vsc -.!1- Investigation report on a Fire Incident at Tirunelveli IRD on 22/09/14. ED O&D has constituted a Committee consisting of DGM O&D, HQO, Chief Manager HSE Corporate (Operations) and Chief Manager HSE,SZ to enquire into the Fire incident at Tiruneveli IRD on 22-09-2014.The Team visited the location on to enquire into the Incident. Incident Description: Reproduced as reported By Location As a part of MBLCRIP ,Works for fixing ofROSOV's on Tanks was taken up by the location from August 31st 2014. Tank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to M/s. Nexigen for cleaning. After product was removed through normal Gantry Tank truck filling, the residual product below the suction level was taken out after opening the manhole cover using hose connection into Tank Trucks for filling. Loaded tank trucks were checked for QC, invoices were made and released. On 19/09/14, one TT (TN74E7530) was filled with SKO from tank and on checking the sample, it was found that the product in 2 compartments were OK and in the third compartment, Product was found mixed with water and sludge. Another TT no TN39L1062 was also filled with product from same SKO Tank and it was observed that product in 2 compartments were good and product in third compartment was found mixed with water and sludge. In order to release Truck no TN74E7530 with good product, that product from Compartment No.3 of the truck no TN74E7530 was transferred to Truck no TN 72Z1500 and it was filled into 2 compartments partially. Subsequently good product from the TN39L1062 was filled i'nto the 3rd compartment of the truck no TN74E7530 . Samples were tested and invoiced and sent outside on 19/09/14. Further removal of SKO product could not be carried out on 20/09/14 due to rake decantation, it was decided to empty out Truck No TN72Z1500 for filling on 22/09/2014. Since one compartment was empty in the TN39L1062, it was decided to transfer the contaminated product from TT No. TN72Z1500 to Truck no TN39L1062. At 11:30 AM on 22/09/14, the arrangement was made for taking the oil into half open drum and pumping product from the cut drum to TN39L1062. On starting the pump, within a matter of 1 min., a fire was noticed on the delivery side of the pump and the fire was immediately extinguished with water & foam by the Depot Officials. The person who was holding the delivery hose (Mr.Manikandan) left the hose down to run away. However·, the fire caught him and he ran with the fire for

Upload: dangcong

Post on 01-Apr-2018

225 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

vsc -.!1-

Investigation report on a Fire Incident at Tirunelveli IRD on 22/09/14.

ED O&D has constituted a Committee consisting of DGM O&D, HQO, Chief Manager HSE Corporate (Operations) and Chief Manager HSE,SZ to enquire into the Fire incident at Tiruneveli IRD on 22-09-2014.The Team visited the location on 23~09-2014 to enquire into the Incident.

Incident Description: Reproduced as reported By Location

As a part of MBLCRIP ,Works for fixing ofROSOV's on Tanks was taken up by the location from August 31st 2014. Tank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to M/s. Nexigen for cleaning. After product was removed through normal Gantry Tank truck filling, the residual product below the suction level was taken out after opening the manhole cover using hose connection into Tank Trucks for filling. Loaded tank trucks were checked for QC, invoices were made and released.

On 19/09/14, one TT (TN74E7530) was filled with SKO from th~ tank and on checking the sample, it was found that the product in 2 compartments were OK and in the third compartment, Product was found mixed with water and sludge.

Another TT no TN39L1062 was also filled with product from same SKO Tank and it was observed that product in 2 compartments were good and product in third compartment was found mixed with water and sludge. In order to release Truck no TN74E7530 with good product, that product from Compartment No.3 of the truck no TN74E7530 was transferred to Truck no TN 72Z1500 and it was filled into 2 compartments partially. Subsequently good product from the TN39L1062 was filled i'nto the 3rd compartment of the truck no TN74E7530 . Samples were tested and invoiced and sent outside on 19/09/14.

Further removal of SKO product could not be carried out on 20/09/14 due to rake decantation, it was decided to empty out Truck No TN72Z1500 for filling on 22/09/2014. Since one compartment was empty in the TN39L1062, it was decided to transfer the contaminated product from TT No. TN72Z1500 to Truck no TN39L1062.

At 11:30 AM on 22/09/14, the arrangement was made for taking the oil into half open drum and pumping product from the cut drum to TN39L1062. On starting the pump, within a matter of 1 min., a fire was noticed on the delivery side of the pump and the fire was immediately extinguished with water & foam by the Depot Officials. The person who was holding the delivery hose (Mr.Manikandan) left the hose down to run away. However·, the fire caught him and he ran with the fire for

Page 2: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

help and in panic. His own contractor who was available on the. spot extinguished the fire with water and removed the cloth. He was immediately shifted to City hospital .During this time, the person who was standing on the TT holding the delivery hose jumped down and fractured his leg, who was also taken to hospital and his condition is stable now.

Depot officials handled the situation promptly and averted major incident.

Methodology adopted by Investigating team :

1) Visit to Accident site along with the Depot Officers. 2) Verification of all Documents related to the incident 3) One to One Interaction with Officers and stakeholders present during the

Incident. 4) Probable cause of leak and fire 5) Conclusion.

SITE Observations:

1. The trucks involved in the incident were removed from the actual site and parked behind the TT loading Gantry' area. It was observed that Company Tank truck no TN39L1062 Tank body was found to be covered with black soot on its left side , Rear Left Tyre and mud flaps found partially burned.

2. Kirloskar make,1987 model Old Mud pump with 1.25 inch dia discharge faucet with Cable connection drawn from nearby Junction Box .opp to Tank no 2(HSD).The glands used were oversized and loosely fitted to the FLP housing.

3. One six Meter long 2" Dia partially burnt Plastic hose with clamps and L bend Fittings with quick shut off Valve. One abandoned MS Spanner.

4. Another plastic hose of app.8 mts length. which was used for suction was found lying near the Tank trucks parked behind the gantry area, partially burned at one end.

5. One pair of Oil soaked Chappals.

6. 14 drums of sludge stored opposite the incident spot 3 meters away from the spot.

Page 3: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

·:r~!i~:=.-

7. Burnt shoes and Burnt strands of clothing's 10 meters form the site of incident towards the TWD pump house.

8. No presence of DCP extinguishers nearby the incident site.

9. Cut drum used for Transferring SKO was found shifted and kept at the Gantry.

10.Water gel blanket could not be produced on 23-09-14 But it was subsequently brought and shown in the morning of 241h Sept 2014. The sealed packet containing the blanket which was kept in its container was found unopened.

