vol-ii_stack yard area

183
FINAL GEOT ECH NICA L INVESTIGATION REPOR T (NOV EMBER 2012) PROPOSED INSTALLATION OF MECHANICAL HANDLING FACILITIES  AT EAST QUAY- 7 (EQ-7) BERTH IN THE INNER HARBOUR OF VISAKHAPATNAM PORT TRUST FOR VIZAG AGRIPORT PVT. L TD. (VOLUM E-II ST ACK YARD AREA) Table of Contents Item Page 1.0 INTRODUCTION 1 2.0 PROJECT DESCRIPTON 2 3.0 SCOPE OF WORK 2 4.0 SUBSURFACE CONDITIONS 4 4.1 Ground Water Levels 6 5.0 ENGINEERING RECOMMENDATIONS 7 5.1 Foundation Protection 9 6.0 METHODOLOGY OF INVESTI GATION 10  Reference & Calculations 12  ANNEXURES   A) Loca tion Plan of Bo rehol es B) Bore ho le Logs C) Laborat ory Test Results

Upload: jibeesh01

Post on 02-Jun-2018

219 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 1/183

FINAL GEOTECHNICAL INVESTIGATION REPORT (NOVEMBER 2012)PROPOSED INSTALLATION OF MECHANICAL HANDLING FACILITIES

AT EAST QUAY-7 (EQ-7) BERTH IN THE INNER HARBOUROF VISAKHAPATNAM PORT TRUST

FOR VIZAG AGRIPORT PVT. LTD.

(VOLUME-II STACK YARD AREA)

Table of Contents

Item Page

1.0 INTRODUCTION 1

2.0 PROJECT DESCRIPTON 2

3.0 SCOPE OF WORK 2

4.0 SUBSURFACE CONDITIONS 4

4.1 Ground Water Levels 6

5.0 ENGINEERING RECOMMENDATIONS 7

5.1 Foundation Protection 9

6.0 METHODOLOGY OF INVESTIGATION 10

Reference & Calculations 12

ANNEXURES

A) Location Plan of BoreholesB) Borehole LogsC) Laboratory Test Results

Page 2: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 2/183

FINAL GEOTECHNICAL INVESTIGATION REPORT (NOVEMBER 2012)

PROPOSED INSTALLATION OF MECHANICAL HANDLING FACILITIES AT EAST QUAY-7 (EQ-7) BERTH IN THE INNER HARBOUR

OF VISAKHAPATNAM PORT TRUSTFOR VIZAG AGRIPORT PVT. LTD.

(VOLUME-II STACK YARD AREA)

1.0 INTRODUCTION

Visakhapatnam Port Trust (VPT) has awarded Installation of Mechanized Fertilizer

Handling Facilities at East Quay-7 (EQ7) in the Inner Harbour of Visakhapatnam Port on

Design, Build, Finance, Operate, Transfer (the “DBFOT”) basis to M/s. Vizag Agriport Pvt.

Ltd. (VAPL).

VAPL awarded the work of geotechnical investigation and topographic survey to DBM

Geotechnics and Constructions Pvt. Ltd. Vide work order No. VAPL/DBM/geo-

tech/VSP/2012/01 dated 29 th may 2012. The field work and laboratory testing for the

geotechnical investigation was completed by DBM Geotechnics in November 2012. This

Volume-II of report presents the results of geotechnical investigation along with the

foundation Engineering recommendation for the Stack Yard Area .

Page 3: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 3/183

2

2.0 PROJECT DESCRIPTION

The existing EQ-7 berth is 255m long for handling fertilizers, dry bulk cargo. The proposed

facilities will include, mechanization such as conveyor system, storage facilities, bagging

plant all the connected civil, mechanical and electrical works. The system shall be designed

for the unloading of fertilizer at the rate of 25,000 TPD. The optimal annual quay capacity of

EQ7 is estimated to be 7.0 million. The system shall consist mainly of (a) Unloading and

Stacking System and (b) Reclaiming, Bagging and Wagon Loading System, etc. The

existing ground surface elevations are between (+)2.70m to (+)4.00m with respect to chart

datum.

3.0 SCOPE OF WORK

The scope of work completed at this site is summarized below:

a) Completing Thirty one boreholes (BH-1 to BH-5, BH-8, BH-10 to BH-12, BH-14,BH-15, BH-18 to BH-21, BH-23, BH-24, BH-26, BH-28, BH-29, BH-31, BH-32A,BH-33 and BH-N1 to BH-N8) in Stack yard area.

b) Conducting in-situ tests such as Standard Penetration Test (SPT) at specifieddepths.

c) Obtaining Undisturbed Soil Samples (UDS) in cohesive soils.

d) Conducting eleven Field Vane Shear Test (FVST) in selected boreholes.

e) Conducting laboratory tests on disturbed (SPT) and Undisturbed soil and rocksamples.

f) Preparing and submitting a geotechnical investigation report.

Page 4: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 4/183

3

g) Topography survey for proposed berth alignment, backup area and stack yard.

Completed borehole co-ordinates, and reduced levels (RL) with respect to Chart

Datum (CD) are summarized in Table A1 below.

TABLE A1BOREHOLE COORDINATES AND ELEVATIONS

BH. NoCO-ORDINATES GROUND

R.L.TERMINATION

DEPTH,BGLTERMINATION

LEVELNORTHING EASTING (m) (m) (m)

BH-1 1960170.557 742490.025 (+)2.723 9.30 (-)6.577BH-2 1960178.833 742548.89 (+)2.716 10.00 (-)7.284BH-3 1960191.293 742621.645 (+)2.961 11.20 (-)8.239BH-4 1960204.398 742692.798 (+)2.851 9.20 (-)6.349BH-5 1960226.557 742786.083 (+)3.172 9.70 (-)6.528BH-8 1960153.858 742636.337 (+)2.506 14.50 (-)11.994

BH-10 1960190.307 742781.307 (+)2.756 13.00 (-)10.244BH-11 1960217.195 742837.117 (+)2.854 14.78 (-)11.926BH-12 1960092.395 742631.144 (+)2.801 14.50 (-)11.699BH-14 1960123.496 742735.68 (+)2.455 13.60 (-)11.145BH-15 1960128.703 742814.601 (+)2.957 19.80 (-)16.843BH-18 1960042.027 742778.714 (+)2.752 18.15 (-)15.398BH-19 1960068.066 742850.323 (+)2.922 14.85 (-)11.928BH-20 1960061.146 742946.34 (+)3.304 13.08 (-)9.776BH-21 1959993.045 742856.859 (+)2.739 17.50 (-)14.761BH-23 1960009.016 742957.088 (+)4.010 15.35 (-)11.340BH-24 1959944.414 742971.158 (+)3.189 16.75 (-)13.561BH-26 1960147.554 742971.466 (+)3.463 12.10 (-)8.637BH-28 1960128.52 743078.659 (+)3.360 8.10 (-)4.740BH-29 1960096.854 742982.144 (+)3.713 9.00 (-)5.287BH-31 1960062.908 743108.691 (+)3.705 9.60 (-)5.895BH-32 1960049.003 743038.329 (+)3.511 13.08 (-)9.569

BH-33 1960021.933 743086.241 (+)3.598 9.60 (-)6.002BH-N1 1960307.729 742966.519 (+)3.610 25.50 (-)21.890BH-N2 1960269.345 742988.127 (+)3.474 27.00 (-)23.526BH-N3 1960272.336 742901.831 (+)3.700 26.00 (-)22.300BH-N4 1960203.424 742928.076 (+)3.600 13.50 (-)9.400BH-N5 1960200.620 742988.790 (+)3.683 11.00 (-)7.317BH-N6 1960201.370 743050.820 (+)3.745 9.00 (-)5.255BH-N7 1959964.655 743069.021 (+)3.485 15.0 (-)11.515BH-N8 1959867.214 743184.218 (+)3.550 13.5 (-)9.950

Page 5: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 5/183

4

4.0 SUBSURFACE CONDITIONS

Subsurface profile generally consists of fill overlying marine deposits underlain by completely

weathered rock and then bedrock. Encountered soil/rock layers are described in detail

below;

LAYER I: FILL

Fill soils, consisting mostly of dark grayish or reddish brown silty clay/sand with boulders,

were encountered at the ground surface. Based on Standard Penetration Tests (SPT),

relative densities of the granular soils (sand) within this layer, ranged between Loose to

dense. The thickness of this layer was typically between 1.50m and 4.50m.

LAYER II: MARINE DEPOSITS

Marine deposits consisting mostly of marine clay and silty sand were encountered at depths

between 1.50m and 4.50m below existing ground surface. Based on SPT tests conducted in

the field and Triaxial Tests conducted on UDS samples in the laboratory, consistencies of

the cohesive soils (clay), ranged typically between very soft to Very stiff generally improving

with the depth. Relative densities of granular soils (sand) within this layer, ranged between

loose to dense. The lower boundary of the marine deposits layer was encountered at depths

between 4.50m and 15.00m below existing ground surface.

Page 6: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 6/183

5

LAYER III: COMPLETELY WEATHERED BEDROCK

Completely weathered bedrock was encountered at depths between 4.5m and 15.0m

below existing ground surface in boreholes BH-14, BH-15, BH-21, BH-32A, and BH-N1,

BH-N2 and BH-N3 only. This completely weathered rock layer was not encountered in the

remaining boreholes. This layer is formed by the complete in-place disintegration of parent

bedrock material, but still partially retains the original rock mass structure. SPT tests

encountered refusals. Core recoveries are less than 10 percent and Rock Quality

Designations (RQDs) were typically nil. Borehole BH-N3 was terminated in this completely

weathered rock at a depth of 26.0m below ground surface. The lower boundary of this

layer was encountered typically at depths between 4.50 and 18.00m below existing ground

surface.

LAYER IV: KHONDALITE BEDROCK

Khondalite bedrock was encountered at depths between 4.50m and 18.00m below existing

ground surface. The bedrock was highly weathered to sound. Core recoveries ranged

between 11 and 96 percent, while Rock Quality Designations (RQDs) ranged between 0 and

91 percent typically improving with the depth. Rock compressive strengths ranged between

379 kg/cm 2 and 1255 kg/cm 2. The boreholes were terminated in hard bedrock at depths

between 8.10m to 27.00m below existing ground surface.

Page 7: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 7/183

6

4.1 Ground water Levels

Water heights at borehole locations were monitored during and after completion of drilling

activities. Groundwater was encountered at depths between 0.5m and 2.6m below ground

surface in boreholes. Significant tidal fluctuations were measured at each borehole location.

Annual and seasonal fluctuations in water levels can be expected to occur.

Page 8: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 8/183

7

5.0 ENGINEERING RECOMMENDATIONS

Soils encountered within stack yard area are not capable of providing adequate support

for the proposed loading of 5 t/m 2. Hence, ground improvement with band drains and

preloading or stone columns should be implemented at this site. Design of the ground

improvement system is not in current scope of work. However, based on our general

experience, Band drains will be spaced at 1.0m center to center in a triangular pattern and

will be completed to completely weathered rock. Pre-drilling may be required within the top

4.00m granular fill soils in some locations. A minimum 0.30m thick layer of sand blanket

should also be provided at existing ground surface.

Temporary preloading soil Fill corresponding to final design loads should be placed. A

consolidation period of upto 6 months may be required.

Proposed warehouse should be supported on bored cast-in-situ piles socketed in bedrock.

Piles should be socketed 1.5D in bedrock. Bedrock was encountered at depths between

4.50m and 18.00m below ground surface. Corresponding pile capacities are given in Table

D below. Piles can be terminated earlier if hard bedrock is encountered, which makes it

practically impossible for piling equipment to penetrate further.

Page 9: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 9/183

8

TABLE D (Except Borehole BH-28, BH-N2 and BH-N3)

Safe Vertical Downward & Lateral Capacity of Piles

PileDiameter, D

(mm)

Safe VerticalDownward

Capacity (MT)

Safe UpliftCapacity

(MT)

Safe LateralCapacity (MT)

500 115 30 3.5600 165 45 4.0750 260 70 5.0

Maximum total settlement of piles installed as described above will be less than 12mm.

Maximum Depth of fixity can be taken as 13.0D (D is pile diameter ) below pile cap or 1D in

bedrock whichever is less.

Page 10: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 10/183

9

5.1 Foundation Protection

Results of chemical analysis on soil and groundwater samples are enclosed in the

Annexure. Results of the soil samples fall under Class 3 for sulphate and class 5 for chloride

concentration. Results of the water samples fall under Class 2 for sulphate and chloride

concentration (As per IS456 and as per CIRIA Sp. Publication No. 31). A ‘very severe’

Exposure Condition was assigned to this site. Therefore following precautions are

recommended to protect subsurface concrete and reinforcement.

Type of Cement: OPC or PPC

Minimum Grade of Reinforced Concrete: M35

Minimum Cement Content for piles: 400 kg/m 3

Maximum Water Cement Ratio: 0.40

Minimum Cover to Reinforcement: 75mm

Page 11: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 11/183

10

6.0 METHODOLOGY OF INVESTIGATION

a) The sub-surface investigation was completed generally as per IS: 1892-1979. The

field investigation was carried out using rotary drilling machines. Casing was used to

support sides of borehole until sufficiently stiff strata was encountered.

b) Standard Penetration Tests (i.e. SPT) were carried out generally at an interval of

1.5m in the boreholes as per IS: 2131. Using this procedure, a 5cm outside

diameter split-barrel sampler is driven into the soil by a 63.50 kg. weight falling

75cm. After an initial set of 15cm, the number of blows required to drive the sampler

an additional 30, is known as the “penetration resistance” or “N value”. N values

obtained in field are shown on borehole logs enclosed in the Annexure.

c) In soil, drilling was progressed with Tungsten Carbide (T.C.) bit, while in rock it was

continued with diamond bit and double tube core barrel to obtain good quality rock

samples. In rock strata, length of rock core recovered from each run of drilling was

measured and recorded in the borelogs as percentage of Core Recovery (CR) and

Rock Quality Designation (RQD). Ratio of total length of rock pieces to the length

drilled expressed as percentage is known as Core Recovery. Ratio of total length of

rock pieces which are 100mm or longer to the total length drilled, expressed as

percentage is known as RQD. All core pieces obtained were serially numbered and

preserved in core boxes.

Page 12: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 12/183

11

d) Laboratory tests were carried out on disturbed and UDS samples obtained from

boreholes. Laboratory tests were conducted as per relevant parts of IS:2720.

Laboratory tests on disturbed samples included grain size analysis and Atterberg

Limits. Additional laboratory tests consisting of unconfined compression tests and

triaxial tests were conducted on UDS samples. Laboratory tests on rock core

samples included unit weight, water absorption test, porosity, and Uniaxial

Compressive Strength.

Sincerely,

DBM GEOTECHNICS AND CONSTRUCTION PVT. LTD.

__________________________________Jaydeep WaghB.E., M.S., P.E. (Geotechnical)

Page 13: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 13/183

12

REFERENCES

1) Foundation Analysis and Design, J.E. Bowles, McGraw Hill Publication, 5 th Edition, 1996.

