FINAL GEOTECHNICAL INVESTIGATION REPORT (NOVEMBER 2012)PROPOSED INSTALLATION OF MECHANICAL HANDLING FACILITIES
AT EAST QUAY-7 (EQ-7) BERTH IN THE INNER HARBOUROF VISAKHAPATNAM PORT TRUST
FOR VIZAG AGRIPORT PVT. LTD.
(VOLUME-II STACK YARD AREA)
Table of Contents
Item Page
1.0 INTRODUCTION 1
2.0 PROJECT DESCRIPTON 2
3.0 SCOPE OF WORK 2
4.0 SUBSURFACE CONDITIONS 4
4.1 Ground Water Levels 6
5.0 ENGINEERING RECOMMENDATIONS 7
5.1 Foundation Protection 9
6.0 METHODOLOGY OF INVESTIGATION 10
Reference & Calculations 12
ANNEXURES
A) Location Plan of BoreholesB) Borehole LogsC) Laboratory Test Results
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 2/183
FINAL GEOTECHNICAL INVESTIGATION REPORT (NOVEMBER 2012)
PROPOSED INSTALLATION OF MECHANICAL HANDLING FACILITIES AT EAST QUAY-7 (EQ-7) BERTH IN THE INNER HARBOUR
OF VISAKHAPATNAM PORT TRUSTFOR VIZAG AGRIPORT PVT. LTD.
(VOLUME-II STACK YARD AREA)
1.0 INTRODUCTION
Visakhapatnam Port Trust (VPT) has awarded Installation of Mechanized Fertilizer
Handling Facilities at East Quay-7 (EQ7) in the Inner Harbour of Visakhapatnam Port on
Design, Build, Finance, Operate, Transfer (the “DBFOT”) basis to M/s. Vizag Agriport Pvt.
Ltd. (VAPL).
VAPL awarded the work of geotechnical investigation and topographic survey to DBM
Geotechnics and Constructions Pvt. Ltd. Vide work order No. VAPL/DBM/geo-
tech/VSP/2012/01 dated 29 th may 2012. The field work and laboratory testing for the
geotechnical investigation was completed by DBM Geotechnics in November 2012. This
Volume-II of report presents the results of geotechnical investigation along with the
foundation Engineering recommendation for the Stack Yard Area .
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 3/183
2
2.0 PROJECT DESCRIPTION
The existing EQ-7 berth is 255m long for handling fertilizers, dry bulk cargo. The proposed
facilities will include, mechanization such as conveyor system, storage facilities, bagging
plant all the connected civil, mechanical and electrical works. The system shall be designed
for the unloading of fertilizer at the rate of 25,000 TPD. The optimal annual quay capacity of
EQ7 is estimated to be 7.0 million. The system shall consist mainly of (a) Unloading and
Stacking System and (b) Reclaiming, Bagging and Wagon Loading System, etc. The
existing ground surface elevations are between (+)2.70m to (+)4.00m with respect to chart
datum.
3.0 SCOPE OF WORK
The scope of work completed at this site is summarized below:
a) Completing Thirty one boreholes (BH-1 to BH-5, BH-8, BH-10 to BH-12, BH-14,BH-15, BH-18 to BH-21, BH-23, BH-24, BH-26, BH-28, BH-29, BH-31, BH-32A,BH-33 and BH-N1 to BH-N8) in Stack yard area.
b) Conducting in-situ tests such as Standard Penetration Test (SPT) at specifieddepths.
c) Obtaining Undisturbed Soil Samples (UDS) in cohesive soils.
d) Conducting eleven Field Vane Shear Test (FVST) in selected boreholes.
e) Conducting laboratory tests on disturbed (SPT) and Undisturbed soil and rocksamples.
f) Preparing and submitting a geotechnical investigation report.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 4/183
3
g) Topography survey for proposed berth alignment, backup area and stack yard.
Completed borehole co-ordinates, and reduced levels (RL) with respect to Chart
Datum (CD) are summarized in Table A1 below.
TABLE A1BOREHOLE COORDINATES AND ELEVATIONS
BH. NoCO-ORDINATES GROUND
R.L.TERMINATION
DEPTH,BGLTERMINATION
LEVELNORTHING EASTING (m) (m) (m)
BH-1 1960170.557 742490.025 (+)2.723 9.30 (-)6.577BH-2 1960178.833 742548.89 (+)2.716 10.00 (-)7.284BH-3 1960191.293 742621.645 (+)2.961 11.20 (-)8.239BH-4 1960204.398 742692.798 (+)2.851 9.20 (-)6.349BH-5 1960226.557 742786.083 (+)3.172 9.70 (-)6.528BH-8 1960153.858 742636.337 (+)2.506 14.50 (-)11.994
BH-10 1960190.307 742781.307 (+)2.756 13.00 (-)10.244BH-11 1960217.195 742837.117 (+)2.854 14.78 (-)11.926BH-12 1960092.395 742631.144 (+)2.801 14.50 (-)11.699BH-14 1960123.496 742735.68 (+)2.455 13.60 (-)11.145BH-15 1960128.703 742814.601 (+)2.957 19.80 (-)16.843BH-18 1960042.027 742778.714 (+)2.752 18.15 (-)15.398BH-19 1960068.066 742850.323 (+)2.922 14.85 (-)11.928BH-20 1960061.146 742946.34 (+)3.304 13.08 (-)9.776BH-21 1959993.045 742856.859 (+)2.739 17.50 (-)14.761BH-23 1960009.016 742957.088 (+)4.010 15.35 (-)11.340BH-24 1959944.414 742971.158 (+)3.189 16.75 (-)13.561BH-26 1960147.554 742971.466 (+)3.463 12.10 (-)8.637BH-28 1960128.52 743078.659 (+)3.360 8.10 (-)4.740BH-29 1960096.854 742982.144 (+)3.713 9.00 (-)5.287BH-31 1960062.908 743108.691 (+)3.705 9.60 (-)5.895BH-32 1960049.003 743038.329 (+)3.511 13.08 (-)9.569
BH-33 1960021.933 743086.241 (+)3.598 9.60 (-)6.002BH-N1 1960307.729 742966.519 (+)3.610 25.50 (-)21.890BH-N2 1960269.345 742988.127 (+)3.474 27.00 (-)23.526BH-N3 1960272.336 742901.831 (+)3.700 26.00 (-)22.300BH-N4 1960203.424 742928.076 (+)3.600 13.50 (-)9.400BH-N5 1960200.620 742988.790 (+)3.683 11.00 (-)7.317BH-N6 1960201.370 743050.820 (+)3.745 9.00 (-)5.255BH-N7 1959964.655 743069.021 (+)3.485 15.0 (-)11.515BH-N8 1959867.214 743184.218 (+)3.550 13.5 (-)9.950
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 5/183
4
4.0 SUBSURFACE CONDITIONS
Subsurface profile generally consists of fill overlying marine deposits underlain by completely
weathered rock and then bedrock. Encountered soil/rock layers are described in detail
below;
LAYER I: FILL
Fill soils, consisting mostly of dark grayish or reddish brown silty clay/sand with boulders,
were encountered at the ground surface. Based on Standard Penetration Tests (SPT),
relative densities of the granular soils (sand) within this layer, ranged between Loose to
dense. The thickness of this layer was typically between 1.50m and 4.50m.
LAYER II: MARINE DEPOSITS
Marine deposits consisting mostly of marine clay and silty sand were encountered at depths
between 1.50m and 4.50m below existing ground surface. Based on SPT tests conducted in
the field and Triaxial Tests conducted on UDS samples in the laboratory, consistencies of
the cohesive soils (clay), ranged typically between very soft to Very stiff generally improving
with the depth. Relative densities of granular soils (sand) within this layer, ranged between
loose to dense. The lower boundary of the marine deposits layer was encountered at depths
between 4.50m and 15.00m below existing ground surface.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 6/183
5
LAYER III: COMPLETELY WEATHERED BEDROCK
Completely weathered bedrock was encountered at depths between 4.5m and 15.0m
below existing ground surface in boreholes BH-14, BH-15, BH-21, BH-32A, and BH-N1,
BH-N2 and BH-N3 only. This completely weathered rock layer was not encountered in the
remaining boreholes. This layer is formed by the complete in-place disintegration of parent
bedrock material, but still partially retains the original rock mass structure. SPT tests
encountered refusals. Core recoveries are less than 10 percent and Rock Quality
Designations (RQDs) were typically nil. Borehole BH-N3 was terminated in this completely
weathered rock at a depth of 26.0m below ground surface. The lower boundary of this
layer was encountered typically at depths between 4.50 and 18.00m below existing ground
surface.
LAYER IV: KHONDALITE BEDROCK
Khondalite bedrock was encountered at depths between 4.50m and 18.00m below existing
ground surface. The bedrock was highly weathered to sound. Core recoveries ranged
between 11 and 96 percent, while Rock Quality Designations (RQDs) ranged between 0 and
91 percent typically improving with the depth. Rock compressive strengths ranged between
379 kg/cm 2 and 1255 kg/cm 2. The boreholes were terminated in hard bedrock at depths
between 8.10m to 27.00m below existing ground surface.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 7/183
6
4.1 Ground water Levels
Water heights at borehole locations were monitored during and after completion of drilling
activities. Groundwater was encountered at depths between 0.5m and 2.6m below ground
surface in boreholes. Significant tidal fluctuations were measured at each borehole location.
Annual and seasonal fluctuations in water levels can be expected to occur.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 8/183
7
5.0 ENGINEERING RECOMMENDATIONS
Soils encountered within stack yard area are not capable of providing adequate support
for the proposed loading of 5 t/m 2. Hence, ground improvement with band drains and
preloading or stone columns should be implemented at this site. Design of the ground
improvement system is not in current scope of work. However, based on our general
experience, Band drains will be spaced at 1.0m center to center in a triangular pattern and
will be completed to completely weathered rock. Pre-drilling may be required within the top
4.00m granular fill soils in some locations. A minimum 0.30m thick layer of sand blanket
should also be provided at existing ground surface.
Temporary preloading soil Fill corresponding to final design loads should be placed. A
consolidation period of upto 6 months may be required.
Proposed warehouse should be supported on bored cast-in-situ piles socketed in bedrock.
Piles should be socketed 1.5D in bedrock. Bedrock was encountered at depths between
4.50m and 18.00m below ground surface. Corresponding pile capacities are given in Table
D below. Piles can be terminated earlier if hard bedrock is encountered, which makes it
practically impossible for piling equipment to penetrate further.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 9/183
8
TABLE D (Except Borehole BH-28, BH-N2 and BH-N3)
Safe Vertical Downward & Lateral Capacity of Piles
PileDiameter, D
(mm)
Safe VerticalDownward
Capacity (MT)
Safe UpliftCapacity
(MT)
Safe LateralCapacity (MT)
500 115 30 3.5600 165 45 4.0750 260 70 5.0
Maximum total settlement of piles installed as described above will be less than 12mm.
Maximum Depth of fixity can be taken as 13.0D (D is pile diameter ) below pile cap or 1D in
bedrock whichever is less.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 10/183
9
5.1 Foundation Protection
Results of chemical analysis on soil and groundwater samples are enclosed in the
Annexure. Results of the soil samples fall under Class 3 for sulphate and class 5 for chloride
concentration. Results of the water samples fall under Class 2 for sulphate and chloride
concentration (As per IS456 and as per CIRIA Sp. Publication No. 31). A ‘very severe’
Exposure Condition was assigned to this site. Therefore following precautions are
recommended to protect subsurface concrete and reinforcement.
Type of Cement: OPC or PPC
Minimum Grade of Reinforced Concrete: M35
Minimum Cement Content for piles: 400 kg/m 3
Maximum Water Cement Ratio: 0.40
Minimum Cover to Reinforcement: 75mm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 11/183
10
6.0 METHODOLOGY OF INVESTIGATION
a) The sub-surface investigation was completed generally as per IS: 1892-1979. The
field investigation was carried out using rotary drilling machines. Casing was used to
support sides of borehole until sufficiently stiff strata was encountered.
b) Standard Penetration Tests (i.e. SPT) were carried out generally at an interval of
1.5m in the boreholes as per IS: 2131. Using this procedure, a 5cm outside
diameter split-barrel sampler is driven into the soil by a 63.50 kg. weight falling
75cm. After an initial set of 15cm, the number of blows required to drive the sampler
an additional 30, is known as the “penetration resistance” or “N value”. N values
obtained in field are shown on borehole logs enclosed in the Annexure.
c) In soil, drilling was progressed with Tungsten Carbide (T.C.) bit, while in rock it was
continued with diamond bit and double tube core barrel to obtain good quality rock
samples. In rock strata, length of rock core recovered from each run of drilling was
measured and recorded in the borelogs as percentage of Core Recovery (CR) and
Rock Quality Designation (RQD). Ratio of total length of rock pieces to the length
drilled expressed as percentage is known as Core Recovery. Ratio of total length of
rock pieces which are 100mm or longer to the total length drilled, expressed as
percentage is known as RQD. All core pieces obtained were serially numbered and
preserved in core boxes.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 12/183
11
d) Laboratory tests were carried out on disturbed and UDS samples obtained from
boreholes. Laboratory tests were conducted as per relevant parts of IS:2720.
Laboratory tests on disturbed samples included grain size analysis and Atterberg
Limits. Additional laboratory tests consisting of unconfined compression tests and
triaxial tests were conducted on UDS samples. Laboratory tests on rock core
samples included unit weight, water absorption test, porosity, and Uniaxial
Compressive Strength.
Sincerely,
DBM GEOTECHNICS AND CONSTRUCTION PVT. LTD.
__________________________________Jaydeep WaghB.E., M.S., P.E. (Geotechnical)
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 13/183
12
REFERENCES
1) Foundation Analysis and Design, J.E. Bowles, McGraw Hill Publication, 5 th Edition, 1996.
2) Canadian Foundation Engineering Manual.
3) Pile Design and Construction Practice, M. J. Tomlinson, Viewpoint Publications, 1992.
4) IS6403-1981: Code of Practice for Design of Shallow Foundations on Soils.
5) Foundation Design Manual, N. V. Nayak, 5 th Edition, 1996
6) Bored Piling in Mumbai Region, K. R. Datye, IGC 1990.
