34 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT 50 SF

PAT TLT

34 SFPAT TLT

137 SF

TREATMENTBAY

111 SF

TREATMENTBAY

107 SF

TREATMENTBAY

118 SF

TREATMENTBAY

106 SF

TREATMENTBAY

101 SF

TREATMENTBAY

130 SF

NURSEWORKSTATION

63 SFPAT TLT

255 SF

EQUIPMENTCLEANING/STORAGE72 SF

CLEANSUPPLY

51 SFALCOVE

68 SF

STAFFLOCKERS

51 SFALCOVE

PATIENT CARE SERVICES(MED-SURG)

INPATIENT DIALYSIS

234 SF

PATIENTROOM

251 SF

PATIENTROOM

262 SF

PATIENTROOM

234 SF

PATIENTROOM

248 SF

PATIENTROOM

275 SFTEAM ROOM

96 SF

EQUIP.STOR.

50 SFSTAFF TLT

2785 SFCORRIDOR

255 SFSTAIR 2

45 SFPAT TLT

34 SFPAT TLT

52 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

45 SFPAT TLT

758 SFCORRIDOR

53 SFSTF TLT

79 SFNOURISH

250 SF

SHAREDOFFICE -

CASEMANAGEMENT

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

2:1

1:32

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 6 FLOOR PLAN

A-116

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 6 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 22: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

353 SF

PUBLICELEVATORS

403 SF

CONFERENCEROOM

210 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

210 SF

NEG.PRESSURE

PATIENTROOM

262 SF

NEG.PRESSURE

IMCUPATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

NEG.PRESSURE

PATIENTROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

211 SF

OBSERVROOM

123456789101112

H

F

G

E

0.5

162 SFELECT

437 SFCHARTING 100 SF

MED

84 SFPHYS DICT

389 SF

CLEANSUPPLY

223 SF

SOILEDUTILITY

89 SFOFFICE

89 SFOFFICE

380 SF

EQUIPSTOR.

246 SF

STAFFLOUNGE

151 SFDATA

48 SFHK

438 SFCHARTING

98 SFMED

84 SFPHYS DICT

248 SF

CLEANSUPPLY 200 SF

SOILEDUTILITY

158 SFELECT

99 SFCONSULT

34 SFPAT TLT

50 SFPAT TLT 34 SF

PAT TLT

44 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT 34 SF

PAT TLT

50 SFPAT TLT

34 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

34 SFPAT TLT50 SF

PAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT50 SF

PAT TLT

34 SFPAT TLT

34 SFPAT TLT

314 SFSTAIR 1

51 SFALCOVE

68 SF

STAFFLOCKERS

51 SFALCOVE

2702 SFCORRIDOR

PATIENT CARE SERVICES(TELEMETRY)

234 SF

NEG.PRESSURE

IMCUPATIENTROOM

251 SF

NEG.PRESSURE

IMCUPATIENTROOM

262 SF

NEG.PRESSURE

IMCUPATIENTROOM

247 SF

NEG.PRESSURE

IMCUPATIENTROOM

234 SF

NEG.PRESSURE

IMCUPATIENTROOM

PATIENT TRANSPORT

BEDS (8)

PATIENT OBSERVATION

45 SFPAT TLT

34 SFPAT TLT

52 SFPAT TLT

50 SFPAT TLT

34 SFPAT TLT

45 SFPAT TLT

(8 ROOMS)

IMCU / NEGATIVE PRESSURE PATIENT ROOMS

94 SF

EQROOM

275 SFTEAM ROOM

2529 SFCORRIDOR

250 SF

SHAREDOFFICE -

CASEMANAGEMENT

518 SF

STAFFTRAINING

ROOM

677 SF

SERVICEELEVATORS

175 SF

MALEPUBLIC TLT

176 SF

FEMALEPUBLIC TLT

940 SF

WORKSTATIONS

182 SF

PULMONARYFUNCTIONTESTING

132 SF

OFFICE -RISK MGMT

121 SF

WORKROOM

116 SFOFFICE - QC

129 SFOFFICE - QC

48 SFSTF TLT

48 SFSTF TLT

61 SFPANTRY

253 SF

PATIENTTRANSPORT

STORAGE348 SF

PATIENTTRANSPORT

ADMIN

116 SFOFFICE - IC

129 SFOFFICE - IC

168 SFRECEPT

141 SF

PULMONARYADMIN

1209 SFCORRIDOR

50 SFSTAFF TLT

255 SFSTAIR 2

213 SF

FAMILYWAITING

BEDS (8)

PATIENT OBSERVATION

(8 ROOMS)

MED / SURG PATIENT ROOMS

(8 ROOMS)

IMCU / NEGATIVE PRESSURE PATIENT ROOMS

53 SFSTF TLT

79 SFNOURISH

256 SF

CONFERENCEROOM

59 SF

RESOURCECENTER

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

2:1

1:11

PM

1/16" = 1'-0"