2) Canadian Foundation Engineering Manual.

3) Pile Design and Construction Practice, M. J. Tomlinson, Viewpoint Publications, 1992.

4) IS6403-1981: Code of Practice for Design of Shallow Foundations on Soils.

5) Foundation Design Manual, N. V. Nayak, 5 th Edition, 1996

6) Bored Piling in Mumbai Region, K. R. Datye, IGC 1990.

7) IS14593: Design and Construction of Bored Cast-in-Situ Piles Founded On Rocks-Guidelines.

Page 14: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 14/183

13

1. SAMPLE CALCULATION OF ALLOWABLE VERTICAL CAPACITY OF 600mm

DIA. PILES SOCKETED 1.5D BEDROCK : IS- 14593 Method

A) SKIN FRICTION CAPACITY IN BEDROCK:

Safe Skin Friction Capacity = Q sf = Q c x α x β x (πxDxL s ) [From Reference 7]Where ,Q c = uniaxial compressive strength of rock = 3790 T/m 2

α = Rock socket side resistance reduction factor = 0. 1 for Q c of 3790 T/m 2

β = Rock socket correction factor = 0.2D = Diameter of pile = 0.6mLs= Socket length into the rock = 0.9m

Q sf = (3790 x 0.1 x 0.2) x (3.142 x 0.6 x 0.9) = 128 MT

B) END BEARING CAPACITY IN BEDROCK:

Safe load carrying capacity = Q eb =Ap x q cxNØxN j (Reference 7)Where,Q c = uni-axial compressive strength of rock = 3790T/m2NØ= Depth factor = 0.8+0.2(l s /d) = 1.1 for 1.5D rock socketing bedrock

Ap= Area of pile toe = 0.282m 2

N j = 0.1 to 0.4 (adopted as 0.1 for weathered rock)Q eb = 3790 x 1.1 x 0.1 x 0.282 = 117 MT

THEREFORE, TOTAL PILE CAPACITY = 128 + 117 = 245 MTCorresponding to pressure in the pile shaft = 866 t/m 2

However, pressure in the pile shaft is restricted to 600 t/m 2

Therefore, Safe pile capacity = 600 t/m 2 x (C/s Area of Pile) = 169 MT

2. SAMPLE CALCULATION OF UPLIFT CAPACITY OF PILES SOCKETEDMINIMUM 1.0D INTO BEDROCK

Downward skin friction restricted to 60 t/m 2

Therefore allowable uplift capacity of pile= 2/3 rd of downward skin friction capacity

= 40 t/m 2

Therefore for 0.6m socketing = 3.1415x0.6x0.6x40= 45 MT

Page 15: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 15/183

14

3. CALCULATION OF LATERAL CAPACITY OF PILE (1200mm Dia.)

Reference: Appendix-C (Revised) of IS 2911 (Part 1/Sec. 2) - 1979.

For soft clay As per Table 2 of Reference mentioned above,

Constant K 2 = 7.75 kg/cm 2

For long and flexible pile, depth of fixity ,

Where,

E = Modulus of Elasticity of pile material = 2.95 x 10 5 kg/cm 2 for concrete M35

I = Moment of Inertia = D4/64 cm 2 (D is pile diameter in cm)

Therefore,

4

45

75.764

1095.2

x

D x x R

R = 6.5 D (D is pile diameter in cm)

Unsupported length of pile, L 1 = 0.0cm

Therefore, L 1/R = 0.0

For fixed head pile and L 1/R = 0.0, L f /R = 2.2

Therefore, length of fixity,

Lf = 2.2 x R = 14.3 (where D is pile diameter in cm)

For fixed head pile, allowable lateral load, Q a corresponding to a deflection Y, 1% ofPile diameter as per IRC-78 = 1.2 cm,

Q a = 12 EIY/( L 1 + Lf )3 = (12 x 2.95 x 10 5 x D4 x 1.2)/[64x(14.3D) 3]

Q a = 71.3(D) kg. = 0.071D MT (where D is pile diameter in cm)

R EI

K 2

4

Page 16: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 16/183

DBM

ANNEXUREANNEXUREANNEXUREANNEXURE

Page 17: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 17/183

DBM

LOCATION PLANLOCATION PLANLOCATION PLANLOCATION PLAN

Page 18: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 18/183

Page 19: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 19/183

DBM

BORE HOLE LOGSBORE HOLE LOGSBORE HOLE LOGSBORE HOLE LOGS

Page 20: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 20/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 5.20m BGL.

1 OF 1:SHEET NO.BH-01:BORE HOLE NO.

0.55m Below GL2.723m

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASINGMETHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 9.30m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :

6.00/

9.30m Below GL.:BOREHOLE DEPTH

9.00

Highly weathered

Fill

09/06/2012 TO 11/06/2012

0.00

Soft grey,marine CLAY

(Reddish silty SAND)

fine grained, greyish

1.50/2.10 SPT1 03/02/02/02(04)

3.50 UDS1

4.50/5.10

SPT201/01/02/02

(03)

6.23SPT3

11/52/--(R)

7.50

8.50

9.30

Soft CLAY withROCK fragments

pink KHONDALITE

150mmØ

NX

0.50

DS1

Soft grey,marine CLAY,with gravels

Moderately weathered,greyish pink,KHONDALITE

Stackyard Area

R . L .

( m )

Berth in the inner harbour of Visakhapatnam Port Trust.

--00 09CH 34 57 79 33 46

--12 27CI 25 36 47 22 25

73.2802 21CH 32 45 98 37 61 0.113.89

--

--

N 1960170.557, E 742490.025

Page 21: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 21/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 4.00m BGL.

1 OF 1:SHEET NO.BH-02:BORE HOLE NO.

Stackyard AreaN 1960178.833, E 742548.89

1.05m Below GL

2.716m

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 10.00m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Mithun

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

10.00m Below GL:BOREHOLE DEPTH

9.00

Slightly weathered,

09/06/2012 TO 11/06/2012

0.00

Soft greyish,marine CLAY

greyish pink

1.50/2.10 SPT1 07/07/05/05

(12)

3.50 UDS1

4.50/5.10

SPT201/02/02/02

(04)

6.30

SPT316/52/--

(R)

7.50

10.00

KHONDALITE

150mmØ

Highly weathered,greyish pink,KHONDALITE

Blackish brown,silty SAND with gravels

0.50 DS1

R . L .

( m )

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

Fill

(Brownish silty SANDwith boulders)

-- -- --23 47 30SM -- --

Medium dense,

Greyish clayey,SAND with gravels

38.1811 49SC 20 20 36 22 14 0.0823.98

--00 15CH 34 51 81 30 51 --

379

98.39

Page 22: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 22/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 7.50m BGL.

1 OF 2:SHEET NO.BH-03:BORE HOLE NO.

Stackyard Area

N 1960191.293, E 742621.645

1.15m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

::

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

11.20m Below GL.:BOREHOLE DEPTH

9.20

09/06/2012 TO 11/06/2012

1.50/2.10 SPT1 04/06/06/08

(12)

3.60

4.50/5.00

6.60

SPT47.50

150mmØ

NX

Soft grey,marine CLAY.

0.00/0.50

DS1

SPT201/02/02/02

(04)

8.10 02/04/06/21(10)

UDS1

Fill(Reddish silty SAND

with boulders)

2.961m

SPT302/02/02/03

(04)

8.20

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Stiff greyish brown,marine CLAY

Moderately weathered,greyish pink,

KHONDALITEfine grained,

77.7900 01CH 32 67 122 40 82 0.084.36

--00 08CH 29 63 76 33 43 --

--01 11CH 28 60 71 28 43 --

703

Page 23: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 23/183

ABBREVIATIONS :

11.00

10.50

S A M P L E &

I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P

T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-03:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 11.20m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

Moderately weathered,greyish pink,

KHONDALITEfine grained,

NX

Page 24: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 24/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.65m & NX Ø Upto 4.50m BGL.

1 OF 1:SHEET NO.BH-04:BORE HOLE NO.

Stackyard Area

N 1960204.398, E 742692.798

0.85m Below GL2.851m

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS A ND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 9.20m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Mithun

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

9.20m Below GL:BOREHOLE DEPTH

9.20

09/06/2012 TO 11/06/2012

Grey marine CLAY

1.50/2.10 SPT1 05/07/07/08(14)

3.60

UDS14.50/5.00

6.18 SPT312/52/--

(R)

7.70

150mmØ

Fresh, greyish pink,fine grained,KHONDALITE

Medium dense,brownish grey,silty SAND

0.00/0.50

DS1

SPT203/03/03/03

(06)

6.20

with gravels

blackish grey,marine CLAY

VIZAG AGRIPORT PVT.LTD.

Geotechnical Invest igation Work for the Proposed Installat ion of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

NX

Fill

(Reddish silty SAND)with gravels)

Medium stiff,

703

85.7001 02CH 32 65 124 41 83 0.044.0

--15 33CI 25 27 44 21 23 --

--00 13CH 29 58 75 31 44 --

Page 25: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 25/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.30m & NX Ø Upto 5.70m BGL.

1 OF 1:SHEET NO.BH-05:BORE HOLE NO.

Stackyard Area

N 1960226.557, E 742786.083

0.95m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE NO:5 IS TERMINATED AT DEPTH OF 9.70m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

9.70m Below GL.:BOREHOLE DEPTH

8.70

12/06/2012 TO 14/06/2012

marine 'CLAY' withwith sea-shells.

1.50/2.10 SPT1 04/09/06/06(15)

3.60

4.50/5.10

6.50

52/--/--(R)

7.70

150mmØ

NX

Highly weathered,brownish grey,

Medium dense,brownish grey,silty SAND

0.00/0.50

DS1

SPT205/07/05/06

(12)

with gravels

9.70

Greyish pink highlyweatheredKHONDALITE.

KHONDALITE.fine grained,

SPT302/02/02/02

(04)

UDS1

6.70/6.73

SPT4

Soft grey,

3.172m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

--40 52SP -- -- -- --

--02 12 34 52 82 29 51 --

59.3600 12CH 27 61 97 33 64 0.194.12

578

08

(Brownish silty SANDwith gravels & boulders)

SM

CH

Fill

Page 26: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 26/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.10m & NX Ø Upto10.50m BGL.

1 OF 2:SHEET NO.BH-08:BORE HOLE NO.

Stackyard AreaN 1960153.858, E 742636.337

0.70m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.GROUND R. L.

:::

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

14.50m Below GL.:BOREHOLE DEPTH

9.00/

14/06/2012 TO 15/06/2012

1.50/2.10 SPT1 03/07/52/--(R)

3.60

SPT3

4.50/

6.60

UDS27.50/

150mmØ

Soft grey,marine CLAY.

0.00/0.50

DS1

SPT201/02/01/02

(03)

9.60

8.00

01/02/02/02(04)

02/02/03/04(05)SPT4

UDS1

2.506m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

(Reddish silty SANDwith gravels & boulders)

Medium stiff greyish,marine CLAY.

--00 19CI 39 42 48 22 26

71.2600 10CH 26 64 111 34 77 0.132.86

68.1302 17CH 31 50 105 35 70 0.124.57

--

5.00

Page 27: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 27/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D

E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-08:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 14.50m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Highly weathered,greyish pink,KHONDALITE

10.50/11.10 09/14/18/22

(32)SPT5

13.50

14.50

12.10

Loose,greyish,cleyeySAND with gravels

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

11.10

150mmØ

NX

23.66

--14 39SC 20 27 36 20 16 --

Medium stiff greyish,marine CLAY.

Page 28: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 28/183

Page 29: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 29/183

ABBREVIATIONS :

11.00

10.50

S A M P L E &

I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-10:BORE HOLE NO.

L O G

D I A O F B O

R E H O L E

D E P T H B E

L O W

B G L

( m

)

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 13.00m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S

%

S I L T %

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

Highly weathered,greyish pink,fine grained,KHONDALITE

Moderately weathered,greyish pink,fine grained,

KHONDALITE

Page 30: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 30/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATACONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.5m & NX Ø Upto9.50m BGL.

1 OF 2:SHEET NO.BH-11:BORE HOLE NO.

N 1960217.195, E 742837.117

2.20m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

14.78m Below GL.:BOREHOLE DEPTH

9.00

(Blackish back filling

22/06/2012 TO 24/06/2012

materials

1.50/2.10 SPT1 03/04/04/05

(08)

3.60

UDS14.50/5.10

6.60

SPT47.50

150mmØ

Soft to medium stiff,marine CLAY

with Boulders)

0.00/0.50

DS1

SPT201/02/02/02

(04)

9.60

8.10

02/02/03/03(05)

02/03/03/04(06)

02/03/04/04(07)SPT5

SPT3

Loose greyish,silty SAND

2.854m

4.00/ VST1

VIZAG AGRIPORT PVT.LTD.

Geotechnical Invest igation Work for the P roposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

--00 18CH 32 50 69 30 39 --

--00 12CH 30 58 72 29 43 --

--23 50SM -- -- -- --27

Stackyard Area

Page 31: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 31/183

ABBREVIATIONS :

11.00

10.50

S A M P L E &

I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-11:BORE HOLE NO.

L O G

D I A O F B O

R E H O L E

D E P T H B E L O W

B G L

( m

)

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS A ND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 14.78m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C

A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

16/52(R)

SPT6

Geotechnical Invest igation Work for the P roposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

150mmØ

Highly weathered,greyish pink,KHONDALITE

NX

Page 32: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 32/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 9.50m BGL.

1 OF 2:SHEET NO.BH-12:BORE HOLE NO.

Stackyard Area

N 1960092.395, E 742631.144

0.95m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

14.50m Below GL.:BOREHOLE DEPTH

9.00/

12/06/2012 TO 15/06/2012

1.50/2.10 SPT1 03/05/06/06(11)

3.60

UDS14.50/5.00

6.50

SPT47.50/

150mmØ

Soft grey,marine CLAY.

0.00/0.50

DS1

SPT201/02/02/03

(04)

9.50

8.10

02/02/03/03(05)

02/03/03/04(06)

UDS2

SPT3

2.801m

Medium densebrownish grey,silty SAND with gravels

Geotechnical Invest igation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

Fill

(Reddish silty SAND)with gravels & boulders)

R . L .

( m )

Medium stiff grey,marine CLAY.

77.3501 05CH 30 65 116 43 73 0.114.11

--00 09CH 29 62 93 38 55 --

90.0300 14CH 25 61 101 41 60

--00 04CH 30 66 75 33 42 --

--

Page 33: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 33/183

ABBREVIATIONS :

11.00

10.50

S A M P L E &

I N - S

I T U

S A M P L E T Y

P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P

T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-12:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 14.50m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Moderately weathered,greyish pink,KHONDALITE

Soft greyish brown,

SPT510.50/11.10 01/01/02/02

(03)

SPT612.00/12.28 14/52/--/--

(R)

150mmØ

14.50

13.50

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

NX12.28

marine CLAY

Moderately weathered,brownish pink,fine grained,KHONDALITE

66.65

Page 34: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 34/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.40m & NX Ø Upto 8.50m BGL.