7) IS14593: Design and Construction of Bored Cast-in-Situ Piles Founded On Rocks-Guidelines.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 14/183
13
1. SAMPLE CALCULATION OF ALLOWABLE VERTICAL CAPACITY OF 600mm
DIA. PILES SOCKETED 1.5D BEDROCK : IS- 14593 Method
A) SKIN FRICTION CAPACITY IN BEDROCK:
Safe Skin Friction Capacity = Q sf = Q c x α x β x (πxDxL s ) [From Reference 7]Where ,Q c = uniaxial compressive strength of rock = 3790 T/m 2
α = Rock socket side resistance reduction factor = 0. 1 for Q c of 3790 T/m 2
β = Rock socket correction factor = 0.2D = Diameter of pile = 0.6mLs= Socket length into the rock = 0.9m
Q sf = (3790 x 0.1 x 0.2) x (3.142 x 0.6 x 0.9) = 128 MT
B) END BEARING CAPACITY IN BEDROCK:
Safe load carrying capacity = Q eb =Ap x q cxNØxN j (Reference 7)Where,Q c = uni-axial compressive strength of rock = 3790T/m2NØ= Depth factor = 0.8+0.2(l s /d) = 1.1 for 1.5D rock socketing bedrock
Ap= Area of pile toe = 0.282m 2
N j = 0.1 to 0.4 (adopted as 0.1 for weathered rock)Q eb = 3790 x 1.1 x 0.1 x 0.282 = 117 MT
THEREFORE, TOTAL PILE CAPACITY = 128 + 117 = 245 MTCorresponding to pressure in the pile shaft = 866 t/m 2
However, pressure in the pile shaft is restricted to 600 t/m 2
Therefore, Safe pile capacity = 600 t/m 2 x (C/s Area of Pile) = 169 MT
2. SAMPLE CALCULATION OF UPLIFT CAPACITY OF PILES SOCKETEDMINIMUM 1.0D INTO BEDROCK
Downward skin friction restricted to 60 t/m 2
Therefore allowable uplift capacity of pile= 2/3 rd of downward skin friction capacity
= 40 t/m 2
Therefore for 0.6m socketing = 3.1415x0.6x0.6x40= 45 MT
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 15/183
14
3. CALCULATION OF LATERAL CAPACITY OF PILE (1200mm Dia.)
Reference: Appendix-C (Revised) of IS 2911 (Part 1/Sec. 2) - 1979.
For soft clay As per Table 2 of Reference mentioned above,
Constant K 2 = 7.75 kg/cm 2
For long and flexible pile, depth of fixity ,
Where,
E = Modulus of Elasticity of pile material = 2.95 x 10 5 kg/cm 2 for concrete M35
I = Moment of Inertia = D4/64 cm 2 (D is pile diameter in cm)
Therefore,
4
45
75.764
1095.2
x
D x x R
R = 6.5 D (D is pile diameter in cm)
Unsupported length of pile, L 1 = 0.0cm
Therefore, L 1/R = 0.0
For fixed head pile and L 1/R = 0.0, L f /R = 2.2
Therefore, length of fixity,
Lf = 2.2 x R = 14.3 (where D is pile diameter in cm)
For fixed head pile, allowable lateral load, Q a corresponding to a deflection Y, 1% ofPile diameter as per IRC-78 = 1.2 cm,
Q a = 12 EIY/( L 1 + Lf )3 = (12 x 2.95 x 10 5 x D4 x 1.2)/[64x(14.3D) 3]
Q a = 71.3(D) kg. = 0.071D MT (where D is pile diameter in cm)
R EI
K 2
4
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 16/183
DBM
ANNEXUREANNEXUREANNEXUREANNEXURE
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 17/183
DBM
LOCATION PLANLOCATION PLANLOCATION PLANLOCATION PLAN
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 18/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 19/183
DBM
BORE HOLE LOGSBORE HOLE LOGSBORE HOLE LOGSBORE HOLE LOGS
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 20/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 5.20m BGL.
1 OF 1:SHEET NO.BH-01:BORE HOLE NO.
0.55m Below GL2.723m
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASINGMETHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 9.30m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :
6.00/
9.30m Below GL.:BOREHOLE DEPTH
9.00
Highly weathered
Fill
09/06/2012 TO 11/06/2012
0.00
Soft grey,marine CLAY
(Reddish silty SAND)
fine grained, greyish
1.50/2.10 SPT1 03/02/02/02(04)
3.50 UDS1
4.50/5.10
SPT201/01/02/02
(03)
6.23SPT3
11/52/--(R)
7.50
8.50
9.30
Soft CLAY withROCK fragments
pink KHONDALITE
150mmØ
NX
0.50
DS1
Soft grey,marine CLAY,with gravels
Moderately weathered,greyish pink,KHONDALITE
Stackyard Area
R . L .
( m )
Berth in the inner harbour of Visakhapatnam Port Trust.
--00 09CH 34 57 79 33 46
--12 27CI 25 36 47 22 25
73.2802 21CH 32 45 98 37 61 0.113.89
--
--
N 1960170.557, E 742490.025
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 21/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 4.00m BGL.
1 OF 1:SHEET NO.BH-02:BORE HOLE NO.
Stackyard AreaN 1960178.833, E 742548.89
1.05m Below GL
2.716m
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 10.00m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Mithun
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
10.00m Below GL:BOREHOLE DEPTH
9.00
Slightly weathered,
09/06/2012 TO 11/06/2012
0.00
Soft greyish,marine CLAY
greyish pink
1.50/2.10 SPT1 07/07/05/05
(12)
3.50 UDS1
4.50/5.10
SPT201/02/02/02
(04)
6.30
SPT316/52/--
(R)
7.50
10.00
KHONDALITE
150mmØ
Highly weathered,greyish pink,KHONDALITE
Blackish brown,silty SAND with gravels
0.50 DS1
R . L .
( m )
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
Fill
(Brownish silty SANDwith boulders)
-- -- --23 47 30SM -- --
Medium dense,
Greyish clayey,SAND with gravels
38.1811 49SC 20 20 36 22 14 0.0823.98
--00 15CH 34 51 81 30 51 --
379
98.39
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 22/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 7.50m BGL.
1 OF 2:SHEET NO.BH-03:BORE HOLE NO.
Stackyard Area
N 1960191.293, E 742621.645
1.15m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
::
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
11.20m Below GL.:BOREHOLE DEPTH
9.20
09/06/2012 TO 11/06/2012
1.50/2.10 SPT1 04/06/06/08
(12)
3.60
4.50/5.00
6.60
SPT47.50
150mmØ
NX
Soft grey,marine CLAY.
0.00/0.50
DS1
SPT201/02/02/02
(04)
8.10 02/04/06/21(10)
UDS1
Fill(Reddish silty SAND
with boulders)
2.961m
SPT302/02/02/03
(04)
8.20
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Stiff greyish brown,marine CLAY
Moderately weathered,greyish pink,
KHONDALITEfine grained,
77.7900 01CH 32 67 122 40 82 0.084.36
--00 08CH 29 63 76 33 43 --
--01 11CH 28 60 71 28 43 --
703
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 23/183
ABBREVIATIONS :
11.00
10.50
S A M P L E &
I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P
T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-03:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 11.20m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
Moderately weathered,greyish pink,
KHONDALITEfine grained,
NX
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 24/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.65m & NX Ø Upto 4.50m BGL.
1 OF 1:SHEET NO.BH-04:BORE HOLE NO.
Stackyard Area
N 1960204.398, E 742692.798
0.85m Below GL2.851m
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS A ND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 9.20m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Mithun
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
9.20m Below GL:BOREHOLE DEPTH
9.20
09/06/2012 TO 11/06/2012
Grey marine CLAY
1.50/2.10 SPT1 05/07/07/08(14)
3.60
UDS14.50/5.00
6.18 SPT312/52/--
(R)
7.70
150mmØ
Fresh, greyish pink,fine grained,KHONDALITE
Medium dense,brownish grey,silty SAND
0.00/0.50
DS1
SPT203/03/03/03
(06)
6.20
with gravels
blackish grey,marine CLAY
VIZAG AGRIPORT PVT.LTD.
Geotechnical Invest igation Work for the Proposed Installat ion of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
NX
Fill
(Reddish silty SAND)with gravels)
Medium stiff,
703
85.7001 02CH 32 65 124 41 83 0.044.0
--15 33CI 25 27 44 21 23 --
--00 13CH 29 58 75 31 44 --
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 25/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.30m & NX Ø Upto 5.70m BGL.
1 OF 1:SHEET NO.BH-05:BORE HOLE NO.
Stackyard Area
N 1960226.557, E 742786.083
0.95m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE NO:5 IS TERMINATED AT DEPTH OF 9.70m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
9.70m Below GL.:BOREHOLE DEPTH
8.70
12/06/2012 TO 14/06/2012
marine 'CLAY' withwith sea-shells.
1.50/2.10 SPT1 04/09/06/06(15)
3.60
4.50/5.10
6.50
52/--/--(R)
7.70
150mmØ
NX
Highly weathered,brownish grey,
Medium dense,brownish grey,silty SAND
0.00/0.50
DS1
SPT205/07/05/06
(12)
with gravels
9.70
Greyish pink highlyweatheredKHONDALITE.
KHONDALITE.fine grained,
SPT302/02/02/02
(04)
UDS1
6.70/6.73
SPT4
Soft grey,
3.172m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
--40 52SP -- -- -- --
--02 12 34 52 82 29 51 --
59.3600 12CH 27 61 97 33 64 0.194.12
578
08
(Brownish silty SANDwith gravels & boulders)
SM
CH
Fill
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 26/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.10m & NX Ø Upto10.50m BGL.
1 OF 2:SHEET NO.BH-08:BORE HOLE NO.
Stackyard AreaN 1960153.858, E 742636.337
0.70m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.GROUND R. L.
:::
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
14.50m Below GL.:BOREHOLE DEPTH
9.00/
14/06/2012 TO 15/06/2012
1.50/2.10 SPT1 03/07/52/--(R)
3.60
SPT3
4.50/
6.60
UDS27.50/
150mmØ
Soft grey,marine CLAY.
0.00/0.50
DS1
SPT201/02/01/02
(03)
9.60
8.00
01/02/02/02(04)
02/02/03/04(05)SPT4
UDS1
2.506m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
(Reddish silty SANDwith gravels & boulders)
Medium stiff greyish,marine CLAY.
--00 19CI 39 42 48 22 26
71.2600 10CH 26 64 111 34 77 0.132.86
68.1302 17CH 31 50 105 35 70 0.124.57
--
5.00
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 27/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D
E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-08:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 14.50m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Highly weathered,greyish pink,KHONDALITE
10.50/11.10 09/14/18/22
(32)SPT5
13.50
14.50
12.10
Loose,greyish,cleyeySAND with gravels
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
11.10
150mmØ
NX
23.66
--14 39SC 20 27 36 20 16 --
Medium stiff greyish,marine CLAY.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 28/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 29/183
ABBREVIATIONS :
11.00
10.50
S A M P L E &
I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-10:BORE HOLE NO.
L O G
D I A O F B O
R E H O L E
D E P T H B E
L O W
B G L
( m
)
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 13.00m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S
%
S I L T %
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
Highly weathered,greyish pink,fine grained,KHONDALITE
Moderately weathered,greyish pink,fine grained,
KHONDALITE
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 30/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATACONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.5m & NX Ø Upto9.50m BGL.
1 OF 2:SHEET NO.BH-11:BORE HOLE NO.
N 1960217.195, E 742837.117
2.20m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
14.78m Below GL.:BOREHOLE DEPTH
9.00
(Blackish back filling
22/06/2012 TO 24/06/2012
materials
1.50/2.10 SPT1 03/04/04/05
(08)
3.60
UDS14.50/5.10
6.60
SPT47.50
150mmØ
Soft to medium stiff,marine CLAY
with Boulders)
0.00/0.50
DS1
SPT201/02/02/02
(04)
9.60
8.10
02/02/03/03(05)
02/03/03/04(06)
02/03/04/04(07)SPT5
SPT3
Loose greyish,silty SAND
2.854m
4.00/ VST1
VIZAG AGRIPORT PVT.LTD.
Geotechnical Invest igation Work for the P roposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
--00 18CH 32 50 69 30 39 --
--00 12CH 30 58 72 29 43 --
--23 50SM -- -- -- --27
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 31/183
ABBREVIATIONS :
11.00
10.50
S A M P L E &
I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-11:BORE HOLE NO.
L O G
D I A O F B O
R E H O L E
D E P T H B E L O W
B G L
( m
)
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS A ND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 14.78m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C
A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
16/52(R)
SPT6
Geotechnical Invest igation Work for the P roposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
150mmØ
Highly weathered,greyish pink,KHONDALITE
NX
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 32/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 9.50m BGL.
1 OF 2:SHEET NO.BH-12:BORE HOLE NO.
Stackyard Area
N 1960092.395, E 742631.144
0.95m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
14.50m Below GL.:BOREHOLE DEPTH
9.00/
12/06/2012 TO 15/06/2012
1.50/2.10 SPT1 03/05/06/06(11)
3.60
UDS14.50/5.00
6.50
SPT47.50/
150mmØ
Soft grey,marine CLAY.
0.00/0.50
DS1
SPT201/02/02/03
(04)
9.50
8.10
02/02/03/03(05)
02/03/03/04(06)
UDS2
SPT3
2.801m
Medium densebrownish grey,silty SAND with gravels
Geotechnical Invest igation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
Fill
(Reddish silty SAND)with gravels & boulders)
R . L .
( m )
Medium stiff grey,marine CLAY.
77.3501 05CH 30 65 116 43 73 0.114.11
--00 09CH 29 62 93 38 55 --
90.0300 14CH 25 61 101 41 60
--00 04CH 30 66 75 33 42 --
--
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 33/183
ABBREVIATIONS :
11.00
10.50
S A M P L E &
I N - S
I T U
S A M P L E T Y
P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P
T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-12:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 14.50m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Moderately weathered,greyish pink,KHONDALITE
Soft greyish brown,
SPT510.50/11.10 01/01/02/02
(03)
SPT612.00/12.28 14/52/--/--
(R)
150mmØ
14.50
13.50
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
NX12.28
marine CLAY
Moderately weathered,brownish pink,fine grained,KHONDALITE
66.65
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 34/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.40m & NX Ø Upto 8.50m BGL.
1 OF 2:SHEET NO.BH-14:BORE HOLE NO.
N 1960123.496, E 742735.68
0.80m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
13.60m Below GL.:BOREHOLE DEPTH
9.00/
Blackish brown color
22/06/2012 TO 24/06/2012
1.50/2.10 SPT1 07/08/10/08(18)
3.60
UDS1
4.50/5.10
6.50
SPT47.50/
150mmØ
Medium stiff greyish,marine CLAY
with Boulders.
0.00/0.50
DS1
SPT201/02/02/02
(04)
9.60
8.10
01/02/03/04(05)
02/02/03/03(05)
02/04/04/08(08)SPT5
SPT3
2.455m
4.00/
7.00
VST1
VST2
back fil ling materials
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
R . L .
( m )
Fill(Reddish silty SAND)
--02 36CH 25 36 65 24 41 --
--01 30CH 29 40 63 26 37 --
--01 22CH 31 46 66 27 39 --
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 35/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-14:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 13.60m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Moderately weathered,grayish pink,KHONDALITE
Highly weathered,brown yellow,KHONDALITE
SPT6 52/--/--/--(R)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
150mmØ 10.50/
10.60
12.10
13.60
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 36/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.30m & NX Ø Upto 11.50m BGL.
