A/C REGN: VT-JGA CHK: Unscheduled PLAN DURATION : Unknown REPORT FOR (date) : 26.05.2015 Location: Hanger, DEL ARRIVAL DOCKING COMPLETION Date: 21.05.2015 Time : 1930 Hrs Date: 21.05.15 Time :19:30 Hrs Target Date: TBA Completion Date: 03.06.2015 Check Start Time : NA RTS: TBA Date : 21.05.15 Time :2000 Hrs 1. CHECK PROGRESS MAJOR ISSUES / FINDINGS , 1 A/C DEFUELLED. 2 WING TO BODY PANELS REMOVED 3 MLG DOORS REMOVED 4 INBOARD GROUND SPOILER REMOVED 5 MLG SUPPORT BEAM ACCESS PANEL S REMOVED 6 ELECTRICAL HARNESS REMOVED 7 ACTUATOR AND ARROW PANELS REMOVED 8 LH INBOARD FLAP ASSEMBLY REMOVED 9 TRANSMISSION ASSEMBLY NO.3 AND 4 REMOVED . TORQUE TUBES REMOVED. 10 FLAP TRACK # 3 AND 4 REMOVED 11 ENGINE PYLON FAIRING REMOVED 12 A/C JACKED 13 LANDING GEAR REMOVED,LANDING GEAR SUPPORT BEAM REMOVED 14 STABILISING LINK REMOVED 15 LH NOSE COWL REMOVED FOR REPAIR AT DELHI 16 HARNESS ALONG THE LANDING GEAR SUPPORT BEAM REMOVED 17 LH MLG FORWARD TRUNION HOUSING REMOVED. 18 OBSERVED DEEP CORROSION ON VACCUUM BLOWER OUTLET AREA AND NEEDS TO BE REPAIRED. 19 STRUCTURE AME PREPARING PANELS FOR INSTALLATION. 20 MLG SUPPORT BEAM INSTALLED 21 HYDRAULIC LINES INSTALLATION OB SIDE OF MLG DOOR 22 CABLE ROOTING DOON..RIGGING TO BE CARRIED OUT. 23 FUEL TANK PANEL 532 B2 INSTALLED 24 LOWER STABILIZER LINK INSTALLED 25 HYDRAULIC FITTING INSIDE DOG HOUSE FITTED. 26 HYDRAULIC LINES PARTIALLY INSTALLED AT IB END OF MLG BEAM 27 HYD.LINES REAR SIDE OF REAR SPAR INSTALLED 28 AIELRON PULLEY INSTALLED 29 30 31 32 33 34 35 36 37 38 39 2. OPEN ISSUES WITH TECH SERVICE & QC S/N ISSUES QUERRY ADDRESSED TO DEPARTMENT REMARKS 1 MR.ALGU TECH SERVICES 22.05.15 24.05.15 2 3 3. MATERIAL STATUS Item Part No/Spec Description ZONE ATA PO NO Shipper Shipped on /AWB Details AWB Details REASON NIS NOS Robbed ROBBERY Raised Date Reply Req. by LH NOSE COWL LOWER SKIN BLEND OUT.AWAITING REAPIR SCHEME FROM MR.ALGU QTY Reqd Rob Date /Order Date or Before 09:00 Hrs of Reason for requiremen t Date of Order STATUS (if received, state “RCVD”)

Upload: alaguvairamuthu

Post on 21-Sep-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Sheet1A/C REGN: VT-JGACHK: UnscheduledPLAN DURATION : UnknownREPORT FOR (date) : 26.05.2015Location: Hanger, DEL

