Agenda: Lean Workshop – Rapid Site Assessment, Value Stream Mapping Day 1 (8:00am – 5:00pm) Introduction to Leadership team Lean Leader module and System Kaizen Approach 1 hr Rapid Site Assessment – Questionnaire and observation of core process steps of key profit center. Summary assessment and share findings with company principal (Laura Green) Day 2 (8:00am – 5:00pm) Break for lunch 12 -1 – Maintenance Technicians - STD Work Introduction of core teams to Exercise Lean Group Installation and maintenance process overview Code of conduct for workshop Discussion of who is customer ( internal and external) requirements Define project scope (which Service Value Stream) Installation and maintenance standardize work Define the current process with the core team Establish standard work with flow chart and template that defines the major steps, key points (safety note, critical note and quality note), reason for the key point and photographic picture is possible. Train participants in new standard Test and validate wherever possible. Evaluation workshops forms completed (continuous improvement for EL Group Prepared by John F Petak www.exerciselean.com 864.363.0984

Upload: exerciseleanllc

Post on 28-Nov-2014

700 views

Category:

Documents


1 download

DESCRIPTION

Workshop Agenda

TRANSCRIPT

Page 1: Warwick Lean  Agenda Aug Wk1  July 12 2010

Agenda: Lean Workshop – Rapid Site Assessment, Value Stream Mapping

Day 1 (8:00am – 5:00pm)

Introduction to Leadership team Lean Leader module and System Kaizen Approach 1 hr

Rapid Site Assessment – Questionnaire and observation of core process steps of key profit center.

Summary assessment and share findings with company principal (Laura Green)

Day 2 (8:00am – 5:00pm) Break for lunch 12 -1 – Maintenance Technicians - STD Work

Introduction of core teams to Exercise Lean Group Installation and maintenance process overview Code of conduct for workshop Discussion of who is customer ( internal and external) requirements Define project scope (which Service Value Stream) Installation and maintenance standardize work Define the current process with the core team Establish standard work with flow chart and template that defines the major steps,

key points (safety note, critical note and quality note), reason for the key point and photographic picture is possible.

Train participants in new standard Test and validate wherever possible. Evaluation workshops forms completed (continuous improvement for EL Group

Day 3 (8:00am – 5:00pm) Break for lunch 12 -1

Define the new product / process introduction elements to track Develop / Review project plan for introduction (Gantt Chart) See steps belowo Step 1 Initiate Projecto Process Designo Process Validationo Launch Readiness Review (Documentation, Training, Materials,

Prepared by John F Petak www.exerciselean.com 864.363.0984

Page 2: Warwick Lean  Agenda Aug Wk1  July 12 2010

o Equipment)o Step 2

Analyze Gaps and Failures in the Current Process. Brainstorm Solutions

o Step 3o Design New Process using VSM with and determine targetsoo Step 4 Install New Process.

Layout Production Area using 5S from the Start Establish Information and Material Flows using Visual Management Only (Launch

Board/Job Status Board) Train Staff on Work Flows Conduct Rehearsals

o Step 5 Run and Debug New Process 1. Daily Meetings 2. PDCA Action Plan 3. Institutionalize Processes

o Step 5 Verification Develop VSM for new process based on what is known Define process flow through flow chart and spaghetti diagram Define targets for Knowledge Management (knowledge collection) Define how standard work will be formatted (Procedure / flow chart / etc) Evaluation workshops forms completed (continuous improvement for EL Group)

Day 4 (8:00am – 5:00pm) Break for lunch 12 -1 Develop an action plan that covers task, sequence, priority, resource and time scale Gantt Keep the timescales realistic (30 – 60 days) Integrate value stream plan with identified actions from the matrix of KAIZEN Systems Evaluation workshops forms completed (continuous improvement for EL Group)

Prepared by John F Petak www.exerciselean.com 864.363.0984

Page 3: Warwick Lean  Agenda Aug Wk1  July 12 2010

Day 5 (8:00am – 5:00pm) Break for lunch 12 -1

Summarize the week Complete business drivers on metrics Finalize Plan Do Check Act worksheet Complete A3 Report Prepare workshop participants for management review Management Review Follow up with management team Evaluation workshops forms completed (continuous improvement for EL Group

Departure

Prepared by John F Petak www.exerciselean.com 864.363.0984