volume 3, issue 1531 december 21st, 2015 contractor’s

6
Doug’s Corner VOLUME 3, ISSUE 1531 COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug’s Corner 1-3 Traffic/Active Work 4-5 Other Resources 6 December 21st, 2015 ONTRACTOR’S C W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1 e official opening date of the Northwest Extension has been unveiled. Anthony demonstrates how to push the buttons on the newly installed Ticket Vending Machines (TVM’s).

Upload: others

Post on 05-Feb-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VOLUME 3, ISSUE 1531 December 21st, 2015 CONTRACTOR’S

Doug’s Corner

VOLUME 3, ISSUE 1531

COURTEOUS

RESPONSIVE

DEPENDABLE

IN THIS ISSUE

Doug’s Corner1-3

Traffic/Active Work4-5

Other Resources6

December 21st, 2015

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

1

The official opening date of the Northwest Extension has been unveiled.

Anthony demonstrates how to push the buttons on the newly installed Ticket Vending Machines (TVM’s).

Page 2: VOLUME 3, ISSUE 1531 December 21st, 2015 CONTRACTOR’S

Jorge and Travis assist with the switch testing throughout the alignment. Keep clear of the tracks at all times!

Doug’s Corner

My Weekin Pictures

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

2

facebook.com/doug.ststevens

instagram.com/nwx_phx

#MOVEPHX

The station platform cameras are being installed at the Northern Station.

Page 3: VOLUME 3, ISSUE 1531 December 21st, 2015 CONTRACTOR’S

ONTRACTOR’SCWU

EEKLYPDATE

Doug’s Corner

My Weekin Pictures

facebook.com/doug.ststevens

/maxxtransit

BETHANY HOME ROAD TO DUNLAP AVENUE

#MOVEPHX

The water that was loaded for our initial weighted pull test has been palatized and will soon be donated to St. Mary’s.

3Our storm drain subcontractor, Team Fishel, has gone above and beyond by donating additional food to St. Mary’s Food Bank in addition to the items from SSWJV/MEC.

Page 4: VOLUME 3, ISSUE 1531 December 21st, 2015 CONTRACTOR’S

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

12.21.15

NORTHDunlapAvenue

toOrangewood

Avenue

C-Street/Dunlap AvenuePunch list, train and signal testing• No restrictions

Dunlap Avenue/19th Avenue IntersectionPunch list, train and signal testing• One lane both northbound and southbound Dunlap Avenue will be maintained.• Turns at signalized intersections will be maintained.

Dunlap Avenue to Butler DrivePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

Butler Drive/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

Butler Drive to Northern AvenuePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

Northern Avenue/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turns at signalized intersections will be maintained.

Northern Avenue to Orangewood AvenuePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.

4

#MOVEPHX

/maxxtransit

Page 5: VOLUME 3, ISSUE 1531 December 21st, 2015 CONTRACTOR’S

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

12.21.15

SOUTHOrangewood

Avenueto

MontebelloAvenue

Orangewood Avenue/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Orangewood Avenue to Glendale AvenuePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained. Glendale Avenue/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turns at signalized intersections will be maintained.Glendale Avenue to Maryland AvenuePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Maryland Avenue/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Maryland Avenue to Bethany Home RoadPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Bethany Home Road/19th Avenue IntersectionPunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.Bethany Home Road to Montebello AvenuePunch list, train and signal testing• One (1) lane both northbound and southbound 19th Avenue will be maintained.• Turn lanes at signalized intersections will be maintained.