washington, 0.c. - transportation...reservation system which will be designed to allow truckers to...

12
THE SECRETARY OF TRANSPORTATION WASHINGTON, 0 .C. 20590 Th e Honorable Jam es L. Obcrstar Cha irman April 15 , 2009 Committee on Transportation and Infrastructure U. S. House of Represe nt ati ves Washington, DC 205 15 Dear Mr. Chairman: This letter report is submitted in accordance with Secti on 1305(c) of the Safe, Accountable, 171exible. and Efficient Transportation Equity Act: A Legacy for Users (S ArET EA- LU). Secti on 1305 of SAFET EA -LU directs the Secretary of Transportation to establish a pilot program to address th e short age of Jong-term parking fo r comme rc ial mo tOr vehicles on the Na ti onal Highway System (NHS). States. metr opolitan pl anning organi za ti ons, and local governments are e li gibl e fo r th e funding ava il ab le fo r Fiscal Years ( FY) 2006-2009. Section 1 305 all ows for a va ri ety of e li g ibl e projects. ra ngin g from construction of spaces and other capital improvements to usin g intelligent transport a ti on systems technology to increase information on the avai lability of both public and private commercial vehicle parking spaces. The Federal Highway Administration (FHWA) so li c ited proposals for FY 2006 funding on August 28 , 2006, after receiving Office of Manageme nt and Budget approval for a new information collecti on und er th e Pape rwork Redu c ti on Act of 1995. Propos al s submitted for the r: y 2006 solicitation were still be ing re vie wed when the FY 2007 so li c ita ti on was published on March 22. 2007. Because th e FY 2007 so li cit ati on wa s published so close to th e du e date for the FY 2006 proposal s, the fY 2006 submiss ion s were pla ce d on ho ld and reviewed in conjunction with the FY 2007 submissions. from that review, we found that many of th e fY 2006 a nd FY 2007 proposal s were meritorious, but they only addressed specific locations acro ss NI IS. Give n the nature of long-h aul truck movement, and gi ve n th e amount of fund s a va il abl e. Fl IWA decided to foc us on a corridor approach and on tec hn ological solutions th at can prov id e fo r more widespread application and a ll eviation of the tru ck parking pro bl em. The inte nt has been to find and fund solutions that could work along NI IS corridors be in g scal ab le across th e Nati o n.

Upload: others

Post on 17-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

THE SECRETARY OF TRANSPORTATION

WASHINGTON, 0 .C. 20590

The Honorable James L. Obcrstar Chairman

April 15 , 2009

Committee on Transportation and Infrastructure U.S. House of Representatives Washington, DC 205 15

Dear Mr. Chairman:

This letter report is submitted in accordance with Section 1305( c) of the Safe, Accountable, 171exible. and Efficient Transportation Equity Act: A Legacy for Users (SArETEA-LU). Section 1305 of SAFETEA-LU directs the Secretary of Transportation to establish a pilot program to address the shortage of Jong-term parking for commercial motOr vehicles on the National Highway System (NHS). States. metropolitan planning organizations, and local governments are eligible fo r the funding available fo r Fiscal Years (FY) 2006-2009. Section 1305 allows for a variety of eligible projects. ranging from construction of spaces and other capital improvements to using intelligent transportation systems technology to increase information on the avai lability of both public and private commercial vehicle parking spaces.

The Federal Highway Administration (FHWA) solicited proposals for FY 2006 funding on August 28, 2006, after receiving Office of Management and Budget approval for a new information collection under the Paperwork Reduction Act of 1995. Proposals submitted for the r:y 2006 solicitation were still be ing reviewed when the FY 2007 so licitation was published on March 22. 2007. Because the FY 2007 solicitation was published so close to the due date for the FY 2006 proposals, the fY 2006 submissions were placed on hold and reviewed in conjunction with the FY 2007 submissions.

from that review, we found that many of the fY 2006 and FY 2007 proposals were meritorious, but they only addressed specific locations across NI IS. Given the nature of long-haul truck movement, and given the amount of funds available. Fl I WA decided to foc us on a corridor approach and on technological solutions that can provide for more widespread application and alleviation of the truck parking problem. The intent has been to find and fund solutions that could work along NI IS corridors being scalab le across the Nation.