1 OF 2:SHEET NO.BH-15:BORE HOLE NO.
N 1960128.703, E 742814.601
1.05m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
19.80m Below GL.:BOREHOLE DEPTH
9.00/
(Brown back filling
19/06/2012 TO 22/06/2012
silty SAND
1.50/2.10 SPT1 03/05/07/08(12)
3.60
UDS14.50/5.00
6.60
SPT47.50/
150mmØ
Soft to medium stiff,
marine CLAY
with Boulders)
0.00/0.50
DS1
SPT201/02/02/02
(04)
9.60
8.10
01/02/03/03(05)
02/03/03/03(06)
02/03/03/04(06)SPT5
SPT3
2.957m
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
R . L .
( m )
Fill
--03 22CH 30 49 68 29 39 --
--09 14CH 29 48 70 30 40 --
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 37/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-15:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 19.80m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
VIZAG AGRIPORT PVT.LTD.
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Completely weathered,pink KHONDALITE
KHONDALITE
Highly weathered ,
Medium stiff greyish, marine CLAYwith sea-shells.
10.5011.10
12.0012.60
13.0013.10
13.60
14.6014.70
15.6015.68
16.6816.80
17.80
18.80
19.80
51/--/--/--(R)
51/--/--/--(R)
52/--/--/--(R)
52/--/--/--(R)
SPT6
SPT7
SPT8
SPT9
SPT10
SPT11
02/02/04/06(06)
04/07/11/13(18)
greyish pink,
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
150mmØ
NX
KHONDALITE
Highly weathered ,greyish pink,
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 38/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.10m & NX Ø Upto 11.75m BGL.
1 OF 2:SHEET NO.BH-18:BORE HOLE NO.
Stackyard AreaN 1960042.027, E 742778.714
1.80m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.GROUND R. L.
::
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
18.15m Below GL.:BOREHOLE DEPTH
9.00/
16/06/2012 TO 19/06/2012
1.502.10 SPT1 06/08/10/12(18)
3.60
4.50/5.00
6.60
SPT47.50/
150mmØ
Soft grey,marine CLAY.
0.00/0.50
DS1
SPT201/02/02/02
(04)
9.50
8.10
01/01/02/02(03)
01/02/02/02(04)
UDS2
2.752m
UDS1
SPT3
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
R . L .
( m )
(Brownish silty SANDwith gravels & boulders)
Fill
Medium dense,reddish,siltySAND with gravels
--00 24 21 55 64 28 36CH
80.3700 21 25 54 110 40 70CH 0.093.71
71.9600 05 28 67 116 43 73CH 0.104.57
--
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 39/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-18:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 18.15m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
13.50/
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Medium dense,grey clayey,SAND
14.10
15.00
16.65
17.40
15.13
18.15
Highly weathered,grayish pink,KHONDALITE
SPT5
SPT6
SPT7 02/04/05/07(09)
01/01/02/02(03)
01/01/02/02(03)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
12.00/
12.60
10.50/
11.10
SPT7 02/04/05/07(09)
SPT8 52/--/--/--(R)
48.01
--01 55 20 24 44 21 23 --SC
150mmØ
Soft grey,marine CLAY.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 40/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 9.50m BGL.
1 OF 2:SHEET NO.BH-19:BORE HOLE NO.
Stackyard Area
N 1960068.066, E 742850.323
0.50m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
14.85m Below GL.:BOREHOLE DEPTH
9.00/
16/06/2012 TO 18/06/2012
1.50/2.10
SPT106/06/05/07
(11)
3.60
4.50/5.00
6.60
SPT47.50/
150mmØ
Soft to medium stiff,grey,marine CLAY.
0.000.50
DS1
SPT201/02/03/04
(05)
9.60
8.10
03/03/05/06(08)
02/02/02/03(04)
SPT5
Stiff blackish grey,marine CLAY.
2.922m
UDS1
SPT3
02/03/03/03(06)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
R . L .
( m )
(Reddish silty SANDwith gravels & boulders)
Fill
--01 12 30 57 61 27 34CH
50.9201 19 29 51 84 35 49CH 0.224.34
--
--00 12 32 56 63 22 41CH --
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 41/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-19:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 14.85m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
12.85
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
KHONDALITE
fine grained,
SPT6
13.85
14.85
KHONDALITE
14/32/52(R)
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
10.50/10.85
11.85
150mmØ
Highly weathered,greyish pink,
Highly Weathered,brownish grey,
35.54
Soft to medium stiff,grey,marine CLAY.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 42/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.25m & NX Ø Upto8.00m BGL.
1 OF 2:SHEET NO.BH- 20:BORE HOLE NO.
N 1960061.146, E 742946.34
1.80m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.
GROUND R. L.
:::
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
13.08m Below GL.:BOREHOLE DEPTH
9.00/
(Blackish back filling
23/06/2012 TO 25/06/2012
materials with Boulders)
1.50/2.10 SPT1 05/08/09/12(17)
3.60
UDS14.50/5.00
6.50
SPT47.50/
150mmØ
0.00/0.50
DS1
SPT202/02/03/03
(05)
9.60
8.10
02/03/03/04(06)
02/03/04/04(07)
02/03/03/04(06)SPT5
SPT3
Medium stiff greyish,marine CLAY
3.304m
4.00 VST1
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
R . L .
( m )
Fill
--00 15 35 50 73 33 40CH --
--00 04 40 96 76 35 41CH --
Stackyard Area
Very stiff greyish,marine CLAY
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 43/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-20:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 13.08m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
13.08
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
pinkish grey,Highly weathered,
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
VIZAG AGRIPORT PVT.LTD.
10.00/10.08
11.58KHONDALITE
pinkish grey,Moderately weathered,
KHONDALITE
52/--/--(R)SPT6
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 44/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.00m & NX Ø Upto11.50m BGL.
1 OF 2:SHEET NO.BH-21:BORE HOLE NO.
Stackyard Area
N 1959993.045, E 742856.859
0.70m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.
GROUND R. L.
:
::
DATE
CASINGMETHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
17.50m Below GL.:BOREHOLE DEPTH
9.00/
13/06/2012 TO 16/06/2012
1.50/2.10 SPT1 05/07/03/05(10)
3.60
4.50/5.00
6.60
SPT47.50/
150mmØ
0.00/0.50
DS1
SPT201/02/02/03
(04)
9.60
8.10 02/02/03/03(05)
01/02/02/02(04)SPT5
UDS1
2.739m
Soft grey,marine CLAY.
SPT302/03/06/08
(09)
Medium dense,brownish red,silty SAND with gravels
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
(Reddish silty SAND)with gravels & boulders)
Soft grey,marine CLAY.
Stiff grey,marine CLAY.
61.7300 03CH 35 62 93 36 57 0.173.2
--00 38CH 23 39 53 26 27 --
--00 11CH 32 57 87 32 55 --
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 45/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P
T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-21:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 17.50m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
38/52/--/--(R)
10.50/11.00
12.00/12.60
13.50/13.67
Soft grey,marine CLAY.
UDS2
SPT6 01/02/02/03(04)
SPT7
52/--/--/--
(R)15.00/
15.05
SPT8
16.50
17.50
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
Completely weathered,greyish pink,KHONDALITE
Highly weathered,greyish pink,fine grained,KHONDALITE
150mmØ
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 46/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.5m & NX Ø Upto9.75m BGL.
1 OF 2:SHEET NO.BH- 23:BORE HOLE NO.
Stackyard Area
N 1960009.016, E 742957.088
2.60m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
15.35m Below GL.:BOREHOLE DEPTH
9.00/
17/06/2012 TO 20/06/2012
1.50/2.10 SPT1 05/07/04/09(11)
3.60
UDS1
4.50/5.10
6.50
SPT47.50/
150mmØ
Soft grey ,marine CLAY.
0.00/0.50
DS1
SPT202/01/01/02
(02)
9.60
8.10
02/02/02/03(04)
01/01/02/02(03)
02/02/03/04(05)SPT5
SPT3
4.01m
Loose grey,silty SANDwith grevels
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
(Blackish silty SAND)with gravels & boulders)
Medium dense,blackish,silty SANDwith gravels
55.1603 17CH 31 49 67 29 38 0.213.66
--22 43SM -- -- -- --35
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 47/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D
E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-23:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 15.35m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Medium dense,grey silty,SAND with gravels
14/30/51/--(R)
SPT 6
SPT 7
04/06/10/15(16)
fine grained,brownish grey,
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
10.50/
12.00/
13.35
14.35
15.35
11.10
12.35
12.35
Highly weathered,
KHONDALITE
brownish pink,Highly weathered,
KHONDALITE
--05 68SM -- -- -- --27
16.26
150mmØ
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 48/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.10m & NX Ø Upto10.20m BGL.
1 OF 2:SHEET NO.BH- 24:BORE HOLE NO.
Stackyard AreaN 1959944.414, E 742971.158
1.70m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
16.75.m Below GL.:BOREHOLE DEPTH
9.00/
17/06/2012 TO 20/06/2012
1.50/2.10 SPT1 02/02/03/03(05)
3.60
UDS1
4.50/5.10
6.50
SPT47.50/
150mmØ
0.00/0.50
DS1
SPT202/03/04/06
(07)
9.60
8.10
02/03/03/04(06)
01/02/03/04(05)
02/03/03/04(06)SPT5
SPT3
Medium stiff grey,marine CLAY
3.189 m
Medium stiff,brownish grey,marine CLAY
Medium stiff grey,marine CLAY
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
(Reddish silty SANDwith gravels & boulders)
Fill
Medium stiff,grey marine,CLAY with sea-shells
--02 35CH 25 38 58 25 33
63.7600 09CH 31 60 112 38 74 0.182.75
--00 22CH 27 51 61 23 38
--
--
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 49/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-24:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 16.75m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
16/52(R)
10.50/11.10
12.00/12.60
13.50/
13.75
14.75
15.75
16.75
Stiff grey,marine CLAY.
fine grained,
SPT603/03/02/05
(05)
SPT7 02/04/05/05(09)
SPT8
KHONDALITE.
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
150mmØ
Highly weathered,
21.44
Medium stiff grey,marine CLAY
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 50/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.5m & NX Ø Upto 4.30m BGL.
1 OF 2:SHEET NO.BH-26:BORE HOLE NO.
N 1960147.554, E 742471.466
1.20m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
12.10m Below GL.:BOREHOLE DEPTH
8.50/
(Black back filling
01/07/2012 TO 04/07/2012
materials SAND
1.50/2.10 SPT1 04/07/09/11(16)
3.60
UDS1
4.50/5.10
6.50
SPT47.50/
NX
Soft grey,marine CLAY
with Boulders.)
0.00/0.50
DS1
SPT204/06/08/12
(14)
8.60
8.10
Highly Weathered,
01/02/02/03(04)
02/03/04/04(07)
51/--/--/--(R)
SPT5
SPT3
3.463m
5.50 VST1
brownish pink,KHONDALITE
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
150mmØ
--01 34CH 26 34 75 31 44 --
--07 05CH 37 51 86 34 52 --
--01 33CH 26 40 73 32 41 --
Fill
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 51/183
ABBREVIATIONS :
11.00
10.50
S A M P L E &
I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-26:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m
)
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 12.10m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
Highly moderately,pinkish greyKHONDALITE
VIZAG AGRIPORT PVT.LTD.
Geotechnical Invest igation Work for the Proposed Installat ion of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
10.10
11.10
12.10
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 52/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.55m & NX Ø Upto 4.50m BGL.
1 OF 1:SHEET NO.BH- 28:BORE HOLE NO.
Stackyard Area
N 1960128.52, E 743078.659
1.10m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
8.10m Below GL.:BOREHOLE DEPTH
06/07/2012 TO 07/07/2012
1.50/2.10 SPT1 01/02/03/05
(05)
3.60
4.50/4.60
7.10
150mmØ
0.00/0.50
DS1
SPT202/02/03/03
(05)
silty to fine grained,
3.36 m
Highly weathered,fine grained,KHONDALITE.
8.10
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
SPT351/--/--/--
(R)
6.10
(Brownish silty SANDwith gravels & boulders)
Fill
Loose grey,
clayey SAND
silty to fine grained,Loose grey,
sandy CLAY
BOREHOLE IS TERMINATED AT DEPTH 8.10m. BELOW GL.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 53/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 54/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.65m & NX Ø Upto 5.30m BGL.
1 OF 1:SHEET NO.BH-31:BORE HOLE NO.
N 1960062.908, E 743108.691
1.55m Below GL3.705m
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 9.60m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
9.60m Below GL.:BOREHOLE DEPTH
05/07/2012 TO 07/07/2012
0.00
Moderately weathered
1.50/2.10 SPT1 05/09/15/21(24)
3.60
UDS14.50/5.00
6.60SPT3
7.60
8.60
9.60
Soft to medium,stiff grey,
grayish pinkKHONDALITE
150mmØ
NX
0.00/0.50
DS1
5.00
6.60
SPT203/03/01/02
(04)
VST1
02/02/03/05(05)
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
(Brownish gravels &boulders)
marine CLAY
--00 26CH 32 42 74 32 42 --
--03 06CH 40 51 78 33 45 --
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 55/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.20m & NX Ø Upto7.85m BGL.
1 OF 2:SHEET NO.BH- 32A:BORE HOLE NO.
N 1960049.003, E 743038.329
1.35m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
11.74m Below GL.:BOREHOLE DEPTH
27/06/2012 TO 29/06/2012
1.50/2.10 SPT1 03/05/07/09
(12)
3.60
UDS14.50/5.00
6.60
SPT47.50/
150mmØ
Medium stiff greyish,marine CLAY
0.00/0.50
DS1
SPT203/04/06/07
(10)
9.24
7.74
01/02/04/04(06)
16/52/--/--/--(R)
SPT3
3.511m
Brownish yellowKHONDALITE
4.00 VST1
7.00 VST2
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill(Reddish back filling
materials with boulders)
Fill(Brownish grey,clayey
SAND with boulders)
Highly weathered,
--13 38SC 25 24 47 23 24 --
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 56/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m ) DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH-32A:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 11.74m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
KHONDALITE
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
Highly weathered,brownish yellow,
10.74
11.74
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 57/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX Ø Upto 5.75m BGL.
1 OF 1:SHEET NO.BH-33:BORE HOLE NO.
N 1960021.933, E 743086.241
1.55m Below GL
3.598m
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 9.60m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
9.60m Below GL.:BOREHOLE DEPTH
Moderately weathered,
(Reddish brown,
01/07/2012 TO 03/07/2012
0.00
Soft brown,
back filling materials1.50/2.10 SPT1 03/05/09/13
(14)
3.60
UDS14.50/5.00
6.60SPT3
7.60
8.60
9.60
greyish pink,
150
mmØ
NX
0.50 DS1
5.00
6.60
Silty SAND
KHONDALITE
SPT201/02/02/06
(04)
VST1
04/07/09/24(16)
with Boulders)
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Fill
marine CLAY
Very stiff greyish,sandy CLAY
Stackyard Area
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 58/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX upto 9.2m BGL.
