volume 2, issue 1141 march 23rd, 2015 contractor’s …march 23rd, 2015 contractor’s w u eekly...

10
Doug’s Corner VOLUME 2, ISSUE 1141 COURTEOUS RESPONSIVE DEPENDABLE IN THIS ISSUE Doug’s Corner 1-3 Traffic/Active Work 4-5 Construction Notices 6-9 Other Resourses 10 MARCH 23rd, 2015 ONTRACTOR’S C W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1

Upload: others

Post on 20-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

Doug’s Corner

VOLUME 2, ISSUE 1141

COURTEOUS

RESPONSIVE

DEPENDABLE

IN THIS ISSUE

Doug’s Corner1-3

Traffic/Active Work4-5

Construction Notices6-9

Other Resourses10

MARCH 23rd, 2015

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

1

Page 2: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

Doug’s Corner

My Weekin Pictures

facebook.com/doug.ststevens

instagram.com/nwx_phx

ONTRACTOR’SCWU

EEKLYPDATE BETHANY HOME ROAD TO DUNLAP AVENUE

2

Page 3: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

ONTRACTOR’SCWU

EEKLYPDATE

Doug’s Corner

My Weekin Pictures

facebook.com/doug.ststevens

instagram.com/nwx_phx

BETHANY HOME ROAD TO DUNLAP AVENUE

3

Page 4: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

03.23.15

NORTHDunlapAvenue

toOrangewood

Avenue

Dunlap Avenue/19th Avenue IntersectionNo restrictions

Dunlap Avenue to Butler DriveTrack Installation• One (1) lane both northbound and southbound 19th Avenue will be

maintained.

Butler Drive/19th Avenue IntersectionNo restrictions

Butler Drive to Northern AvenueOCS, Paving, Catch Basins, Guideway Curb• One (1) lane both northbound and southbound 19th Avenue will be

maintained.• Turn lanes at signalized intersections will be maintained.

Northern Avenue/19th Avenue IntersectionNo restrictions

Northern Avenue to Orangewood AvenueNo restrictions

4

Page 5: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

ONTRACTOR’SCWU

EEKLYPDATE WORK ACTIVITIES AND TRAFFIC CONTROL

03.23.15

SOUTHOrangewood

Avenueto

MontebelloAvenue

Orangewood Avenue to Glendale AvenueMilling, Grading, Roadway Widening• Orangewood Avenue closed west of 19th Avenue March 13th through

April 10th. SEE MAP PAGE SIX (6)• Northview Avenue closed west of 19th Avenue March 16th through

March 26th SEE MAP PAGE SEVEN (7)• Myrtle Avenue closed west of 19th Avenue March 26th through April

7th SEE MAP PAGE EIGHT (8)

Glendale Avenue/19th Avenue IntersectionDemolition, Roadway Widening, Curb and Gutter, Catch Basin, As-phalt• One (1) lane both northbound and southbound 19th Avenue will be

maintained with no turn restrictions March 16th through April 14th.• One (1) lane both eastbound and westbound Glendale Avenue will be

maintained with turn restrictions March 16th through April 14th. SEE MAP PAGE NINE (9)

Glendale Avenue to Maryland AvenueConstruct Track, Install Conduit, Station Work• One (1) lane both northbound and southbound 19th Avenue will be

maintained.• Turn lanes at signalized intersections will be maintained.

Maryland Avenue to Bethany Home RoadContruct Track, Duct Bank, OCS• One (1) lane both northbound and southbound 19th Avenue will be

maintained.• Turn lanes at signalized intersections will be maintained.

Bethany Home Road/19th Avenue IntersectionNo restrictions

Bethany Home Road to Montebello AvenueGuideway Curb, Duct Bank, OCS• One (1) lane both northbound and southbound 19th Avenue will be

maintained.• Turn lanes at signalized intersections will be maintained. 5

Page 6: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

6

CN

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Orangewood AvenueRoadway, Catch Basin, Curb and Gutter

March 13th through April 10th, 2015

Work Description• Demolition, Road Widening, Grading, Curb Return, Catch

Basins, Sidewalk, Asphalt

Traffic Restrictions• Road closed at Orangewood Avenue west of 19th Avenue• Gardenia Avenue and Morten Avenue will remain open• Use 21st Avenue as alternate access to Orangewood

Avenue

ONSTRUCTIONOTICE

GARDENIA AVENUE

19TH

AVENUE

WORK

ZONE

19TH

AVENUE

21ST

AVENUE

ORANGEWOOD AVE.

MORTEN AVENUE

21ST

AVENUE

Page 7: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

7

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Northview AvenueRoadway and Utility Work

March 16th through March 26th, 2015

Work Description• Demolition, Road Widening, Grading, Curb Return, Catch

Basin

Traffic Restrictions• Road closed at Northview Avenue west of 19th Avenue• Gardenia Drive and Myrtle Avenue will remain open• Use 21st Avenue as alternate access to Northview Ave-

nue

ONSTRUCTIONOTICE

CN

Page 8: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

8

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Myrtle AvenueRoadway and Utility Work

March 26th through April 7th, 2015

Work Description• Demolition, Road Widening, Grading, Curb Return, Catch

Basin

Traffic Restrictions• Road closed at Myrtle Avenue west of 19th Avenue• Glendale Ave and Northview Avenue will remain open• Use 21st Avenue as alternate access to Myrtle Avenue• Myrtle Avenue and Northview Avenue will not close simul-

taneously

MYRTLE AVE.

GLENDALE AVE.

19TH

AVENUE

WORK

ZONE

19TH

AVENUE

21ST

AVE

NORTHVIEW AVE.

ONSTRUCTIONOTICE

CN

Page 9: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

9

QUESTIONS?VALLEY METROCommunity OutreachCoordinators

Carla Kahn (623) 261.2605Lisa Saldin (602) 495.8213

SSWJVCommunity OutreachSuperintendents

Mike Howard (602) 619.5813Ryan Clark (480) 271.4117

24/7 Project Hotline602.254.RAIL (7245)

STAY CONNECTED

Construction dates and restrictions are subject to change. For the latest infor-mation, visit the project web-site at:

valleymetro.org/northwest

facebook.com/valleymetro

Glendale AvenueRoadway and Utility Work

March 16th through April 14th, 2015Work Description• Demolition, Road Widening, Grading, Curb Return, Catch

Basin, Driveways, Paving

Traffic Restrictions• One lane both eastbound and westbound Glendale Ave-

nue at 19th Avenue intersection• No left turn from eastbound Glendale Avenue to north-

bound 19th Avenue from March 16th through April 14th• No left turn from westbound Glendale Avenue to south-

bound 19th Avenue from March 16th through April 14th

ONSTRUCTIONOTICE

CN

Page 10: VOLUME 2, ISSUE 1141 MARCH 23rd, 2015 CONTRACTOR’S …MARCH 23rd, 2015 CONTRACTOR’S W U EEKLY PDATE BETHANY HOME ROAD TO DUNLAP AVENUE 1. Doug’s Corner ... AV E NU E WO R K Z

ONTRACTOR’SCWU

EEKLYPDATE OTHER RESOURCESNorthwest Extension Appfor iPHONE and Android

10