Document verification: 1) Hot work Permit 2) Job safety analysis 3) Scope of PO placed on Handling Contractor, Arumuga Nainar and MRR with

attachments 4) Security Gate Records. 5) Fire Engine Log book. 6) Training

Observations on Document verification:

- There was no work permit made for the specified job of Transferring product form One Tank truck to another tank truck which caused this incident.

- Available Permits no 0086 -00 signed and verified by Depot manager for M/s Nexigen on 19-09-14 for the cleaning of TK 03 was extended on 20-09-14 vide permit no 0086-01. This was received by Nithin kochuraman but not approved by depot manager, but was utilized by Handling Contractor, Arumuga nainar.

This has been done through the online Hot work system . The same Permit was extended on 22-09-14 manually by the Location in charge with a comment to enter the permit in the system without giving reasons.

- No Electrical permit was issued by the depot though temporary power connection was taken from JB by the Contractor.

- JSA made on 19-09-14 has been made casually and not on the specific Job being undertaken. There was no JSA prepared for the job being undertaken on 22-09-14.

Page 4: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

- The gate records showed that this contract employee who sustained Burn injuries has been shown as Mani instead of Manikandan who has been coming to HPCL for One year.

- There has been no record of payment to Manikanttan by the contractor in the wage register submitted alongwith the Bill .It has also been seen that there is no witnessing of the disbursement of wages to contract employee by HPCL officers.

- There is no Photo identity card issued to the above person even though he was working inside the premises for more than a year.

Interactions with stakeholders:

- Electrician has confirmed that he has tripped the power on seeing the incident from MCC room.

- Electrician has also confirmed that he has noticed that there was a fuse blow out in all three phases in MCC room on the cable which has been connected to the Motor of Mud pump utilised by depot officials for Tank truck to Tank truck transfer.

- Nexigen personnel has informed that their Mud pump which was kept inside the dyke of TK 03 was found shifted to the Incident spot without their knowledge or permission.

- SOP's for MBLCRI project were not readily available with the depot or the Officer handling MBLCRI jobs.

- Safety officer has confirmed that they have connected a 2.5" diaPlastic Hosepipe to the pump discharge faucet of 1.25" Dia using Teflon packing and a Clamp. The hose was physically held by the contract worker Shri.Manikandan to prevent it from sagging. Contractor along with another contract worker Shri.V.Murugan were standing on the Truck holding the delivery end of the Hose.

- Safety officer has also confirmed that neither the Tank trucks nor the pump set was earthed.

Safety officer who was supervismg the activity has informed that he has immediately pulled out the suction hose form the cut drum on noticing the fire.

Video footage could not be seen due to the non-functioning of 3 cameras m incident areas.

- Our Non management employees have confirmed that Fire fighting operations were carried out by them and could extinguish the fire within 2/3 minutes.

Page 5: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

Probable Causes of leaks and fire:

- The cause of leak evidently was due to the imperfect match between the oversized Plastic hose and the pump discharge faucet.

- The clamped end most probably could not stand the discharge pressure making the hose to get detached fl·om the discharge faucet resulting in the product get sprayed outside.

- Sparking that ignited the product vapor might have occurred due to discharge of Static charges generated due to use of Plastic hoses for the transfer of product mixed w·ith sludge and water.

- Since the product being transferred contained water and sludge mix, presence of pyrophoric substances like Iron sulphide in the mixture can not be ruled out which might have got ignited when came into contact with air.

Conclusion:

The investigating team after going through the above Process has arrived at the following conclusions:

1) The location was successful in containing the fire immediately with Participation of all personnel of the depot, which should be noted.

2) The location has not followed Standard Operating procedures in carrying out the above job, which led to the Incident.

3) The Location has failed to identify the hazards dearly and did not analyse the risks involved in the activity that was being undertaken. More so because the job, was of non-routine nature where special f(.)cus should have been there.

4) The team found that the quality of JSA's made by the Location is very poor. The one liner JSAs do not meaningfully capture the hazards involved and the associated and probable risks. ·

5) The type of Materials used by the location for the above operation showed that the location was careless in its approach towards doing this job, maybe out of lack of knowledge or awareness.

6) The presence of MS spanner at the site indicated that non-Sparking tools were not used while carrying out the above activity, though non-sparking tools were available with the location.

7) The presence of the abandoned chappels at the incident spot proved that Implementation of PPE' s was not strictly being enforced.

Page 6: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

8) T'here is lack of Knowledge on First Aid Procedures, \Vhich has been revealed by the non-usage of the water gel Blanket on the Vktim by tht: ·ream.

9) Work permit system was bypassed while doing this job, which led to this incident.

1 0) They have used the Hot work permit with a specific job requirement to be clone by Nexigen, to another contractor for doing a different job requirement which is totally wrong and incorrect.

11) We have found in our interactions with the officers that there is lack of awareness among young officers on the job hazards connected with their jobs.

12) The Investigation members felt that there is no cohesion between the Location in charge and the Otlicers in the Depot.

13) We noticed that there was total lack of involvement or the Location in charge in the day to day operations.

Recommendations:

I ) Depot can start Normal Operations .

2) MBLCRlP work can be resumed only after the Zonal Operations and HSE team make SOP's required for working at depot and ensure strict compliance of the SOP's and all safety requirements.

3) There is a Training calendar available at the depot and trainings are held as per the same. Ilowever the effectiveness of all the Training program's

• including First Aid, usage of PPE etc need to revisited.

4) Zone shall arrange training on Work permit system and JSA immediately to all the officers. ·,,

5) Zonal Operation shall monitor proper implementation of site specific SOP's at th<: Depot.

o?~~\v~ Shailesh.R.Rao ,_, \j DGM-0&0 HB

~~<>~\2d4 M.Selva kurnar Ch.Mgr.-HSE O&D,SZ

)~an. Cl;~gr.-HSE Mktg.,HB (WZ)

Page 7: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

li:· G

f ~: f I" 1;:.

I

··~~

['! ·~j.

I!