1 OF 3:SHEET NO.BH- N1:BORE HOLE NO.
Stackyard Area
N 1960307.729, E 742966.519
0.55m Below GL
:
:
:
:
LOCATIONCO-ORDINATES
GROUND W. T.GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
25.50m Below GL.:BOREHOLE DEPTH
9.00/
12/08/2012 TO 17/08/2012
1.50/1.60 SPT1 53/--/--/--(R)
3.60
4.50/5.10
6.60
7.50/
150mmØ
0.00/0.50
DS1
SPT203/03/04/05
(07)
9.28
7.85
04/06/08/10(14)SPT3
3.61 m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Medium stiff to stiff,sandy CLAY with
Hard,yellowish grey,sandy CLAY as
SPT6 23/51/--/--(R)
(Reddish,silty SANDwith gravels & boulders)
Fill
Medium dense,brownish,SAND with
SPT5 17/25/51/--(R)
SPT4 03/04/08/10(12)
NX
sea-shells
sea-shells
completely weathered,ROCK
--01 33CI 37 29 48 25 23
--00 97SP -- -- -- --03
--
--03 44CI 33 20 42 22 20 --
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 59/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P
E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T
H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E
X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 3:SHEET NO.BH- N1:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT819/51/--/--
(R)
SPT710/20/35/53
(55)
CONTINUED ON NEXT PAGE
53/--/--/--
(R)SPT10
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
yellowish, grey ROCK
10.50/10.98
12.00/12.28
13.50/13.60
15.00/
15.10
SPT955/--/--/--
(R)
55/--/--/--(R)SPT1219.50/
19.57
18.00/18.10 51/--/--/--
(R)SPT11
NX
55/--/--/--(R)SPT1016.50/
16.58
Brownish grey,ROCK
Highly weathered,greyish brown,ROCK
Hard,brownish
yellow,sandy CLAY as completelyweathered,ROCK
Completely weathered,
Completely weathered,
--26 40SM -- -- -- --34
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 60/183
ABBREVIATIONS :
21.00
20.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
21.50
22.00
23.50
23.00
22.50
24.50
25.50
25.00
24.00
27.00
26.50
26.00
29.00
28.50
28.00
27.50
30.00
29.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m ) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
3 OF 3:SHEET NO.BH- N1:BORE HOLE NO.
L O G
D I A O F B O R
E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT1452/--/--/--
(R)
BOREHOLE IS TERMINATED AT DEPTH 26.00m. BELOW GL.
SPT1552/--/--/--
(R)
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX 21.00/21.05
22.50/22.57
30.20
24.00
25.50
Moderately weathered,brownish grey,ROCK
Highly weathered,
greyish brown,ROCK
2.26
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 61/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 2.50m & NX upto 11.20m BGL.
1 OF 3:SHEET NO.BH- N2:BORE HOLE NO.
Stackyard Area
N 1960269.345, E 742988.127
1.05m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASINGMETHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
27.00m Below GL.:BOREHOLE DEPTH
9.00/
13/08/2012 TO 19/08/2012
1.50/2.10 SPT1 11/17/20/23
(37)
3.60
4.50/4.78
6.10
7.50/
150mmØ
0.00/0.50
DS1
SPT205/08/12/06
(20)
9.12
7.60
15/52/--/--(R)SPT3
3.474 m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
SPT5 52/--/--/--(R)
(Dense,brownish,siltySAND with gravels)
Fill
SPT4 52/--/--/--(R)
SPT4 53/--/--/--(R)
6.50
Completely weathered,ROCK
Medium dense,greyish brown,silty SAND with gravels
Completely weathered,ROCK
Highly weathered,greyish yellow,ROCK
Completely weathered,yellowish,ROCK
--32 44SM -- -- -- --24
--09 52SM -- -- -- --39
--65 24SM -- -- -- --11
NX
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 62/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 3:SHEET NO.BH- N2:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A
T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT854/--/--/--
(R)
SPT755/--/--/--
(R)
CONTINUED ON NEXT PAGE
52/--/--/--
(R)SPT10
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
10.50/10.60
12.00/12.12
13.50/13.58
15.00/
15.10
SPT955/--/--/--
(R)
51/--/--/--(R)SPT1319.50/
19.55
18.00/18.10 55/--/--/--(R)SPT12
NX
53/--/--/--(R)SPT1116.50/
16.60
Completely weathered,Brownish grey,ROCK
Completely weathered,yellowish grey,ROCK
Completely weathered,yellowish,ROCK
--53 33GM -- -- -- --14
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 63/183
ABBREVIATIONS :
21.00
20.50
S A M P L E & I N - S
I T U
S A M P L E T Y P
E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
21.50
22.00
23.50
23.00
22.50
24.50
25.50
25.00
24.00
27.00
26.50
26.00
29.00
28.50
28.00
27.50
30.00
29.50
T E S T D E P T
H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E
X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
3 OF 3:SHEET NO.BH- N2:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT1452/--/--/--
(R)
BOREHOLE IS TERMINATED AT DEPTH 27.00m. BELOW GL.
SPT1553/--/--/--
(R)
SPT1655/--/--/--
(R)
Highly weathered,yellowish grey,ROCK
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX 21.0021.06
22.00/22.05
23.00/23.05
30.20
26.00
25.00
pinkish grey,Highly weathered,
KHONDALITE
SPT1756/--/--/--
(R)24.00/24.08
27.00
Completely weathered,yellowish grey,ROCK
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 64/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.60m & NX upto 10.50m BGL.
1 OF 3:SHEET NO.BH- N3:BORE HOLE NO.
Stackyard Area
N 1960272.336, E 742901.831
1.70m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
::
DATE
CASINGMETHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
26.00m Below GL.:BOREHOLE DEPTH
9.00/
12/08/2012 TO 16/08/2012
1.50/2.10 SPT1 09/08/06/05(14)
3.60
4.50/5.10
6.60
7.50/
150mmØ
0.00/0.50
DS1
SPT208/05/05/04
(10)
9.10
8.10
04/04/03/04(07)SPT3
3.700m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Loose to brownish grey,silty SAND
Very stiff,greyish brown,sandy
UDS1
SPT5 53/--/--/--(R)
(Medium dense,reddish brown,silty
Fill
Grey,sandy CLAY
SPT4 10/12/15/19(27)
10.00/10.05
SPT6 51/--/--/--(R)
SAND with gravels)
with gravels
CLAY with gravels
NX Completely weathered,
yellowish ROCK
--19 70SM -- -- -- --15
56.6102 31CI 35 46 22 2432 0.153.89
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 65/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D
E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 3:SHEET NO.BH- N3:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT855/--/--/--
(R)
SPT753/--/--/--
(R)
CONTINUED ON NEXT PAGE
51/--/--/--
(R)
SPT10
SPT11
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
Completely weathered,
11.00/11.05
12.00/12.07
13.00/13.05
15.00/
15.07
16.00
SPT953/--/--/--
(R)
14.00/14.10 52/--/--/--
(R)
52/--/--/--(R)SPT1217.00/
17.05
55/--/--/--(R)SPT1419.00
19.07
18.00/
18.05 52/--/--/--(R)SPT13
NX
yellowish ROCK
Highly weathered,
yellowish ROCK
Completely weathered,
yellowish ROCK
10.05
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 66/183
ABBREVIATIONS :
21.00
20.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T
R E S U L T
21.50
22.00
23.50
23.00
22.50
24.50
25.50
25.00
24.00
27.00
26.50
26.00
29.00
28.50
28.00
27.50
30.00
29.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m )
/
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
3 OF 3:SHEET NO.BH- N3:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
SPT1553/--/--/--
(R)
BOREHOLE IS TERMINATED AT DEPTH 26.00m. BELOW GL.
SPT1655/--/--/--
(R)
SPT1755/--/--/--
(R)
Completely weathered,
ROCK
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
NX
20.50/20.57
22.00/22.09
23.50/23.58
30.20
26.00
25.00
greyish yellow,
greyish brown,ROCKCompletely weathered,
0.89
--53 36SM -- -- -- --14
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 67/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 3.00m & NX upto 9.00m BGL.
1 OF 2:SHEET NO.BH- N4:BORE HOLE NO.
Stackyard Area
N 1960203.424, E 742928.076
1.4m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUSAL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
13.50m Below GL.:BOREHOLE DEPTH
18/08/2012 TO 20/08/2012
1.50/2.10 SPT1 07/09/12/15(21)
3.60
4.50/5.00
6.60
SPT47.50/
150mmØ
0.00/0.50
DS1
SPT205/07/09/12
(16)
8.10 01/02/03/04(05)
UDS1
Fill(Medium dense,brownish,silty
3.600m
SPT301/02/04/05
(06)
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Loose grey,silty SAND
Medium dense,greyishbrown,silty SAND
SPT59.00/9.60 02/03/03/04
(06)
SAND with gravels)
with gravels
Medium stiff,grey,with gravels
--07 69SM -- -- -- --24
63.7700 01CI 32 87 29 5867 0.144.12
--01 76SM -- -- -- --23
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 68/183
NX
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH- N4:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 13.50m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
Highly weathered,pinkish grey,KHONDALITE
150mmØ SPT610.50/
10.58 54/--/--/--(R)
11.50
12.50
13.50
Slightly weathered,pinkish grey,KHONDALITE
720
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 69/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX upto 8.00m BGL.
1 OF 2:SHEET NO.BH- N5:BORE HOLE NO.
Stackyard Area
N 1960200.62, E 742988.79
1.65m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.GROUND R. L.
:
::
DATE
CASING
METHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
CONTINUED ON NEXT PAGEREMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
11.00m Below GL.:BOREHOLE DEPTH
19/08/2012 TO 21/08/2012
1.50/2.10 SPT1 03/02/02/02
(04)
3.60
4.50/5.00
6.60
SPT47.50/
150mmØ
NX
0.00/0.50
DS1
SPT202/02/03/03
(05)
8.00 08/10/14/53(24)
UDS1
Fill(Loose,reddish brown silty SAND with
3.683m
SPT303/08/10/14
(18)
8.00
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
yellowish brown,silty SAND with gravels
Moderately weathered,pinkish grey,KHONDALITE
9.00
10.00
Medium stiff grey,silty CALY with
brownish grey,silty SAND with gravels
Medium dense,
gravels)
sea-shells
Fill(Blackish grey,clayey SAND withgravels)
Medium dense, --23 52SM -- -- -- --25
82.8601 08CH 94 33 6131 603.710.07
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 70/183
ABBREVIATIONS :
11.00
10.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
R . L .
( m )
DESCRIPTION
F I E L D T E S T R E S U L T
11.50
12.00
13.50
13.00
12.50
14.50
15.50
15.00
14.00
17.00
16.50
16.00
19.00
18.50
18.00
17.50
20.00
19.50
T E S T D E P T H ( m )
( S P T ' N ' )
N M C
L L %
P L A S T I C I T Y I N D E X
C u / ( k g / c m
) /
U C S ( k g / c m )
LABORATORY DATA
2 2
CONSISTENCY LIMIT
2 OF 2:SHEET NO.BH- N5:BORE HOLE NO.
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 11.00m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Mr. Prajit N.
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
P L I ( k g / c m ) 2
C L A Y %
S A N D %
G R A V E L S %
S I L T %
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
Moderately weathered,greyish pink,
KHONDALITE
NX 521
11.00
10.00
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 71/183
ABBREVIATIONS :
1.00
0.50
S A M P L E & I N - S
I T U
S A M P L E T Y P E & N O
.
T C R ( % )
R Q D ( % )
C L A Y %
DESCRIPTION
F I E L D T E S T R E S U L T
1.50
2.00
3.50
3.00
2.50
4.50
5.50
5.00
4.00
7.00
6.50
6.00
9.00
8.50
8.00
7.50
10.00
9.50
T E S T D E P T H ( m )
( S P T ' N ' )
S I L T %
S A N D %
G R A V E L S %
N M C
L L %
P L A S T I C I T Y I N D E X
LABORATORY DATA
CONSISTENCY LIMIT
ROTARY DRILLING
150mm Ø Upto 1.50m & NX upto 4.50m BGL.
1 OF 1:SHEET NO.BH- N6:BORE HOLE NO.
Stackyard Area
N 1960201.37, E 743050.82
1.85m Below GL
:
:
:
:
LOCATION
CO-ORDINATES
GROUND W. T.
GROUND R. L.
:
:
:
DATE
CASINGMETHOD
L O G
D I A O F B O R E H O L E
D E P T H B E L O W
B G L
( m )
P L %
Ø ( d e g r e e s )
FIELD DATA
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD. MUMBAI.
BOREHOLE IS TERMINATED AT DEPTH 9.00m. BELOW GL.REMARKS :
DS DISTURBED SAMPLE
N : SPT VALUESPT STD. PENETRATION TEST:
CR CORE RECOVERY (%)RQD ROCK QUALITY DESIGNATION (%):
: R
NMC : NATURAL MOISTURE CONTENTLL (%) : LIQUID LIMIT
PL(%) PLASTIC LIMIT: Ø : ANGLE OF INTERNAL FRICTIONUC : UNCONFINED COMPRESSION TESTCu
: REFUS AL 'N' VALUE: COHESION
Checked By :Prajit Nagrale
Drawn By:Rupesh
SCALE : 1: 50JOB NO. : 3228
GRAIN SIZE ANALYSIS
:TCR TOTAL CORE RECOVERY (%):
UDS UNDISTURBED SOIL SAMPLE:PLI : POINT LOAD INDEXUCS : UNIAXIAL COMPRESSIVE STRENGTH
C L A S S I F I C A T I O N
C u / ( k g / c m
² ) /
U C S ( k g / c m ² )
P L I ( k g / c m ² )
3.00/
6.00/
9.00m Below GL.:BOREHOLE DEPTH
21/08/2012 TO 22/08/2012
1.50/2.10 SPT1 03/04/05/06(09)
3.50
4.50/4.75
6.08
150mmØ
0.00/0.50
DS1
UDS1
24/52/--/--(R)SPT2
3.745 m
VIZAG AGRIPORT PVT.LTD.
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities at East Quay-7 (EQ-7)
CLIENT :
PROJECT :Berth in the inner harbour of Visakhapatnam Port Trust.
R . L .