Page 2: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page2 The Honorable James L. Oberstar

Therefore, FHW A issued a new solicitation on November 16, 2007. In that solicitation, FHW A explained its thinking and clearly indicated that it was looking for corridor level solutions. The corridor level thinking, exemplified by Corridors of the Future, was used as an example of the type of corridors that were envisioned for funding. States were encouraged to assemble corridors or use existing ones when they submitted proposals. During the solicitation process Congress rescinded the FY 2008 funds for Section 1305, leaving the Department $11.2 million in funds in FY 2006 and FY 2007 for distribution. The new round of proposals more closely reflected a corridor level concept, and two projects were selected-the California iPark project along the 1-5 corridor and the 1-95 Corridor Coalition truck parking project along a seven-State region on the east coast.

The California iPark project will be funded at $5,455,372 over a 3-year period. This project will identify truck parking spaces at both public and private parking facilities through technology (cameras and sensors) and then communicate the availability of those spaces to the trucking community through communication devices such as cell phones, personal digital assistants, navigation programs, and other appropriate devices. Additionally, they will demonstrate a reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively utilize their hours of service.

The 1-95 Corridor Coalition will be funded at $5,521,688 over a 3-year period. Seven States along the corridor are participating and are focusing on 8,351 parking spaces that will be monitored through advanced technology. The availability of those spaces will be communicated through traffic management centers to a selected lead center and then to the trucking community. The 1-95 Corridor Coalition will consider technology similar to that used by the 1-5 corridor, but will also look at park-and-ride facilities that are not used during the evening hours and will work with businesses to utilize their parking facilities during the evening hours. Additionally, the partner States plan to build an additional 250 spaces at a cost of $4 million-this amount is not included in the $5.5 million grant figure.

The FHW A will work closely with the 1-95 States and with the State of California as they roll out their demonstration projects. Each of the projects will have 3 years to develop and evaluate the technological approaches they are proposing to help alleviate truck parking problems. The methodologies these projects will prototype for identifying and communicating available truck parking are scalable to the rest of the Nation. They also provide a unique opportunity to evaluate comparable solutions-one from the private sector, one from the 1-5 corridor project, and one from the public sector, 1-95 Corridor Coalition.

Page 3: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page 3 The Honorable James L. Oberstar

Both the 1-95 Corridor Coalition Truck Parking Team on the East Coast and the 1-5 Truck Parking Team in California have obligated funds and have developed a project plan. They are now in the process of project design and expect to begin project implementation in the latter part of2009. When the FY 2009 funding becomes available, FHWA will either solicit for new projects or fund the next tier of projects from the November 2007 solicitation.

Identical letters have been sent to the Ranking Member of the House Committee on Transportation and Infrastructure and the Chairman and Ranking Member of the Senate Committee on Environment and Public Works.

Page 4: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

THE SECRETARY OF TRANSPORTATION

WASHINGTON, D.C. 20590

The Honorable John L. Mica Ranking Member

Apri l 15. 2009

Committee on Transportation and Infrastructure U.S. House of Representatives Washington, DC 20515

Dear Congressman Mica:

This letter report is submitted in accordance wi th Section 1305( c) of the Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). Section 1305 of SAFETEA-LU directs the Secretary of Transportation to estab li sh a pilot program to address the shortage or long-term parking for commercial motor vehicles on the National Highway System (NHS). States. metropolitan planning organizations, and local governments are eligible for the funding available fo r Fiscal Years (FY) 2006- 2009. Section 1305 al lows for a variety of eligible projects, ranging from construction of spaces and other capital improvements to using intelligent transportation systems technology to increase information on the avai lability of both public and pri vate commercial vehicle parking spaces.

TI1e Federal Highway Administration (FHWA) so licited proposals for FY 2006 funding on August 28, 2006, after receiving Office of Management and Budget approval for a new information collection under the Paperwork Reduction Act of 1995. Proposals submitted for the FY 2006 solici tation were still being reviewed when the FY 2007 so licitation was published on March 22, 2007. Because the FY 2007 sol icitat ion was published so close to the due date for the FY 2006 proposals, the FY 2006 submissions were placed on hold and reviewed in conjunction with the FY 2007 submissions.