\

1:

\·i: ' l; ,,,

,,, 1i D

'IRU LI

fikchfl? e/JC :£

THE NEW INDIAN EXPRESS MAD URAl TUESDAY23 SEPTEMBER 2014

2 Labourers Hurt in. Fire Accident· at HPCL Express News Service

Tinmelveli: Two contract labourers were injured in a fire accident at the Hindu­stan Petroleum Corporation Limited (HPCL), here on Monday while pumping kerosene sludge from one yehicle to another.

Sources said, Mani alias Manikandan (2.8) from Thenpathu, and. Murugan (25) from Rajavallipuram work as contract labourers at HPCL, Thatcbanallur in Tirun.elvel'i. On :Monday, · when they were involved in pumping kerosene sludge from one lorry to another, they received burn injuries due to a fire accident that took place following a techni­cal snag in the motor pump used to transfer kerosene. Following this, the HPCL administration doused the

Fire and Rescue Service personnel monitoring rescue operations Inside HPCl, Tbatchanallur on _Monday I P JUSTIME

fire and admitted the duo in a private hospital.

Manikandan suffered about 85 per cent burn inju­ries and is critical. Murugan

suffered minor burns and his condition is stable, said · sources.

Assistant Commissioner of Police .Loganathan and

Thatcrumallur ~or Vel- .Assistant District Frre Officer laikkannu led poli(!e team Saravanababu said, "While and Palayamkottai Station.", .the HpeL,pasensured all .Fire Q6irer Vettum Perumal, .. ~etymeaS'ures and preca.u .. Assistant District Fire Offi~r t!onary st~ps to avoid fire Saravanababu led the·Fire a:ccidents'and also control and Rescue personnel \:Qe fire lJ:t'case of an ~cci~ reached the spot and in- &rit, there are two short;, spected rescue operations. oomings. in terms of o~ra:-Sour~es said, the HPCL tions. Themotorpumpused

teP,rte{furcleaned thekerQ:- tptransferthesludgewasold . sene tank that has the capac- and caused fire. This should ity of 2,900 kilolitres and havebeenreplacedlongago. transferred the sludge into a .Secondly, the contract la­locry which was again bqurers were not trained to pumped into another lorry do such jo~. They (HPCL) using a motor pipe. "We do should have·employed only not know why they trans- trained personnel," · · ferred from one vehicle and Luckily,· as it . involved agam pumped into another keroseii~sludge,theaccident. instead of pumping into the resulted in fewer casualties. respective vehicle directly," It would have turried serious said a senior fire official. had it been petrol, he said.

Official sources pointed Thatchanallur police reg-out that fire originated from istered a case under acciden­the motor pump. tal fire and are investigat~

Commenting on the issue, · ing.

·- ,l tinp

~-

' I .I

1 'I

J r

Page 8: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

--·~~;~,;-~~]~-

~crc;)fC11CI1 ~~)fi:ll!li CfiTtift~f"CI1" ftlfi:l~s HINDUSTAN PETROLEUM CORPORATION LIMITED

Tirunelveli IRD

~~ ~ ~ ~ mr t-~ crci; ~ Work Permit For HOTWORK/ENTRY TO CONFINED SPACE

~ .mm- of/Hotwork Permit No: 11879-2014-0086-00 <orir ~ 09:00-17:00 ~ (fil;,'llfl ~ 19/09/2014 Work clearance for 09:00-17:00 shift of date (~ il' ~ (fil; 'lift$~~~). 1o: 45 _ 17:oo ~I\; 19/09/2014(Valid for the shift unless <:'lui!' renewed) for the duration: 10:45- 17:00 Hrs.

;;ni't finm "1m (fcmm/~/~)/Issued to

(Department/Section/Contractor) : M/s Nexlgen

<orir lliT ~ ~ (aR/~/~ <f ~)/Exact location of

work(Area/Unlt/Equipment no. etc) :Tank farm No~01

<orir fcr<Rur/Job Description : Cleaning of TK•03 by Water jetting. Manhole to be opened. Cleaning to be done

mm- ~ ~ 'l:f f:IW~fi:llilld ~ >m ~~I /The following items shall be checked before Issuing the. permit.

(3'ffrrr m., ~ '!J*t * ~ >il1<r fiilrJJ# fit fiTH'Frlf qm Hr.rr !;Select the appropriate button. Checklist items marked · with *shall be complied by receiv~r)

fll;1n ~ ~ ~/SNc . ~/Item iT1IT ~/Not ~/SNo

~ ~/Item

if11l/Done ~/No Done Reqd. Reqd.

For~ I\; F.tv/~ ~trr.r 3l' 'f;/A ~ ~ /General Points IS /B ~~ /Hot Work/Entry to

confimed space

N<li<Ol/<orir m- lliT firt'tafUT finm

"" mJ ~r.r QC[ tt~r.IT 3t«''W

~) ~ 1 :lfliT /Equipment/Work Area 1 /Proper ventilation and Lighting Insp~cted provided

3ffil1mf lliT m ;;ifu F<mlr i7f1lT' mq; q

"" ~ lliT ~~rrf.\t~r;f.lc!;m ~ <7f1lT /l ~ 2 ~ s3!T ~ /Surraounding Area 2 (." /Proper means to of exit;excape

Checked. Cleared and Cov-ered provided

3ffil1mf ~ O!IOft' ~. ~ ~ lliT tffifr;<lffi/5llilm/3!!T.!/W.Iffi fcmm ~

3 'I<Ji3iQfl~i11" l><lir s~ /Sewers,

"" 3 ~ l06If ~ i7f1lT ~ /Standby

~ manhol~:s, CBD etc. had hot personnel provided from

surfaces nearby covered: Process/Malnt/Contractor/Fire/Safety Dept.

~ ~ ~ 1'ili1'd clil" "'li1<1\lf1Qcj l); tftil; ;;mr f<R' ~ ffi;r

~~<mmrcli~:lfliT .,.,.,w

~ ~ /~onsidered hazard from other "" 4 t!<T ;!ffi clil" 'Jffu finm :lfliT ~ /Checked -~

or oil and Gas trapped behind the operation and concerned persons

I lining in Equipment. altered;

~ ~ ll'lT s3!Tfoi?;IJ~WT!lt;r

~ f<'i'antr l); ~ 3!T,S <W i7f1lT ~ /Shield ~ ~ SJ!f /Equipment blinded v 5* ~

disconnected /closed/Isolated/wedge provided against a spark. opened.