( m )
Stiff grey,sandy CLAY
(Reddish brown siltySAND with gravels)
Fill
yellowish grey,ROCK
55/--/--/--(R)
SPT3
7.00
8.00
9.00
NX
Highly weathered,pinkish grey,KHONDALITE
58.5001 04CH 92 36 56
--04 22CH 64 28 36 --
36 59
--61 30 -- -- -- --09
32 43
3.20.15
GMGP
908
Completely weathered,
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 72/183
DBM
LABORATORY TESTLABORATORY TESTLABORATORY TESTLABORATORY TEST
RESULTSRESULTSRESULTSRESULTS
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 73/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 01 1.50 - 2.10 SPT 1 ----- ----- ----- CH 0 9 34 57 79 33 46 14 ----- ----- ----- ----- ----- ----- ----- ----- 2.63
BH - 01 3.00 - 3.50 UDS 1 1.53 0.88 73.28 CH 2 21 32 45 98 37 61 15 TUU 0.11 3.89 ----- 40 ----- ----- ----- 2.62
BH - 01 4.50 - 5.10 SPT 2 ----- ----- ----- CI 12 27 25 36 47 22 25 12 ----- ----- ----- ----- ----- ----- ----- ----- 2.65
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 74/183
Particle
% % % % mm mm mm
BH - 01 1 .50 - 2.10 CH 0 9 34 57 ----- ----- ----- ----- ----- 79 33 46 SPT 1
BH - 01 3 .00 - 3.50 CH 2 21 32 45 ----- ----- ----- ----- ----- 98 37 61 UDS 1
BH - 01 4 .50 - 5.10 CI 12 27 25 36 ----- ----- ----- ----- ----- 47 22 25 SPT 2
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 75/183
Project:
1.25 mm/min 07.07.201238.00 mm 0176.00 mm 3.00 - 3.500.88 g/cm 3 TUU73.28 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 3.82 0.306 0.806 6.84 9.00
2 1.00 4.77 0.379 1.379 7.60 10.00
3 1.50 5.80 0.455 1.955 8.36 11.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.11 k cm 2 3.89
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 76/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 02 1.50 - 2.10 SPT 1 ----- ----- ----- SM 23 47 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.66
BH - 02 3.00 - 3.50 UDS 1 2.05 1.48 38.18 SC 11 49 20 20 36 22 14 -----DSUU(RM)
0.08 23.98 ----- ----- ----- ----- ----- 2.65
BH - 02 4.50 - 5.10 SPT 2 ----- ----- ----- CH 0 15 34 51 81 30 51 ----- ----- ----- ----- ----- 70 ----- ----- ----- 2.63
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
R e m a r k s
Permeability Test
Chemical Analysis
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
S w e l l i n g P r e s s u r e
k g / c m 2
Compaction Test
Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
SOIL TEST DATA SHEET
Project :
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Mechanical Analysis
S o i l C l a s s i f i c a t i o n ( I . S )
VerticalConsolidation
Shear Test
Location :
F r e e S w e l l I n d e x %
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
05.07.2012FLB 04 DATE:
30
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 77/183
Particle
% % % % mm mm mm
BH - 02 1 .50 - 2.10 SM 23 47 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1
BH - 02 3 .00 - 3.50 SC 11 49 20 20 ----- ----- ----- ----- ----- 36 22 14 UDS 1
BH - 02 4 .50 - 5.10 CH 0 15 34 51 ----- ----- ----- ----- ----- 81 30 51 SPT 2
P l a s t i c L i m i t , W
p
------------
Gravel Sand ClayClassifi--cation
( IS ) L i q u i d L i m i t , W
l
G R A I N S I Z E D
I S T R I B U T I O N C U R V E Coeff. Of
CurvatureCc
D302/(D 60*D
10 )
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
L o c a t i o n :
J o b
N o .
:
3 2 2 8
Coeff. ofUniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
30
Depth in m. Φ
1 0 %
Symbol Φ
6 0 %
Φ 3 0 %
Bore HoleNo.
Silt
P r o j e c t :
P l a s t i c i t y I n d e x , I p
R e m a r k s
Size(mm)
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 78/183
:
:
: UU (RM): 1.25: 60.0: 25.0: 1.48: 38.16
Serial No.Normal
Pressure,σv
ShearForce atFailure
ShearStress atFailure,
σs
Changein Length
, ∆ L
Strain atFailure
Condition of Test Date :Bore Hole No. :
Depth of Sample (m) Type of Sample:
Dry Density, γ d
Moisture Content,
Rate of StrainSize of theHeight of Specimen
gm / cm 3
%
IS - 2720, P-13
DIRECT SHEAR TEST
G eo t ec h n i c a l I n v es t i g a t i o n Wo r k f o r t h e Pr o p o s ed I n s t a l l a t i o n o f M e ch a n i c a lH a n d l i n g F a c i l i t i e s a t E a s t Q u a y -7 (E Q -7 ) B er t h i n t h e i n n e r h a r b ou r o f
07.07.2012BH -02
3.00 - 3.50UDS 01
----------------
mm/minmm(Square )mm
Project
Location
Kg / cm 2 Kg. Kg / cm 2 mm %
1 0.50 9.68 0.299 3.00 5.00
2 1.00 16.13 0.533 4.80 8.00
3 1.50 22.58 0.765 5.40 9.00
28.31
0.08 23.98COHESION, C u ( Kg / cm 2 ) :- ANGLE OF INTERNAL FRICTION, φ 0 :-
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD. Job No. :- 3228
0.00
0.50
1.00
1.50
2.00
0.00 0.50 1.00 1.50 2.00
S h e ar S t r e s s
( K g / c m
2 )
Normal Stress (Kg/cm 2)
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 79/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 03 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 8 29 63 76 33 43 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 03 4.50 - 5.00 UDS 1 1.52 0.85 77.79 CH 0 1 32 67 122 40 82 ----- TUU 0.08 4.36 ----- ----- ----- 0.64 2.04 2.60
BH - 03 6.00 - 6.60 SPT 3 ----- ----- ----- CH 1 11 28 60 71 28 43 ----- ----- ----- ----- ----- 60 ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 80/183
Particle
% % % % mm mm mm
BH - 03 3 .00 - 3.60 CH 0 8 29 63 ----- ----- ----- ----- ----- 76 33 43 SPT 2
BH - 03 4 .50 - 5.00 CH 0 1 32 67 ----- ----- ----- ----- ----- 122 40 82 UDS 1
BH - 03 6 .00 - 6.60 CH 1 11 28 60 ----- ----- ----- ----- ----- 71 28 43 SPT 3
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 81/183
IS - 2720 , P-15Project:
Location: ----------- Date: 04.09.2012
Bore Hole No./Trial Pit No.: BH - 03 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.85 1.05 gm/cm 3 0.10 - 0.25 3.38 1.17E-01 1.25E-04Moisture Content, w 77.79 56.60 % 0.25 - 0.50 2.53 9.85E-02 7.89E-05Initial Void Ratio,e o 2.04 1.47 0.50 - 1.00 1.71 9.74E-02 5.28E-05Specific Gravity,G 2.60 2.60 1.00 - 2.00 0.94 7.03E-02 2.10E-05
Degree of Saturation, S r 98.95 100.00 % 2.00 - 4.00 0.66 3.75E-02 7.90E-060.640.51 kg/cm 2
0.1 2.04394840.25 1.99067930.5 1.917
1 1.7752 1.584 1.3864555
2 1.39102141 1.41232910.5 1.4321148
0.25 1.45494440.1 1.4716861
0 00 00 00 00 00 0
Job No.: 3228Checked By:
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
2.05
2.10
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 82/183
Project:
1.25 mm/min 07.07.201238.00 mm 0376.00 mm 4.50 - 5.000.85 g/cm 3 TUU77.79 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 3.34 0.268 0.768 6.84 9.00
2 1.00 4.37 0.347 1.347 7.60 10.00
3 1.50 5.41 0.419 1.919 9.12 12.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.08 k /cm 2 4.36
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 83/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 04 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 13 29 58 75 31 44 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----
BH - 04 4.50 - 5.00 UDS 1 1.48 0.80 85.70 CH 1 2 32 65 124 41 83 ----- TUU 0.04 4.0 ----- ----- ----- 0.93 2.27 2.61
BH - 04 6.00 - 6.60 SPT 3 ----- ----- ----- CI 15 33 25 27 44 21 23 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 84/183
Particle
% % % % mm mm mm
BH - 04 3 .00 - 3.60 CH 0 13 29 58 ----- ----- ----- ----- ----- 75 31 44 SPT 2
BH - 04 4 .50 - 5.00 CH 1 2 32 65 ----- ----- ----- ----- ----- 124 41 83 UDS 1
BH - 04 6 .00 - 6.60 CI 15 33 25 27 ----- ----- ----- ----- ----- 44 21 23 SPT 3
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 85/183
IS - 2720 , P-15Project:
Location: ----------- Date: 04.09.2012
Bore Hole No./Trial Pit No.: BH - 4 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.80 1.04 gm/cm 3 0.10 - 0.25 3.52 1.56E-01 1.75E-04Moisture Content, w 85.70 58.17 % 0.25 - 0.50 2.06 1.43E-01 9.32E-05Initial Void Ratio,e o 2.27 1.52 0.50 - 1.00 1.32 9.99E-02 4.19E-05Specific Gravity,G 2.61 2.61 1.00 - 2.00 0.71 9.35E-02 2.11E-05
Degree of Saturation, S r 98.33 100.00 % 2.00 - 4.00 0.49 5.27E-02 8.17E-060.930.60 kg/cm 2
0.1 2.27484460.25 2.1980.5 2.084
1 1.932 1.6564 1.3758998
2 1.38408691 1.41847270.5 1.4610457
0.25 1.49379420.1 1.5183555
0 00 00 00 00 00 0
Job No.: 3228Checked By: R AVI A .
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
2.05
2.10
2.15
2.20
2.25
2.30
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 86/183
Project:
1.25 mm/min 07.07.201238.00 mm 0476.00 mm 4.50 - 5.000.81 g/cm 3 TUU85.70 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 1.99 0.156 0.656 8.36 11.00
2 1.00 3.10 0.241 1.241 9.12 12.00
3 1.50 3.90 0.299 1.799 9.88 13.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.04 k /cm 2 4.00
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
0.0 0.5 1.0 1.5 2.0
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 87/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 05 3.00 - 3.60 SPT 2 ----- ----- ----- SP-SM 40 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 05 4.50 - 5.10 SPT 3 ----- ----- ----- CH 2 12 34 52 80 29 51 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----
BH - 05 6.00 - 6.50 UDS 1 1.63 1.02 59.36 CH 0 12 27 61 97 33 64 ----- TUU 0.19 4.12 ----- ----- ----- 0.42 1.57 2.63
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
8
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 88/183
Particle
% % % % mm mm mm
BH - 05 3 .00 - 3.60 SP-SM 40 52 0.12 1.50 4.70 39.17 3.99 ----- ----- ----- SPT 2
BH - 05 4 .50 - 5.10 CH 2 12 34 52 ----- ----- ----- ----- ----- 80 29 51 SPT 3
BH - 05 6 .00 - 6.50 CH 0 12 27 61 ----- ----- ----- ----- ----- 97 33 64 UDS 1
8
P l a s t i c L i m i t , W
p
------------
Φ 3 0 %
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 89/183
IS - 2720 , P-15Project:
Location: ----------- Date: 04.09.2012
Bore Hole No./Trial Pit No.: BH - 05 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.02 1.19 gm/cm 3 0.10 - 0.25 3.58 1.10E-01 1.25E-04Moisture Content, w 59.36 45.71 % 0.25 - 0.50 2.28 9.76E-02 7.05E-05Initial Void Ratio,e o 1.57 1.20 0.50 - 1.00 1.65 7.19E-02 3.76E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 1.08 5.35E-02 1.82E-05
Degree of Saturation, S r 99.28 100.00 % 2.00 - 4.00 0.76 2.83E-02 6.85E-060.420.51 kg/cm 2
0.1 1.57253130.25 1.53008450.5 1.4683438
1 1.37959152 1.25225124 1.1249109
2 1.14291861 1.16349880.5 1.1763615
0.25 1.19179670.1 1.2020868
0 00 00 00 00 00 0
Job No.: 3228Checked By:
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 90/183
Project:
1.25 mm/min 07.07.201238.00 mm 0576.00 mm 6.00 - 6.501.02 g/cm 3 TUU59.36 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 5.80 0.455 0.955 8.36 11.00
2 1.00 6.76 0.524 1.524 9.12 12.00
3 1.50 7.79 0.598 2.098 9.88 13.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.19 k /cm 2 4.12
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 91/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 08 3.00 - 3.60 SPT 2 ----- ----- ----- CI 0 19 39 42 48 22 26 ----- ----- ----- ----- ----- 30 ----- ----- ----- 2.64
BH - 08 4.50 - 5.00 UDS 1 1.56 0.91 71.26 CH 0 10 26 64 111 34 77 ----- TUU 0.13 2.86 ----- ----- ----- ----- ----- -----
BH - 08 7.50 - 8.00 UDS 2 1.57 0.93 68.13 CH 2 17 31 50 105 35 70 ----- TUU 0.12 4.57 ----- ----- ----- ----- ----- -----
BH - 08 10.50 - 11.10 SPT 5 ----- ----- ----- SC 14 39 20 27 36 20 16 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 92/183
Particle
% % % % mm mm mm
BH - 08 3 .00 - 3.60 CI 0 19 39 42 ----- ----- ----- ----- ----- 48 22 26 SPT 2
BH - 08 4 .50 - 5.00 CH 0 10 26 64 ----- ----- ----- ----- ----- 111 34 77 UDS 1
B H - 08 7 .50 - 8. 00 CH 2 17 31 50 ----- ----- ----- ----- ----- 105 35 70 UDS 2
BH - 08 10.50 - 11.10 SC 14 39 20 27 ----- ----- ----- ----- ----- 36 20 16 SPT 5
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 93/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH - 08 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS - 1
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.91 1.29 gm/cm 3 0.10 - 0.25 3.37 2.19E-01 2.34E-04Moisture Content, w 71.26 39.69 % 0.25 - 0.50 2.18 2.00E-01 1.39E-04Initial Void Ratio,e o 1.89 1.04 0.50 - 1.00 1.35 1.75E-01 7.50E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.93 9.65E-02 2.85E-05
Degree of Saturation, S r 99.11 100.00 % 2.00 - 4.00 0.53 5.55E-02 9.39E-060.810.39 kg/cm 2
0.1 1.89097430.25 1.7960.5 1.656
1 1.4242 1.194 0.9470712
2 0.96297161 0.98899030.5 1.0092272
0.25 1.0265730.1 1.0439188
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 94/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH - 08 Dia.of Specimen: 60 mmDepth in M.: 7.50 - 8.10 Height of specimen: 20 mmType of Samples: UDS - 2
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.93 1.12 gm/cm 3 0.10 - 0.25 4.29 1.00E-01 1.36E-04Moisture Content, w 68.13 51.54 % 0.25 - 0.50 2.91 9.30E-02 8.57E-05Initial Void Ratio,e o 1.83 1.36 0.50 - 1.00 1.62 8.82E-02 4.52E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 0.96 6.00E-02 1.83E-05
Degree of Saturation, S r 98.44 100.00 % 2.00 - 4.00 0.70 3.87E-02 8.58E-060.630.66 kg/cm 2
0.1 1.82715410.25 1.78474680.5 1.72
1 1.62 1.4444 1.255
2 1.26879121 1.29140840.5 1.3253343
0.25 1.34512440.1 1.3606737
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 95/183
Project:
1.25 mm/min 09.07.201238.00 mm 876.00 mm 4.50 - 5.000.91 g/cm 3 TUU71.26 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.29 0.337 0.837 8.36 11.00
2 1.00 5.01 0.389 1.389 9.12 12.00
3 1.50 5.80 0.445 1.945 9.88 13.00
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Cohesion: 0.13 k /cm 2 2.86
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
0.0
0.5
1.0
1.5
2.0
0.0 0.5 1.0 1.5 2.0
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 96/183
Project:
1.25 mm/min 09.07.201238.00 mm 876.00 mm 7.50 - 8.000.93 g/cm 3 TUU68.13 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.69 0.376 0.876 6.84 9.00
2 1.00 5.57 0.442 1.442 7.60 10.00
3 1.50 6.68 0.524 2.024 8.36 11.00
Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Cohesion: 0.12 k /cm 2 4.57
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 97/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 10 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 20 33 47 62 27 35 ----- ----- ----- ----- ----- 35 ----- ----- ----- -----
BH - 10 6.00 - 6.50 UDS 1 1.74 1.21 43.91 CH 9 36 21 34 67 29 38 ----- TUU 0.26 4.8 ----- ----- ----- 0.44 1.19 2.65
BH - 10 9.00 - 9.60 SPT 3 ----- ----- ----- CH 0 8 34 58 82 31 51 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 98/183
Particle
% % % % mm mm mm
BH - 10 3 .00 - 3.60 CH 0 20 33 47 ----- ----- ----- ----- ----- 62 27 35 SPT 2
BH - 10 6 .00 - 6.50 CH 9 36 21 34 ----- ----- ----- ----- ----- 67 29 38 UDS 1
BH - 10 9 .00 - 9.60 CH 0 8 34 58 ----- ----- ----- ----- ----- 82 31 51 SPT 3
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 99/183
IS - 2720 , P-15Project:
Location: ----------- Date: 31.08.2012
Bore Hole No./Trial Pit No.: BH-10 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.21 1.51 gm/cm 3 0.10 - 0.25 4.51 2.00E-01 2.86E-04Moisture Content, w 43.91 28.44 % 0.25 - 0.50 2.67 1.26E-01 1.07E-04Initial Void Ratio,e o 1.19 0.75 0.50 - 1.00 1.69 9.90E-02 5.30E-05Specific Gravity,G 2.65 2.65 1.00 - 2.00 0.98 6.60E-02 2.05E-05
Degree of Saturation, S r 97.85 100.00 % 2.00 - 4.00 0.70 3.60E-02 8.00E-060.440.48 kg/cm 2
0.1 1.18921640.25 1.12353990.5 1.0567688
1 0.9552 0.8264 0.6944535
2 0.70321041 0.71634570.5 0.7305756
0.25 0.74371090.1 0.7535624
0 00 00 00 00 00 0
Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
0.68
0.73
0.78
0.83
0.88
0.93
0.98
1.03
1.08
1.13
1.18
1.23
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 100/183
Project:
1.25 mm/min 09.07.201238.00 mm 1076.00 mm 6.00 - 6.501.21 g/cm 3 TUU43.91 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 8.13 0.646 1.146 7.60 10.00
2 1.00 9.37 0.727 1.727 9.12 12.00
3 1.50 10.60 0.813 2.313 9.88 13.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.26 k /cm 2 4.8
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 101/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 11 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 18 32 50 69 30 39 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 11 4.50 - 5.00 UDS 1 1.66 1.08 54.17 CH 0 12 30 58 72 29 43 ----- TUU 0.14 3.43 ----- 44 ----- ----- ----- 2.63
BH - 11 9.00 - 9.60 SPT 5 ----- ----- ----- SM 23 50 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
27
Location :
SOIL TEST DATA SHEET
Project :
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 102/183
Particle
% % % % mm mm mm
BH - 11 3.00 - 3.60 CH 0 18 32 50 ----- ----- ----- ----- ----- 69 30 39 SPT 2
BH - 11 4.50 - 5.00 CH 0 12 30 58 ----- ----- ----- ----- ----- 72 29 43 UDS 1
BH - 11 9.00 - 9.60 SM 23 50 ----- ----- ----- ----- ----- ----- ----- ----- SPT 5
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
27
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 103/183
Project:
1.25 mm/min 18.08.201238.00 mm BH - 1176.00 mm 4.50 - 5.001.08 g/cm 3 TUU54.17 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.53 0.363 0.863 6.84 9.00
2 1.00 5.41 0.429 1.429 7.60 10.00
3 1.50 6.28 0.493 1.993 8.36 11.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :
Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
Cohesion: 0.14 k cm 2 3.43
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
.