From that review, we found that many of the FY 2006 and FY 2007 proposals were meritorious, but they only addressed speci fie locations across N IIS. Given the nature of long-haul truck movement, and given the amount of funds available. f'HW A decided to focus on a corridor approach and on technological solutions that can provide for more widespread application and alleviation of the truck parking problem. The intent has been to find and fund solutions that could work along NHS corridors being scalable across the Nation.

Page 5: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page2 The Honorable John L. Mica

Therefore, FHW A issued a new solicitation on November 16, 2007. In that solicitation, FHW A explained its thinking and clearly indicated that it was looking for corridor level solutions. The corridor level thinking, exemplified by Corridors of the Future, was used as an example of the type of corridors that were envisioned for funding. States were encouraged to assemble corridors or use existing ones when they submitted proposals. During the solicitation process Congress rescinded the FY 2008 funds for Section 1305, leaving the Department $11.2 million in funds in FY 2006 and FY 2007 for distribution. The new round of proposals more closely reflected a corridor level concept, and two projects were selected-the California iPark project along the 1-5 corridor and the 1-95 Corridor Coalition truck parking project along a seven-State region on the east coast.

The California iPark project will be funded at $5,455,3 72 over a 3-year period. This project will identify truck parking spaces at both public and private parking facilities through technology (cameras and sensors) and then communicate the availability of those spaces to the trucking community through communication devices such as cell phones, personal digital assistants, navigation programs, and other appropriate devices. Additionally, they will demonstrate a reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively utilize their hours of service.

The 1-95 Corridor Coalition will be funded at $5,521,688 over a 3-year period. Seven States along the corridor are participating and are focusing on 8,351 parking spaces that will be monitored through advanced technology. The availability of those spaces will be communicated through traffic management centers to a selected lead center and then to the trucking community. The 1-95 Corridor Coalition will consider technology similar to that used by the 1-5 corridor, but will also look at park-and-ride facilities that are not used during the evening hours and will work with businesses to utilize their parking facilities during the evening hours. Additionally, the partner States plan to build an additional 250 spaces at a cost of $4 million-this amount is not included in the $5.5 million grant figure.

The FHWA will work closely with the J-95 States and with the State of California as they roll out their demonstration projects. Each of the projects will have 3 years to develop and evaluate the technological approaches they are proposing to help alleviate truck parking problems. The methodologies these projects will prototype for identifying and communicating available truck parking are scalable to the rest of the Nation. They also provide a unique opportunity to evaluate comparable solutions----one from the private sector, one from the 1-5 corridor project, and one from the public sector, 1-95 Corridor Coalition.

Page 6: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page3 The Honorable John L. Mica

Both the 1-95 Corridor Coalition Truck Parking Team on the East Coast and the 1-5 Truck Parking Team in California have obligated funds and have developed a project plan. They are now in the process of project design and expect to begin project implementation in the latter part of 2009. When the FY 2009 funding becomes available, FHWA will either solicit for new projects or fund the next tier of projects from the November 2007 solicitation.

Identical letters have been sent to the Chairman of the House Committee on Transportation and Infrastructure and the Chairman and Rankin Member of the Senate Committee on Environment and Public Works.

Page 7: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

THE SECRETARY OF TRANSPORTATION

WASHINGTON, D.C. 20590

The Honorable Barbara Boxer Chairman

Apri l 15, 2009

Committee on Environment and Public Works United States Senate Washington, DC 205 10

Dear Madam Chairman:

This letter report is submitted in accordance with Section I 305(c) of the Safe, Accountable, Flexible, and Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). Section 1305 of SAFETEA-LU directs the Secretary of Transportation to establish a pilot program to address the shortage of long-term parking for commercial motor vehicles on the National Highway System (NHS). States, metropolitan planning organizations, and local governments are eligible for the funding available for Fiscal Years (FY) 2006- 2009. Section 1305 allows for a variety of eligible projects, ranging from construction of spaces and other capi tal improvements to using intelligent transportation systems technology to increase information on the availability of both public and private commercial vehicle parking spaces.

