walk-up equipment manufacturer 500-1913 · 12 zzpm7170 1 8ft tower climber certified 126.96 277 2...
TRANSCRIPT
Equipment Manufacturer
500-1913
Walk-up
Equipment Manufacturer
500-1913
Walk-up
0
.5 1.0
05'
Meters2.0 3.0
10'
TRANSFER
STATION
W/ STEP
36"
0,92M
60"
1,53M
96"
2,44M
53'-2"
[16.22M]
33'-6"
[10.22M]
6'-2"
[1.88M]
6'-2"
[1.88M]
8'
[2.44M]
6'-5"
[1.95M]
6'-3"
[1.90M]
7'-6"
[2.28M]
LEG
LIFT
90° HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
BABBLE-ON
ROCKY
RIDGE
CLIMBER
POST
MOUNT
WHEEL
TOWER
CLIMBER
ADA
STAIRS
HOPSCOTCH
CLIMBER
STEEL
SLIDE
ADA
STAIRS
BABBLE-ON
STEEL
SLIDE
6'-4"
[1.92M]
DEEP RUNG
ARCH CLIMBER
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 7
4
7
3
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
WA
LK-U
PC
AT
AL
OG
P
RE
-D
ES
IG
N
500-1913 3/16"=1'-0"
M. MERTZ
11-FEB-19
39'0" x 21'0" x 13'5"11,89M x 6,4M x 4,09M
53'2" x 33'6"16,22M x 10,22M
1,276 SqFt.118,53 SqM.
136 Ft.41,46M
8 Ft.2,44M
37 5-12
11
0
.5 1.0
05'
Meters2.0 3.0
10'
36"
0,92M
60"
1,53M
96"
2,44M
53'-2"
[16.22M]
33'-6"
[10.22M]
6'-2"
[1.88M]
6'-2"
[1.88M]
8'
[2.44M]
6'-5"
[1.95M]
6'-3"
[1.90M]
7'-6"
[2.28M]
7
8
9
11
12
14
15
16
17
18
19
19
20
21
6'-4"
[1.92M]
10
13
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 7
4
7
3
2
3
2
3
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
WA
LK-U
PC
AT
AL
OG
P
RE
-D
ES
IG
N
500-1913 3/16"=1'-0"
M. MERTZ
11-FEB-19
39'0" x 21'0" x 13'5"11,89M x 6,4M x 4,09M
53'2" x 33'6"16,22M x 10,22M
1,276 SqFt.118,53 SqM.
136 Ft.41,46M
8 Ft.2,44M
37 5-12
11
DATE:
SCALE:
DRAWN BY:
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4) INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2) INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
(112"
(144"
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
T
R
A
N
S
F
E
R
S
T
A
T
I
O
N
1
3
2
"
1
3
2
"
1
3
2
"
1
3
2
"
1
4
4
"
1
4
4
"
1
4
4
"
1
4
4
"
1
4
4
"
1
4
4
"
1
8
0
"
1
8
0
"
1
8
0
"
1
2
0
"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
48"
73"
44"
26"
24"
12"
18"
36"
9"
6"
29"
29"
15"
17"
15"
150"
18"
13"
41"
16"
32"
19"
16"
24"
76"
11"
25"
16"
12"
24"
88"
18"
156"
134"
TRANSFER
STATION
W/ STEP
90° HORIZONTAL
LOOP LADDER
W/ ACCESS
LADDER
ROCKY
RIDGE
CLIMBER
TOWER
CLIMBER
DEEP RUNG
ARCH CLIMBER
STEEL
SLIDE
ADA
STAIRS
HOPSCOTCH
CLIMBER
STEEL
SLIDE
ADA
STAIRS
163"
42"
24"
42"
24"
221"
120"
258"
172"
13"
40"
11"
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
FOOTING LEGEND
1
1
2
"
1
8
5
0
Z
Z
C
H
1
4
4
"
G
Z
SPIRAL SLIDE CENTER POST FOOTING (DETAIL1)
SUPPORT POST FOOTING (DETAIL 1 or 4)(112" INDICATES POST LENGTH)
CANTILEVER, "T" POST, AND COMPONENTPOST FOOTING (DETAIL 2)
(ZZCH1850 INDICATES PART NUMBER)
GROUND ZERO POST FOOTING (DETAIL 2)(144" INDICATES POST LENGTH)
COMPONENT FOOTING (DETAIL 3)
WA
LK-U
PC
AT
AL
OG
P
RE
-D
ES
IG
N
500-1913 3/16"=1'-0"
M. MERTZ
11-FEB-19
Posts
ZZPM0016 11 5in OD X 120in STEEL POST W/ RIVETED CAP
ZZPM0026 42 5in OD X 132in STEEL POST W/ RIVETED CAP
ZZPM0036 63 5in OD X 144in STEEL POST W/ RIVETED CAP
ZZPM0066 34 5in OD X 180in STEEL POST W/ RIVETED CAP
Decks & Kick Plates
ZZPM0617 25 TRIANGULAR COATED DECK ASSEMBLY
ZZPM0619 16 HEX COATED DECK ASSEMBLY
ADA Items
ZZPM2007 17 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 18 APPROACH STEP FOR TRANSFER STATION
Slides
ZZPM2906 19 STAINLESS STEEL SLIDE- 96in DECK
ZZPM2908 110 STAINLESS STEEL SLIDE- 60in DECK
Activity Panels
ZZPM4290 111 STEERING WHEEL (POST MOUNT)
Climbers
ZZPM7170 112 8ft TOWER CLIMBER
ZZPM7420 113 DEEP RUNG ARCH CLIMBER (60in DECK)