~ 8J<i; ~ ~ q-q lfm~n<l$"1sf<l>liJ ~

~ ~~~ m:%5 finm i7f1lT

~ ~ ~ ~ /Equipment properly drained 6* /Portable equipment I nozzles and depressurized. properly grounded.

~ 8Jq; ~ ~;Qr.;\& finm i7f1lT

"" l'f'rtWr ~ ~ W~T l); ~ ~ q;6lf

~ 7 ~/Equlpme(lt properly 7* ltm :lfliT ~ /Standby persons steamedLPurged. provided for entry to confined space.

8 N<li<OT tJr.fr ~ 'Rt.lr finm i7f1lT ~ ~/Equipment water flushed.

9 ~ ~ Wlil/~ <W ~ /Iron sulfide removed/kept wet. "" c ~ l!ihT t-_ ft:nl· /For Vehicle Entry

~ ~ 3Iom 'r.om i7f1lT ~ t!<T

http://1 0.90.147.188/iwps/hwp_print_2.asp?hwpno=ll879-2014-0086-00 20-09-2014

---5:::;.;;: ,;-l-, ---..:;;.::"'),•

Page 9: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

tWm- <i ~ ~ /Equipment .../

frFrt~frR 31T<O(UT/'IItr ~ ('Qf<\; m=m .../ 10 electrically isolated and tagged vide 1* ~ ~~/Spark arrestor on the

permit no. mobile equiomentL_vehicle_l)l'ovided.

11 ;!ffi 'tR! Gas Test: HCs =% LEL .../ 0.0/19-Sep-20 14/09:05 c:TfcR:m ;!ffi;Toxic Gas= ppm, 02= % 0.0/19-Sep-20 14/11 :30

0.0/19-Sep-20 14/15:00 W<:l QT<ft ~~~~~ ~ fll;m

~I q;r<rr met tltR1r ~ 12* ~I /Running Water Hose I Fire ../ 'fJ /0 ~ ~ t" ~ I For Excavation

Work Extinguisher provided. Fire water svstem available.

~ <nrn.,ms lP'lVT;i!i~ oic; ~n ~ m tffi s:m mr mr ~ ~;<M

.../ ~~~~Qffi~Wil

.../ 13* ~~·I Area cordoned off and 1 ~I /Clearance obtained for Precautionary tags/ Board provided. excavation/road cutting/Dyke

lshuttinQ from concerned deott.

Remarks: 1.~ ~ ~ ffi<kiffil"UIC"l w~ ~ ~ (~ m::T R fVn 'Pt)/ The activity t)as the

following expected residual hazards{Tick the releva11t items): Jti~'H$lC1 ~ <l'i1fi/ H2S iifcR:rn" <IW!~ ~/thl$'t)q;)f{tll ~!mm<:n 'li'HI<llfvltll/'ffu:r- ~/J!C'<l" Lack of Oxygen/H2S, Toxic Gases/Combustible gases/Pyrophoric Iron/Corrosive Chemicals/Steam - · Condensate/Others ·

2.d1r.1<1l ~ (~, wa=rr ;;y=rr, ~' ~ W) <); m~ .3@fun Fvl<kiffi!?!IC"l -tilT ·arr 3"Q7Wr

cnr.rr ~ (~ m3/IJ'tTC1"/"q~rnT/5fC ~'flRlk</m~r 'Q<R ~~~ ~lwa=rr tfR:/T[lf{ ~~~ ~I • Following PPEs to be used in addition to standard PPEs(Helmet, Safety Shoes, Hand Gloves, Boiler Suit): Face shield/Apron/Goggles/Dust Respirator/Fresh Air Mask/Lifeline/Safety Belt/ Airline/Earmuff etc.

3 .J!C'<l" ~ 3ffilfun ~I . • , 1 wL1 Additional Precautions If Any. · . () . . . . r-; ~--- y0J:

1. Post one secLirlt:9uard at site for supervision during .work ·.;(;_ ~. , . ·

Signed and-verified Originally

http://1 0.90.147.188/iwps/hwp __ print 2.asp?hwpno=li879-2014-0086-00 20-09-2014

. -

Page 10: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

,vork Permit Printing ....

~crS)'f(1101 ~!;;)~<!Iii ~~r;r ~fRt5 HINDUSTAN .PETROLEUM CORPORATION LIMITED

Tirunelveli IRD

~/~~of rtu <F ~crt"~ Work Permit For HOTWORK/ENTRY TO CONFINED SPACE

Page 3 of6

~ ~ o:i/Hotwork Permit No: 11879-2014-0086-01 m ~ 09:00-17:00 ~ (111;,"'11~ farri;t; Work Clearance for 09:00-17:00 shift of date 20~09/2014(~ ;r ~ (111; '11ft ;l; F.nl" w t) 20/09/2014 (Valid for the shift unless renewed) for the

10:45- 17:00 ~ ;l; mror duration: 10:45- 17:00 Hrs.

~ ~ ~ 'lfr "'I'Wir.tlllia om 'f;'t ;;f'i;r.rr tJ /The following Items shall be checked before issuing the permit.

(3firrr ;rl';;,r .,;t Fl * ~ ;;if;r ~.Hf .,;t 1lTH'Mff ifRi Ht;rr {tjSeiect the appropriate button. Checklist items marked with * shall be complied by receiver)

f.li>rr ~ f.li>rr ~

~/SNo WO/Item JfliT ftt/Not ~/SNo W</Item Jflll/Oone ~/No

Done Reqd. R~d.

For~ ;l; fl:rv/<ftfmr ~it ~/A ~ ~ /General Points jllr /B ~u /Hot Work/Entry to

onfimed space

~1m at. lliT f.tfrllfUT r.nm ../

~ ~QJ<f ~ t!Qr<fl ~~ ../ 1 ~ /Equipment/Work Area 1 ~ /Proper ventilation and Lighting

Inspected !provided

3!l<IG1<1 lliT at. ;;ir.r ~ ~, ~ cr ../

~ lliT f?;Q~QTjF.m;m f?."m ~ .J 2 ~ 53fT ~ /Surraounding Area 2- ~ /Proper. means to of exit/excape

Checked. Cleared and Covered !provided

l3fmqm * i'!TOit' ~' $.M't 3!TI?; lliT ~/\alf/5tn!m/.3!1T.f/<.J<alr fcrnm ~

~ ~~/Sewers, .J ~ lj;1jf l?;m ~ ~ /Standby

../ 3 persof1nel provided from manholes, CBD etc. had hot

Process/Maint/Contractor/Fire/Safety surfaces nearby covered. Dept.

