warehouse material movement transformation · 2. asia process transformation office – warehouse...
TRANSCRIPT
Warehouse
Material Movement
Transformation
USER GUIDE BUSINESS TO SYSTEM SOLUTION TRANSFORMATION
Written and shared by Kittipong Artratanakul Email: [email protected] Tel: +66824999644
Episode I:
Business to system Solutions I Believe in your business questions
To improve your things,
yourselves and Achieve Business Goals
Kittipong Artratanakul
Professional Highlights
1. End to end (supplier to customer/ consumer)
Material movement Mastery – material movement
design (layout, construction), material movement
operation, workflow, equipment and control in both
physical and system, led inventory management
knowledge program Globally.
2. Supply chain operation excellence – logistics
operation (warehouse, distribution center, demand
planning, transportation and customer service
3. Project management – project manager for re-
engineering, cost saving, system implementation
and methodology in Asia and Global
4. System – Mastery in system functional design for
end to end supply chain and well know standard
platform (A-SIS maGistor, SAP, SAP-EWM, JDA-
WMS&WFM, TMS, Load builder, ...etc.)
WORK Experiences
1. Supply Chain Business Unit Head, Process,
Operation, System Solution Transformation and Big
Data/ Analytics, iREV - Industrial Revolution
Company
2. Asia Process Transformation Office – Warehouse
and Transportation, FrieslandCampina
3. Logistics Operation Division, Vice President, FN
outlet Public Company
4. Asia Process Transformation, Asia Supply
Network, Procter&Gamble
5. Global material movement and control system &
transportation technical/Functional Subject Matter
Expert, IT development, Procter&Gamble
Key Contributions in material movement
1. Setup new manufacturing plant, Distribution
Center and Transformed process and system
solution project included people/ organization
readiness more than 30 sites, 90 projects in 14
countries
2. Contribute saving 10 million USD in 11 counties
by transformed in both ways Business to system
solution and Utilize/ optimize system solution to
support business requirement
User Guide
This is an introduction to possible
solutions that used to be implemented
in world
Not mind which system is your
currently using
Read the warehouse and material
movement transformation guide and
pick up any business ideas and
possible solutions that will be helped
save and improve your warehouse and
material movement in your site
PART I: General
Task Management
Dual Management
Labor Management
Custom Printing (Loftware)
3PL WMS Connectivity
Multiple LE Configurations
Multiple UOM configurations
Product Zoning Optimization
Product Zoning by Dock Zone
Processes & Systems Configuration Audit
Task management:
Work tasks are automatically assigned by
system based on Jobs, priority, and work
distant
Benefit:
Productivity, Forklift/ people cost
Dual tasking:
Enables access to multiple tasks for single
user. shipping and receiving
Benefit:
Productivity, Forklift/ people cost
Labor Management:
Optimize, Engineering standard and track work
processes
Benefit:
Productivity, track & Pay accuracy
Custom Label Printing:
Bolt on program to assist with label formats
and connect to WMS application
Benefit:
Supply Chain Network
3PL WMS Connectivity:
Standard 3PL interface to your ERP
Benefit:
Standardize support & control and productivity
Multiple LE configuration:
Standard solution when Multiple Legal Entities
exist or incoming
Benefit:
Productivity, Business requirement
Multiple UOM configuration:
Standard solution to handle multiple UOM
which are BUOM and multiple AUOM
Benefit:
Productivity, Business requirement
Product Zoning Optimization:
Configuration is optimized to current inventory
and product flow profiles
Benefit:
Productivity, Space Utilization
Product Zoning by Dock Zone:
Ability to reduce travel by zoning pick and puts
within dock areas
Benefit:
Productivity, Space Utilization
Site work processes & systems
configuration audit by your
transformation team:
To ensure health in the system and operations
are running well
Benefit:
Productivity, Inventory accuracy and Space
Utilization
PART II: Receiving
Less than Case Receiving
eASN (Advance Shipping Notification)
Consume from Receipt (Materials)
eCOA (Certificated of Analysis)
Less than case receiving:
Able to receive less than case and good in
control the inventory in our system
Benefit:
Productivity, Inventory accuracy and Space
Utilization
eASN (Advance Shipping Notification):
Inform deliveries from supplier in advance and
allow to interface to ERP and WMS
Benefit:
Productivity, Space Utilization and WH
planning
Consume from Receipt (Mat):
Supports JIT, allows/directs mat supply from
receipt to consumption
Benefit:
Productivity and Space Utilization
eCOA (Certificated of Analysis):
Allows auto release of materials for receipts
from qualified venders
Benefit:
Productivity, Inventory available leadtime and
service
PART III: Line Take
Away, Line
Delivery/Supply, Quality
Auto Line Takeaway
QM Directed Product Release
Process Order Based Material Staging
Common Staging w/o Process Order
Less than Pallet Line Delivery
Material Delivery Utilizing Kan Ban
Direct Material Delivery or Task Queue
Kit Building and Delivery to
production/customization
Auto Line Take away:
Allows automating Line Take process via
control systems (able to connect to PLC, etc.)