ARRIVALDOCKINGCOMPLETIONDate: 21.05.2015Time : 1930 HrsDate: 21.05.15Time :19:30 Hrs Target Date: TBACompletion Date: 03.06.2015Check Start Time : NARTS: TBA Date : 21.05.15Time :2000 Hrs 1. CHECK PROGRESSMAJOR ISSUES / FINDINGS ,1A/C DEFUELLED.2WING TO BODY PANELS REMOVED3MLG DOORS REMOVED4INBOARD GROUND SPOILER REMOVED5MLG SUPPORT BEAM ACCESS PANEL S REMOVED6ELECTRICAL HARNESS REMOVED7ACTUATOR AND ARROW PANELS REMOVED8LH INBOARD FLAP ASSEMBLY REMOVED9TRANSMISSION ASSEMBLY NO.3 AND 4 REMOVED . TORQUE TUBES REMOVED.10FLAP TRACK # 3 AND 4 REMOVED11ENGINE PYLON FAIRING REMOVED12A/C JACKED13LANDING GEAR REMOVED,LANDING GEAR SUPPORT BEAM REMOVED14STABILISING LINK REMOVED15LH NOSE COWL REMOVED FOR REPAIR AT DELHI16HARNESS ALONG THE LANDING GEAR SUPPORT BEAM REMOVED17LH MLG FORWARD TRUNION HOUSING REMOVED.18OBSERVED DEEP CORROSION ON VACCUUM BLOWER OUTLET AREA AND NEEDS TO BE REPAIRED.19STRUCTURE AME PREPARING PANELS FOR INSTALLATION.20MLG SUPPORT BEAM INSTALLED21HYDRAULIC LINES INSTALLATION OB SIDE OF MLG DOOR22CABLE ROOTING DOON..RIGGING TO BE CARRIED OUT.23FUEL TANK PANEL 532 B2 INSTALLED24LOWER STABILIZER LINK INSTALLED25HYDRAULIC FITTING INSIDE DOG HOUSE FITTED.26HYDRAULIC LINES PARTIALLY INSTALLED AT IB END OF MLG BEAM27HYD.LINES REAR SIDE OF REAR SPAR INSTALLED28AIELRON PULLEY INSTALLED29303132333435363738392. OPEN ISSUES WITH TECH SERVICE & QCS/NISSUESQUERRY ADDRESSED TO DEPARTMENT Raised Date Reply Req. byREMARKS

1LH NOSE COWL LOWER SKIN BLEND OUT.AWAITING REAPIR SCHEME FROM MR.ALGUMR.ALGUTECH SERVICES22.05.1524.05.15233. MATERIAL STATUSItemPart No/SpecDescriptionQTY ReqdRob Date /Order DateReq on or Before 09:00 Hrs of DateZONEATAReason for requirementPO NODate of OrderShipperShipped on /AWB DetailsAWB DetailsSTATUS (if received, state RCVD) REASON

NISNOSRobbed

ROBBERY11151952-11STANDBY POWER CONTROL UNIT---MCC CONTROL NO.0215/MAY/028123.05.1526.05.15DUE ROBBERY FOR VT-JLH25A3307-7ESCAPE SLIDE ROBBED --NO CONTROL NUMBER RECEIVED .423.05.1526.05.15DUE ROBBERY FOR VT-JFA3113A1320-16 (IPC # 27-51-15-05A ITEM 220)#6 FLAP TRACK FORWADS CASTING REMOVED.MCC CONTROL NO:2015/MAY/030124.05.1526.05.15DUE ROBBERY FOR VT-JGJ4R6200M3-13 APU INLET DOOR ACTUATOR. NO CONTROL NUMBER RECEIVED .125.05.1527.05.15DUE ROBBERY FOR VT-JBB567SPARE SHORTAGES / AOG1BMS13-48T32CL3G20WIRE15 FT.22.05.1526.05.15AVIONICSP0086515 22.05.152BMS13-60T11CL1G18WIRE15 FT.22.05.1526.05.15AVIONICSP0086515 22.05.153BACC63BP20C28PNCONNECTOR122.05.1526.05.15AVIONICS4RT876-1-4YELLOWSLEEVE THERMOSTAT122.05.1526.05.15AVIONICS5RT876-1-8 YELLOWSLEEVE THERMOSTAT122.05.1526.05.15AVIONICS6RT876-3-8 YELLOWSLEEVE THERMOSTAT122.05.1526.05.15AVIONICSP0086515 22.05.157273A2126-1 SPACER225.05.1526.05.15A&C8 NAS6704DU26 BOLT125.05.1526.05.15A&C9161A7303-1 NUT125.05.1526.05.15A&C10161A7304-2 WASHER125.05.1526.05.15A&C11 NAS6704DU30BOLT125.05.1526.05.15A&C12 BACB30LM4DU30BOLT125.05.1526.05.15A&C13161A7120-1WASHER125.05.1526.05.15A&C14273A2101-2MLG RETACT ACTUATOR125.05.1526.05.15A&C15NAS6704DU30 BOLT125.05.1526.05.15A&C16171819PRELOADING SHORTAGE W/o12345678910SPARES SENT FOR REPAIR 123456Prepared By, Checked By, AmarpalA K Singh