The Federal Highway Administration (FHWA) solicited proposals for FY 2006 funding on August 28, 2006, after receiving Office of Management and Budget approval for a new information collection under the Paperwork Reduction Act of 1995. Proposals submitted for the FY 2006 solicitation were still being reviewed when the FY 2007 solicitation was published on March 22, 2007. Because the FY 2007 solicitation was published so close to the due date for the f'Y 2006 proposals, the FY 2006 submissions were placed on hold and reviewed in conjunction with the FY 2007 submissions.

From that review, we found that many of the FY 2006 and FY 2007 proposals were meritorious, but they only addressed specific locations across NHS. Given the nature of long-haul truck movement, and given the amount of funds available. FHW A decided to focus on a corridor approach and on technological solutions that can provide for more widespread application and alleviation of the truck parking problem. The intent has been to find and fund solutions that could work along NHS corridors being scalable across the Nation.

Page 8: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page 2 The Honorable Barbara Boxer

Therefore, FHW A issued a new solicitation on November 16, 2007. In that solicitation, FHW A explained its thinking and clearly indicated that it was looking for corridor level solutions. The corridor level thinking, exemplified by Corridors of the Future, was used as an example of the type of corridors that were envisioned for funding. States were encouraged to assemble corridors or use existing ones when they submitted proposals. During the solicitation process Congress rescinded the FY 2008 funds for Section 1305, leaving the Department $11.2 million in funds in FY 2006 and FY 2007 for distribution. The new round of proposals more closely reflected a corridor level concept, and two projects were selected-the California iPark project along the 1-5 corridor and the 1-95 Corridor Coalition truck parking project along a seven-State region on the east coast.

The California iPark project will be funded at $5,455,372 over a 3-year period. This project will identify truck parking spaces at both public and private parking facilities through technology (cameras and sensors) and then communicate the availability of those spaces to the trucking community through communication devices such as cell phones, personal digital assistants, navigation programs, and other appropriate devices. Additionally, they will demonstrate a reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively utilize their hours of service.

The 1-95 Corridor Coalition will be funded at $5,521,688 over a 3-year period. Seven States along the corridor are participating and are focusing on 8,351 parking spaces that will be monitored through advanced technology. The availability of those spaces will be communicated through traffic management centers to a selected lead center and then to the trucking community. The 1-95 Corridor Coalition will consider technology similar to that used by the 1-5 corridor, but will also look at park-and-ride facilities that are not used during the evening hours and will work with businesses to utilize their parking facilities during the evening hours. Additionally, the partner States plan to build an additional 250 spaces at a cost of $4 million-this amount is not included in the $5.5 million grant figure.

The FHW A will work closely with the 1-95 States and with the State of California as they roll out their demonstration projects. Each of the projects will have 3 years to develop and evaluate the technological approaches they are proposing to help alleviate truck parking problems. The methodologies these projects will prototype for identifying and communicating available truck parking are scalable to the rest of the Nation. They also provide a unique opportunity to evaluate comparable solutions-one from the private sector, one from the 1-5 corridor project, and one from the public sector, 1-95 Corridor Coalition.

Page 9: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page 3 The Honorable Barbara Boxer

Both the 1-95 Corridor Coalition Truck Parking Team on the East Coast and the 1-5 Truck Parking Team in California have obligated funds and have developed a project plan. They are now in the process of project design and expect to begin project implementation in the latter part of2009. When the FY 2009 funding becomes available, FHWA will either solicit for new projects or fund the next tier of projects from the November 2007 solicitation.

Identical letters have been sent to the Ranking Member of the Senate Committee on Environment and Public Works and to the Chairman and king Member of the House Committee on Transportation and Infrastructure.

Page 10: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

THE SECRETARY OF TRANSPORTATION

WASHINGTON. 0 C. 20590

The Honorable James M. lnhofe Ranking Member

April 15, 2009

Committee on Environment and Public Works United States Senate Washington. DC 205 10

Dear Senator lnhofe:

This letter report is submitted in accordance with Section I 305(c) of the Safe, Accountable, Flexible, and Effi cient Transportation Equity Act: A Legacy for Users (SAFETEA-LU). Section 1305 of SArETEA-LU directs the Secretary of Transportation to establish a pilot program to address the shortage of long-term parking for commercial motor vehicles on the National Highway System (NHS). States. metropolitan planning organizations, and local governments arc eligible for the funding available for Fiscal Years (FY) 2006- 2009. Section 1305 allows for a variety of eligible projects. ranging from construction of spaces and other capital improvements to using intelligent transportation systems technology to increase information on the availability of both public and private commercial vehicle parking spaces.