ZZPM7966 114 ROCKY RIDGE CLIMBER (60in DECK)
ZZPM8270 115 HOPSCOTCH CLIMBER (60in DECK)
Overhead Events
ZZPM5770 116 LEG LIFT
ZZPM5850 117 90 DEGREE HORIZONTAL LOOP LADDER
ZZPM5970 118 OVERHEAD EVENT ACCESS LADDER (36in DECK)
Audible Activities
ZZPM4467 119 GROUND TO GROUND BABBLE-ON
Stairs and Ladders
ZZPM9170 120 24in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
ZZPM9177 121 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
Additional Tool & Maintenance Kits
ZZUN1471 122 INSTALLER HARDWARE KIT
ZZUN9910 123 SURFACING WARNING LABEL KIT
ZZUN9930 124 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 125 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 126 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 500-1913 - Bill Of Material
Walk-up
Ref.No. Quantity
Monday, May 04, 2020 Page of1 1 Playworld.com
CertifiedZZPM00161 5in OD X 120in STEEL POST W/ RIVETED CAP
1 67.11 99 0 1.00 0.13 0
CertifiedZZPM00262 5in OD X 132in STEEL POST W/ RIVETED CAP
4 296.84 434 0 4.00 0.48 0
CertifiedZZPM00363 5in OD X 144in STEEL POST W/ RIVETED CAP
6 485.46 704 0 6.00 0.78 0
CertifiedZZPM00664 5in OD X 180in STEEL POST W/ RIVETED CAP
3 302.43 434 0 3.00 0.39 0
CertifiedZZPM06175 TRIANGULAR COATED DECK ASSEMBLY2 92.80 339 4 2.00 0.00 0
CertifiedZZPM06196 HEX COATED DECK ASSEMBLY 1 228.72 638 8 2.00 0.00 0
CertifiedZZPM20077 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 155.24 329 2 2.00 0.09 0
CertifiedZZUN20198 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZPM29069 STAINLESS STEEL SLIDE- 96in DECK1 217.90 448 2 4.00 0.06 1
CertifiedZZPM290810 STAINLESS STEEL SLIDE- 60in DECK1 165.10 322 2 4.00 0.06 1
CertifiedZZPM429011 STEERING WHEEL (POST MOUNT) 1 8.67 47 1 0.25 0.00 1
CertifiedZZPM717012 8ft TOWER CLIMBER 1 126.96 277 2 2.00 0.90 1
CertifiedZZPM742013 DEEP RUNG ARCH CLIMBER (60in DECK)1 118.82 228 2 2.00 0.06 1
CertifiedZZPM796614 ROCKY RIDGE CLIMBER (60in DECK)1 123.05 532 0 2.00 0.07 0
CertifiedZZPM827015 HOPSCOTCH CLIMBER (60in DECK) 1 96.46 179 2 2.00 0.06 1
CertifiedZZPM577016 LEG LIFT 1 7.20 33 1 0.50 0.00 1
CertifiedZZPM585017 90 DEGREE HORIZONTAL LOOP LADDER1 72.66 210 2 1.00 0.00 1
CertifiedZZPM597018 OVERHEAD EVENT ACCESS LADDER (36in DECK)
1 26.16 77 1 1.50 0.06 0
CertifiedZZPM446719 GROUND TO GROUND BABBLE-ON 1 45.47 248 2 1.50 0.00 1
CertifiedZZPM917020 24in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 174.86 374 1 2.00 0.00 0
CertifiedZZPM917721 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 286.99 640 2 1.50 0.00 0
N/AZZUN147122 INSTALLER HARDWARE KIT 1 57
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1913 - Compliance and Technical Data
Walk-up
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Monday, May 04, 2020 Page of1 3 Playworld.com
CertifiedZZUN991023 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993024 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067825 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID26 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1913 - Compliance and Technical Data
Walk-up
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
553 1,233 6,810 35 45.58 3.183,134.82 9Totals:
7 Metric Tons555 Kg249 Kg1,410.67 Kg 2.42 m3
Monday, May 04, 2020 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1913 - Compliance and Technical Data
Walk-up
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 500-1913, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Monday, May 04, 2020 Page of3 3 Playworld.com