Benefit:
Productivity, Inventory accuracy
Quality Management Directed Product
Release
Enables releasing product across Plant
codes/WMS sites
Benefit:
Productivity, Inventory accuracy
Process Order Based Material Staging:
Creates pick requirements based on PO
requirements or once it needed
Benefit:
Productivity, reduce paper work, FIFO
Compliance
Common staging w/o Process order:
Enables sharing components between
production with single point of consumption
Benefit:
Productivity, FIFO Compliance
Less Than Pallet Line Delivery:
Enables delivering full and partial pallet Qty in
FIFO to customization/ production lines
Benefit:
Productivity, FIFO Compliance
Mat Delivery Utilizing Kanban:
Automated material request based on Kanban
location capacities and process order
requirements
Benefit:
Productivity and Space Utilization
Direct Mat Delivery or Task Queue:
Ability to request or directly deliver material
Benefit:
Productivity, FIFO Compliance and Business
requirement
Kit Building and delivery to production/
customization
Allows kitting less than pallet Qty for multi
items on a single pallet/ UL based on PO
requirements
Benefit:
Productivity and Space Utilization
PART IV: Picking
Direct Case Pick
Direct Case Pick by Aisle
Voice Picking
Case Pick Count Back
Layer Picking
Pallet Builder
Directed and Batch Less Than Case Picking
Order Invoicing/ COD
Pack Auditing
Campaign/wave Picking
Directed Case Pick:
System directed paperless picking with
automated assignment, pallet calculation and
travel seq.
Benefit:
Productivity and Paperless
Directed Case Pick by Aisle:
Optimized picking potential by aisle or
warehouse zone
Benefit:
Productivity, Paperless and Space Utilization
Voice Picking:
Voice directed hands free picking
Benefit:
Productivity, Fast /Effective Training
Case Pick Count Back:
Validates picked and location inventory
accuracy
Benefit:
Inventory and Order Accuracy
Layer Picking:
Ability to separate layer and odd case picking
Benefit:
Productivity, business requirement
Pallet Builder:
Provides complexes picking and truck load
solutions for palletized shipments
Benefit:
Productivity, Damage avoidance and Business
Requirements
Directed and Batch LTC Picking:
Applications to pick less than case via RF
directed or with pick list batch
Benefit:
Productivity, business requirement
Order Invoicing/COD:
Ability to print invoice /COD (from ERP) during
picking process
Benefit:
Productivity, business requirement
Pack Auditing:
Ability to configure and execute audits for
picked cartons
Benefit:
Inventory accuracy, customer service
Campaigns/ wave Pick:
pick by wave (consolidated orders into one
group order), sort...
Benefit:
Productivity, business requirement
PART V: Shipping
QI products shipping
Details ASN’s
Cross Docking
Slide Shipping
DC Shipment
Parcel Manifesting
Group Shipment (stage)
Late Stage Differentiation
Load Builder
QI Product Shipping:
Supports shipping QI products between sites
(inter plant transfer)
Benefit:
Productivity, Inventory accuracy and Space
Utilization
Detailed ASN's (advance shipment
notification):
Sends detailed pallet ID level information for
interplant and customer palletized shipments
Benefit:
Productivity, Inventory accuracy and Quality
Cross Docking:
Supports internal and external cross dock
requirements
Benefit:
Productivity, Inventory accuracy and Space
Utilization
Slide/ Direct Shipping:
Product directed directly from
production/customization to shipments when
requirement exist
Benefit:
Productivity, Inventory accuracy and Space
Utilization
DC shipment:
Push Shipment and Ability to create shipment
without order details. User directed loading
Benefit:
Productivity, Inventory accuracy and Space
Utilization
Parcel Manifesting:
Integrated case rating application for Parcel
shipping
Benefit:
Productivity and Customer requirement
Group Shipment (stage):
Push Shipment. Ability to create a parent
shipping (interplant) and execute across
multiple (by child)
Benefit:
Productivity, Inv accuracy, Space Utilization
Late Stage Differentiation:
Configurable services customer and or
hazardous labeling, manifesting, and rework
Benefit:
Productivity and Customer requirement
Load Builder:
Able to design/ guide how to load with fully
truck space optimization in both case, pallet or
both loading
Benefit:
Productivity and Cost saving
See more in next Episode
Episode II: Business to system Solutions
Internal Movement
Transportation