1 OF 2:SHEET NO.BH-14:BORE HOLE NO.

N 1960123.496, E 742735.68

0.80m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

13.60m Below GL.:BOREHOLE DEPTH

9.00/

Blackish brown color

22/06/2012 TO 24/06/2012

1.50/2.10 SPT1 07/08/10/08(18)

3.60

UDS1

4.50/5.10

6.50

SPT47.50/

150mmØ

Medium stiff greyish,marine CLAY

with Boulders.

0.00/0.50

DS1

SPT201/02/02/02

(04)

9.60

8.10

01/02/03/04(05)

02/02/03/03(05)

02/04/04/08(08)SPT5

SPT3

2.455m

4.00/

7.00

VST1

VST2

back fil ling materials

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

R . L .

( m )

Fill(Reddish silty SAND)

--02 36CH 25 36 65 24 41 --

--01 30CH 29 40 63 26 37 --

--01 22CH 31 46 66 27 39 --

Stackyard Area

Page 35: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 35/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-14:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 13.60m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Moderately weathered,grayish pink,KHONDALITE

Highly weathered,brown yellow,KHONDALITE

SPT6 52/--/--/--(R)

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

150mmØ 10.50/

10.60

12.10

13.60

Page 36: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 36/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.30m & NX Ø Upto 11.50m BGL.

1 OF 2:SHEET NO.BH-15:BORE HOLE NO.

N 1960128.703, E 742814.601

1.05m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

19.80m Below GL.:BOREHOLE DEPTH

9.00/

(Brown back filling

19/06/2012 TO 22/06/2012

silty SAND

1.50/2.10 SPT1 03/05/07/08(12)

3.60

UDS14.50/5.00

6.60

SPT47.50/

150mmØ

Soft to medium stiff,

marine CLAY

with Boulders)

0.00/0.50

DS1

SPT201/02/02/02

(04)

9.60

8.10

01/02/03/03(05)

02/03/03/03(06)

02/03/03/04(06)SPT5

SPT3

2.957m

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

R . L .

( m )

Fill

--03 22CH 30 49 68 29 39 --

--09 14CH 29 48 70 30 40 --

Stackyard Area

Page 37: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 37/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-15:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 19.80m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

VIZAG AGRIPORT PVT.LTD.

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Completely weathered,pink KHONDALITE

KHONDALITE

Highly weathered ,

Medium stiff greyish, marine CLAYwith sea-shells.

10.5011.10

12.0012.60

13.0013.10

13.60

14.6014.70

15.6015.68

16.6816.80

17.80

18.80

19.80

51/--/--/--(R)

51/--/--/--(R)

52/--/--/--(R)

52/--/--/--(R)

SPT6

SPT7

SPT8

SPT9

SPT10

SPT11

02/02/04/06(06)

04/07/11/13(18)

greyish pink,

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

150mmØ

NX

KHONDALITE

Highly weathered ,greyish pink,

Page 38: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 38/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.10m & NX Ø Upto 11.75m BGL.

1 OF 2:SHEET NO.BH-18:BORE HOLE NO.

Stackyard AreaN 1960042.027, E 742778.714

1.80m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.GROUND R. L.

::

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

18.15m Below GL.:BOREHOLE DEPTH

9.00/

16/06/2012 TO 19/06/2012

1.502.10 SPT1 06/08/10/12(18)

3.60

4.50/5.00

6.60

SPT47.50/

150mmØ

Soft grey,marine CLAY.

0.00/0.50

DS1

SPT201/02/02/02

(04)

9.50

8.10

01/01/02/02(03)

01/02/02/02(04)

UDS2

2.752m

UDS1

SPT3

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

R . L .

( m )

(Brownish silty SANDwith gravels & boulders)

Fill

Medium dense,reddish,siltySAND with gravels

--00 24 21 55 64 28 36CH

80.3700 21 25 54 110 40 70CH 0.093.71

71.9600 05 28 67 116 43 73CH 0.104.57

--

Page 39: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 39/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-18:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 18.15m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

13.50/

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Medium dense,grey clayey,SAND

14.10

15.00

16.65

17.40

15.13

18.15

Highly weathered,grayish pink,KHONDALITE

SPT5

SPT6

SPT7 02/04/05/07(09)

01/01/02/02(03)

01/01/02/02(03)

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

12.00/

12.60

10.50/

11.10

SPT7 02/04/05/07(09)

SPT8 52/--/--/--(R)

48.01

--01 55 20 24 44 21 23 --SC

150mmØ

Soft grey,marine CLAY.

Page 40: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 40/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 9.50m BGL.

1 OF 2:SHEET NO.BH-19:BORE HOLE NO.

Stackyard Area

N 1960068.066, E 742850.323

0.50m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

14.85m Below GL.:BOREHOLE DEPTH

9.00/

16/06/2012 TO 18/06/2012

1.50/2.10

SPT106/06/05/07

(11)

3.60

4.50/5.00

6.60

SPT47.50/

150mmØ

Soft to medium stiff,grey,marine CLAY.

0.000.50

DS1

SPT201/02/03/04

(05)

9.60

8.10

03/03/05/06(08)

02/02/02/03(04)

SPT5

Stiff blackish grey,marine CLAY.

2.922m

UDS1

SPT3

02/03/03/03(06)

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

R . L .

( m )

(Reddish silty SANDwith gravels & boulders)

Fill

--01 12 30 57 61 27 34CH

50.9201 19 29 51 84 35 49CH 0.224.34

--

--00 12 32 56 63 22 41CH --

Page 41: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 41/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-19:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 14.85m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

12.85

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

KHONDALITE

fine grained,

SPT6

13.85

14.85

KHONDALITE

14/32/52(R)

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

10.50/10.85

11.85

150mmØ

Highly weathered,greyish pink,

Highly Weathered,brownish grey,

35.54

Soft to medium stiff,grey,marine CLAY.

Page 42: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 42/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.25m & NX Ø Upto8.00m BGL.

1 OF 2:SHEET NO.BH- 20:BORE HOLE NO.

N 1960061.146, E 742946.34

1.80m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.

GROUND R. L.

:::

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

13.08m Below GL.:BOREHOLE DEPTH

9.00/

(Blackish back filling

23/06/2012 TO 25/06/2012

materials with Boulders)

1.50/2.10 SPT1 05/08/09/12(17)

3.60

UDS14.50/5.00

6.50

SPT47.50/

150mmØ

0.00/0.50

DS1

SPT202/02/03/03

(05)

9.60

8.10

02/03/03/04(06)

02/03/04/04(07)

02/03/03/04(06)SPT5

SPT3

Medium stiff greyish,marine CLAY

3.304m

4.00 VST1

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

R . L .

( m )

Fill

--00 15 35 50 73 33 40CH --

--00 04 40 96 76 35 41CH --

Stackyard Area

Very stiff greyish,marine CLAY

Page 43: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 43/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-20:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 13.08m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

13.08

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

pinkish grey,Highly weathered,

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

VIZAG AGRIPORT PVT.LTD.

10.00/10.08

11.58KHONDALITE

pinkish grey,Moderately weathered,

KHONDALITE

52/--/--(R)SPT6

Page 44: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 44/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.00m & NX Ø Upto11.50m BGL.

1 OF 2:SHEET NO.BH-21:BORE HOLE NO.

Stackyard Area

N 1959993.045, E 742856.859

0.70m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.

GROUND R. L.

:

::

DATE

CASINGMETHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

17.50m Below GL.:BOREHOLE DEPTH

9.00/

13/06/2012 TO 16/06/2012

1.50/2.10 SPT1 05/07/03/05(10)

3.60

4.50/5.00

6.60

SPT47.50/

150mmØ

0.00/0.50

DS1

SPT201/02/02/03

(04)

9.60

8.10 02/02/03/03(05)

01/02/02/02(04)SPT5

UDS1

2.739m

Soft grey,marine CLAY.

SPT302/03/06/08

(09)

Medium dense,brownish red,silty SAND with gravels

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

(Reddish silty SAND)with gravels & boulders)

Soft grey,marine CLAY.

Stiff grey,marine CLAY.

61.7300 03CH 35 62 93 36 57 0.173.2

--00 38CH 23 39 53 26 27 --

--00 11CH 32 57 87 32 55 --

Page 45: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 45/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P

T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-21:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 17.50m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

38/52/--/--(R)

10.50/11.00

12.00/12.60

13.50/13.67

Soft grey,marine CLAY.

UDS2

SPT6 01/02/02/03(04)

SPT7

52/--/--/--

(R)15.00/

15.05

SPT8

16.50

17.50

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

Completely weathered,greyish pink,KHONDALITE

Highly weathered,greyish pink,fine grained,KHONDALITE

150mmØ

Page 46: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 46/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.5m & NX Ø Upto9.75m BGL.

1 OF 2:SHEET NO.BH- 23:BORE HOLE NO.

Stackyard Area

N 1960009.016, E 742957.088

2.60m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

15.35m Below GL.:BOREHOLE DEPTH

9.00/

17/06/2012 TO 20/06/2012

1.50/2.10 SPT1 05/07/04/09(11)

3.60

UDS1

4.50/5.10

6.50

SPT47.50/

150mmØ

Soft grey ,marine CLAY.

0.00/0.50

DS1

SPT202/01/01/02

(02)

9.60

8.10

02/02/02/03(04)

01/01/02/02(03)

02/02/03/04(05)SPT5

SPT3

4.01m

Loose grey,silty SANDwith grevels

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

(Blackish silty SAND)with gravels & boulders)

Medium dense,blackish,silty SANDwith gravels

55.1603 17CH 31 49 67 29 38 0.213.66

--22 43SM -- -- -- --35

Page 47: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 47/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D

E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-23:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 15.35m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Medium dense,grey silty,SAND with gravels

14/30/51/--(R)

SPT 6

SPT 7

04/06/10/15(16)

fine grained,brownish grey,

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

10.50/

12.00/

13.35

14.35

15.35

11.10

12.35

12.35

Highly weathered,

KHONDALITE

brownish pink,Highly weathered,

KHONDALITE

--05 68SM -- -- -- --27

16.26

150mmØ

Page 48: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 48/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.10m & NX Ø Upto10.20m BGL.

1 OF 2:SHEET NO.BH- 24:BORE HOLE NO.

Stackyard AreaN 1959944.414, E 742971.158

1.70m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

16.75.m Below GL.:BOREHOLE DEPTH

9.00/

17/06/2012 TO 20/06/2012

1.50/2.10 SPT1 02/02/03/03(05)

3.60

UDS1

4.50/5.10

6.50

SPT47.50/

150mmØ

0.00/0.50

DS1

SPT202/03/04/06

(07)

9.60

8.10

02/03/03/04(06)

01/02/03/04(05)

02/03/03/04(06)SPT5

SPT3

Medium stiff grey,marine CLAY

3.189 m

Medium stiff,brownish grey,marine CLAY

Medium stiff grey,marine CLAY

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

(Reddish silty SANDwith gravels & boulders)

Fill

Medium stiff,grey marine,CLAY with sea-shells

--02 35CH 25 38 58 25 33

63.7600 09CH 31 60 112 38 74 0.182.75

--00 22CH 27 51 61 23 38

--

--

Page 49: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 49/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-24:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 16.75m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

16/52(R)

10.50/11.10

12.00/12.60

13.50/

13.75

14.75

15.75

16.75

Stiff grey,marine CLAY.

fine grained,

SPT603/03/02/05

(05)

SPT7 02/04/05/05(09)

SPT8

KHONDALITE.

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

150mmØ

Highly weathered,

21.44

Medium stiff grey,marine CLAY

Page 50: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 50/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.5m & NX Ø Upto 4.30m BGL.

1 OF 2:SHEET NO.BH-26:BORE HOLE NO.

N 1960147.554, E 742471.466

1.20m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

12.10m Below GL.:BOREHOLE DEPTH

8.50/

(Black back filling

01/07/2012 TO 04/07/2012

materials SAND

1.50/2.10 SPT1 04/07/09/11(16)

3.60

UDS1

4.50/5.10

6.50

SPT47.50/

NX

Soft grey,marine CLAY

with Boulders.)

0.00/0.50

DS1

SPT204/06/08/12

(14)

8.60

8.10

Highly Weathered,

01/02/02/03(04)

02/03/04/04(07)

51/--/--/--(R)

SPT5

SPT3

3.463m

5.50 VST1

brownish pink,KHONDALITE

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

150mmØ

--01 34CH 26 34 75 31 44 --

--07 05CH 37 51 86 34 52 --

--01 33CH 26 40 73 32 41 --

Fill

Stackyard Area

Page 51: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 51/183

ABBREVIATIONS :

11.00

10.50

S A M P L E &

I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-26:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m

)

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 12.10m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

Highly moderately,pinkish greyKHONDALITE

VIZAG AGRIPORT PVT.LTD.

Geotechnical Invest igation Work for the Proposed Installat ion of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

10.10

11.10

12.10

Page 52: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 52/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.55m & NX Ø Upto 4.50m BGL.

1 OF 1:SHEET NO.BH- 28:BORE HOLE NO.

Stackyard Area

N 1960128.52, E 743078.659

1.10m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

8.10m Below GL.:BOREHOLE DEPTH

06/07/2012 TO 07/07/2012

1.50/2.10 SPT1 01/02/03/05

(05)

3.60

4.50/4.60

7.10

150mmØ

0.00/0.50

DS1

SPT202/02/03/03

(05)

silty to fine grained,

3.36 m

Highly weathered,fine grained,KHONDALITE.

8.10

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

SPT351/--/--/--

(R)

6.10

(Brownish silty SANDwith gravels & boulders)

Fill

Loose grey,

clayey SAND

silty to fine grained,Loose grey,

sandy CLAY

BOREHOLE IS TERMINATED AT DEPTH 8.10m. BELOW GL.

Page 53: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 53/183

Page 54: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 54/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.65m & NX Ø Upto 5.30m BGL.

1 OF 1:SHEET NO.BH-31:BORE HOLE NO.

N 1960062.908, E 743108.691

1.55m Below GL3.705m

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 9.60m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

9.60m Below GL.:BOREHOLE DEPTH

05/07/2012 TO 07/07/2012

0.00

Moderately weathered

1.50/2.10 SPT1 05/09/15/21(24)

3.60

UDS14.50/5.00

6.60SPT3

7.60

8.60

9.60

Soft to medium,stiff grey,

grayish pinkKHONDALITE

150mmØ

NX

0.00/0.50

DS1

5.00

6.60

SPT203/03/01/02

(04)

VST1

02/02/03/05(05)

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

(Brownish gravels &boulders)

marine CLAY

--00 26CH 32 42 74 32 42 --

--03 06CH 40 51 78 33 45 --

Stackyard Area

Page 55: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 55/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.20m & NX Ø Upto7.85m BGL.