3l<'lT llfi<m;r.r ~ ~ <fll J1 I 01'1\ifl II <i i);tl'JU;;>td1T<Tf{*Rof

~~'1\l~rcn-m·~ '"" ...... ,..~ ~ ../ 4 ~ ;lffi <Ill ;;iRr r.nm ~ ~ /Checked ../ F /Considered hazard from other or oil and Gas trapped behind the

operation and concerned persons lining in Equipment. altered.

~· ~ ern 53!f!<ic."!JTWT!~ ~ <); ~ ~ nur ~~/Shield s. ~ 53fT /Equlpmen"t blinded ../ 5* ../

disconnected /closed/isolated/wedge provided against a spark. opened. ~ cS'rCI\ ~ ~ ~ ~li{i$<;i5Rl<li

../ ~ ~~~ mEs r.nm ~

../ 6 ~ ~ /Equipment"properly drained 6* ~ /Portable equipment I nozzles and depressurized. loroperlv q~ounded. ~ cS'rCI\ ~ "ftra:ls/Qr.;\s r.nm ~

../ ~~*mtQri);~~CI\off

".J 7 /Equipment properly 7* ~ ~ ~ /Standby persons ~tt~amed_Lpuraed. !Provided for entry to confined space.

8 ~-tll<!l"~~QT~~ ../ t; /Equlpm~nt water flushed.

9 ~ ~ ~pl)orr nur ~ /Iron ../ fr/C ~ ll1fu ;l; F.nl" /For Vehicle Entry sulfide removed/kept wet.

~ ~ 3!WT r.nm ~ t; zyzi fmtQl'lor 3t1<!i\OT /~ * "fQT<\1 m=m

10 q@rc vi ~-~ /Equipment ../ 1* ~ ~ t/Spark arrestor on the ../ electrlcafly isolated and tagged vide lpermlt no.

mobile equipment/vehicle provided.

11 ;lffi 'tR! Gas Test: HCs =% LEL ../ Gffil:mf ;lffi/Toxic Gas= ppm, 02= %

~ lll<ll" ~/~im'O t!?Jii r.nm ../ ~ /D 12* prml ~ <iln fmvr ~

~I Running Water Hose f. Fire ~ m ;l; F.nl" I For Excavation

Page 11: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

-~;~:'-'~~·-(<"--o.I·.·o

.{ork Permit Printing .... Page 4 of6

Extinguisher provided. Fire water !work system available.

~ lW SJIT Q<i Q<i ~ F<il;;cM ~ llil<1.tm <lifbr;<rtq <ic; ~Foro

../ ~ f<rn'm ~ ~ mR ~ *rr

../ 13* ~ ~ I Area cordoned off and 1 ~I /Clearance obtained for Precautionary tags/ Board provided. ~excavation/road cutting/Dyke

!shutting from concerned deptt.

Remarks: 1.3lR'Im <m<l 'Jl fv1<h1ffi\1!l(1 ~ ~ ~ (~ 1/C'J 'Jl lVP <m:)! The activity has the

foliowing expected residual hazards(Tick the relevant items): 3'tlf4'1"1$1Ci <fiT c:nafr; H2S iifcRrn <lffi/~ <lffi/lfll$<1lflmlfi ~/'fi'lffir<P {l'lil'11fv14l/RRT- uvfraw/.31c=lf Lack of Oxygen/H2S, Toxic Gases/Combustible gases/Pyrophoric Iron/Corrosive Chemicals/Steam -Condensate/Others

.. 2.~ QTc!lt· (~; wm ~~ ~~ ~ W) ct m:!:f .3ifrlfuf; fv1MffiR!li1 QTc!Tt <fiT afT ~

q;r.:rr ~ (~ •rrUQ~I'Ci'/'il'~rnT/SR ~'lifQ~c:::V~~r ~ ~~~ ~/Wiffi 6Tiz/~ ~~~ ~I . Following PPEs to be used In addition to standard PPEs(Helmet, Safety Shoes, Hand Gloves, Boiler Suit). r::ace shield/Apron/Goggles/Dust Respirator/Fresh Air Mask/Lifeline/Safety Belt/ Airline/Earmuff etc. 3 .~ lfiT$' .3ifrlfuf; ~I Additidnal Precautions If Any.

~ll>rO!llfri~ ~ li>r lff(!Tiffi' 'Ifl'lili<ITll>r~ri~ 'Ifl'lili<IT li>r trf(lith Issuer Name & Designation Issuer Signature Receiver Name & Designation Receiver Signature

BHASKAR V KOCHURAMAN NITHIN ~-· Depot Manag~r Senior Officer - Hssand E v ..

Page 12: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

I.

,vork Permit Printing ....

ftiR5)'ft1101 q~)~"''il1 q;lqft~ro=r ~~~5 HINDUSTAN PETROLEUM CORPORATION LIMITED

Tirunelveli IRD

~~ ~ ~ ~ rnr t- ~a<\; mm: . Work Permit For HOTWORK/ENT~Y TO CONFINED SPACE

Page 5 of6

r.r<rr.r ~~of/Renewal Hotwork Permit No: 11879-2014-0086-01 ~ ~ ~ '1fr ~l'Ott't:rfilli1 r.r<rr.r 'Ill ;;iiq.rr ll /The following renewal should be check before issuing the permit renew.

t;tcm;w /Renewals

r.r<rr.r lfl11l' lfl11l' Gas Test vaiues 3lfil' ~ ~ mtmfi ;;nft;!;cfr 'fiT ~ifiT

~/Renewal ~/Date l!'/From Cflfi/To for HCs, toxic Additional Precautions lffC!Till\ lffC!Till\

No. Time Time 02 etc. If any, otherwise Issuer's Receiver's mention 'NIL' Signature Signature

1. Post one security s~ Signed and

0 19/09/2014 08:51 17:00 guard at site for V flfie -supervision during Originally

0.0,0.0,0.0 work

1. One additional

()~ 1 20/09/2014 10:45 17:00 security guard to be

posted at site for 0.0 ensuring complinces A-.