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 104/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 12 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 9 29 62 93 38 55 ----- ----- ----- ----- ----- 70 ----- ----- ----- -----
BH - 12 4.50 - 5.00 UDS 1 1.52 0.86 77.35 CH 1 5 30 65 116 43 73 ----- TUU 0.11 4.11 ----- ----- ----- ----- ----- -----
BH - 12 7.50 - 8.10 SPT 4 ----- ----- ----- CH 0 4 30 66 75 33 42 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.60
BH - 12 9.00 - 9.50 UDS 2 1.47 0.77 90.026 CH 0 14 25 61 101 41 60 ----- ----- ----- ----- ----- ----- ----- 1.02 2.40 2.63
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 105/183
Particle
% % % % mm mm mm
BH - 12 3 .00 - 3.60 CH 0 9 29 62 ----- ----- ----- ----- ----- 93 38 55 SPT 2
BH - 12 4 .50 - 5.00 CH 1 5 30 65 ----- ----- ----- ----- ----- 116 43 73 UDS 1
BH - 12 7 .50 - 8.10 CH 0 4 30 66 ----- ----- ----- ----- ----- 75 33 42 SPT 4
BH - 12 9 .00 - 9.50 CH 0 14 25 61 ----- ----- ----- ----- ----- 101 41 60 UDS 2
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 106/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH- -12 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.86 1.13 gm/cm 3 0.10 - 0.25 3.18 1.82E-01 1.84E-04Moisture Content, w 77.35 50.40 % 0.25 - 0.50 2.10 1.73E-01 1.15E-04Initial Void Ratio,e o 2.06 1.32 0.50 - 1.00 1.32 1.37E-01 5.72E-05Specific Gravity,G 2.61 2.61 1.00 - 2.00 0.91 7.92E-02 2.28E-05
Degree of Saturation, S r 98.14 100.00 % 2.00 - 4.00 0.55 4.39E-02 7.62E-060.710.41 kg/cm 2
0.1 2.0570.25 1.97356870.5 1.845
1 1.652 1.444 1.2256065
2 1.23474661 1.25759670.5 1.2789236
0.25 1.29872710.1 1.3154838
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
2.05
2.10
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 107/183
IS - 2720 , P-15Project:
Location: ----------- Date: 04.09.2012
Bore Hole No./Trial Pit No.: BH - 12 Dia.of Specimen: 60 mmDepth in M.: 9.00 - 9.50 Height of specimen: 20 mmType of Samples: UDS - 02
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.77 1.04 gm/cm 3 0.10 - 0.25 3.12 1.82E-01 1.80E-04Moisture Content, w 90.03 57.90 % 0.25 - 0.50 2.11 1.73E-01 1.16E-04Initial Void Ratio,e o 2.40 1.52 0.50 - 1.00 1.20 9.99E-02 3.79E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.63 9.12E-02 1.83E-05
Degree of Saturation, S r 98.66 100.00 % 2.00 - 4.00 0.48 5.64E-02 8.62E-061.020.65 kg/cm 2
0.1 2.39985650.25 2.3070.5 2.164
1 2.0062 1.7324 1.4240977
2 1.4393971 1.46489590.5 1.4835951
0.25 1.50909410.1 1.5226935
0 00 00 00 00 00 0
Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
2.05
2.10
2.15
2.20
2.252.30
2.35
2.40
2.45
2.50
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 108/183
Project:
1.25 mm/min 09.07.201238.00 mm 1276.00 mm 4.50 - 5.000.86 g/cm 3 TUU77.35 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.13 0.339 0.839 5.32 7.00
2 1.00 5.17 0.419 1.419 6.08 8.00
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilitiesat East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
. . . . . .
Cohesion: 0.11 k cm 2 4.11
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 109/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 110/183
Particle
% % % % mm mm mm
BH - 14 3.00 - 3.60 CH 2 36 25 36 ----- ----- ----- ----- ----- 65 24 41 SPT 2
BH - 14 6.00 - 6.50 CH 1 30 29 40 ----- ----- ----- ----- ----- 63 26 37 UDS 1
BH - 14 9.00 - 9.60 CH 1 22 31 46 ----- ----- ----- ----- ----- 66 27 39 SPT 5
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 111/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 112/183
Project:
1.25 mm/min 18.08.201238.00 mm 1476.00 mm 6.00 - 6.501.00 g/cm 3 TUU57.45 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.77 0.366 0.866 9.88 13.00
2 1.00 5.64 0.428 1.428 10.64 14.00
3 1.50 6.44 0.483 1.983 11.40 15.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.13 k cm 2 3.89
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 113/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 15 3.00 - 3.60 SPT 2 ----- ----- ----- CH 3 22 30 45 68 29 39 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 15 4.50 - 5.00 UDS 1 1.55 0.93 66.78 CH 0 7 39 54 74 32 42 ----- TUU 0.11 3.66 ----- 42 ----- ----- ----- 2.63
BH - 15 10.50 - 11.10 SPT 6 ----- ----- ----- CH 9 14 29 48 70 30 40 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 114/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 115/183
IS - 2720 , P-15Project:
Location: ----------- Date: 06.09.2012
Bore Hole No./Trial Pit No.: BH - 18 Dia.of Specimen: 60 mmDepth in M.: 9.00 - 9.50 Height of specimen: 20 mmType of Samples: UDS - 02
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.90 1.12 gm/cm 3 0.10 - 0.25 3.99 1.70E-01 2.15E-04Moisture Content, w 71.96 50.81 % 0.25 - 0.50 2.23 1.17E-01 8.26E-05Initial Void Ratio,e o 1.91 1.33 0.50 - 1.00 1.51 9.82E-02 4.70E-05Specific Gravity,G 2.62 2.62 1.00 - 2.00 0.95 7.42E-02 2.23E-05
Degree of Saturation, S r 98.88 100.00 % 2.00 - 4.00 0.74 3.99E-02 9.35E-060.640.51 kg/cm 2
0.1 1.90667870.25 1.83255840.5 1.75
1 1.6152 1.4214 1.2279692
2 1.2439561 1.27011610.5 1.2919162
0.25 1.31226290.1 1.3311563
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
1.85
1.90
1.95
2.00
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 116/183
Project:
1.25 mm/min 18.08.201238.00 mm 1576.00 mm 4.50 - 5.000.93 g/cm 3 TUU66.78 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 3.66 0.290 0.790 7.60 10.00
2 1.00 4.53 0.355 1.355 8.36 11.00
3 1.50 5.41 0.420 1.920 9.12 12.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.11 k cm 2 3.66
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 117/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 118/183
Particle
% % % % mm mm mm
BH - 18 3 .00 - 3.60 CH 0 24 21 55 ----- ----- ----- ----- ----- 64 28 36 SPT 2
BH - 18 4 .50 - 5.00 CH 0 21 25 54 ----- ----- ----- ----- ----- 110 40 70 UDS 1
BH - 18 9 .00 - 9.50 CH 0 5 28 67 ----- ----- ----- ----- ----- 116 43 73 UDS 2
BH - 18 13.50 - 14.10 SC 1 55 20 24 ----- ----- ----- ----- ----- 44 21 23 SPT 7
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 119/183
Project:
1.25 mm/min 09.07.201238.00 mm 1876.00 mm 9.00 - 9.500.90 g/cm 3 TUU71.96 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 3.98 0.315 0.815 7.60 10.00
2 1.00 4.93 0.387 1.387 8.36 11.00
3 1.50 6.28 0.487 1.987 9.12 12.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.1 k cm 2 4.57
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 120/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 19 3.00 - 3.60 SPT 2 ----- ----- ----- CH 1 12 30 57 61 27 34 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 19 4.50 - 5.00 UDS 1 1.68 1.11 50.92 CH 1 19 29 51 84 35 49 ----- TUU 0.22 4.34 ----- 55 ----- ----- ----- -----
BH - 19 9.00 - 9.60 SPT 5 ----- ----- ----- CH 0 12 32 56 63 22 41 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.63
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 121/183
Particle
% % % % mm mm mm
BH - 19 3 .00 - 3.60 CH 1 12 30 57 ----- ----- ----- ----- ----- 61 27 34 SPT 2
BH - 19 4 .50 - 5.00 CH 1 19 29 51 ----- ----- ----- ----- ----- 84 35 49 UDS 1
BH - 19 9 .00 - 9.60 CH 0 12 32 56 ----- ----- ----- ----- ----- 63 22 41 SPT 5
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 122/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH - 19 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.11 1.53 gm/cm 3 0.10 - 0.25 3.51 2.48E-01 2.76E-04Moisture Content, w 50.92 27.31 % 0.25 - 0.50 2.43 2.11E-01 1.63E-04Initial Void Ratio,e o 1.38 0.72 0.50 - 1.00 1.42 1.60E-01 7.20E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 0.85 9.82E-02 2.65E-05
Degree of Saturation, S r 97.52 100.00 % 2.00 - 4.00 0.56 5.47E-02 9.69E-060.650.41 kg/cm 2
0.1 1.37853740.25 1.290.5 1.169
1 0.9962 0.84 0.6031342
2 0.62810891 0.66259760.5 0.6840045
0.25 0.7042220.1 0.7208718
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 123/183
Project:
1.25 mm/min 09.07.201238.00 mm 1976.00 mm 4.50 - 5.001.11 g/cm 3 TUU50.92 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 7.71 0.598 1.098 9.12 12.00
2 1.00 8.59 0.659 1.659 9.88 13.00
3 1.50 9.62 0.729 2.229 10.64 14.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.22 k cm 2 4.34
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 124/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 20 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 15 35 50 73 33 40 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 20 4.50 - 5.00 UDS 1 1.63 1.02 60.24 CH 0 4 40 56 76 35 41 ----- TUU 0.14 5.93 ----- 48 ----- ----- ----- 2.65
BH - 20 9.00 - 9.60 SPT 5 ----- ----- ----- CH 0 12 35 53 74 32 42 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 125/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 126/183
Project:
1.25 mm/min 18.08.201238.00 mm BH - 2076.00 mm 4.50 - 5.001.02 g/cm 3 TUU60.24 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.85 0.381 0.881 8.36 11.00
2 1.00 5.72 0.444 1.444 9.12 12.00
3 1.50 6.60 0.506 2.006 9.88 13.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.14 k cm 2 5.93
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 127/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 21 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 38 23 39 53 26 27 ----- ----- ----- ----- ----- 40 ----- ----- ----- -----
BH - 21 4.50 - 5.00 UDS 1 1.60 0.99 61.73 CH 0 3 35 62 93 36 57 ----- TUU 0.17 3.2 ----- ----- ----- ----- ----- -----
BH - 21 7.50 - 8.10 SPT 4 ----- ----- ----- CH 0 11 32 57 87 32 55 ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.61
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 128/183
Particle
% % % % mm mm mm
BH - 21 3 .00 - 3.60 CH 0 38 23 39 ----- ----- ----- ----- ----- 53 26 27 SPT 2
BH - 21 4 .50 - 5.00 CH 0 3 35 62 ----- ----- ----- ----- ----- 93 36 57 UDS 1
BH - 21 7 .50 - 8.10 CH 0 11 32 57 ----- ----- ----- ----- ----- 87 32 55 SPT 4
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 3 0 %
Bore HoleNo.