1 OF 2:SHEET NO.BH- 32A:BORE HOLE NO.

N 1960049.003, E 743038.329

1.35m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

11.74m Below GL.:BOREHOLE DEPTH

27/06/2012 TO 29/06/2012

1.50/2.10 SPT1 03/05/07/09

(12)

3.60

UDS14.50/5.00

6.60

SPT47.50/

150mmØ

Medium stiff greyish,marine CLAY

0.00/0.50

DS1

SPT203/04/06/07

(10)

9.24

7.74

01/02/04/04(06)

16/52/--/--/--(R)

SPT3

3.511m

Brownish yellowKHONDALITE

4.00 VST1

7.00 VST2

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill(Reddish back filling

materials with boulders)

Fill(Brownish grey,clayey

SAND with boulders)

Highly weathered,

--13 38SC 25 24 47 23 24 --

Stackyard Area

Page 56: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 56/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m ) DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH-32A:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 11.74m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

KHONDALITE

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

Highly weathered,brownish yellow,

10.74

11.74

Page 57: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 57/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX Ø Upto 5.75m BGL.

1 OF 1:SHEET NO.BH-33:BORE HOLE NO.

N 1960021.933, E 743086.241

1.55m Below GL

3.598m

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 9.60m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

9.60m Below GL.:BOREHOLE DEPTH

Moderately weathered,

(Reddish brown,

01/07/2012 TO 03/07/2012

0.00

Soft brown,

back filling materials1.50/2.10 SPT1 03/05/09/13

(14)

3.60

UDS14.50/5.00

6.60SPT3

7.60

8.60

9.60

greyish pink,

150

mmØ

NX

0.50 DS1

5.00

6.60

Silty SAND

KHONDALITE

SPT201/02/02/06

(04)

VST1

04/07/09/24(16)

with Boulders)

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Fill

marine CLAY

Very stiff greyish,sandy CLAY

Stackyard Area

Page 58: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 58/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX upto 9.2m BGL.

1 OF 3:SHEET NO.BH- N1:BORE HOLE NO.

Stackyard Area

N 1960307.729, E 742966.519

0.55m Below GL

:

:

:

:

LOCATIONCO-ORDINATES

GROUND W. T.GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

25.50m Below GL.:BOREHOLE DEPTH

9.00/

12/08/2012 TO 17/08/2012

1.50/1.60 SPT1 53/--/--/--(R)

3.60

4.50/5.10

6.60

7.50/

150mmØ

0.00/0.50

DS1

SPT203/03/04/05

(07)

9.28

7.85

04/06/08/10(14)SPT3

3.61 m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Medium stiff to stiff,sandy CLAY with

Hard,yellowish grey,sandy CLAY as

SPT6 23/51/--/--(R)

(Reddish,silty SANDwith gravels & boulders)

Fill

Medium dense,brownish,SAND with

SPT5 17/25/51/--(R)

SPT4 03/04/08/10(12)

NX

sea-shells

sea-shells

completely weathered,ROCK

--01 33CI 37 29 48 25 23

--00 97SP -- -- -- --03

--

--03 44CI 33 20 42 22 20 --

Page 59: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 59/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P

E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T

H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E

X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 3:SHEET NO.BH- N1:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT819/51/--/--

(R)

SPT710/20/35/53

(55)

CONTINUED ON NEXT PAGE

53/--/--/--

(R)SPT10

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

yellowish, grey ROCK

10.50/10.98

12.00/12.28

13.50/13.60

15.00/

15.10

SPT955/--/--/--

(R)

55/--/--/--(R)SPT1219.50/

19.57

18.00/18.10 51/--/--/--

(R)SPT11

NX

55/--/--/--(R)SPT1016.50/

16.58

Brownish grey,ROCK

Highly weathered,greyish brown,ROCK

Hard,brownish

yellow,sandy CLAY as completelyweathered,ROCK

Completely weathered,

Completely weathered,

--26 40SM -- -- -- --34

Page 60: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 60/183

ABBREVIATIONS :

21.00

20.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

21.50

22.00

23.50

23.00

22.50

24.50

25.50

25.00

24.00

27.00

26.50

26.00

29.00

28.50

28.00

27.50

30.00

29.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m ) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

3 OF 3:SHEET NO.BH- N1:BORE HOLE NO.

L O G

D I A O F B O R

E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT1452/--/--/--

(R)

BOREHOLE IS TERMINATED AT DEPTH 26.00m. BELOW GL.

SPT1552/--/--/--

(R)

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX 21.00/21.05

22.50/22.57

30.20

24.00

25.50

Moderately weathered,brownish grey,ROCK

Highly weathered,

greyish brown,ROCK

2.26

Page 61: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 61/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 2.50m & NX upto 11.20m BGL.

1 OF 3:SHEET NO.BH- N2:BORE HOLE NO.

Stackyard Area

N 1960269.345, E 742988.127

1.05m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASINGMETHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

27.00m Below GL.:BOREHOLE DEPTH

9.00/

13/08/2012 TO 19/08/2012

1.50/2.10 SPT1 11/17/20/23

(37)

3.60

4.50/4.78

6.10

7.50/

150mmØ

0.00/0.50

DS1

SPT205/08/12/06

(20)

9.12

7.60

15/52/--/--(R)SPT3

3.474 m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

SPT5 52/--/--/--(R)

(Dense,brownish,siltySAND with gravels)

Fill

SPT4 52/--/--/--(R)

SPT4 53/--/--/--(R)

6.50

Completely weathered,ROCK

Medium dense,greyish brown,silty SAND with gravels

Completely weathered,ROCK

Highly weathered,greyish yellow,ROCK

Completely weathered,yellowish,ROCK

--32 44SM -- -- -- --24

--09 52SM -- -- -- --39

--65 24SM -- -- -- --11

NX

Page 62: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 62/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 3:SHEET NO.BH- N2:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A

T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT854/--/--/--

(R)

SPT755/--/--/--

(R)

CONTINUED ON NEXT PAGE

52/--/--/--

(R)SPT10

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

10.50/10.60

12.00/12.12

13.50/13.58

15.00/

15.10

SPT955/--/--/--

(R)

51/--/--/--(R)SPT1319.50/

19.55

18.00/18.10 55/--/--/--(R)SPT12

NX

53/--/--/--(R)SPT1116.50/

16.60

Completely weathered,Brownish grey,ROCK

Completely weathered,yellowish grey,ROCK

Completely weathered,yellowish,ROCK

--53 33GM -- -- -- --14

Page 63: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 63/183

ABBREVIATIONS :

21.00

20.50

S A M P L E & I N - S

I T U

S A M P L E T Y P

E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

21.50

22.00

23.50

23.00

22.50

24.50

25.50

25.00

24.00

27.00

26.50

26.00

29.00

28.50

28.00

27.50

30.00

29.50

T E S T D E P T

H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E

X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

3 OF 3:SHEET NO.BH- N2:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT1452/--/--/--

(R)

BOREHOLE IS TERMINATED AT DEPTH 27.00m. BELOW GL.

SPT1553/--/--/--

(R)

SPT1655/--/--/--

(R)

Highly weathered,yellowish grey,ROCK

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX 21.0021.06

22.00/22.05

23.00/23.05

30.20

26.00

25.00

pinkish grey,Highly weathered,

KHONDALITE

SPT1756/--/--/--

(R)24.00/24.08

27.00

Completely weathered,yellowish grey,ROCK

Page 64: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 64/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.60m & NX upto 10.50m BGL.

1 OF 3:SHEET NO.BH- N3:BORE HOLE NO.

Stackyard Area

N 1960272.336, E 742901.831

1.70m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

::

DATE

CASINGMETHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

26.00m Below GL.:BOREHOLE DEPTH

9.00/

12/08/2012 TO 16/08/2012

1.50/2.10 SPT1 09/08/06/05(14)

3.60

4.50/5.10

6.60

7.50/

150mmØ

0.00/0.50

DS1

SPT208/05/05/04

(10)

9.10

8.10

04/04/03/04(07)SPT3

3.700m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Loose to brownish grey,silty SAND

Very stiff,greyish brown,sandy

UDS1

SPT5 53/--/--/--(R)

(Medium dense,reddish brown,silty

Fill

Grey,sandy CLAY

SPT4 10/12/15/19(27)

10.00/10.05

SPT6 51/--/--/--(R)

SAND with gravels)

with gravels

CLAY with gravels

NX Completely weathered,

yellowish ROCK

--19 70SM -- -- -- --15

56.6102 31CI 35 46 22 2432 0.153.89

Page 65: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 65/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D

E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 3:SHEET NO.BH- N3:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT855/--/--/--

(R)

SPT753/--/--/--

(R)

CONTINUED ON NEXT PAGE

51/--/--/--

(R)

SPT10

SPT11

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

Completely weathered,

11.00/11.05

12.00/12.07

13.00/13.05

15.00/

15.07

16.00

SPT953/--/--/--

(R)

14.00/14.10 52/--/--/--

(R)

52/--/--/--(R)SPT1217.00/

17.05

55/--/--/--(R)SPT1419.00

19.07

18.00/

18.05 52/--/--/--(R)SPT13

NX

yellowish ROCK

Highly weathered,

yellowish ROCK

Completely weathered,

yellowish ROCK

10.05

Page 66: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 66/183

ABBREVIATIONS :

21.00

20.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T

R E S U L T

21.50

22.00

23.50

23.00

22.50

24.50

25.50

25.00

24.00

27.00

26.50

26.00

29.00

28.50

28.00

27.50

30.00

29.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m )

/

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

3 OF 3:SHEET NO.BH- N3:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

SPT1553/--/--/--

(R)

BOREHOLE IS TERMINATED AT DEPTH 26.00m. BELOW GL.

SPT1655/--/--/--

(R)

SPT1755/--/--/--

(R)

Completely weathered,

ROCK

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

NX

20.50/20.57

22.00/22.09

23.50/23.58

30.20

26.00

25.00

greyish yellow,

greyish brown,ROCKCompletely weathered,

0.89

--53 36SM -- -- -- --14

Page 67: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 67/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 3.00m & NX upto 9.00m BGL.

1 OF 2:SHEET NO.BH- N4:BORE HOLE NO.

Stackyard Area

N 1960203.424, E 742928.076

1.4m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUSAL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

13.50m Below GL.:BOREHOLE DEPTH

18/08/2012 TO 20/08/2012

1.50/2.10 SPT1 07/09/12/15(21)

3.60

4.50/5.00

6.60

SPT47.50/

150mmØ

0.00/0.50

DS1

SPT205/07/09/12

(16)

8.10 01/02/03/04(05)

UDS1

Fill(Medium dense,brownish,silty

3.600m

SPT301/02/04/05

(06)

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Loose grey,silty SAND

Medium dense,greyishbrown,silty SAND

SPT59.00/9.60 02/03/03/04

(06)

SAND with gravels)

with gravels

Medium stiff,grey,with gravels

--07 69SM -- -- -- --24

63.7700 01CI 32 87 29 5867 0.144.12

--01 76SM -- -- -- --23

Page 68: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 68/183

NX

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH- N4:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 13.50m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

Highly weathered,pinkish grey,KHONDALITE

150mmØ SPT610.50/

10.58 54/--/--/--(R)

11.50

12.50

13.50

Slightly weathered,pinkish grey,KHONDALITE

720

Page 69: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 69/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX upto 8.00m BGL.

1 OF 2:SHEET NO.BH- N5:BORE HOLE NO.

Stackyard Area

N 1960200.62, E 742988.79

1.65m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.GROUND R. L.

:

::

DATE

CASING

METHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

CONTINUED ON NEXT PAGEREMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

11.00m Below GL.:BOREHOLE DEPTH

19/08/2012 TO 21/08/2012

1.50/2.10 SPT1 03/02/02/02

(04)

3.60

4.50/5.00

6.60

SPT47.50/

150mmØ

NX

0.00/0.50

DS1

SPT202/02/03/03

(05)

8.00 08/10/14/53(24)

UDS1

Fill(Loose,reddish brown silty SAND with

3.683m

SPT303/08/10/14

(18)

8.00

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

yellowish brown,silty SAND with gravels

Moderately weathered,pinkish grey,KHONDALITE

9.00

10.00

Medium stiff grey,silty CALY with

brownish grey,silty SAND with gravels

Medium dense,

gravels)

sea-shells

Fill(Blackish grey,clayey SAND withgravels)

Medium dense, --23 52SM -- -- -- --25

82.8601 08CH 94 33 6131 603.710.07

Page 70: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 70/183

ABBREVIATIONS :

11.00

10.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

R . L .

( m )

DESCRIPTION

F I E L D T E S T R E S U L T

11.50

12.00

13.50

13.00

12.50

14.50

15.50

15.00

14.00

17.00

16.50

16.00

19.00

18.50

18.00

17.50

20.00

19.50

T E S T D E P T H ( m )

( S P T ' N ' )

N M C

L L %

P L A S T I C I T Y I N D E X

C u / ( k g / c m

) /

U C S ( k g / c m )

LABORATORY DATA

2 2

CONSISTENCY LIMIT

2 OF 2:SHEET NO.BH- N5:BORE HOLE NO.

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 11.00m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Mr. Prajit N.

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

P L I ( k g / c m ) 2

C L A Y %

S A N D %

G R A V E L S %

S I L T %

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

Moderately weathered,greyish pink,

KHONDALITE

NX 521

11.00

10.00

Page 71: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 71/183

ABBREVIATIONS :

1.00

0.50

S A M P L E & I N - S

I T U

S A M P L E T Y P E & N O

.

T C R ( % )

R Q D ( % )

C L A Y %

DESCRIPTION

F I E L D T E S T R E S U L T

1.50

2.00

3.50

3.00

2.50

4.50

5.50

5.00

4.00

7.00

6.50

6.00

9.00

8.50

8.00

7.50

10.00

9.50

T E S T D E P T H ( m )

( S P T ' N ' )

S I L T %

S A N D %

G R A V E L S %

N M C

L L %

P L A S T I C I T Y I N D E X

LABORATORY DATA

CONSISTENCY LIMIT

ROTARY DRILLING

150mm Ø Upto 1.50m & NX upto 4.50m BGL.

1 OF 1:SHEET NO.BH- N6:BORE HOLE NO.

Stackyard Area

N 1960201.37, E 743050.82

1.85m Below GL

:

:

:

:

LOCATION

CO-ORDINATES

GROUND W. T.

GROUND R. L.

:

:

:

DATE

CASINGMETHOD

L O G

D I A O F B O R E H O L E

D E P T H B E L O W

B G L

( m )

P L %

Ø ( d e g r e e s )

FIELD DATA

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.

BOREHOLE IS TERMINATED AT DEPTH 9.00m. BELOW GL.REMARKS :

DS DISTURBED SAMPLE

N : SPT VALUESPT STD. PENETRATION TEST:

CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):

: R

NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT

PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu

: REFUS AL 'N' VALUE: COHESION

Checked By :Prajit Nagrale

Drawn By:Rupesh

SCALE : 1: 50JOB NO. : 3228

GRAIN SIZE ANALYSIS

:TCR TOTAL CORE RECOVERY (%):

UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH

C L A S S I F I C A T I O N

C u / ( k g / c m

² ) /

U C S ( k g / c m ² )

P L I ( k g / c m ² )

3.00/

6.00/

9.00m Below GL.:BOREHOLE DEPTH

21/08/2012 TO 22/08/2012

1.50/2.10 SPT1 03/04/05/06(09)

3.50

4.50/4.75

6.08

150mmØ

0.00/0.50

DS1

UDS1

24/52/--/--(R)SPT2

3.745 m

VIZAG AGRIPORT PVT.LTD.