2. '221 o?l2ol~ w:4o I f.1·c.JO O·O t~ ~ MJ.,J.I. .1 ~L ~....,..Y fJ..:~'" ~~.

~)'lr ~r/Spe.cial Instructions

l.~afr WT/~WT dT ~ ~ <l ~ tc1T ~ ~ c)> ~ cr$ tr@R: am ~ ~I omcl

~~c)>~ <:r2IT ~M ~ ~ <Pt1 The work permit shall be filled up ensuring that complete information is provided in all the sections/subsections. Sketches shou'ld be provided wherever possible to avoid miscommunication. 2.W~ ~ CfiT ~ ftt~ Gm 'Bt'r Wlffi '(!Ci ~ c,OQfthJIC1 W!ffi ~ CfiT ~ Cfi'{C'IT

~ 't!Ct ~ ~ ~ ~ ~ «r qfhMt<il .m ~ ~t:rr ~ 1

Appropriate safeguards and required personnel protective equipments(PPEs) shall be determined by a careful analysis of the potential hazard and the opeartions to be. · performed prior to starting the work. 3.~ ·~~~c)> tTiTi ~afr Cl'il<T ~ ~ Cfi'{C'IT. ~I I In case of fire alarm I siren, all work

must Immediately be stopped.

4.4~'tlll't<il ahf -at ~ ~ 'Jlftr/~ 't!Ct ~ $<'lfct~4il't ~ q-~ <fiT \Ta~r ~ ~~

only certified vehicle/engines and permitted type of elecrtrical equipment and tools are allowed in operating area. 5.~ ~ ;jj)ffii<H{~C1 't!Ci ~ ffi dl ~ ~I Welding .machines should be located in non-hazardous and ventilated areas. 6.Q<f'fCi'fiU1<1 ~ dl. ~ ~~ G'f ~ (1Cl'i ~ CfiT ~ <i1'tT to:rr ~I .

Page 13: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

. .Vork Perrriit Printing ....

. No h.ot work should. be permitted unless explosive meter reading is Zero.

-, ~~:;,_~>'"-"-.

"'•-==-~.Ii',C:

t'age o 01 o

7 .~ cmt c;zrft'p ~ ~mo:r ;A- U<r~r CR(lf ~, q;a:r ~ £jiiJf c;r ~ m on$ Cfidft Cl'iT ~ 31'~ 1Jcl~T ~ tR mRcncfr CllT ~ ~ ~I When a person is entering confined space, the receiver must keep minimum two stand by designated person at .the manhole or entry point. · ·

s.~ :lfr mm-~ ~ 6ITcrn 3{q m ~ tJfr '% ~ ~ f<n cmt :lfr umn;~ mm- <)>

~.ct~l Before box up of any vessel manhole cover, ensure that no men/materials are inside the vessel. ·

9.com ~ ~ m * ~ ~ ~ ~ ;;rn,r f<n ~ .mor :lfr ~ ~ <)> ~ ~R'f (i(1)11J\jkJ.CI> ~I WR ~R'f '6IC;("f ;mm ~ ffi ~ ;;rrtf· ~ f<n V!<lT ~ JITfr ~aRT 31'~ ~ ~ ~~frRt:r ~ ~I For renewal of work clearance, the issue shall ensure that the conditions are satisfactory for the work to continue. if the conditions have changed, it may be necessary to iss·ue a new permit or amend the existing permit. 10.~ tT ~ ;A-~ ~ mrr. ~ ~ (1Cii ~/fcffi[c=r ~ \jfT ~ ~~

·The clearance on the same permit can be renewed/extended upto a maximum of seven calendar days. · ll.trmic: 3fCI'~~ tT ~ ~ Q'{ ~:lfr ~ ~ ~ ~I /The permit must be available at work site at all times. 12.<mr lilrrn ~·Q'{ ~ ~ ~ ~ 'QCi ~~~~.'{<SIT ;,rr.:rr ~I On completion of the work, the permit must be closed & kept as record

• 0

~ "1~1~-tc CfiT ~ffii~/Closinl! of the work permit llllWcl'r: ~ ~ *' 1%' ~~4ii'i1a\C1 ~ ~~~ §'311' t vci ~= ;;IT;r fll;ln 1%' ~ ~ ~ §'311' t vci m liT'Ii t m liT'Ii fil;ln 11'41 t1 /Receiver: Certified that the jtlt fll;lfi tml' ~ ~ ~ ~ t1 /Issuer: Verified that subject work has been completed/stopped and area is he subject work has been completed and area is cleared. · leared and is safe from any hazard.

~'lim ilm'll~

~'II~ i!m'll~

Date&. Na,me & Designation lffCillffi'/Sign Date&. Name &. Designation lffC1Tiffi' I Sign Time Time

-

Page 14: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

r:A/-.f-a. ch tn-M ( Jll-_.

HOT WORK Job Safety Analysis- Tfrunelveli DEPOT . Date: 19-09-2014

Job Safety Amilysis No. 21 Job: Tank Man hole opening of HSD TK-03

Title of worker who perform the job : Mfs Arumuga Nainar Superviser: Shri. A. N·ainar

·I

Analysis By NKR

Sequence of Basic jobs. Potential Hazards or accidents Recommended safe procedure Person Completion Date no. re.sponsible &sign·

1 TANK CLEANING, TANK NO. PERSON GETTING UNCONCIOUS DUE·TIO ENSURE ZERO VAPOUR AND TANK FULLY GAS FREE

NKR 03 VAPUR INSIDE TANK · BEFORE ENTERING INSIDE TANK.

19-09-2014

2 TANK CLEANING, TANK NO. FIRE INSIDE-TANK IN ACCUMULATED ENSURE ZERO VAPOUR AND TANK FULLY GAS FREE

NKR 03 . PRODUCT INSIDE TANK BEFORE ENTERING INSIDE TANK. ··j 19-09-2014

ORIGINATED REVIEWED By NITHIN K BY. NITHIN K Approved By VBHASKAR

Sr. HSE OFFICER Sr. HSE OFFICER DEPOT MANAGER

Page 15: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

., I>

il! ; ~;· II':

"_;r•·

I ' ·orstnu UlthlJI _: til -n~i<_..,_t.· ... c.·~-;. ·ps6JIT6l.I&U~

·,_

{iJ "Act th."tlil 'Sections~

I· (111) 'Acte1:.l W 'Sections~ .

i-IRST INFORMATION REPORT (!Jl~Gt ~~J>ruot ~ii...<»IJ>

T\u...c~:>:

(Ur.C~r Secuon 154 Cr P C. i

(~-JJ>AGifiw. r..1bfl..t 154 l§'"""Y;J

'Year~.;,.(!) . 2.. .:>I4

.A~~ .. Fiie. (ii) •Act eLu.D ..

