Enabling EES Adoption:Recent Polic Chan es in
Electricity MarketsPresented by
Rahul Walawalkar Ph.D., CEM, CDSM
Vice President, Emerging Technologies & Markets
Customized Energy Solutions Ltd.
1528 Walnut Street, 22nd Floor
Philadelphia, PA 19103 USA
Phone: 215‐875‐9440
Fax: 215‐875‐9490
info@ces‐ltd.com
Analyze.
Simplify.
Implement.
OutlineOutline
Barriers for Energy Storage Commercialization
Overview of Electricit Markets in US
Summary of recent market rule changes
FERC
NYISO
PJM
MISO
CAISO
Summary
2
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 2/7
5/6/20
Analyze.
Simplify.
Implement.
Barriers for adoptionBarriers for adoption
Inability to capture value for the multiple benefits
Energy arbitrage
Transmission optimization
Distribution upgrade deferral
Ancillary services
Power quality for end users
Regulatory uncertainty
Technology maturity
Cost reductionsPerformance validation
3
Analyze.
Simplify.
Implement.
EES Technology InnovationsEES Technology Innovations
Innovations have resulted in significant
mprovemen s n es gn, er ormance apa es
Technology choice
Power & Energy rating
Life expectancy
Round Trip Efficiency
Response rate & any other operating considerations
Footprint & any special permitting requirements
Capability to meet requirements for different markets
4
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 3/7
5/6/20
Analyze.
Simplify.
Implement.
Role of Electricity MarketsRole of Electricity Markets
Provides price transparency to quantify value proposition
of various EES technolo ies
Market Design
Access to various markets for
Energy
Ancillary Services
Capacity
Financial Transmission Rights
Generation Supply mix & Demand Curve
Market sizeLocational factors
Electric transmission network & interconnection
5
Analyze.
Simplify.
Implement.
Electricity Markets in North AmericaElectricity Markets in North America
6Source: FERC: http://www.ferc.gov/industries/electric/indus‐act/rto/rto‐map.asp
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 4/7
5/6/20
Analyze.
Simplify.
Implement.
Comparison of ISOs/ RTOsComparison of ISOs/ RTOs
7
Analyze.
Simplify.
Implement.
Electricity Market FeaturesElectricity Market Features
10
8Source: FERC
MISO Ancillary Service Markets started functioning in January 2009. CAISO completed implementation of MRTU on 31 st March 2009.PJM has switched from the systemwide capacity market to locational markets in 2007.
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 5/7
5/6/20
Analyze.
Simplify.
Implement.
Policy initiatives to integrate energy storage in gridPolicy initiatives to integrate energy storage in grid
NYISO has created a LimitedEnergy Storage Resource(LESR) category for allowingstorage participation inregulation market
MISO has created a StoredEnergy Resource (SER) categoryfor storage participation inregulation markets from 2010
FERC issuedOrder 890 in2007 to openregulationmarket fornon-gen
resources
CAISO has initiated astakeholder processto integrate nongenerationresources. FERCapprovedtransmissionincentives forstorage in Ca.
Source: FERC
In 2009, ERCOT added requirementsfor wind farms to provide regulationand voltage support
US Congress has proposed “Storage Technology of Renewable and Green Energy Act” of 2009 to provideinvestment tax credits for storage projects.
Analyze.
Simplify.
Implement.
ConclusionsConclusions
Over past 3 years, various system operators have
worked to remove barriers for storage technologies to
participate in various electricity markets
The price discovery mechanisms provided by these
markets help in identifying right opportunities,
locations and determine appropriate configurations
More initiatives will be introduced in coming year
specially as various ISOs tackle the challenges related to
renewable integration. e.g.
Non generation participation in ancillary services – CAISO
Updates to frequency regulation market rules ‐ PJM
10
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 6/7
5/6/20
Analyze.
Simplify.
Implement.
Proposed Energy Storage Projects (DOE Smart Grid Demo)roposed Energy Storage Projects (DOE Smart Grid Demo)
Major projects include: CAES demonstration (NY and CA), Renewable Integration (CA, TX, NM),Peak Shaving, Community Energy Storage and demonstration of new technologies.
Visit www.energy.govfor additional details.
Analyze.
Simplify.
Implement.
AcknowledgementsAcknowledgements
Colleagues from Customized Energy Solutions
Jacqueline DeRosa, Director ‐ Regulatory Affairs, CaISO
Rick Mancini, Director ‐ Regulatory Affairs, NYISO
Jeff Whitehead, Director ‐ Regulatory Affairs, PJM
David Sapper, Director ‐ Regulatory Affairs, MISO
Eddie Kolodziej, Director ‐ Regulatory Affairs, ERCOT
Nancy Chafetz, Director ‐ Regulatory Affairs, ISO‐NE
Jim Krajecki, Director ‐ Regulatory Affairs, SPP
12
8/6/2019 Walawalkar ISO Policy Changes 2010
http://slidepdf.com/reader/full/walawalkar-iso-policy-changes-2010 7/7
5/6/20
Analyze.
Simplify.
Implement.
QUESTIONS ???UESTIONS ???
Dr. Rahul WalawalkarDr. Rahul Walawalkar215215‐‐875875‐‐94409440
rahul@cesrahul@ces‐‐ltd.comltd.com