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)

CLIENT :

PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.

R . L .

( m )

Stiff grey,sandy CLAY

(Reddish brown siltySAND with gravels)

Fill

yellowish grey,ROCK

55/--/--/--(R)

SPT3

7.00

8.00

9.00

NX

Highly weathered,pinkish grey,KHONDALITE

58.5001 04CH 92 36 56

--04 22CH 64 28 36 --

36 59

--61 30 -- -- -- --09

32 43

3.20.15

GMGP

908

Completely weathered,

Page 72: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 72/183

DBM

LABORATORY TESTLABORATORY TESTLABORATORY TESTLABORATORY TEST

RESULTSRESULTSRESULTSRESULTS

Page 73: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 73/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 01 1.50 - 2.10 SPT 1 ----- ----- ----- CH 0 9 34 57 79 33 46 14 ----- ----- ----- ----- ----- ----- ----- ----- 2.63

BH - 01 3.00 - 3.50 UDS 1 1.53 0.88 73.28 CH 2 21 32 45 98 37 61 15 TUU 0.11 3.89 ----- 40 ----- ----- ----- 2.62

BH - 01 4.50 - 5.10 SPT 2 ----- ----- ----- CI 12 27 25 36 47 22 25 12 ----- ----- ----- ----- ----- ----- ----- ----- 2.65

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 74: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 74/183

Particle

% % % % mm mm mm

BH - 01 1 .50 - 2.10 CH 0 9 34 57 ----- ----- ----- ----- ----- 79 33 46 SPT 1

BH - 01 3 .00 - 3.50 CH 2 21 32 45 ----- ----- ----- ----- ----- 98 37 61 UDS 1

BH - 01 4 .50 - 5.10 CI 12 27 25 36 ----- ----- ----- ----- ----- 47 22 25 SPT 2

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 75: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 75/183

Project:

1.25 mm/min 07.07.201238.00 mm 0176.00 mm 3.00 - 3.500.88 g/cm 3 TUU73.28 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 3.82 0.306 0.806 6.84 9.00

2 1.00 4.77 0.379 1.379 7.60 10.00

3 1.50 5.80 0.455 1.955 8.36 11.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.11 k cm 2 3.89

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 76: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 76/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 02 1.50 - 2.10 SPT 1 ----- ----- ----- SM 23 47 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.66

BH - 02 3.00 - 3.50 UDS 1 2.05 1.48 38.18 SC 11 49 20 20 36 22 14 -----DSUU(RM)

0.08 23.98 ----- ----- ----- ----- ----- 2.65

BH - 02 4.50 - 5.10 SPT 2 ----- ----- ----- CH 0 15 34 51 81 30 51 ----- ----- ----- ----- ----- 70 ----- ----- ----- 2.63

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

R e m a r k s

Permeability Test

Chemical Analysis

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

S w e l l i n g P r e s s u r e

k g / c m 2

Compaction Test

Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

SOIL TEST DATA SHEET

Project :

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Mechanical Analysis

S o i l C l a s s i f i c a t i o n ( I . S )

VerticalConsolidation

Shear Test

Location :

F r e e S w e l l I n d e x %

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

05.07.2012FLB 04 DATE:

30

Page 77: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 77/183

Particle

% % % % mm mm mm

BH - 02 1 .50 - 2.10 SM 23 47 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1

BH - 02 3 .00 - 3.50 SC 11 49 20 20 ----- ----- ----- ----- ----- 36 22 14 UDS 1

BH - 02 4 .50 - 5.10 CH 0 15 34 51 ----- ----- ----- ----- ----- 81 30 51 SPT 2

P l a s t i c L i m i t , W

p

------------

Gravel Sand ClayClassifi--cation

( IS ) L i q u i d L i m i t , W

l

G R A I N S I Z E D

I S T R I B U T I O N C U R V E Coeff. Of

CurvatureCc

D302/(D 60*D

10 )

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

L o c a t i o n :

J o b

N o .

:

3 2 2 8

Coeff. ofUniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

30

Depth in m. Φ

1 0 %

Symbol Φ

6 0 %

Φ 3 0 %

Bore HoleNo.

Silt

P r o j e c t :

P l a s t i c i t y I n d e x , I p

R e m a r k s

Size(mm)

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 78: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 78/183

:

:

: UU (RM): 1.25: 60.0: 25.0: 1.48: 38.16

Serial No.Normal

Pressure,σv

ShearForce atFailure

ShearStress atFailure,

σs

Changein Length

, ∆ L

Strain atFailure

Condition of Test Date :Bore Hole No. :

Depth of Sample (m) Type of Sample:

Dry Density, γ d

Moisture Content,

Rate of StrainSize of theHeight of Specimen

gm / cm 3

%

IS - 2720, P-13

DIRECT SHEAR TEST

G eo t ec h n i c a l I n v es t i g a t i o n Wo r k f o r t h e Pr o p o s ed I n s t a l l a t i o n o f M e ch a n i c a lH a n d l i n g F a c i l i t i e s a t E a s t Q u a y -7 (E Q -7 ) B er t h i n t h e i n n e r h a r b ou r o f

07.07.2012BH -02

3.00 - 3.50UDS 01

----------------

mm/minmm(Square )mm

Project

Location

Kg / cm 2 Kg. Kg / cm 2 mm %

1 0.50 9.68 0.299 3.00 5.00

2 1.00 16.13 0.533 4.80 8.00

3 1.50 22.58 0.765 5.40 9.00

28.31

0.08 23.98COHESION, C u ( Kg / cm 2 ) :- ANGLE OF INTERNAL FRICTION, φ 0 :-

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD. Job No. :- 3228

0.00

0.50

1.00

1.50

2.00

0.00 0.50 1.00 1.50 2.00

S h e ar S t r e s s

( K g / c m

2 )

Normal Stress (Kg/cm 2)

Page 79: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 79/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 03 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 8 29 63 76 33 43 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 03 4.50 - 5.00 UDS 1 1.52 0.85 77.79 CH 0 1 32 67 122 40 82 ----- TUU 0.08 4.36 ----- ----- ----- 0.64 2.04 2.60

BH - 03 6.00 - 6.60 SPT 3 ----- ----- ----- CH 1 11 28 60 71 28 43 ----- ----- ----- ----- ----- 60 ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 80: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 80/183

Particle

% % % % mm mm mm

BH - 03 3 .00 - 3.60 CH 0 8 29 63 ----- ----- ----- ----- ----- 76 33 43 SPT 2

BH - 03 4 .50 - 5.00 CH 0 1 32 67 ----- ----- ----- ----- ----- 122 40 82 UDS 1

BH - 03 6 .00 - 6.60 CH 1 11 28 60 ----- ----- ----- ----- ----- 71 28 43 SPT 3

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 81: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 81/183

IS - 2720 , P-15Project:

Location: ----------- Date: 04.09.2012

Bore Hole No./Trial Pit No.: BH - 03 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.85 1.05 gm/cm 3 0.10 - 0.25 3.38 1.17E-01 1.25E-04Moisture Content, w 77.79 56.60 % 0.25 - 0.50 2.53 9.85E-02 7.89E-05Initial Void Ratio,e o 2.04 1.47 0.50 - 1.00 1.71 9.74E-02 5.28E-05Specific Gravity,G 2.60 2.60 1.00 - 2.00 0.94 7.03E-02 2.10E-05

Degree of Saturation, S r 98.95 100.00 % 2.00 - 4.00 0.66 3.75E-02 7.90E-060.640.51 kg/cm 2

0.1 2.04394840.25 1.99067930.5 1.917

1 1.7752 1.584 1.3864555

2 1.39102141 1.41232910.5 1.4321148

0.25 1.45494440.1 1.4716861

0 00 00 00 00 00 0

Job No.: 3228Checked By:

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

2.05

2.10

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 82: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 82/183

Project:

1.25 mm/min 07.07.201238.00 mm 0376.00 mm 4.50 - 5.000.85 g/cm 3 TUU77.79 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 3.34 0.268 0.768 6.84 9.00

2 1.00 4.37 0.347 1.347 7.60 10.00

3 1.50 5.41 0.419 1.919 9.12 12.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.08 k /cm 2 4.36

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 83: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 83/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 04 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 13 29 58 75 31 44 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----

BH - 04 4.50 - 5.00 UDS 1 1.48 0.80 85.70 CH 1 2 32 65 124 41 83 ----- TUU 0.04 4.0 ----- ----- ----- 0.93 2.27 2.61

BH - 04 6.00 - 6.60 SPT 3 ----- ----- ----- CI 15 33 25 27 44 21 23 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 84: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 84/183

Particle

% % % % mm mm mm

BH - 04 3 .00 - 3.60 CH 0 13 29 58 ----- ----- ----- ----- ----- 75 31 44 SPT 2

BH - 04 4 .50 - 5.00 CH 1 2 32 65 ----- ----- ----- ----- ----- 124 41 83 UDS 1

BH - 04 6 .00 - 6.60 CI 15 33 25 27 ----- ----- ----- ----- ----- 44 21 23 SPT 3

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 85: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 85/183

IS - 2720 , P-15Project:

Location: ----------- Date: 04.09.2012

Bore Hole No./Trial Pit No.: BH - 4 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.80 1.04 gm/cm 3 0.10 - 0.25 3.52 1.56E-01 1.75E-04Moisture Content, w 85.70 58.17 % 0.25 - 0.50 2.06 1.43E-01 9.32E-05Initial Void Ratio,e o 2.27 1.52 0.50 - 1.00 1.32 9.99E-02 4.19E-05Specific Gravity,G 2.61 2.61 1.00 - 2.00 0.71 9.35E-02 2.11E-05

Degree of Saturation, S r 98.33 100.00 % 2.00 - 4.00 0.49 5.27E-02 8.17E-060.930.60 kg/cm 2

0.1 2.27484460.25 2.1980.5 2.084

1 1.932 1.6564 1.3758998

2 1.38408691 1.41847270.5 1.4610457

0.25 1.49379420.1 1.5183555

0 00 00 00 00 00 0

Job No.: 3228Checked By: R AVI A .

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

2.05

2.10

2.15

2.20

2.25

2.30

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 86: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 86/183

Project:

1.25 mm/min 07.07.201238.00 mm 0476.00 mm 4.50 - 5.000.81 g/cm 3 TUU85.70 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 1.99 0.156 0.656 8.36 11.00

2 1.00 3.10 0.241 1.241 9.12 12.00

3 1.50 3.90 0.299 1.799 9.88 13.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.04 k /cm 2 4.00

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 87: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 87/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 05 3.00 - 3.60 SPT 2 ----- ----- ----- SP-SM 40 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 05 4.50 - 5.10 SPT 3 ----- ----- ----- CH 2 12 34 52 80 29 51 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----

BH - 05 6.00 - 6.50 UDS 1 1.63 1.02 59.36 CH 0 12 27 61 97 33 64 ----- TUU 0.19 4.12 ----- ----- ----- 0.42 1.57 2.63

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

8

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 88: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 88/183

Particle

% % % % mm mm mm

BH - 05 3 .00 - 3.60 SP-SM 40 52 0.12 1.50 4.70 39.17 3.99 ----- ----- ----- SPT 2

BH - 05 4 .50 - 5.10 CH 2 12 34 52 ----- ----- ----- ----- ----- 80 29 51 SPT 3

BH - 05 6 .00 - 6.50 CH 0 12 27 61 ----- ----- ----- ----- ----- 97 33 64 UDS 1

8

P l a s t i c L i m i t , W

p

------------

Φ 3 0 %

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 89: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 89/183

IS - 2720 , P-15Project:

Location: ----------- Date: 04.09.2012

Bore Hole No./Trial Pit No.: BH - 05 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.02 1.19 gm/cm 3 0.10 - 0.25 3.58 1.10E-01 1.25E-04Moisture Content, w 59.36 45.71 % 0.25 - 0.50 2.28 9.76E-02 7.05E-05Initial Void Ratio,e o 1.57 1.20 0.50 - 1.00 1.65 7.19E-02 3.76E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 1.08 5.35E-02 1.82E-05

Degree of Saturation, S r 99.28 100.00 % 2.00 - 4.00 0.76 2.83E-02 6.85E-060.420.51 kg/cm 2

0.1 1.57253130.25 1.53008450.5 1.4683438

1 1.37959152 1.25225124 1.1249109

2 1.14291861 1.16349880.5 1.1763615

0.25 1.19179670.1 1.2020868

0 00 00 00 00 00 0

Job No.: 3228Checked By:

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.10

1.15

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 90: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 90/183

Project:

1.25 mm/min 07.07.201238.00 mm 0576.00 mm 6.00 - 6.501.02 g/cm 3 TUU59.36 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 5.80 0.455 0.955 8.36 11.00

2 1.00 6.76 0.524 1.524 9.12 12.00

3 1.50 7.79 0.598 2.098 9.88 13.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.19 k /cm 2 4.12

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 91: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 91/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 08 3.00 - 3.60 SPT 2 ----- ----- ----- CI 0 19 39 42 48 22 26 ----- ----- ----- ----- ----- 30 ----- ----- ----- 2.64

BH - 08 4.50 - 5.00 UDS 1 1.56 0.91 71.26 CH 0 10 26 64 111 34 77 ----- TUU 0.13 2.86 ----- ----- ----- ----- ----- -----

BH - 08 7.50 - 8.00 UDS 2 1.57 0.93 68.13 CH 2 17 31 50 105 35 70 ----- TUU 0.12 4.57 ----- ----- ----- ----- ----- -----

BH - 08 10.50 - 11.10 SPT 5 ----- ----- ----- SC 14 39 20 27 36 20 16 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 92: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 92/183

Particle

% % % % mm mm mm

BH - 08 3 .00 - 3.60 CI 0 19 39 42 ----- ----- ----- ----- ----- 48 22 26 SPT 2

BH - 08 4 .50 - 5.00 CH 0 10 26 64 ----- ----- ----- ----- ----- 111 34 77 UDS 1

B H - 08 7 .50 - 8. 00 CH 2 17 31 50 ----- ----- ----- ----- ----- 105 35 70 UDS 2

BH - 08 10.50 - 11.10 SC 14 39 20 27 ----- ----- ----- ----- ----- 36 20 16 SPT 5

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 93: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 93/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH - 08 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS - 1

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.91 1.29 gm/cm 3 0.10 - 0.25 3.37 2.19E-01 2.34E-04Moisture Content, w 71.26 39.69 % 0.25 - 0.50 2.18 2.00E-01 1.39E-04Initial Void Ratio,e o 1.89 1.04 0.50 - 1.00 1.35 1.75E-01 7.50E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.93 9.65E-02 2.85E-05

Degree of Saturation, S r 99.11 100.00 % 2.00 - 4.00 0.53 5.55E-02 9.39E-060.810.39 kg/cm 2

