vu tran khoa

4
(Resume .doc) RESUME Date: October 21, 2015 Full name : VU TRAN KHOA Employee number : 05520 Date of Birth : 03 September 1986 Marital status : Single Sex : Male Nationality : Vietnamese Present position : Geotechnical Engineer EMERGENCY CONTACT Contact name : VU MINH KHOI Relationship : My Father Address : Phu Nhi villages - Hung Loc - Hau Loc - Thanh Hoa. Home phone : Cell phone : 0972066738 EDUCATION & QUALIFICATION Road and bridge construction – University of transportation and communications (2005- 2010). TRAINING PROGRAM Steel CAD training (04 hours). Static and machinery foundation design (20 hours). Slab on grade design (08 hours). PROFESSIONAL EXPERIENCE AND POSITION: CIMAS Engineering Co., Ltd - Page 1 of 3 -

Upload: khoa-vu

Post on 23-Jan-2018

294 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Vu Tran Khoa

(Resume .doc)

RESUME

Date: October 21, 2015

Full name : VU TRAN KHOA

Employee number : 05520

Date of Birth : 03 September 1986

Marital status : Single

Sex : Male

Nationality : Vietnamese

Present position : Geotechnical Engineer

EMERGENCY CONTACT

Contact name : VU MINH KHOI

Relationship : My Father

Address : Phu Nhi villages - Hung Loc - Hau Loc - Thanh Hoa.

Home phone :

Cell phone : 0972066738

EDUCATION & QUALIFICATION

• Road and bridge construction – University of transportation and communications (2005-

2010).

TRAINING PROGRAM

• Steel CAD training (04 hours).

• Static and machinery foundation design (20 hours).

• Slab on grade design (08 hours).

PROFESSIONAL EXPERIENCE AND POSITION:

• CIMAS Engineering Co., Ltd

- Page 1 of 3 -

Page 2: Vu Tran Khoa

(Resume .doc)

Jul/2015 - Present: Designer for Thai Binh Cooling Water System in CIMAS office

Responsibilities:

- Check calculation of culvert

- Provide truck loading for calculation of culvert

- Settlement calculation of culvert ( On soil, The settlement of pile

groups)

May/2014 – Jun/2014: Designer for PU Synthetic Leather Plant in Nhon Trach, Viet Nam

Responsibilities:

- Design for ground slab on grade.

- Design for Road and Paving.

Apr/2014 – Jun/2015: Designer for Urenco Project for an Industrial Waste Power

Generation System in Nam Son, Soc Son, Viet Nam.

Responsibilities:

- Design for ground slab on grade.

- Design for Road and Paving.

Dec/2013 – Apr/2015: Designer for Mong Duong II Project 7km slurry pipe line in Viet

Nam

Responsibilities:

- Calculation soil bearing capacity for shallow foundation

- Design square pile for pipe sleeper and support

- Design bored pile D600 for High Pedestal Pier of 240m Pipe

Bridge cross river

- Calculation soil bearing capacity for square pile foundation

design.

- Earth work, Excavation and backfill corridor for 7km pipe

line.

Oct/2013 – Dec/2013: Probation time

• Transportation Engineering Construction Consultant Company No.1 ( TECCO1)

May/2013 – Sep/2013: Designer for Project Highway 1A through the territory of Quang Tri

- Page 2 of 3 -

Page 3: Vu Tran Khoa

(Resume .doc)

Responsibilities:

- Alignment Design

- Chaired items soft soil treatment for embankment

- Calculation soil bearing capacity of pile of Abutment.

May/2012 – April/2013: Designer for Noi Bai airport to Nhat Tan bridge connecting road

construction project

Responsibilities:

- Alignment Design

- Soft soil treatment for Embankment

- Calculation soil bearing capacity of pile for Abutment.

- Calculation and Design retaining wall

Aug/2012 – April/2013: Investment Project XDCT expand National Highway 1 through

paragraph Km840 Hue province -: - Km854

Responsibilities:

- Chaired items soft soil treatment for embankment

Sep/2011 – May/2012: Designer for Upgrading, Improvement and Consolidation of Right

Song Thao Dyke with The Road from Co Tiet Village to Trung Ha

Bridge

Responsibilities:

- Alignment Design

- Soft soil treatment for Embankment

- Calculation soil bearing capacity of pile of Abutment.

- Calculation and Design retaining wall

Sep/2010 – Aug/2011: Designer for National Highway 15

Responsibilities:

- Alignment Design

- Design Culvert and Retaining wall

- Design For bored piles retaining walls

July/2010 – Sep/2011: Designer for Upgrading, Improvement and Consolidation of Right

- Page 3 of 3 -

Page 4: Vu Tran Khoa

(Resume .doc)

Song Thao Dyke with Road from Co Tiet Village to Trung Ha

Bridge

Responsibilities:

- The alignment about 20,5km with 2 at-grade intersections, 3

grade-separated junctions and many other bridges. Soft soil

treatment for Embankment

- Treatment and strengthening of weak embankment

- Page 4 of 3 -