Silt Φ
6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 129/183
Project:
1.25 mm/min 09.07.201238.00 mm 2176.00 mm 4.50 - 5.000.99 g/cm 3 TUU61.73 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 5.33 0.423 0.923 7.60 10.00
2 1.00 6.28 0.493 1.493 8.36 11.00
3 1.50 7.16 0.555 2.055 9.12 12.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.17 k cm 2 3.2
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 130/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 23 3.00 - 3.60 SPT 2 ----- ----- ----- SM 22 43 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 23 6.00 - 6.50 UDS 1 1.65 1.06 55.16 CH 3 17 31 49 67 29 38 ----- TUU 0.21 3.66 ----- 40 ----- 0.31 1.47 2.63
BH - 23 10.50 - 11.10 SPT 6 ----- ----- ----- SM 5 68 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
35
27
Permeability Test
Chemical Analysis
Consistency Limits
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Mechanical Analysis
05.07.2012
VerticalConsolidation
FLB 04
Shear Test
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 131/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 132/183
IS - 2720 , P-15Project:
Location: ----------- Date: 03.09.2012
Bore Hole No./Trial Pit No.: BH - 23 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.06 1.16 gm/cm 3 0.10 - 0.25 3.83 4.67E-02 5.67E-05Moisture Content, w 55.16 48.35 % 0.25 - 0.50 2.46 4.45E-02 3.47E-05Initial Void Ratio,e o 1.47 1.27 0.50 - 1.00 1.61 4.36E-02 2.23E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 1.17 3.32E-02 1.23E-05
Degree of Saturation, S r 98.38 100.00 % 2.00 - 4.00 0.82 2.05E-02 5.31E-060.310.71 kg/cm 2
0.1 1.47465620.25 1.45733360.5 1.43
1 1.3772 1.2984 1.2036813
2 1.21481731 1.23213990.5 1.2469878
0.25 1.26307310.1 1.2717344
0 00 00 00 00 00 0
Job No.: 3228Checked By:
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
1.20
1.25
1.30
1.35
1.40
1.45
1.50
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 133/183
Project:
1.25 mm/min 09.07.201238.00 mm 2376.00 mm 6.00 - 6.501.06 g/cm 3 TUU55.16 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 6.68 0.524 1.024 8.36 11.00
2 1.00 7.63 0.592 1.592 9.12 12.00
3 1.50 8.67 0.665 2.165 9.88 13.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.21 k cm 2 3.66
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 134/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 135/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 136/183
IS - 2720 , P-15Project:
Location: ----------- Date: 06.09.2012
Bore Hole No./Trial Pit No.: BH - 24 Dia.of Specimen: 60 mmDepth in M.: 6.00 - 6.50 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.97 1.34 gm/cm 3 0.10 - 0.25 3.95 2.40E-01 3.01E-04Moisture Content, w 63.76 36.63 % 0.25 - 0.50 2.11 2.25E-01 1.50E-04Initial Void Ratio,e o 1.71 0.96 0.50 - 1.00 1.22 1.51E-01 5.85E-05Specific Gravity,G 2.63 2.63 1.00 - 2.00 0.80 9.86E-02 2.49E-05
Degree of Saturation, S r 97.85 100.00 % 2.00 - 4.00 0.49 5.54E-02 8.69E-060.760.42 kg/cm 2
0.1 1.71368410.25 1.61599150.5 1.469
1 1.2822 1.05697254 0.8290231
2 0.85751681 0.89686520.5 0.9212883
0.25 0.94435460.1 0.9633504
0 00 00 00 00 00 0
Job No.: 3228Checked By:DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
0.80
0.85
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 137/183
Project:
1.25 mm/min 09.07.201238.00 mm 2476.00 mm 6.00 - 6.500.97 g/cm 3 TUU63.76 % UDS 01
Serial No.Cell
Pressure σ 3
DeviatoricForce atFailure
DeviatoricStress at
Failure, d
Normal Stressat Failure, 1
Change inLength atFailure, ∆L
Strain atFailure,ε
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities
at East Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 5.17 0.405 0.905 8.36 11.00
2 1.00 6.04 0.469 1.469 9.12 12.00
3 1.50 7.00 0.537 2.037 9.88 13.00
0.5
1.0
1.5
2.0
2.5
S h e a r S t r e s s , k g / s q . c m
Cohesion: 0.18 k cm 2 2.75
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 138/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 26 4.50 - 5.10 SPT 3 ----- ----- ----- CH 1 34 26 39 75 31 44 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 26 6.00 - 6.50 UDS 1 1.49 0.81 84.76 CH 7 5 37 51 86 34 52 ----- TUU 0.07 3.43 ----- 45 ----- ----- ----- 2.61
BH - 26 7.50 - 8.10 SPT 4 ----- ----- ----- CH 1 33 26 40 73 32 41 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 139/183
Particle
% % % % mm mm mm
BH - 26 4 .50 - 5.10 CH 1 34 26 39 ----- ----- ----- ----- ----- 75 31 44 SPT 3
BH - 26 6 .00 - 6.50 CH 7 5 37 51 ----- ----- ----- ----- ----- 86 34 52 UDS 1
BH - 26 7 .50 - 8.10 CH 1 33 26 40 ----- ----- ----- ----- ----- 73 32 41 SPT 4
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 140/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 141/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 142/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 143/183
0.6904 0.0789 1.2533 0.1049 1.8053 0.1265 135.00000.6970 0.0717 1.2621 0.0954 1.8159 0.1150 140.00000.7029 0.0640 1.2700 0.0851 1.8254 0.1026 145.0000
0.7081 0.0558 1.2769 0.0742 1.8337 0.0894 150.00000.7126 0.0472 1.2829 0.0627 1.8409 0.0756 155.00000.7163 0.0382 1.2878 0.0508 1.8469 0.0612 160.00000.7193 0.0289 1.2917 0.0384 1.8516 0.0463 165.00000.7214 0.0194 1.2945 0.0258 1.8550 0.0311 170.00000.7226 0.0097 1.2962 0.0129 1.8570 0.0156 175.00000.7231 0.0000 1.2968 0.0000 1.8577 0.0000 180.0000
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 144/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 28 1.50 - 2.10 SPT 1 ----- ----- ----- CH 0 20 38 42 63 28 35 ----- ----- ----- ----- ----- 42 ----- ----- ----- 2.63
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 145/183
Particle
% % % % mm mm mm
BH - 28 1.5 0 - 2.10 CH 0 20 38 42 ----- ----- ----- ----- ----- 63 28 35 SPT 1
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 146/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 29 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 9 43 48 64 31 33 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 29 4.50 - 5.00 UDS 1 1.68 1.12 50.29 CH 0 10 40 50 68 33 35 ----- TUU 0.28 5.48 ----- 43 ----- ----- ----- 2.64
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 147/183
Particle
% % % % mm mm mm
BH - 29 3 .00 - 3.60 CH 0 9 43 48 ----- ----- ----- ----- ----- 64 31 33 SPT 2
BH - 29 4 .50 - 5.00 CH 0 10 40 50 ----- ----- ----- ----- ----- 68 33 35 UDS 1
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 148/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH - 29 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 1.12 1.32 gm/cm 3 0.10 - 0.25 3.83 6.13E-02 7.44E-05Moisture Content, w 50.29 38.03 % 0.25 - 0.50 2.57 5.98E-02 4.88E-05Initial Void Ratio,e o 1.36 1.00 0.50 - 1.00 1.54 5.47E-02 2.67E-05Specific Gravity,G 2.64 2.64 1.00 - 2.00 1.15 5.44E-02 1.98E-05
Degree of Saturation, S r 97.50 100.00 % 2.00 - 4.00 0.84 4.19E-02 1.11E-050.590.94 kg/cm 2
0.1 1.36170.25 1.340.5 1.305
1 1.2422 1.124 0.9424983
2 0.95784931 0.97083870.5 0.9802855
0.25 0.99445570.1 1.0039025
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
0.90
0.95
1.00
1.05
1.10
1.15
1.20
1.25
1.30
1.35
1.40
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 149/183
Project:
1.25 mm/min 18.08.201238.00 mm BH - 2976.00 mm 4.50 - 5.001.12 g/cm 3 TUU50.29 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 8.29 0.672 1.172 6.08 8.00
2 1.00 9.95 0.798 1.798 6.84 9.00
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities atEast Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
. . . . . .
Cohesion: 0.28 k cm 2 5.48
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
0.0
0.5
1.0
1.5
2.0
2.5
3.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 150/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 151/183
Particle
% % % % mm mm mm
BH - 31 3 .00 - 3.60 CH 0 26 32 42 ----- ----- ----- ----- ----- 74 32 42 SPT 2
BH - 31 4 .50 - 5.00 CH 3 6 40 51 ----- ----- ----- ----- ----- 78 33 45 UDS 1
BH - 31 6 .00 - 6.60 CH 7 11 35 47 ----- ----- ----- ----- ----- 72 30 42 SPT 3
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 152/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 153/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 32A 3.00 - 3.60 SPT 2 ----- ----- ----- SC 13 38 25 24 47 23 24 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 32A 4.50 - 5.00 UDS 1 1.52 0.87 75.01 CH 2 8 40 50 79 30 49 ----- TUU 0.09 2.86 ----- 48 ----- ----- ----- 2.62
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 154/183
Particle
% % % % mm mm mm
B H - 32 A 3 .0 0 - 3. 60 SC 13 38 25 24 ----- ----- ----- ----- ----- 47 23 24 SPT 2
B H - 32 A 4 .5 0 - 5. 00 CH 2 8 40 50 ----- ----- ----- ----- ----- 79 30 49 UDS 1
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 155/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 156/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - 33 3.00 - 3.60 SPT 2 ----- ----- ----- CH 0 8 39 53 78 30 48 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - 33 4.50 - 5.00 UDS 1 1.59 0.96 64.87 CH 1 9 42 48 75 28 47 ----- TUU 0.10 3.15 ----- 42 ----- ----- ----- 2.62
BH - 33 6.00 - 6.60 SPT 3 ----- ----- ----- CH 17 20 27 36 57 27 30 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Location :
SOIL TEST DATA SHEET
Project : Geotechnical Investigation W ork f or t he Proposed Installat ion of Mechanical Handling Facilit ies at East Quay-7 (EQ-7) Berth i n t he inner harbour of Visakhapatnam Port Trust.
R e m a r k s
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Consistency Limits
B o r e H o l e N o .
S a m p l e T y p e
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Compaction Test
Permeability Test
Chemical Analysis
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
Shear Test
18.08.2012
Mechanical AnalysisVertical
Consolidation
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density
gm/ cm 3
FLB 04
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 157/183
Particle
% % % % mm mm mm
BH - 33 3 .00 - 3.60 CH 0 8 39 53 ----- ----- ----- ----- ----- 78 30 48 SPT 2
BH - 33 4 .50 - 5.00 CH 1 9 42 48 ----- ----- ----- ----- ----- 75 28 47 UDS 1
BH - 33 6 .00 - 6.60 CH 17 20 27 36 ----- ----- ----- ----- ----- 57 27 30 SPT 3
Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel Φ
6 0 %
G e o t e c h ni c al I nv e s t i g a t i onW
or k f or t h eP r o p o s e d I n s t al l a t i on
of M e c h ani c al H an d l i n gF a c i l i t i e s a t E a s t Q
u a y -
7 ( E Q-7 ) B er t h i n
t h e
i nn er h ar b o ur of V i s ak h a p a t n amP or t T r u s t .
3 2 2 8
Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
P r o j e c t :
P l a s t i c L i m i t , W
p
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
------------
Symbol Φ
3 0 %
Bore HoleNo.
Silt
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 158/183
IS - 2720 , P-15Project:
Location: ----------- Date: 07.09.2012
Bore Hole No./Trial Pit No.: BH - 33 Dia.of Specimen: 60 mmDepth in M.: 4.50 - 5.00 Height of specimen: 20 mmType of Samples: UDS-01
PressureIncrement
Coefficientof
consolidation Cv
Coefficient ofvolume
compressibiltymv
Permeability (K)
kg/cm 2 m 2 /year cm 2 /kg cm/secDry density γ d 0.96 1.07 gm/cm 3 0.10 - 0.25 3.41 6.80E-02 7.37E-05Moisture Content, w 64.87 55.41 % 0.25 - 0.50 1.73 6.55E-02 3.59E-05Initial Void Ratio,e o 1.72 1.45 0.50 - 1.00 1.37 5.82E-02 2.53E-05Specific Gravity,G 2.62 2.62 1.00 - 2.00 1.07 4.05E-02 1.37E-05
Degree of Saturation, S r 99.00 100.00 % 2.00 - 4.00 0.78 2.18E-02 5.40E-060.360.53 kg/cm 2
0.1 1.71672580.25 1.6890.5 1.645
1 1.5682 1.46407034 1.3567596
2 1.37713511 1.39343540.5 1.4097358
0.25 1.43011120.1 1.451845
0 00 00 00 00 00 0
Job No.: 3228Checked By: PRA JEET N.DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Compression Index, Cc:Δe/LogΔPreconsolidation Pressure, P c:
CONSOLIDATION TEST
EndStartProperties of Soil
Geotechnical I nvesti gation w ork f or Proposed Proj ect at EQ - 07 Jet ty ,Vizag
1.30
1.35
1.40
1.45
1.50
1.55
1.60
1.65
1.70
1.75
1.80
0.10 1.00 10.00
V o
i d s
R a
t i o , e
Pressure Increment (Kg/cm 2)
Voids Ratio, e Vs Pressure Increment (Kg/cm 2)
Pc
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 159/183
Project:
1.25 mm/min 18.08.201238.00 mm BH - 3376.00 mm 4.50 - 5.000.96 g/cm 3 TUU64.87 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 3.34 0.265 0.765 7.60 10.00
2 1.00 4.05 0.318 1.318 8.36 11.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation Work for the Proposed Installation of Mechanical Handling Facilities atEast Quay-7 (EQ-7) Berth in the inner harbour of Visakhapatnam Port Trust.
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
. . . . . .