0.1 1.89097430.25 1.7960.5 1.656

1 1.4242 1.194 0.9470712

2 0.96297161 0.98899030.5 1.0092272

0.25 1.0265730.1 1.0439188

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

0.90

0.95

1.00

1.05

1.10

1.15

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 94: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 94/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH - 08 Dia.of Specimen: 60 mmDepth in M.: 7.50 - 8.10 Height of specimen: 20 mmType of Samples: UDS - 2

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.93 1.12 gm/cm 3 0.10 - 0.25 4.29 1.00E-01 1.36E-04Moisture Content, w 68.13 51.54 % 0.25 - 0.50 2.91 9.30E-02 8.57E-05Initial Void Ratio,e o 1.83 1.36 0.50 - 1.00 1.62 8.82E-02 4.52E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 0.96 6.00E-02 1.83E-05

Degree of Saturation, S r 98.44 100.00 % 2.00 - 4.00 0.70 3.87E-02 8.58E-060.630.66 kg/cm 2

0.1 1.82715410.25 1.78474680.5 1.72

1 1.62 1.4444 1.255

2 1.26879121 1.29140840.5 1.3253343

0.25 1.34512440.1 1.3606737

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 95: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 95/183

Project:

1.25 mm/min 09.07.201238.00 mm 876.00 mm 4.50 - 5.000.91 g/cm 3 TUU71.26 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.29 0.337 0.837 8.36 11.00

2 1.00 5.01 0.389 1.389 9.12 12.00

3 1.50 5.80 0.445 1.945 9.88 13.00

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Cohesion: 0.13 k /cm 2 2.86

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 96: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 96/183

Project:

1.25 mm/min 09.07.201238.00 mm 876.00 mm 7.50 - 8.000.93 g/cm 3 TUU68.13 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.69 0.376 0.876 6.84 9.00

2 1.00 5.57 0.442 1.442 7.60 10.00

3 1.50 6.68 0.524 2.024 8.36 11.00

Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Cohesion: 0.12 k /cm 2 4.57

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 97: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 97/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 10 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 20 33 47 62 27 35 ----- ----- ----- ----- ----- 35 ----- ----- ----- -----

BH - 10 6.00 - 6.50 UDS 1 1.74 1.21 43.91 CH 9 36 21 34 67 29 38 ----- TUU 0.26 4.8 ----- ----- ----- 0.44 1.19 2.65

BH - 10 9.00 - 9.60 SPT 3 ----- ----- ----- CH 0 8 34 58 82 31 51 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 98: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 98/183

Particle

% % % % mm mm mm

BH - 10 3 .00 - 3.60 CH 0 20 33 47 ----- ----- ----- ----- ----- 62 27 35 SPT 2

BH - 10 6 .00 - 6.50 CH 9 36 21 34 ----- ----- ----- ----- ----- 67 29 38 UDS 1

BH - 10 9 .00 - 9.60 CH 0 8 34 58 ----- ----- ----- ----- ----- 82 31 51 SPT 3

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 99: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 99/183

IS - 2720 , P-15Project:

Location: ----------- Date: 31.08.2012

Bore Hole No./Trial Pit No.: BH-10 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.21 1.51 gm/cm 3 0.10 - 0.25 4.51 2.00E-01 2.86E-04Moisture Content, w 43.91 28.44 % 0.25 - 0.50 2.67 1.26E-01 1.07E-04Initial Void Ratio,e o 1.19 0.75 0.50 - 1.00 1.69 9.90E-02 5.30E-05Specific Gravity,G 2.65 2.65 1.00 - 2.00 0.98 6.60E-02 2.05E-05

Degree of Saturation, S r 97.85 100.00 % 2.00 - 4.00 0.70 3.60E-02 8.00E-060.440.48 kg/cm 2

0.1 1.18921640.25 1.12353990.5 1.0567688

1 0.9552 0.8264 0.6944535

2 0.70321041 0.71634570.5 0.7305756

0.25 0.74371090.1 0.7535624

0 00 00 00 00 00 0

Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

0.68

0.73

0.78

0.83

0.88

0.93

0.98

1.03

1.08

1.13

1.18

1.23

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 100: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 100/183

Project:

1.25 mm/min 09.07.201238.00 mm 1076.00 mm 6.00 - 6.501.21 g/cm 3 TUU43.91 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 8.13 0.646 1.146 7.60 10.00

2 1.00 9.37 0.727 1.727 9.12 12.00

3 1.50 10.60 0.813 2.313 9.88 13.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.26 k /cm 2 4.8

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 101: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 101/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 11 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 18 32 50 69 30 39 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 11 4.50 - 5.00 UDS 1 1.66 1.08 54.17 CH 0 12 30 58 72 29 43 ----- TUU 0.14 3.43 ----- 44 ----- ----- ----- 2.63

BH - 11 9.00 - 9.60 SPT 5 ----- ----- ----- SM 23 50 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

27

Location :

SOIL TEST DATA SHEET

Project :

Page 102: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 102/183

Particle

% % % % mm mm mm

BH - 11 3.00 - 3.60 CH 0 18 32 50 ----- ----- ----- ----- ----- 69 30 39 SPT 2

BH - 11 4.50 - 5.00 CH 0 12 30 58 ----- ----- ----- ----- ----- 72 29 43 UDS 1

BH - 11 9.00 - 9.60 SM 23 50 ----- ----- ----- ----- ----- ----- ----- ----- SPT 5

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

27

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 103: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 103/183

Project:

1.25 mm/min 18.08.201238.00 mm BH - 1176.00 mm 4.50 - 5.001.08 g/cm 3 TUU54.17 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.53 0.363 0.863 6.84 9.00

2 1.00 5.41 0.429 1.429 7.60 10.00

3 1.50 6.28 0.493 1.993 8.36 11.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :

Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

Cohesion: 0.14 k cm 2 3.43

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

.

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 104: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 104/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 12 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 9 29 62 93 38 55 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----

BH - 12 4.50 - 5.00 UDS 1 1.52 0.86 77.35 CH 1 5 30 65 116 43 73 ----- TUU 0.11 4.11 ----- ----- ----- ----- ----- -----

BH - 12 7.50 - 8.10 SPT 4 ----- ----- ----- CH 0 4 30 66 75 33 42 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.60

BH - 12 9.00 - 9.50 UDS 2 1.47 0.77 90.026 CH 0 14 25 61 101 41 60 ----- ----- ----- ----- ----- ----- ----- 1.02 2.40 2.63

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 105: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 105/183

Particle

% % % % mm mm mm

BH - 12 3 .00 - 3.60 CH 0 9 29 62 ----- ----- ----- ----- ----- 93 38 55 SPT 2

BH - 12 4 .50 - 5.00 CH 1 5 30 65 ----- ----- ----- ----- ----- 116 43 73 UDS 1

BH - 12 7 .50 - 8.10 CH 0 4 30 66 ----- ----- ----- ----- ----- 75 33 42 SPT 4

BH - 12 9 .00 - 9.50 CH 0 14 25 61 ----- ----- ----- ----- ----- 101 41 60 UDS 2

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 106: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 106/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH- -12 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.86 1.13 gm/cm 3 0.10 - 0.25 3.18 1.82E-01 1.84E-04Moisture Content, w 77.35 50.40 % 0.25 - 0.50 2.10 1.73E-01 1.15E-04Initial Void Ratio,e o 2.06 1.32 0.50 - 1.00 1.32 1.37E-01 5.72E-05Specific Gravity,G 2.61 2.61 1.00 - 2.00 0.91 7.92E-02 2.28E-05

Degree of Saturation, S r 98.14 100.00 % 2.00 - 4.00 0.55 4.39E-02 7.62E-060.710.41 kg/cm 2

0.1 2.0570.25 1.97356870.5 1.845

1 1.652 1.444 1.2256065

2 1.23474661 1.25759670.5 1.2789236

0.25 1.29872710.1 1.3154838

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

2.05

2.10

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 107: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 107/183

IS - 2720 , P-15Project:

Location: ----------- Date: 04.09.2012

Bore Hole No./Trial Pit No.: BH - 12 Dia.of Specimen: 60 mmDepth in M.: 9.00 - 9.50 Height of specimen: 20 mmType of Samples: UDS - 02

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.77 1.04 gm/cm 3 0.10 - 0.25 3.12 1.82E-01 1.80E-04Moisture Content, w 90.03 57.90 % 0.25 - 0.50 2.11 1.73E-01 1.16E-04Initial Void Ratio,e o 2.40 1.52 0.50 - 1.00 1.20 9.99E-02 3.79E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.63 9.12E-02 1.83E-05

Degree of Saturation, S r 98.66 100.00 % 2.00 - 4.00 0.48 5.64E-02 8.62E-061.020.65 kg/cm 2

0.1 2.39985650.25 2.3070.5 2.164

1 2.0062 1.7324 1.4240977

2 1.4393971 1.46489590.5 1.4835951

0.25 1.50909410.1 1.5226935

0 00 00 00 00 00 0

Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

2.05

2.10

2.15

2.20

2.252.30

2.35

2.40

2.45

2.50

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 108: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 108/183

Project:

1.25 mm/min 09.07.201238.00 mm 1276.00 mm 4.50 - 5.000.86 g/cm 3 TUU77.35 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.13 0.339 0.839 5.32 7.00

2 1.00 5.17 0.419 1.419 6.08 8.00

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

. . . . . .

Cohesion: 0.11 k cm 2 4.11

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 109: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 109/183

Page 110: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 110/183

Particle

% % % % mm mm mm

BH - 14 3.00 - 3.60 CH 2 36 25 36 ----- ----- ----- ----- ----- 65 24 41 SPT 2

BH - 14 6.00 - 6.50 CH 1 30 29 40 ----- ----- ----- ----- ----- 63 26 37 UDS 1

BH - 14 9.00 - 9.60 CH 1 22 31 46 ----- ----- ----- ----- ----- 66 27 39 SPT 5

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 111: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 111/183

Page 112: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 112/183

Project:

1.25 mm/min 18.08.201238.00 mm 1476.00 mm 6.00 - 6.501.00 g/cm 3 TUU57.45 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.77 0.366 0.866 9.88 13.00

2 1.00 5.64 0.428 1.428 10.64 14.00

3 1.50 6.44 0.483 1.983 11.40 15.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.13 k cm 2 3.89

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Page 113: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 113/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 15 3.00 - 3.60 SPT 2 ----- ----- ----- CH 3 22 30 45 68 29 39 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 15 4.50 - 5.00 UDS 1 1.55 0.93 66.78 CH 0 7 39 54 74 32 42 ----- TUU 0.11 3.66 ----- 42 ----- ----- ----- 2.63

BH - 15 10.50 - 11.10 SPT 6 ----- ----- ----- CH 9 14 29 48 70 30 40 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

Page 114: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 114/183

Page 115: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 115/183

IS - 2720 , P-15Project:

Location: ----------- Date: 06.09.2012

Bore Hole No./Trial Pit No.: BH - 18 Dia.of Specimen: 60 mmDepth in M.: 9.00 - 9.50 Height of specimen: 20 mmType of Samples: UDS - 02

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.90 1.12 gm/cm 3 0.10 - 0.25 3.99 1.70E-01 2.15E-04Moisture Content, w 71.96 50.81 % 0.25 - 0.50 2.23 1.17E-01 8.26E-05Initial Void Ratio,e o 1.91 1.33 0.50 - 1.00 1.51 9.82E-02 4.70E-05Specific Gravity,G 2.62 2.62 1.00 - 2.00 0.95 7.42E-02 2.23E-05

Degree of Saturation, S r 98.88 100.00 % 2.00 - 4.00 0.74 3.99E-02 9.35E-060.640.51 kg/cm 2

0.1 1.90667870.25 1.83255840.5 1.75

1 1.6152 1.4214 1.2279692

2 1.2439561 1.27011610.5 1.2919162

0.25 1.31226290.1 1.3311563

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

1.85

1.90

1.95

2.00

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 116: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 116/183

Project:

1.25 mm/min 18.08.201238.00 mm 1576.00 mm 4.50 - 5.000.93 g/cm 3 TUU66.78 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 3.66 0.290 0.790 7.60 10.00

2 1.00 4.53 0.355 1.355 8.36 11.00

3 1.50 5.41 0.420 1.920 9.12 12.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.11 k cm 2 3.66

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Page 117: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 117/183

Page 118: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 118/183

Particle

% % % % mm mm mm

BH - 18 3 .00 - 3.60 CH 0 24 21 55 ----- ----- ----- ----- ----- 64 28 36 SPT 2

BH - 18 4 .50 - 5.00 CH 0 21 25 54 ----- ----- ----- ----- ----- 110 40 70 UDS 1

BH - 18 9 .00 - 9.50 CH 0 5 28 67 ----- ----- ----- ----- ----- 116 43 73 UDS 2

BH - 18 13.50 - 14.10 SC 1 55 20 24 ----- ----- ----- ----- ----- 44 21 23 SPT 7

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 119: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 119/183

Project:

1.25 mm/min 09.07.201238.00 mm 1876.00 mm 9.00 - 9.500.90 g/cm 3 TUU71.96 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 3.98 0.315 0.815 7.60 10.00

2 1.00 4.93 0.387 1.387 8.36 11.00

3 1.50 6.28 0.487 1.987 9.12 12.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.1 k cm 2 4.57

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

Page 120: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 120/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 19 3.00 - 3.60 SPT 2 ----- ----- ----- CH 1 12 30 57 61 27 34 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 19 4.50 - 5.00 UDS 1 1.68 1.11 50.92 CH 1 19 29 51 84 35 49 ----- TUU 0.22 4.34 ----- 55 ----- ----- ----- -----

BH - 19 9.00 - 9.60 SPT 5 ----- ----- ----- CH 0 12 32 56 63 22 41 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.63

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 121: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 121/183

Particle

% % % % mm mm mm

BH - 19 3 .00 - 3.60 CH 1 12 30 57 ----- ----- ----- ----- ----- 61 27 34 SPT 2

BH - 19 4 .50 - 5.00 CH 1 19 29 51 ----- ----- ----- ----- ----- 84 35 49 UDS 1

BH - 19 9 .00 - 9.60 CH 0 12 32 56 ----- ----- ----- ----- ----- 63 22 41 SPT 5

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 122: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 122/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH - 19 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.11 1.53 gm/cm 3 0.10 - 0.25 3.51 2.48E-01 2.76E-04Moisture Content, w 50.92 27.31 % 0.25 - 0.50 2.43 2.11E-01 1.63E-04Initial Void Ratio,e o 1.38 0.72 0.50 - 1.00 1.42 1.60E-01 7.20E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 0.85 9.82E-02 2.65E-05

Degree of Saturation, S r 97.52 100.00 % 2.00 - 4.00 0.56 5.47E-02 9.69E-060.650.41 kg/cm 2

0.1 1.37853740.25 1.290.5 1.169

1 0.9962 0.84 0.6031342

2 0.62810891 0.66259760.5 0.6840045

0.25 0.7042220.1 0.7208718

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.50

0.55

0.60

0.65

0.70

0.75

0.80

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

1.25

1.30

1.35

1.40

1.45

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 123: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 123/183

Project:

1.25 mm/min 09.07.201238.00 mm 1976.00 mm 4.50 - 5.001.11 g/cm 3 TUU50.92 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 7.71 0.598 1.098 9.12 12.00

2 1.00 8.59 0.659 1.659 9.88 13.00

3 1.50 9.62 0.729 2.229 10.64 14.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.22 k cm 2 4.34

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Page 124: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 124/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 20 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 15 35 50 73 33 40 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 20 4.50 - 5.00 UDS 1 1.63 1.02 60.24 CH 0 4 40 56 76 35 41 ----- TUU 0.14 5.93 ----- 48 ----- ----- ----- 2.65

BH - 20 9.00 - 9.60 SPT 5 ----- ----- ----- CH 0 12 35 53 74 32 42 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

Page 125: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 125/183

Page 126: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 126/183

Project:

1.25 mm/min 18.08.201238.00 mm BH - 2076.00 mm 4.50 - 5.001.02 g/cm 3 TUU60.24 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.85 0.381 0.881 8.36 11.00

2 1.00 5.72 0.444 1.444 9.12 12.00

3 1.50 6.60 0.506 2.006 9.88 13.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.14 k cm 2 5.93

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Page 127: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 127/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 21 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 38 23 39 53 26 27 ----- ----- ----- ----- ----- 40 ----- ----- ----- -----

BH - 21 4.50 - 5.00 UDS 1 1.60 0.99 61.73 CH 0 3 35 62 93 36 57 ----- TUU 0.17 3.2 ----- ----- ----- ----- ----- -----

BH - 21 7.50 - 8.10 SPT 4 ----- ----- ----- CH 0 11 32 57 87 32 55 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.61

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 128: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 128/183

Particle

% % % % mm mm mm

BH - 21 3 .00 - 3.60 CH 0 38 23 39 ----- ----- ----- ----- ----- 53 26 27 SPT 2

BH - 21 4 .50 - 5.00 CH 0 3 35 62 ----- ----- ----- ----- ----- 93 36 57 UDS 1

BH - 21 7 .50 - 8.10 CH 0 11 32 57 ----- ----- ----- ----- ----- 87 32 55 SPT 4

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 3 0 %

Bore HoleNo.