MAIN HOSPITALLEVEL 7 FLOOR PLAN

A-117

Author

Checker

Approver

AUGUST 1, 2014

1/16" = 1'-0"1 MAIN HOSPITAL LEVEL 7 FLOOR PLAN - AREA B

Issued Drawing LogNo. Date Item

Page 23: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

12345678910111213

H

F

G

E

0.5

243 SF

ELEVATORMACHINE

ROOM

356 SFSTAIR 2

SHAFT

AHU

SHAFT

AHU

SHAFT

12345678910111213

H

F

G

E

0.5

ROOF

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

NORTH

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

A BA B

KEY PLAN

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

4:5

2:46

PM

1" = 20'-0"

PENTHOUSE ANDROOF PLAN

A-119

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"1 PENTHOUSE FLOOR PLAN

1" = 20'-0"2 ROOF FLOOR PLAN - OVERALL

Issued Drawing LogNo. Date Item

Page 24: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

E.D. CANOPYWAS

HING

TON

ADVE

NTIS

T

EMERGENCY

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

CELLAR-21' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

ROOF131' - 0"

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

CELLAR-21' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

ROOF127' - 0"

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

CELLAR-21' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

ROOF126' - 0"

EP3G1EP1 EP4

G1 C1

C2 EP1 G2 M2 C2

EP1

G4

G5

C3

BUILDING SIGNAGE, ILLUMINATED

MAIN HOSPITALENTRY

SOUTH COURTYARDENTRY EMERGENCY

ENTRYEMERGENCY

VEHICLES

E.D. CANOPY

CONNECTION TOBUILDING 'A'

C2

G2

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

CELLAR-21' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

ROOF126' - 0"

G1

EP3 G1EP1EP4

C1

G5

G2C2

EP1

C2C1G2

CENTRAL UTILITY PLANTWEST PATIO

LAODING DOCK

E.D CANOPY

C2

C2

G5 G2

C1 ARCHITECTURAL SPLIT FACECMU VENEER, W BUFF FINISH.

MATERIAL LEGEND

C1B ARCHITECTURAL SPLIT FACE CMUSCREEN WALL. W BUFF FINISH

C2 ARCHITECTURAL GROUND FACECMU VENEER W. SMOOTH FINISH

EP1POLYMER BASED SOLID PHENOLIC EXTERIOR WALLPANELS, INSTALLED WITH EXPOSED FASTENERS.BIRCH WOOD GRAINED VENEER FINISH

EP2 COMPOSITE ALUMINUM METAL PANEL SYSTEM.

EP3COMPOSITE ALUMINUM METAL PANEL SYSTEM.3-STONE JADE COLOR, STAGGERED SEAM,RANDOM PATTERN AND SIZE.

EP4 SCREEN WALL SYSTEM PAINTED W/ HIGHPERFORMANCE SILVER COATING

G1ALUMINUM CURTAINWALL WINDOWSYSTEM W/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING

G2ALUMINUM STOREFRONT WINDOW SYSTEMW/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING

G3ALUMINUM STOREFRONT WINDOW SYSTEMW/ HIGH PERFORMANCE INSULATED GLAZINGAND SPANDREL GLAZING

G4 PUNCHED ALUMINUM WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLASS

G5 ALUMINUM RIBBON WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLAZING

G6FOOD COURT VERANDA METAL GUARDRAILSYSTEM W/ HIGH PERFORMANCE PAINTEDMETAL SLAB FASCIA COVER

L1 ARCHITECTURAL ALUMINUM LOUVER SYSTEMHIGH PERFORMANCE PAINTED FINISH

M1A PAINTED ALUMINUM HORIZONTALSUNSHADES FINSIH TYP. DARK GRAY COLOR

M1B PAINTED ALUMINUM VERTICALSUNSHADES , TYP. DARK GRAY COLOR

M2 METAL WRAPPED BUILDING COPINGDARK GRAY PAINTED

MATERIAL LEGEND ABBREVIATIONS:CMU - CONCRETE MASONRY UNIT WALL SYSTEMEP - EXTERIOR WALL PANEL SYSTEMG - GLAZING SYSTEML - LOUVER SYSTEMM - METTALIC FINISH SYSTEM

C3 LARGE FORMAT CMU VENEER W.ROUGH FINISH

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:41

PM

As indicated

HOSPITAL EAST ANDWEST ELEVATIONS

A-200

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"1 EAST ELEVATION - OVERALL

1" = 20'-0"2 WEST ELEVATION - OVERALL

Issued Drawing LogNo. Date Item

Page 25: WASHINGTON ADVENTIST HOSPITAL WHITE OAK …mhcc.maryland.gov/mhcc/pages/hcfs/hcfs_con/...washington adventist hospital white oak certificate of need (c.o.n.) submittal project drawings

FUTURE MOB

EMERGENCY

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

ROOF131' - 0"

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE

FUTURE MOB

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE

ROOF131' - 0"

LEVEL 10' - 0"

LEVEL 218' - 0"

LEVEL 336' - 0"

LEVEL 451' - 0"

LEVEL 566' - 0"

LEVEL 681' - 0"

LEVEL 796' - 0"

PENTHOUSE111' - 0"

EMERGENCYAMBULANCE ENTRANCE

G1

EP1

C1

G1

C2

EP1

CENTRAL UTILITYPLANT BEYOND

G1

G1

G2

C3

G1

EP1 G1

G2

SOUTH COURTYARDENTRY

INTERIORSPACE

C3

C2

C1 ARCHITECTURAL SPLIT FACECMU VENEER, W BUFF FINISH.