Cohesion: 0.1 k cm 2 3.15
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
0.0 0.5 1.0 1.5 2.0
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 160/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 161/183
Particle
% % % % mm mm mm
BH - N - 01 3.00 - 3.60 CI 1 33 37 29 ----- ----- ----- ----- ----- 48 25 23 SPT 2
BH - N - 01 4.50 - 5.10 CI 3 44 33 20 ----- ----- ----- ----- ----- 42 22 20 SPT 3
BH - N - 01 6.00 - 6.60 SP 0 97 0.16 0.32 0.58 3.63 1.10 ----- ----- ----- SPT 4
BH - N - 01 10.50 - 10.98 SM 26 40 ----- ----- ----- ----- ----- ----- ----- ----- SPT 7
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
Φ 6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
3
34
Φ 3 0 %
Bore HoleNo.
Silt
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 162/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH-N-2 1.50 - 2.10 SPT 1 ----- ----- ----- SM 32 44 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.65
BH-N-2 3.00 - 3.60 SPT 2 ----- ----- ----- SM 9 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH-N-2 9.00 - 9.12 SPT 10 ----- ----- ----- GM 65 24 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH-N-2 18.00 - 18.10 SPT 12 ----- ----- ----- GM 53 33 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
08.09.2012
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Mechanical Analysis
SOIL TEST DATA SHEET
Project :
S w e l l i n g P r e s s u r e
k g / c m 2
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S a m p l e T y p e
Location :
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
39
Compaction Test
Permeability Test
Chemical Analysis
R e m a r k s
FLB 04
Consistency LimitsVertical
Consolidation
B o r e H o l e N o .
DATE:
S o i l C l a s s i f i c a t i o n ( I . S ) Shear Test
24
11
14
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 163/183
Particle
% % % % mm mm mm
BH-N-2 1.50 - 2.10 SM 32 44 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1
BH-N-2 3.00 - 3.60 SM 9 52 ----- ----- ----- ----- ----- ----- ----- ----- SPT 2
BH-N-2 9.00 - 9.12 GM 65 24 ----- ----- ----- ----- ----- ----- ----- ----- SPT 10
BH-N-2 18.00 - 18.10 GM 53 33 ----- ----- ----- ----- ----- ----- ----- ----- SPT 12
Sand
P l a s t i c i t y I n d e x , I p
R e m a r k s
L o c a t i o n :
L i q u i d L i m i t , W
l
P r o j e c t :
P l a s t i c L i m i t , W
p
------------
24
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
J o b
N o .
:
Symbol
3 2 2 8
Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
39
Φ 3 0 %
Φ 6 0 %
Bore HoleNo.
Silt Coeff. ofUniformity,Cu = D60 /
D10
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
Gravel
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
11
14
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 164/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - N - 3 3.00 - 3.60 SPT 2 ----- ----- ----- SM 15 70 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - N - 3 6.00 - 6.60 UDS 1 1.53 0.98 56.61 CI 2 31 35 32 46 22 24 ----- TUU 0.15 3.89 ----- ----- ----- ----- ----- 2.65
BH - N - 3 7.50 - 8.10 SPT 4 ----- ----- ----- SC 2 49 32 17 42 20 22 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - N - 3 22.00 - 22.09 SPT 16 ----- ----- ----- SM 53 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
11
15
Mechanical Analysis
10.09.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 165/183
Particle
% % % % mm mm mm
BH - N - 3 3 .00 - 3.60 SM 15 70 ----- ----- ----- ----- ----- ----- ----- ----- SPT 2
BH - N - 3 6 .00 - 6.60 CI 2 31 35 32 ----- ----- ----- ----- ----- 46 22 24 UDS 1
BH - N - 3 7 .50 - 8.10 SC 2 49 32 17 ----- ----- ----- ----- ----- 42 20 22 SPT 4
BH - N - 3 22.00 - 22.09 SM 53 36 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1611
Φ 3 0 %
Bore HoleNo.
Silt
15
Φ 6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 166/183
Project:
1.25 mm/min 10.03.201238.00 mm BH-N-376.00 mm 6.00 - 6.501.03 g/cm 3 UU57.61 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.91 0.385 0.885 8.36 11.00
2 1.00 5.88 0.456 1.456 9.12 12.00
Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
. . . . . .
Cohesion: 0.15 k cm 2 3.89
JOB No. 3228Checked By: Ravi ADBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
Angle of internal friction,
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 167/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH -N- 04 1.50 - 2.10 SPT 1 ----- ----- ----- SM 7 69 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH -N- 04 4.50 - 5.00 UDS 1 1.58 0.96 63.77 CH 0 1 32 67 87 29 58 ----- TUU 0.14 4.12 ----- ----- ----- ----- ----- 2.64
BH -N- 04 9.00 - 9.60 SPT 5 ----- ----- ----- SM 1 76 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
23
24
Mechanical Analysis
10.09.2012
VerticalConsolidation
FLB 04
Shear Test
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 168/183
Particle
% % % % mm mm mm
BH -N- 04 1 .50 - 2 .10 SM 7 69 ----- ----- ----- ----- ----- ----- ----- ----- SPT 1
BH -N- 04 4 .50 - 5 .00 CH 0 1 32 67 ----- ----- ----- ----- ----- 87 29 58 UDS 1
BH -N- 04 9 .00 - 9 .60 SM 1 76 ----- ----- ----- ----- ----- ----- ----- ----- SPT 523
Φ 3 0 %
Bore HoleNo.
Silt
24
Φ 6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k sCoeff. of
Uniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Classifi--cation
( IS )
Size(mm)
L o c a t i o n :
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
3 2 2 8
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 169/183
Project:
1.25 mm/min 10.03.201238.00 mm BH-N-476.00 mm 4.50 - 5.000.96 g/cm 3 UU63.77 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.69 0.372 0.872 7.60 10.00
2 1.00 5.57 0.437 1.437 8.36 11.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
. . . . . .
Cohesion: 0.14 k cm 2 4.12
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 170/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH -N- 5 1.50-2.00 SPT 2 ----- ----- ----- SC 20 32 20 28 38 22 16 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH -N- 5 4.50 - 5.00 UDS 1 1.50 0.82 82.86 CH 1 8 31 60 94 33 61 ----- TUU 0.07 3.71 ----- ----- ----- ----- ----- 2.62
BH -N- 5 7.50 - 8.00 SPT 4 ----- ----- ----- SM 23 52 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
Permeability Test
Chemical Analysis
Consistency Limits
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
S w e l l i n g P r e s s u r e
k g / c m 2
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Mechanical Analysis
S a m p l e T y p e
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
10.09.2012
VerticalConsolidation
FLB 04
Shear Test
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
25
Location :
B o r e H o l e N o .
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 171/183
Particle
% % % % mm mm mm
B H - N- 5 1 .5 0- 2. 00 SC 20 32 20 28 ----- ----- ----- ----- ----- 38 22 16 SPT 2
B H - N- 5 4 .5 0 - 5. 00 CH 1 8 31 60 ----- ----- ----- ----- ----- 94 33 61 UDS 1
B H - N- 5 7 .5 0 - 8. 00 SM 23 52 ----- ----- ----- ----- ----- ----- ----- ----- SPT 4
P l a s t i c L i m i t , W
p
------------
Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
Classifi--cation
( IS )
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
3 2 2 8
Coeff. ofUniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Size(mm)
L o c a t i o n :
Φ 3 0 %
Bore HoleNo.
Silt
25
Φ 6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k s
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 172/183
Project:
1.25 mm/min 10.03.201238.00 mm BH-N-576.00 mm 4.50 - 5.000.82 g/cm 3 UU82.86 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 2.86 0.229 0.729 6.84 9.00
2 1.00 3.74 0.297 1.297 7.60 10.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
. . . . . .
Cohesion: 0.07 k cm 2 3.71
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
0.0 0.5 1.0 1.5 2.0
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 173/183
------------
W e t D e n s i t y
D r y D e n s i t y
G r a v e l %
S a n d %
S i l t %
C l a y %
L i q u i d %
P l a s t i c %
P l a s t i c i t y I n d e x , I p %
T y p e
C o
h e s i o n C u
k g / c m 2
D e g r e e
φ
C o m p . I n d e x C c v
( L a b )
I n i t i a l V o i d R a t i o
BH - N - 6 1.50 - 2.10 SPT 1 ----- ----- ----- CH 4 22 32 43 64 28 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
BH - N - 6 3.00 - 3.50 UDS 1 1.62 1.02 58.50 CH 1 4 36 59 92 36 56 ----- TUU 0.15 3.2 ----- ----- ----- ----- ----- 2.63
BH - N - 6 4.50 - 4.75 SPT 2 ----- ----- ----- GP-GM 61 30 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- -----
CHEM : Tuu : Triaxial Test ( Unconsolidated Undrained ) SP : Swelling Pressure or Swelling Potential Testφ :
Angle of Internal Friction
COMP : Tcu : Triaxial Test ( Consolidated Undrained ) SPT : Standard Penetration Test SampleCu :
Undrained Cohesion
DS : Tcd : Triaxial Test ( Consolidated Drained )UDS : Undisturbed Soil Sample φ' :
Effective Angle of Internal Friction
K : NP : Non Plastic VL : Laboratory Vane Shear TestCu' :
Effective Cohesion
FSI : SL : Shrikage Limit Test UC : Unconfined Compression Test-----> : Combined Silt + Clay
9
10.09.2012
VerticalConsolidation
FLB 04
Shear Test
DATE:
S o i l C l a s s i f i c a t i o n ( I . S )
3228Job. No. :
Free Swell Test
Direct Shear
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
R e m a r k s
F r e e S w e l l I n d e x %
D e p t h i n m
.
Density(Remoulded)
gm/ cm 3
S p e c i f i c G r a v i t y
N a t u r a l M o i s t u r e
C o n t e n t , w
%
C u
f r o m U n c o n f i n e d C o m p r e s s i o n
T e s t K g / c m
2
S h r i n k a g e L i m i t %
Mechanical Analysis
Location :
B o r e H o l e N o .
S a m p l e T y p e
Compaction Test
Geotechnical Investigation work for Proposed Project at EQ -07 Jett y,Vizag
SOIL TEST DATA SHEET
Project :
S w e l l i n g P r e s s u r e
k g / c m 2
Permeability Test
Chemical Analysis
Consistency Limits
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 174/183
Particle
% % % % mm mm mm
BH - N - 6 1 .50 - 2.10 CH 4 22 32 43 ----- ----- ----- ----- ----- 64 28 36 SPT 1
BH - N - 6 3 .00 - 3.50 CH 1 4 36 59 ----- ----- ----- ----- ----- 92 36 56 UDS 1
BH - N - 6 4 .50 - 4.75 GP-GM 61 30 0.08 0.17 11 137.50 0.03 ----- ----- ----- SPT 2
Φ 6 0 %
P l a s t i c i t y I n d e x , I p
R e m a r k s
Size(mm)
L o c a t i o n :
Φ 3 0 %
Bore HoleNo.
Silt
9
G R A I N S I Z E D
I S T R I B U T I O N C U R V E
L i q u i d L i m i t , W
l
P r o j e c t :
J o b
N o .
:
3 2 2 8
Coeff. ofUniformity,Cu = D60 /
D10
DB
M G E O
T E C H N I C S & C O N S T R U C T I O N S P V T .L T D .
Depth in m. Φ
1 0 % Coeff. OfCurvature
Cc
D302/(D 60*D
10 )
Classifi--cation
( IS )Symbol
G e o t e c h ni c al I nv e s t i g a t i on
w or k
f or P r o p o s e d P r o j e c t a t E Q- 0 7
J e t t y ,V i z a g
Gravel Sand Clay
P l a s t i c L i m i t , W
p
------------
0
10
20
30
40
50
60
70
80
90
100
0.00010.0010.010.1110
P E R C E N T A G E F I N E R T H A N
PARTICLE SIZE ( mm )
GRAVELFC
SANDC M F
SILT CLAY
80.0 20.0 4.75 2.00 0.425 75x10 -3 2x10 -3
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 175/183
Project:
1.25 mm/min 10.03.201238.00 mm BH-N-676.00 mm 3.00 - 3.501.02 g/cm 3 UU58.50 % UDS 01
Serial No.Cell
Pressure σ 3
Deviatoric
Force at Failure
DeviatoricStress at
Failure, d
Normal Stress
at Failure, 1
Change inLength atFailure, ∆L
Strain at
Failure,ε
kg/cm 2 kg kg/cm 2 cm cm 2 %
1 0.50 4.77 0.374 0.874 8.36 11.00
2 1.00 5.64 0.438 1.438 9.12 12.00
TRIAXIAL COMPRESSION TEST IS 2720 - P 11, 1971
State of Sample:
Height of Specimen:
Date:Bore Hole No.:
Geotechnical Investigation work for Proposed Project at EQ -07 Jetty,Vizag
Diameter of Specimen:Rate of Strain :Location: --------
Depth (m)Condition of Test :Dry Density,γ d :
Moisture Content:
. . . . . .
Cohesion: 0.15 k cm 2 3.2
JOB No. 3228Checked By: Ravi A
Angle of internal friction,
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
0.0
0.5
1.0
1.5
2.0
2.5
0.0 0.5 1.0 1.5 2.0 2.5
S h e a r S t r e s s , k g / s q . c m
Normal Stress, kg/sq.cm
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 176/183
FLB 10
T E :
OCATION: ---------------------- 10.07 .2012
Sr . No. Bor e Hole No. Dept h in m . Type of Sam plepH
Electrometrically Sul ph at e as SO 3
( % ) Chlor ide as Cl ( %) Rem ar ks
1 BH -01 1.50 - 2.10 SPT -1 7.40 0.340 1.225
2 BH - 02 4.50 - 5.10 SPT - 2 7.48 0.535 2.349
3 BH - 03 6.00 - 6.60 SPT - 3 7.49 0.577 2.369
4 BH - 04 6.00 - 6.60 SPT - 3 7.75 0.303 1.060
5 BH - 05 4.50 - 5.10 SPT - 3 7.46 0.421 1.560
6 BH - 08 3.00 - 3.60 SPT - 2 6.80 0.289 1.040
7 BH - 10 3.00 - 3.60 SPT - 2 7.30 0.458 1.42
8 BH - 12 7.50 - 8.10 SPT - 4 7.48 0.513 2.79
9 BH - 18 3.00 - 3.60 SPT - 2 7.20 0.392 1.83
10 BH - 19 3.00 - 3.60 SPT - 2 7.28 0.415 1.65
11 BH - 21 7.50 - 8.10 SPT - 4 7.33 0.131 0.46
12 BH - 23 3.00 - 3.60 SPT - 2 7.39 0.194 0.64
13 BH - 24 3.00 - 3.60 SPT - 2 7.35 0.312 1.06
DBM GEOTECHNI CS & CONSTRUCTIONS PVT. LTD
CHEMI CAL TEST RESULT OF SOIL SAMPLES.
Geotechnical In vesti gation wor k for Proposed Pr oject at EQ -07 Jetty,Vizag
3228
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 177/183
DBM
SUB-SURFACE SOIL PROFILE
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 178/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 179/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 180/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 181/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 182/183
8/10/2019 Vol-ii_stack Yard Area
http://slidepdf.com/reader/full/vol-iistack-yard-area 183/183