Silt Φ

6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 129: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 129/183

Project:

1.25 mm/min 09.07.201238.00 mm 2176.00 mm 4.50 - 5.000.99 g/cm 3 TUU61.73 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 5.33 0.423 0.923 7.60 10.00

2 1.00 6.28 0.493 1.493 8.36 11.00

3 1.50 7.16 0.555 2.055 9.12 12.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.17 k cm 2 3.2

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

Page 130: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 130/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 23 3.00 - 3.60 SPT 2 ----- ----- ----- SM 22 43 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 23 6.00 - 6.50 UDS 1 1.65 1.06 55.16 CH 3 17 31 49 67 29 38 ----- TUU 0.21 3.66 ----- 40 ----- 0.31 1.47 2.63

BH - 23 10.50 - 11.10 SPT 6 ----- ----- ----- SM 5 68 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

35

27

Permeability Test

Chemical Analysis

Consistency Limits

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Mechanical Analysis

05.07.2012

VerticalConsolidation

FLB 04

Shear Test

Page 131: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 131/183

Page 132: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 132/183

IS - 2720 , P-15Project:

Location: ----------- Date: 03.09.2012

Bore Hole No./Trial Pit No.: BH - 23 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.06 1.16 gm/cm 3 0.10 - 0.25 3.83 4.67E-02 5.67E-05Moisture Content, w 55.16 48.35 % 0.25 - 0.50 2.46 4.45E-02 3.47E-05Initial Void Ratio,e o 1.47 1.27 0.50 - 1.00 1.61 4.36E-02 2.23E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 1.17 3.32E-02 1.23E-05

Degree of Saturation, S r 98.38 100.00 % 2.00 - 4.00 0.82 2.05E-02 5.31E-060.310.71 kg/cm 2

0.1 1.47465620.25 1.45733360.5 1.43

1 1.3772 1.2984 1.2036813

2 1.21481731 1.23213990.5 1.2469878

0.25 1.26307310.1 1.2717344

0 00 00 00 00 00 0

Job No.: 3228Checked By:

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

1.20

1.25

1.30

1.35

1.40

1.45

1.50

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 133: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 133/183

Project:

1.25 mm/min 09.07.201238.00 mm 2376.00 mm 6.00 - 6.501.06 g/cm 3 TUU55.16 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 6.68 0.524 1.024 8.36 11.00

2 1.00 7.63 0.592 1.592 9.12 12.00

3 1.50 8.67 0.665 2.165 9.88 13.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.21 k cm 2 3.66

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Page 134: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 134/183

Page 135: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 135/183

Page 136: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 136/183

IS - 2720 , P-15Project:

Location: ----------- Date: 06.09.2012

Bore Hole No./Trial Pit No.: BH - 24 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.97 1.34 gm/cm 3 0.10 - 0.25 3.95 2.40E-01 3.01E-04Moisture Content, w 63.76 36.63 % 0.25 - 0.50 2.11 2.25E-01 1.50E-04Initial Void Ratio,e o 1.71 0.96 0.50 - 1.00 1.22 1.51E-01 5.85E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.80 9.86E-02 2.49E-05

Degree of Saturation, S r 97.85 100.00 % 2.00 - 4.00 0.49 5.54E-02 8.69E-060.760.42 kg/cm 2

0.1 1.71368410.25 1.61599150.5 1.469

1 1.2822 1.05697254 0.8290231

2 0.85751681 0.89686520.5 0.9212883

0.25 0.94435460.1 0.9633504

0 00 00 00 00 00 0

Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

0.80

0.85

0.90

0.95

1.00

1.05

1.10

1.15

1.20

1.25

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 137: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 137/183

Project:

1.25 mm/min 09.07.201238.00 mm 2476.00 mm 6.00 - 6.500.97 g/cm 3 TUU63.76 % UDS 01

Serial No.Cell

Pressure σ 3

DeviatoricForce atFailure

DeviatoricStress at

Failure, d

Normal Stressat Failure, 1

Change inLength atFailure, ∆L

Strain atFailure,ε

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities

at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 5.17 0.405 0.905 8.36 11.00

2 1.00 6.04 0.469 1.469 9.12 12.00

3 1.50 7.00 0.537 2.037 9.88 13.00

0.5

1.0

1.5

2.0

2.5

S h e a r S t r e s s , k g / s q . c m

Cohesion: 0.18 k cm 2 2.75

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

Page 138: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 138/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 26 4.50 - 5.10 SPT 3 ----- ----- ----- CH 1 34 26 39 75 31 44 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 26 6.00 - 6.50 UDS 1 1.49 0.81 84.76 CH 7 5 37 51 86 34 52 ----- TUU 0.07 3.43 ----- 45 ----- ----- ----- 2.61

BH - 26 7.50 - 8.10 SPT 4 ----- ----- ----- CH 1 33 26 40 73 32 41 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Page 139: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 139/183

Particle

% % % % mm mm mm

BH - 26 4 .50 - 5.10 CH 1 34 26 39 ----- ----- ----- ----- ----- 75 31 44 SPT 3

BH - 26 6 .00 - 6.50 CH 7 5 37 51 ----- ----- ----- ----- ----- 86 34 52 UDS 1

BH - 26 7 .50 - 8.10 CH 1 33 26 40 ----- ----- ----- ----- ----- 73 32 41 SPT 4

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 140: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 140/183

Page 141: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 141/183

Page 142: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 142/183

Page 143: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 143/183

0.6904 0.0789 1.2533 0.1049 1.8053 0.1265 135.00000.6970 0.0717 1.2621 0.0954 1.8159 0.1150 140.00000.7029 0.0640 1.2700 0.0851 1.8254 0.1026 145.0000

0.7081 0.0558 1.2769 0.0742 1.8337 0.0894 150.00000.7126 0.0472 1.2829 0.0627 1.8409 0.0756 155.00000.7163 0.0382 1.2878 0.0508 1.8469 0.0612 160.00000.7193 0.0289 1.2917 0.0384 1.8516 0.0463 165.00000.7214 0.0194 1.2945 0.0258 1.8550 0.0311 170.00000.7226 0.0097 1.2962 0.0129 1.8570 0.0156 175.00000.7231 0.0000 1.2968 0.0000 1.8577 0.0000 180.0000

Page 144: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 144/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 28 1.50 - 2.10 SPT 1 ----- ----- ----- CH 0 20 38 42 63 28 35 ----- ----- ----- ----- ----- 42 ----- ----- ----- 2.63

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

Page 145: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 145/183

Particle

% % % % mm mm mm

BH - 28 1.5 0 - 2.10 CH 0 20 38 42 ----- ----- ----- ----- ----- 63 28 35 SPT 1

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 146: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 146/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 29 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 9 43 48 64 31 33 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 29 4.50 - 5.00 UDS 1 1.68 1.12 50.29 CH 0 10 40 50 68 33 35 ----- TUU 0.28 5.48 ----- 43 ----- ----- ----- 2.64

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Page 147: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 147/183

Particle

% % % % mm mm mm

BH - 29 3 .00 - 3.60 CH 0 9 43 48 ----- ----- ----- ----- ----- 64 31 33 SPT 2

BH - 29 4 .50 - 5.00 CH 0 10 40 50 ----- ----- ----- ----- ----- 68 33 35 UDS 1

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 148: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 148/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH - 29 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.12 1.32 gm/cm 3 0.10 - 0.25 3.83 6.13E-02 7.44E-05Moisture Content, w 50.29 38.03 % 0.25 - 0.50 2.57 5.98E-02 4.88E-05Initial Void Ratio,e o 1.36 1.00 0.50 - 1.00 1.54 5.47E-02 2.67E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 1.15 5.44E-02 1.98E-05

Degree of Saturation, S r 97.50 100.00 % 2.00 - 4.00 0.84 4.19E-02 1.11E-050.590.94 kg/cm 2

0.1 1.36170.25 1.340.5 1.305

1 1.2422 1.124 0.9424983

2 0.95784931 0.97083870.5 0.9802855

0.25 0.99445570.1 1.0039025

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

0.90

0.95

1.00

1.05

1.10

1.15

1.20

1.25

1.30

1.35

1.40

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 149: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 149/183

Project:

1.25 mm/min 18.08.201238.00 mm BH - 2976.00 mm 4.50 - 5.001.12 g/cm 3 TUU50.29 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 8.29 0.672 1.172 6.08 8.00

2 1.00 9.95 0.798 1.798 6.84 9.00

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities atEast Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

. . . . . .

Cohesion: 0.28 k cm 2 5.48

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

0.0

0.5

1.0

1.5

2.0

2.5

3.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 150: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 150/183

Page 151: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 151/183

Particle

% % % % mm mm mm

BH - 31 3 .00 - 3.60 CH 0 26 32 42 ----- ----- ----- ----- ----- 74 32 42 SPT 2

BH - 31 4 .50 - 5.00 CH 3 6 40 51 ----- ----- ----- ----- ----- 78 33 45 UDS 1

BH - 31 6 .00 - 6.60 CH 7 11 35 47 ----- ----- ----- ----- ----- 72 30 42 SPT 3

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 152: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 152/183

Page 153: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 153/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 32A 3.00 - 3.60 SPT 2 ----- ----- ----- SC 13 38 25 24 47 23 24 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 32A 4.50 - 5.00 UDS 1 1.52 0.87 75.01 CH 2 8 40 50 79 30 49 ----- TUU 0.09 2.86 ----- 48 ----- ----- ----- 2.62

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Page 154: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 154/183

Particle

% % % % mm mm mm

B H - 32 A 3 .0 0 - 3. 60 SC 13 38 25 24 ----- ----- ----- ----- ----- 47 23 24 SPT 2

B H - 32 A 4 .5 0 - 5. 00 CH 2 8 40 50 ----- ----- ----- ----- ----- 79 30 49 UDS 1

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 155: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 155/183

Page 156: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 156/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - 33 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 8 39 53 78 30 48 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - 33 4.50 - 5.00 UDS 1 1.59 0.96 64.87 CH 1 9 42 48 75 28 47 ----- TUU 0.10 3.15 ----- 42 ----- ----- ----- 2.62

BH - 33 6.00 - 6.60 SPT 3 ----- ----- ----- CH 17 20 27 36 57 27 30 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Location :

SOIL TEST DATA SHEET

Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.

R e m a r k s

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Consistency Limits

B o r e H o l e N o .

S a m p l e T y p e

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

Compaction Test

Permeability Test

Chemical Analysis

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

Shear Test

18.08.2012

Mechanical AnalysisVertical

Consolidation

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density

gm/ cm 3

FLB 04

Page 157: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 157/183

Particle

% % % % mm mm mm

BH - 33 3 .00 - 3.60 CH 0 8 39 53 ----- ----- ----- ----- ----- 78 30 48 SPT 2

BH - 33 4 .50 - 5.00 CH 1 9 42 48 ----- ----- ----- ----- ----- 75 28 47 UDS 1

BH - 33 6 .00 - 6.60 CH 17 20 27 36 ----- ----- ----- ----- ----- 57 27 30 SPT 3

Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel Φ

6 0 %

G e o t e c h ni c al I nv e s t i g a t i onW

or k f or t h eP r o p o s e d I n s t al l a t i on

of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q

u a y -

7 ( E Q-7 ) B er t h i n

t h e

i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .

3 2 2 8

Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

P r o j e c t :

P l a s t i c L i m i t , W

p

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

------------

Symbol Φ

3 0 %

Bore HoleNo.

Silt

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 158: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 158/183

IS - 2720 , P-15Project:

Location: ----------- Date: 07.09.2012

Bore Hole No./Trial Pit No.: BH - 33 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01

PressureIncrement

Coefficientof

consolidation Cv

Coefficient ofvolume

compressibiltymv

Permeability (K)

kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.96 1.07 gm/cm 3 0.10 - 0.25 3.41 6.80E-02 7.37E-05Moisture Content, w 64.87 55.41 % 0.25 - 0.50 1.73 6.55E-02 3.59E-05Initial Void Ratio,e o 1.72 1.45 0.50 - 1.00 1.37 5.82E-02 2.53E-05Specific Gravity,G 2.62 2.62 1.00 - 2.00 1.07 4.05E-02 1.37E-05

Degree of Saturation, S r 99.00 100.00 % 2.00 - 4.00 0.78 2.18E-02 5.40E-060.360.53 kg/cm 2

0.1 1.71672580.25 1.6890.5 1.645

1 1.5682 1.46407034 1.3567596

2 1.37713511 1.39343540.5 1.4097358

0.25 1.43011120.1 1.451845

0 00 00 00 00 00 0

Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:

CONSOLIDATION TEST

EndStartProperties of Soil

Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag

1.30

1.35

1.40

1.45

1.50

1.55

1.60

1.65

1.70

1.75

1.80

0.10 1.00 10.00

V o

i d s

R a

t i o , e

Pressure Increment (Kg/cm 2)

Voids Ratio, e Vs Pressure Increment (Kg/cm 2)

Pc

Page 159: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 159/183

Project:

1.25 mm/min 18.08.201238.00 mm BH - 3376.00 mm 4.50 - 5.000.96 g/cm 3 TUU64.87 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 3.34 0.265 0.765 7.60 10.00

2 1.00 4.05 0.318 1.318 8.36 11.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities atEast Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

. . . . . .