•FIR No. (!11-!!J .... ~- D,!IOO,

•Sections~

(iv) 'Other Acts & Sections Ui!D ...:.~ ~ -

-;JI-1?'/dmtiJPt J7 TAI\liL '\ \IH POl 10

l'<n.I;RAfEO 1"'\\"I:SfiGAIJO:O. H)l{\11

c 3795563 47bjz.'J'1- ·Date !!l"oir .... ?, -~ - .:::-. 'i · L4-

(a) ·occurrence of Offence Day ®!iJ!D ~ !!l'oir .;6,..&..~ ... 1::>.!.:.1.~ 'Date from !!l'oir I!P~ . . .... .-= .............. ·Date to !!l'oir """".. . ...... ~ ................. ·nme Period~ ~611 .1.1.3.<> h,_ • Time from Cjr,mD ~ ··········='Time To <lJimD """" .

[:., (bl lnforrnatton Received at PS Date""'"'"'-~ ~ ~~ !!l'oir .?2.:.'?'1::.)+. ... Time GJimD .. \.7...39. ... (c) General Diary Refell!nce: Entry No(s) Qurlll !!I'L~ ~ ~ .. .,;, .. \i.?..b ... )J.). ............ Time <lJimD ..• .l73-~ .. J, .. . '• "'-Lj <>"! l ~~

~ I:J- Type of Information:~ """"''Written 1 Ocal<l(!!l~ (!ji6UID /...W ~"' ..

,L,

Place ot Occurrence (a) Direction and Distance tromPS i!!>lb!D ~ ~ ""'"'"' ~ """""'"' ~@til. ""' ~ ·············-~---~.":"" . .Scn.ui+J G.vvt. . ·························": .... BeafNumber~ ..,.,.u .,.,;, ....... t.+: .. :..!lL. .. (b) 'Addressl'J""'ll'f'. lh~~-~----~~ ..... 4.-:~~- .Lb?.t ....... ~ ... ·································· (c) lncaseoutsidelimitofthisPnliceStation.thentheNameofP.S.iJ<i. ""'""" !11-uw .. ~., ~ ~f<ilr. ~ ~ ...l.Jil QwJ1 ...... District urrfUL.LW ........ ~ .•••••••.••..•.•............

'eompfa1nant /Informant . (a) Name ~""!!Ju!L.uonr I~ ~ QwJ1 ............... .Y..: .... I>.-.~J~. (b) Fathe(s I Husband's Name ~ 1 ....,..,..; Quwtt ..

(c) Date I Year of Birth !!l'oir I llin;hjij ~.;,.(!) ············-·········

(f) Occupation~ -.:D.<>t=-t. .. !'1!1.~ (d) Nationality !!>1'4-omi> .... ~~---·················- (e) Pas.;>ort No.~@ ..... ...,; It:.(!) """ ...•.......... Date of Issue~ !!l'oir.

(g)Address(!p8>6Uil. ~-~-~---··-~-~---···~:'1?!:! ...... ~... -~-~~---··· .. .

Details of Known /Suspected I Un<:lOwn accused with full particulars. (Attach sepljrate sheet ff necessary) ..

it-',w.c.-'-~~.~ ..._ ~ . .-; ~·-:~·.. :·······

,., I•

Reasons for delay in reporting by the complainant/Informant ~"""'"' 1 ~ ~.;, <Y""!!JUllU..!fj!Q> ~ ~ ~

Particulars of properties stolen I Involved (Attach separate sheet if necessary) ....,QPTLw.:.._ I""'~""'"' Qen~ ~-~ g;;ofl§, !'b".tl!i.• ~~)

l:i 'Total value of properties stolen I •nvolved ....-6lllfLiJuL.L 1 '""'~''""'" Qen~ Qm~ ~

~~ <.2) M""""'~~ {i) V ~ 'Inquest Report I Un-natural Oeath Case No. if any: Ul"" f1116mr....., ~ 1 ~ ""J'J'"' fi1!DU4 """ ~ ~"'····························· ............. ~ ...... W9:"':.~~1· ....... . r..rp_p,... R.'-O t?.4n. 1 "\ ·- .,n '"·

..Place of Issue~~----

-I •.

I J

Page 16: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to

~ '

i i:

~ r

' J: :1'

l[i j, ,, 11,

.1j

l

Wt~.­~·-

I·:

1

;.:

"

<.

~ .

\

CtR Con1ents (Anach seoardt>? s:,~: .r ~~cwreG) 19~ ~ru .,.?fmiB.oM&U)I~ f.htn,s.a..uo. oO)blJI .... ~;,..:. ~1!1 ~0,4·~,· ~lt.Olblmlo'+.ti.Njlill

uJ/v-""' ~ /(S!:.I j<>lD ~~~~ U-LN1 .iP'Il~"'2)<--(: ']k-....., k,,,,.-"<(iu7 r~,.l.''"- --)t.-• .(-lo.._.,

J yeuu'"" " k"'J'.&..>-t IJr- Tl. ... v ehool~. :»<>pol: ~. \-H'LL ~~- D• ""' ~-" 'I lk <c"'-j>t~.-i. ;, . .,.....;.. 5 ~"'"""' " ~ '" ~""".J,U.. r; c, ,.,.... & 4 71114- ""'""' He~.~ (ii£ . Tk ~"" ... 40 6d I Ck ' . 2 '- '1 14 ~ v g)__, k<.o-

~·t """-4"" . j.;,M.v,\::~ ~ Gvf>~ Lb; • ~~ . b '- ] 3 >05 . \ c . 9""/"-Lt=- '1,- t'l.lic... 'jh-...t,.k""'-0"' I'> L"'->n S I>·

