Warsaw, 19th September 2008 Transition Facility 2006- Transition Facility 2006- „Training of water „Training of water quality monitoring for quality monitoring for State Sanitary Inspection State Sanitary Inspection Dorota Bevanda – Project Leader Environmental Hygiene Department – Chief Sanitary Inspectorate

Upload: georgia-roberts

Post on 29-Jan-2016

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Warsaw, 19th September 2008

Transition Facility 2006- Transition Facility 2006- „Training of water quality „Training of water quality

monitoring for State monitoring for State Sanitary InspectionSanitary Inspection ””

Dorota Bevanda – Project Leader

Environmental Hygiene Department – Chief Sanitary Inspectorate

Page 2: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

The main aim of this project is to improve the system

for sanitary supervision of drinking water quality

based on

Directive 98/83/EC and Directive 89/106/EEC

concerning risk assessment for water,

protection of human health and water quality

improvement.

Total project budget is 883 800 EURO, including Total project budget is 883 800 EURO, including 300 000 EURO of national co-financing.300 000 EURO of national co-financing.

Within the framework of this project under the twinning contract the following will be achieved: - training courses, papers, reports, guidelines;

Warsaw, 19th September 2008

Page 3: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

2004/016-829.03.02: „Management system for drinking water monitoring in the Chief Sanitary inspectorate”:

Total project budget is 1 755 100 EURO, Total project budget is 1 755 100 EURO, including 627 000 EURO of national co-financing. including 627 000 EURO of national co-financing.

2005/017-488.03.03: „Extension of the sanitary supervision system in the field of water quality”:

Total project budget is 1 281 210 EURO, Total project budget is 1 281 210 EURO, including 301 370 EURO of national co-financing.including 301 370 EURO of national co-financing.

Within the framework of the abovementioned projects under the twinning covenant the following will be achieved: - training courses, papers, reports, guidelines, additionally investments were made;

Warsaw, 19th September 2008

Page 4: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Additionally, the TF 2006 project aims to:

Improve Improve rules for monitoring health risks rules for monitoring health risks caused by caused by consumptionconsumption of water of inadequate of water of inadequate quality, including water-borne diseasesquality, including water-borne diseases,, and and health risk assessment, health risk assessment,

- Strengthen Strengthen the quality of control activitiesthe quality of control activities involving involving determining chemical parameters of determining chemical parameters of water intended for human consumption (in water intended for human consumption (in accordance with Directive 98/83/EC) performed accordance with Directive 98/83/EC) performed in laboratories of the State Sanitary Inspection, in laboratories of the State Sanitary Inspection,

Improve Improve State Sanitary Inspection’s State Sanitary Inspection’s supervision over new technologies of water supervision over new technologies of water treatment and materials in contact with water, treatment and materials in contact with water, their impact on water quality, as well as possible their impact on water quality, as well as possible consequences for human health, consequences for human health,

Develop Develop strategy for informing consumers strategy for informing consumers about water quality, including potential and about water quality, including potential and existing emergencies. existing emergencies.

Warsaw, 19th September 2008

Page 5: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Current information:Current information:

•in December 2007 a new in December 2007 a new twinning contract was signedtwinning contract was signed

•on 15 July 2008 Resident on 15 July 2008 Resident Twinning Advisor, Mr. Michael Twinning Advisor, Mr. Michael CSICSAKY, started his work with CSICSAKY, started his work with assistant Monika Stanisławska;assistant Monika Stanisławska;

Warsaw, 19th September 2008

Page 6: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Project aim: improve staff qualifications improve staff qualifications will be achieved achieved through training cyclestraining cycles:

Warsaw, 19th September 2008

Page 7: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Project aim: improve staff qualifications improve staff qualifications will be achieved achieved through training cyclestraining cycles:

Warsaw, 19th September 2008

Page 8: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Project aim: improve staff qualifications improve staff qualifications will be achieved achieved through training cyclestraining cycles:

Warsaw, 19th September 2008

Page 9: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Project aim: improve staff qualifications improve staff qualifications will be achieved achieved through training cyclestraining cycles:

Warsaw, 19th September 2008

Page 10: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

• Development of risk management strategy for water-borne diseases,

• Preparation of a health risk assessment involving in particular occurrence indicators of pathogenic bacteria and parasites in water,

• Creation of Quality Management System procedures for State Sanitary Inspection’s operations within the framework of sectoral water policy,

TF 2006 project benchmarks include:

Warsaw, 19th September 2008

Page 11: Warsaw, 19th September 2008 Transition Facility 2006- „Training of water quality monitoring for State Sanitary Inspection” Transition Facility 2006- „Training

Project benchmarks include:

• Create monitoring and assessment system for biofilm on distribution network materials in line with European Accreditation System requirements,

•Prepare methodology guidelines for a drinking water quality reporting system, and a drinking and bathing water quality information system for consumers,

•Create a drinking water quality assurance scheme involving in particular determining chemical parameters in water intended for consumption, in line with Directive 98/83/EC.