Cohesion: 0.1 k cm 2 3.15

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 160: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 160/183

Page 161: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 161/183

Particle

% % % % mm mm mm

BH - N - 01 3.00 - 3.60 CI 1 33 37 29 ----- ----- ----- ----- ----- 48 25 23 SPT 2

BH - N - 01 4.50 - 5.10 CI 3 44 33 20 ----- ----- ----- ----- ----- 42 22 20 SPT 3

BH - N - 01 6.00 - 6.60 SP 0 97 0.16 0.32 0.58 3.63 1.10 ----- ----- ----- SPT 4

BH - N - 01 10.50 - 10.98 SM 26 40 ----- ----- ----- ----- ----- ----- ----- ----- SPT 7

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

Φ 6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

3

34

Φ 3 0 %

Bore HoleNo.

Silt

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 162: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 162/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH-N-2 1.50 - 2.10 SPT 1 ----- ----- ----- SM 32 44 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.65

BH-N-2 3.00 - 3.60 SPT 2 ----- ----- ----- SM 9 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH-N-2 9.00 - 9.12 SPT 10 ----- ----- ----- GM 65 24 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH-N-2 18.00 - 18.10 SPT 12 ----- ----- ----- GM 53 33 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

08.09.2012

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Mechanical Analysis

SOIL TEST DATA SHEET

Project :

S w e l l i n g P r e s s u r e

k g / c m 2

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S a m p l e T y p e

Location :

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

39

Compaction Test

Permeability Test

Chemical Analysis

R e m a r k s

FLB 04

Consistency LimitsVertical

Consolidation

B o r e H o l e N o .

DATE:

S o i l C l a s s i f i c a t i o n ( I . S ) Shear Test

24

11

14

Page 163: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 163/183

Particle

% % % % mm mm mm

BH-N-2 1.50 - 2.10 SM 32 44 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1

BH-N-2 3.00 - 3.60 SM 9 52 ----- ----- ----- ----- ----- ----- ----- ----- SPT 2

BH-N-2 9.00 - 9.12 GM 65 24 ----- ----- ----- ----- ----- ----- ----- ----- SPT 10

BH-N-2 18.00 - 18.10 GM 53 33 ----- ----- ----- ----- ----- ----- ----- ----- SPT 12

Sand

P l a s t i c i t y I n d e x , I p

R e m a r k s

L o c a t i o n :

L i q u i d L i m i t , W

l

P r o j e c t :

P l a s t i c L i m i t , W

p

------------

24

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

J o b

N o .

:

Symbol

3 2 2 8

Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

39

Φ 3 0 %

Φ 6 0 %

Bore HoleNo.

Silt Coeff. ofUniformity,Cu = D60 /

D10

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

Gravel

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

11

14

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 164: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 164/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - N - 3 3.00 - 3.60 SPT 2 ----- ----- ----- SM 15 70 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - N - 3 6.00 - 6.60 UDS 1 1.53 0.98 56.61 CI 2 31 35 32 46 22 24 ----- TUU 0.15 3.89 ----- ----- ----- ----- ----- 2.65

BH - N - 3 7.50 - 8.10 SPT 4 ----- ----- ----- SC 2 49 32 17 42 20 22 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - N - 3 22.00 - 22.09 SPT 16 ----- ----- ----- SM 53 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

11

15

Mechanical Analysis

10.09.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 165: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 165/183

Particle

% % % % mm mm mm

BH - N - 3 3 .00 - 3.60 SM 15 70 ----- ----- ----- ----- ----- ----- ----- ----- SPT 2

BH - N - 3 6 .00 - 6.60 CI 2 31 35 32 ----- ----- ----- ----- ----- 46 22 24 UDS 1

BH - N - 3 7 .50 - 8.10 SC 2 49 32 17 ----- ----- ----- ----- ----- 42 20 22 SPT 4

BH - N - 3 22.00 - 22.09 SM 53 36 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1611

Φ 3 0 %

Bore HoleNo.

Silt

15

Φ 6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 166: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 166/183

Project:

1.25 mm/min 10.03.201238.00 mm BH-N-376.00 mm 6.00 - 6.501.03 g/cm 3 UU57.61 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.91 0.385 0.885 8.36 11.00

2 1.00 5.88 0.456 1.456 9.12 12.00

Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

. . . . . .

Cohesion: 0.15 k cm 2 3.89

JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

Angle of internal friction,

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 167: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 167/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH -N- 04 1.50 - 2.10 SPT 1 ----- ----- ----- SM 7 69 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH -N- 04 4.50 - 5.00 UDS 1 1.58 0.96 63.77 CH 0 1 32 67 87 29 58 ----- TUU 0.14 4.12 ----- ----- ----- ----- ----- 2.64

BH -N- 04 9.00 - 9.60 SPT 5 ----- ----- ----- SM 1 76 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

23

24

Mechanical Analysis

10.09.2012

VerticalConsolidation

FLB 04

Shear Test

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

Permeability Test

Chemical Analysis

Consistency Limits

Page 168: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 168/183

Particle

% % % % mm mm mm

BH -N- 04 1 .50 - 2 .10 SM 7 69 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1

BH -N- 04 4 .50 - 5 .00 CH 0 1 32 67 ----- ----- ----- ----- ----- 87 29 58 UDS 1

BH -N- 04 9 .00 - 9 .60 SM 1 76 ----- ----- ----- ----- ----- ----- ----- ----- SPT 523

Φ 3 0 %

Bore HoleNo.

Silt

24

Φ 6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k sCoeff. of

Uniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Classifi--cation

( IS )

Size(mm)

L o c a t i o n :

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

3 2 2 8

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 169: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 169/183

Project:

1.25 mm/min 10.03.201238.00 mm BH-N-476.00 mm 4.50 - 5.000.96 g/cm 3 UU63.77 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.69 0.372 0.872 7.60 10.00

2 1.00 5.57 0.437 1.437 8.36 11.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

. . . . . .

Cohesion: 0.14 k cm 2 4.12

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 170: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 170/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH -N- 5 1.50-2.00 SPT 2 ----- ----- ----- SC 20 32 20 28 38 22 16 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH -N- 5 4.50 - 5.00 UDS 1 1.50 0.82 82.86 CH 1 8 31 60 94 33 61 ----- TUU 0.07 3.71 ----- ----- ----- ----- ----- 2.62

BH -N- 5 7.50 - 8.00 SPT 4 ----- ----- ----- SM 23 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

Permeability Test

Chemical Analysis

Consistency Limits

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

S w e l l i n g P r e s s u r e

k g / c m 2

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Mechanical Analysis

S a m p l e T y p e

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

10.09.2012

VerticalConsolidation

FLB 04

Shear Test

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

25

Location :

B o r e H o l e N o .

Page 171: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 171/183

Particle

% % % % mm mm mm

B H - N- 5 1 .5 0- 2. 00 SC 20 32 20 28 ----- ----- ----- ----- ----- 38 22 16 SPT 2

B H - N- 5 4 .5 0 - 5. 00 CH 1 8 31 60 ----- ----- ----- ----- ----- 94 33 61 UDS 1

B H - N- 5 7 .5 0 - 8. 00 SM 23 52 ----- ----- ----- ----- ----- ----- ----- ----- SPT 4

P l a s t i c L i m i t , W

p

------------

Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

Classifi--cation

( IS )

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

3 2 2 8

Coeff. ofUniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Size(mm)

L o c a t i o n :

Φ 3 0 %

Bore HoleNo.

Silt

25

Φ 6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k s

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 172: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 172/183

Project:

1.25 mm/min 10.03.201238.00 mm BH-N-576.00 mm 4.50 - 5.000.82 g/cm 3 UU82.86 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 2.86 0.229 0.729 6.84 9.00

2 1.00 3.74 0.297 1.297 7.60 10.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

. . . . . .

Cohesion: 0.07 k cm 2 3.71

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

0.0 0.5 1.0 1.5 2.0

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 173: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 173/183

------------

W e t D e n s i t y

D r y D e n s i t y

G r a v e l %

S a n d %

S i l t %

C l a y %

L i q u i d %

P l a s t i c %

P l a s t i c i t y I n d e x , I p %

T y p e

C o

h e s i o n C u

k g / c m 2

D e g r e e

φ

C o m p . I n d e x C c v

( L a b )

I n i t i a l V o i d R a t i o

BH - N - 6 1.50 - 2.10 SPT 1 ----- ----- ----- CH 4 22 32 43 64 28 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

BH - N - 6 3.00 - 3.50 UDS 1 1.62 1.02 58.50 CH 1 4 36 59 92 36 56 ----- TUU 0.15 3.2 ----- ----- ----- ----- ----- 2.63

BH - N - 6 4.50 - 4.75 SPT 2 ----- ----- ----- GP-GM 61 30 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----

CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :

Angle of Internal Friction

COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :

Undrained Cohesion

DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :

Effective Angle of Internal Friction

K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :

Effective Cohesion

FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay

9

10.09.2012

VerticalConsolidation

FLB 04

Shear Test

DATE:

S o i l C l a s s i f i c a t i o n ( I . S )

3228Job. No. :

Free Swell Test

Direct Shear

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.

R e m a r k s

F r e e S w e l l I n d e x %

D e p t h i n m

.

Density(Remoulded)

gm/ cm 3

S p e c i f i c G r a v i t y

N a t u r a l M o i s t u r e

C o n t e n t , w

%

C u

f r o m U n c o n f i n e d C o m p r e s s i o n

T e s t K g / c m

2

S h r i n k a g e L i m i t %

Mechanical Analysis

Location :

B o r e H o l e N o .

S a m p l e T y p e

Compaction Test

Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag

SOIL TEST DATA SHEET

Project :

S w e l l i n g P r e s s u r e

k g / c m 2

Permeability Test

Chemical Analysis

Consistency Limits

Page 174: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 174/183

Particle

% % % % mm mm mm

BH - N - 6 1 .50 - 2.10 CH 4 22 32 43 ----- ----- ----- ----- ----- 64 28 36 SPT 1

BH - N - 6 3 .00 - 3.50 CH 1 4 36 59 ----- ----- ----- ----- ----- 92 36 56 UDS 1

BH - N - 6 4 .50 - 4.75 GP-GM 61 30 0.08 0.17 11 137.50 0.03 ----- ----- ----- SPT 2

Φ 6 0 %

P l a s t i c i t y I n d e x , I p

R e m a r k s

Size(mm)

L o c a t i o n :

Φ 3 0 %

Bore HoleNo.

Silt

9

G R A I N S I Z E D

I S T R I B U T I O N C U R V E

L i q u i d L i m i t , W

l

P r o j e c t :

J o b

N o .

:

3 2 2 8

Coeff. ofUniformity,Cu = D60 /

D10

DB

M G E O

T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .

Depth in m. Φ

1 0 % Coeff. OfCurvature

Cc

D302/(D 60*D

10 )

Classifi--cation

( IS )Symbol

G e o t e c h ni c al I nv e s t i g a t i on

w or k

f or P r o p o s e d P r o j e c t a t E Q- 0 7

J e t t y ,V i z a g

Gravel Sand Clay

P l a s t i c L i m i t , W

p

------------

0

10

20

30

40

50

60

70

80

90

100

0.00010.0010.010.1110

P E R C E N T A G E F I N E R T H A N

PARTICLE SIZE ( mm )

GRAVELFC

SANDC M F

SILT CLAY

80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3

Page 175: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 175/183

Project:

1.25 mm/min 10.03.201238.00 mm BH-N-676.00 mm 3.00 - 3.501.02 g/cm 3 UU58.50 % UDS 01

Serial No.Cell

Pressure σ 3

Deviatoric

Force at Failure

DeviatoricStress at

Failure, d

Normal Stress

at Failure, 1

Change inLength atFailure, ∆L

Strain at

Failure,ε

kg/cm 2 kg kg/cm 2 cm cm 2 %

1 0.50 4.77 0.374 0.874 8.36 11.00

2 1.00 5.64 0.438 1.438 9.12 12.00

TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971

State of Sample:

Height of Specimen:

Date:Bore Hole No.:

Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag

Diameter of Specimen:Rate of Strain :Location: --------

Depth (m)Condition of Test :Dry Density,γ d :

Moisture Content:

. . . . . .

Cohesion: 0.15 k cm 2 3.2

JOB No. 3228Checked By: Ravi A

Angle of internal friction,

DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

0.0

0.5

1.0

1.5

2.0

2.5

0.0 0.5 1.0 1.5 2.0 2.5

S h e a r S t r e s s , k g / s q . c m

Normal Stress, kg/sq.cm

Page 176: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 176/183

FLB 10

T E :

OCATION: ---------------------- 10.07 .2012

Sr . No. Bor e Hole No. Dept h in m . Type of Sam plepH

Electrometrically Sul ph at e as SO 3

( % ) Chlor ide as Cl ( %) Rem ar ks

1 BH -01 1.50 - 2.10 SPT -1 7.40 0.340 1.225

2 BH - 02 4.50 - 5.10 SPT - 2 7.48 0.535 2.349

3 BH - 03 6.00 - 6.60 SPT - 3 7.49 0.577 2.369

4 BH - 04 6.00 - 6.60 SPT - 3 7.75 0.303 1.060

5 BH - 05 4.50 - 5.10 SPT - 3 7.46 0.421 1.560

6 BH - 08 3.00 - 3.60 SPT - 2 6.80 0.289 1.040

7 BH - 10 3.00 - 3.60 SPT - 2 7.30 0.458 1.42

8 BH - 12 7.50 - 8.10 SPT - 4 7.48 0.513 2.79

9 BH - 18 3.00 - 3.60 SPT - 2 7.20 0.392 1.83

10 BH - 19 3.00 - 3.60 SPT - 2 7.28 0.415 1.65

11 BH - 21 7.50 - 8.10 SPT - 4 7.33 0.131 0.46

12 BH - 23 3.00 - 3.60 SPT - 2 7.39 0.194 0.64

13 BH - 24 3.00 - 3.60 SPT - 2 7.35 0.312 1.06

DBM GEOTECHNI CS & CONSTRUCTIONS PVT. LTD

CHEMI CAL TEST RESULT OF SOIL SAMPLES.

Geotechnical In vesti gation wor k for Proposed Pr oject at EQ -07 Jetty,Vizag

3228

Page 177: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 177/183

DBM

SUB-SURFACE SOIL PROFILE

Page 178: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 178/183

Page 179: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 179/183

Page 180: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 180/183

Page 181: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 181/183

Page 182: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 182/183

Page 183: Vol-ii_stack Yard Area

8/10/2019 Vol-ii_stack Yard Area

http://slidepdf.com/reader/full/vol-iistack-yard-area 183/183