MATERIAL LEGEND

C1B ARCHITECTURAL SPLIT FACE CMUSCREEN WALL. W BUFF FINISH

C2 ARCHITECTURAL GROUND FACECMU VENEER W. SMOOTH FINISH

EP1POLYMER BASED SOLID PHENOLIC EXTERIOR WALLPANELS, INSTALLED WITH EXPOSED FASTENERS.BIRCH WOOD GRAINED VENEER FINISH

EP2 COMPOSITE ALUMINUM METAL PANEL SYSTEM.

EP3COMPOSITE ALUMINUM METAL PANEL SYSTEM.3-STONE JADE COLOR, STAGGERED SEAM,RANDOM PATTERN AND SIZE.

EP4 SCREEN WALL SYSTEM PAINTED W/ HIGHPERFORMANCE SILVER COATING

G1ALUMINUM CURTAINWALL WINDOWSYSTEM W/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING

G2ALUMINUM STOREFRONT WINDOW SYSTEMW/SPANDREL & FRIT GLASS.HIGH PERFORMANCE INSULATED GLAZING

G3ALUMINUM STOREFRONT WINDOW SYSTEMW/ HIGH PERFORMANCE INSULATED GLAZINGAND SPANDREL GLAZING

G4 PUNCHED ALUMINUM WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLASS

G5 ALUMINUM RIBBON WINDOW SYSTEM W/ HIGHPERFORMANCE INSULATED GLAZING

G6FOOD COURT VERANDA METAL GUARDRAILSYSTEM W/ HIGH PERFORMANCE PAINTEDMETAL SLAB FASCIA COVER

L1 ARCHITECTURAL ALUMINUM LOUVER SYSTEMHIGH PERFORMANCE PAINTED FINISH

M1A PAINTED ALUMINUM HORIZONTALSUNSHADES FINSIH TYP. DARK GRAY COLOR

M1B PAINTED ALUMINUM VERTICALSUNSHADES , TYP. DARK GRAY COLOR

M2 METAL WRAPPED BUILDING COPINGDARK GRAY PAINTED

MATERIAL LEGEND ABBREVIATIONS:CMU - CONCRETE MASONRY UNIT WALL SYSTEMEP - EXTERIOR WALL PANEL SYSTEMG - GLAZING SYSTEML - LOUVER SYSTEMM - METTALIC FINISH SYSTEM

C3 LARGE FORMAT CMU VENEER W.ROUGH FINISH

0'

GRAPHIC SCALE

KEYPLAN

CONTACT:

Drawn

RTKL Proj No.

Scale:

2008 RTKL ASSOCIATES INC.

RTKL Associates, Inc., Washington, DC

NOT FORCONSTRUCTION

FILE

NAME

:TIM

E:

1

Issue Date:

Soltesz Engineering,Rockville, MD

Parker Rodriguez Inc., Alexandria, VATLC Engineering, Orlando, FL

Perrine Planning & Zoning, Inc., Rockville, MDThe Traffic Group, Inc., Baltimore, MDThe Walker Group LLC, Bethesda, MDLerch, Early & Brewer, Bethesda, MD

LaSalle Engineering, LLC, Willow Grove, PA

NORTH

Checked

Approved

CONSULTANTS:

Geoffrey A. MorganVice President

Washington Adventist Hospital301.891.5458

2

3

4

5

6

7

8

9

1

2

3

4

5

6

7

8

9

A B C D E F G H J K

A B C D E F G H J K

8' 16' 32'

1/16" = 1' - 0"

CON APPLICATION

Was

hing

ton

Adv

entis

t Hos

pita

lR

epla

cem

ent P

roje

ct

PLU

M O

RC

HA R

D D

RIV

ESI

LVER

SPR

ING

, MA R

YLAN

D 2

0 904

- OCT 4, 2013 CON SUBMITTAL

C:\U

sers

\hm

celro

y\D

ocum

ents

\WAS

HIN

GTO

NAD

VEN

TIST

_IN

TER

IOR

_CEN

TRAL

_E_h

mce

lroy.

rvt

8/8/

2014

1:5

0:42

PM

As indicated

HOSPITAL NORTHAND SOUTHELEVATIONS

A-201

Author

Checker

Approver

AUGUST 1, 2014

1" = 20'-0"1 NORTH ELEVATION - OVERALL

1" = 20'-0"2 SOUTH ELEVATION - OVERALL

Issued Drawing LogNo. Date Item