The rederal Highway Administration (FHWA) solicited proposals for FY 2006 funding on August 28. 2006, after receiving Office of Management and Budget approval for a new information collection under the Paperwork Reduction Act of 1995. Proposals submitted for the FY 2006 solicitation were still being reviewed when the FY 2007 solicitation was published on March 22, 2007. Because the FY 2007 solicitat ion was published so close to the due date for the FY 2006 proposals, the FY 2006 submissions were placed on hold and reviewed in conjunction with the FY 2007 submissions.

From that review, we found that many of the rY 2006 and FY 2007 proposals were meritorious, but they only addressed specific locations across NI IS. Given the nature of long-haul truck movement, and given the amount of funds available. FHW I\ decided to focus on a corridor approach and on technological solutions that can provide for more widespread application and alleviation of the truck parking problem. The intent has been to find and fund solutions that could work along NHS corridors being scalable across the Nation.

Page 11: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page 2 The Honorable James M. lnhofe

Therefore, FHWA issued a new solicitation on November 16, 2007. In that solicitation, FHWA explained its thinking and clearly indicated that it was looking for corridor level solutions. The corridor level thinking, exemplified by Corridors of the Future, was used as an example of the type of corridors that were envisioned for funding. States were encouraged to assemble corridors or use existing ones when they submitted proposals. During the solicitation process Congress rescinded the FY 2008 funds for Section 1305, leaving the Department $11.2 million in funds in FY 2006 and FY 2007 for distribution. The new round of proposals more closely reflected a corridor level concept, and two projects were selected-the California iPark project along the 1-5 corridor and the 1-95 Corridor Coalition truck parking project along a seven-State region on the east coast.

The California iPark project will be funded at $5,455,372 over a 3-year period. This project will identify truck parking spaces at both public and private parking facilities through technology (cameras and sensors) and then communicate the availability of those spaces to the trucking community through communication devices such as cell phones, personal digital assistants, navigation programs, and other appropriate devices. Additionally, they will demonstrate a reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively utilize their hours of service.

The I-95 Corridor Coalition will be funded at $5,521,688 over a 3-year period. Seven States along the corridor are participating and are focusing on 8,351 parking spaces that will be monitored through advanced technology. The availability of those spaces will be communicated through traffic management centers to a selected lead center and then to the trucking community. The 1-95 Corridor Coalition will consider technology similar to that used by the I-5 corridor, but will also look at park-and-ride facilities that are not used during the evening hours and will work with businesses to utilize their parking facilities during the evening hours. Additionally, the partner States plan to build an additional 250 spaces at a cost of $4 million-this amount is not included in the $5.5 million grant figure.

The FHWA will work closely with the 1-95 States and with the State of California as they roll out their demonstration projects. Each of the projects will have 3 years to develop and evaluate the technological approaches they are proposing to help alleviate truck parking problems. The methodologies these projects will prototype for identifying and communicating available truck parking are scalable to the rest of the Nation. They also provide a unique opportunity to evaluate comparable solutions-one from the private sector, one from the 1-5 corridor project, and one from the public sector, 1-95 Corridor Coalition.

Page 12: WASHINGTON, 0.C. - Transportation...reservation system which will be designed to allow truckers to make an advance reservation for a parking space enabling them to more effectively

Page 3 The Honorable James M. Inhofe

Both the 1-95 Corridor Coalition Truck Parking Team on the East Coast and the 1-5 Truck Parking Team in California have obligated funds and have developed a project plan. They are now in the process of project design and expect to begin project implementation in the latter part of2009. When the FY 2009 funding becomes available, FHWA will either solicit for new projects or fund the next tier of projects from the November 2007 solicitation.

Identical letters have been sent to the Chairman of the Senate Committee on Environment and Public Works and to the Chairman and Ranking Member of the House Committee on Transportation and Infrastructure.