Walkerton Accommodation Review April 24, 2008

The following most recommended scenarios were reviewed by the

Accommodation Review Committee

New JK-8 School on Brant Central Site & Downsized WDSS on Current Site

Value of Elementary School to Students Plans have been in place for several years to

merge elementary school communities Large playground retained Safe school location & bus loading area Less split classrooms & improved timetable

scheduling Opportunity for more specialized course

instruction

Value to Elementary Students cont’d

New facility would be fully wheel chair accessible

Larger parent volunteer base to assist with activities

Potential to increase the number of school extracurricular activities such as sports, clubs & band

Value of Secondary School to Students

Retain a secondary school in the town Maintain the cultural identity Maintains the physical learning environment Continued focus on technology in current

shop facilities Opportunity to develop partnerships with

other organizations Maintains full co-operative education program Maintain gym facility for regional school

activities

Value of Elementary School to Community New facility may attract more use after hours

by community groups Retains soccer fields for community use Attracts & retains families in the community

Value of Secondary School to Community Retains facility for community use after hour Keeps night school programs within town Retains student population for after school

jobs or volunteer opportunities

Value of Schools to Economy

Keeps employment opportunities within town Attracts & retains families in the community Local business benefit from school spending Money brought in during construction phase Source of student workforce Cooperative programs with local businesses

are maintained

Value of Schools to the Board

Operating costs decrease with one elementary school

Minimal transportation increase Opportunity to access ministry funding for

new build

JK-12 New School

Value of School to Students

Building will be designed to meet all the need of both elementary and secondary students

Provides required space for elementary students

Outside space will be designed according to student needs

More opportunity for before & after school programs since there will be coordinated busing

Fewer split classes

Value to Students cont’d…

Continued focus on technology in a new building

Enhanced programs to attract students in order to meet the labour demands of today and into the future.

Maintains full co-op program Maintains full educational experiences in

home community.

Value of School to Community

New school available for community use. Opportunity to develop community

partnerships – corporate and municipal. Co-op program is maintained within the

community.

Value of School to the Economy

Young families along with development will be attracted to the community.

Allows student jobs to be facilitated. Dollars will be retained in community.

Value of School to the Board

Best business case – more efficient building Lower operational costs Minimal increase to the transportation budget Opportunity to access ministry funding for

new build

JK-12 New School

This proposal has two important further recommendations: school must have enough gym space to

achieve Ministry expectations. we recommend that the Board maintain

the Brant Central School site as a playing field and track for senior students.

JK-12 in Renovated WDSS with New 2 Storey Elementary Wing

Value of School to Secondary Students

Keeps a secondary school setting in Walkerton, which as an ARC we felt was one of the main concerns of the public.

Retains all of the current shop classrooms and maintains the program that is currently in place.

There would be easy access to co-op placements within the elementary school

Potential use of the Brant Central site for physical education programs, for example a track with a washroom facility.

Value of School to Elementary Students There would be fewer split classes since

there is a larger student population. The transition to Grade 9 would be easier. Careful planning would be needed to

accommodate the student needs A new Kindergarten to Grade 12 school

community would be established.

Value of School to Community

The community will continue to have use of the large WDSS facility

Both an elementary AND secondary school setting will remain in Walkerton

A full co-op program will continue

Value of School to the Economy

We encourage the school and the board to investigate possible partnerships with the municipality and other organizations

Allows student jobs to be facilitated in Walkerton.

Value of School to the Board

Potentially no additional relocation costs during construction as renovating can be done in stages.

Minimal increase in transportation costs Total operating costs would be reduced since

only one school would be maintained instead of three.

Current WDSS Floor Plan

Demolish south west wing from Cafeteria to Gym A/BOldest part of school

with the most problems

Build New 2 Story

Elementary Wing

Offices Located North West end

of new build

Offices Located North West end

of new build

2 Story ElementaryClassrooms

Offices Located North West end

of new build

2 Store ElementaryClassrooms

Secondary Classrooms

Maintaining Tech Wing & Gym A/B

Offices Located North West end

of new build

2 Store ElementaryClassrooms

Gym A/B & Music Room

Common Area

Gym C & Cafeteria

Common Area

Secondary Classrooms

New green space

Fenced Playground

New green space

Fenced Playground

Teacher & Student Parking