_'S-vj, ~ 1-W . C: Vl '2. L '=- q. ~ i 4 ~ c<..b< :·v~..t_ \ 7 ..3 D (n,

'T""" u. ~" .::."'/;""' .,.--.. """' ..-, ·n. q .\4- at «J>-~ " :;, \dv, ~ 1-b t:<W<- tr-~ -'" """" DoJo ,t. , Ilk~ :I'- < •ww>if~ I'}, '"7 ~ " }'-.....P u. . . . N'"". v l .. -- /'' /L_ 1\' . ""'-- lf\/1-~: I. A. ~-' "'"' v. fVt.A-~'"lM l~ . ...,.,q,"> o-v.. '-"'-''~ <JUJr '{5/fuu-r TVI-v· IPUI? J'---"'L~CVI->, ~NfYO..c):o-y Mv- 1\.JC<,(""<.N ~ , • .,.. , • ....,.-~ <'V~ ,.,-y. CJ ,·. · --' '· t'h:.. '' _ _j)_ •. n }\._.~ 0n· N•~ 6:,"' ~ ~Y~'Y_,; t-0\ Vh cit ~ ~~ ' .lYe ~~- b. \'vie_ • ~~,.4_~ a ~ fil-e. GCc..t..l;~ ~ -~ ~-~ """"""""' lk """'- r"' tt.. ~ ~ 1'\¥ r;, ,.,< ~ "'"" ""' if«~ ~ -=t~ .. 'JI"., h.oA ~ '"-', 4 ""'"""" . \-1-u..c """"' . --"­

"" 15'.,.._ hj>~ f.o l·h,_ ')>-<. '1\- ('V,. ~ [~ -~ ~' loa. c.,_J,L ,_,l ~ t1<. -!-"""'- .irn"""'-'<licL; h. <;;do 64~ -'':f<"'CJ ·

H-e """' y.""- .,.., A""' """"' "-"' ~ b> s ~ .,...,,w ;., """ ~~"- . M•· v. ~ LV""'- '-"'""> M lie. 'I T ju'"""-'

~.... """" %- F"<- · """" 11<>C ki.. ~ "~ w\~ ~... . 1-k. oJoo """" ~ t-., _tl., ~,b.L . s~!ll> ~ c,.,.d.,- tr~ ,.\\"\ wb"' \~l"tv( 'f;Yu.~'. ~ -M. 6~ 'j<n..vr-t"~~"'"' 6~ tal~ ~ o..~ ..lh tiu>:, ~ (.rfd.j V·Y3~~1~ ....... ~~ ~. 'l:t¥'c.L.' (\I"'Y'u~k.t..l , "J 4-45)"07o7.3:.. S\\r, ~~ o..k- 173£> \--n., ~'Vj '2. L-t::.CL ~LC,. CVv\<>l ~~ q_ ~ .... Cv, ~Jh..~ ~~..s · CI('"N.::> 4 '~>} 1 ~ ;&c.u-~ q.. ffv.e.. (~{d.J ~- nt .~~ ... IPJ. '2-L...<t·lft-.

v->\~ fh..... ~M:: v-JCV> -~ _1-o tk :T"-4· \IV\.~~ t-k, 2::1 ~ ,!J'~ "'b Aif2.. '-.JG>.i -~ /-1:> lN'r-L• '('~ ~,.GV-t. S'v ~uh.:..~v 6.sv -~101;

'The <SY'I'<f'"n.J. F !t~ ~ ~

~ ~ c.c:,p\~ Weme. ~ tD ti-e ~~ ~· ,A c..,.y,-

13. Action taken :Since the above report reveals commission of offence(s) u/s as mention<·<! at item No.2. registered the case and took up the investigation I dir1:~. 9.: .. ~~ ~.' ..... ~-~k~;~c:~tigation I Refused lnvestigatiOJ

toPS ........... ~~f,S ..................................... on point of jurisdiction .

...r.-.~--·--·· · '"·-"'-· · .. ~.~· .. ,;, · .a.A.... 2 · · · · ,....,. ..... _ .. ~ · · .. .n~. "'-·'·-· · · rc..>-• .>n • • • 1---"~-.·-.r.o.-~. ..-~Q .n.... ----"-·- -<>~ ··~ ~ ~ ~ ®JOO) -~~ .ulf61T~ ~'""' ....., ~ lfl.L. ,.,...,.......... • .., @!!J!!lllll'& ~ ..,.,..... ..........,. ~ 6T"""""""-&Il61TOITUULL!5J ,_,..,"""""""' ................................. ..,.............. • • .. ... :. : .... ,......QJ U608•owo•mu ....

or~Gl.mm••r ~!51/ Ul!l)I&<WUL<!il or..,..,..,....,. &®!9 ~ ........... ....................... ......... . ........................................................................................................................................... &ITQJQJ ~~ UliT!!l!!JU~·

FIR read over to the Complainant /Informant. admitted to. be correctly recorded and a , ,.py given to the Complainant I Informant free of cost. ep~. ~..-~ 1 g,I'Q!.U ~ uo,.~....U,, ~ mflurr& or~(bl ~,. 6flD!l)l<i.

~Uif.~~!l)I~IL~Ll5J. ~ ?-¥ , • 14. Signature I Thumb Impression of the Complainant /Informant .o...~~ V \ \~ "~~ ' Signature of the Officer in~~

®~~.-mT/ ~ ~ 9.:...;, I ~.u ~ ~~'0~"-0.0\\ J ~ ...,..,.;, !f,lom<uw Qurr!DJU4 ~ ~"2--'\.-\cq)t-; , 15. .Date_& ~lftl? of d~~ .to the co_urt: . ').. \ ~ "Name QuwiT .......... ,J;h .... ~-"' ~-.-J:.~ ~~ ........ . ~~ .,J!!!IPMIAI I !JITC5"'- C$1r(!PUI A. ' ~ ' 1

"Rank lfl-> .......................... ::1 .. ~:1. .. ~.?:-'Nb.~.~~-~--G.~ 0.. "- ~ -~""".:: o. '-

Page 17: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 18: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 19: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 20: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 21: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 22: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to
Page 23: vsc -.!1- - HPCLwebapps188.hpcl.co.in/hpclond/PDFS/invtirunelveli.pdfTank No 2 for HSD was fitted with ROSOV and MOV. Subsequently Tank no 3 for SKO was being emptied to handover to