VLAB 1 Final presentation
2014/4/8@TaiwanTeam members: Maha Siva Reddy、Shyam Sankar、Shameeja Shafi(IIT)Alireza Borhani、Will Lippitt(UW)Yao-Yu, Benjamin, Yang、Hsiang-Wen, Ken, Yang(NTU)
OUTLINE
• Teammate introduction
• Tasks
• Result analysis
• Conclusion
TEAMMATE INTRODUCTION
Teammate introduction
• IIT: mechanical background, pursuing MS in construction technology and management
• UW: architecture and civil engineering background, construction management
Maha siva Reddy (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD
– Speak Telugu, hindhi and India English
– Playing guitar, volleyball, rubik’s cube
Shyam Sankar (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD
– 2-year experience of pipline laying works, billing and procurement
– NBA and soccer follower, and playing basketball or football daily an hour
Shameeja Shafi (IIT)
• Brief Biography
– Mechanical engineering background and master in construction tech. and management
– Familiar with CAD, Revit and MSproject
– Speak English, Hindi, Malayalam
– Reading books, listening to the music, playing badminton
Will Lippitt (UW)
• Brief Biography
– Architecture background and MS in construction management
– Sketchup, CAD
– One year experience as a general contractor project manager and 8 year in construction
– Speak Japanese, French and English
– Walk a dog
Alireza Borhani (UW)
• Brief Biography
– Civil engineering background and MS construction management
– AutoCAD
– Speak Persian, German and English
– Traveling and going to the movies
TASKS
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
A CASE STUDY
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
Location
Global team project location
Case studylocation
Location
LinBian train station
Situation
• The flood was caused by land subsidence
Situation
• Sedimentation after the flood
http://blog.xuite.net/jin.ishin/train/26020943-%E5%85%AB%E5%85%AB%E6%B0%B4%E7%81%BD%E5%B1%8F%E6%9D%B1%E6%95%91%E7%81%BD%E7%B4%80%E5%AF%A6
Hydrology Information about LinBian
• Max. flood elevation (100-years recurrence interval )=5.9 meters
• Avg. flood elevation (100-years recurrence interval )=0.89 meters
• 100-year rainfall intensity=1012 mm per day
LinBian: a township in
south Taiwan
Information
Location SituationHydrology
information
Solutions
FloodgateElevating the
baseWall Stilt house
A case study
Near future solution
Installing the flood gate
Elevating the base
(gmap)
Near future solution
Elevating the baseBuilding the wall
(gmap)
Far future solution
• Stilt house
(elevated house)
The house in England(inthralld.com )
Green elevated house https://news.housefun.com.tw/news/article/35546949922.html
The house in Cambodia(Flickr CC)
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
DESIGN STRATEGY
Design Strategy
• It should be economical
• It should be completed in minimum time
• Renovation of an existing building
• It should serve the functionality of a flood house and be aesthetically appealing
• The building should be environmental friendly
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
3D MODEL
3D Model
• The original
• Second version
• Final version
• The special parts
The original
Second version
Final version
The roof is further extended such that rain water flows out and falls outside
the buildings boundary.
Glass curtains are provided to make the structure aesthetically pleasing
Floodgate provided
The fence height was increased to 1m to prevent heavy water floods from
hitting the building.
Floodgate provided
Greenery that surrounds the building adding to its aesthetic appeal also
absorb water during floods.
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
4D MODEL
Original building
See pictures
Tasks
Tasks
A case study
Design strategy
3D Model 4D ModelCost
estimation
COST ESTIMATION
Cost estimation
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
Cost information
• Cost Database
– Website
– Material Cost Sheet
– Assumption
– Calculation
The website
US Material
US Labor
US Equipment
Documents
US cement price
India price list
Assumption
• Labor: $USD 5/DAY
• Choose middle level price material
Calculation
1) Find the item cost on the website or the document
2) Choose the middle level quality material
3) Change the labor cost from US cost to India cost
4) Search and Change the material cost from US cost to India cost
5) Change the unit to calculate the item cost
The tools
• Autodesk Quantity Takeoff– Material checking
• Autodesk Revit– Quantity summary– Member details– Material filtering
• Microsoft Office Excel– Item compilation– Quick Calculation
• Matlab– Labor cost translation
Cost estimation
Process
Cost information
Tools
Results
Cost by items
Cost proportions
Cost by items
Cost by items
Type Cost(USD)
Exterior - Brick on Mt.I. Stud 12730
Interior - 3 1/8" Partition (1-hr) 443
Interior - 6 1/8" Partition (2-hr) 1442
2' x 4' ACT System 784
Windows 74989
Generic - 9" 5960
Generic - 4" Brick 2264
Glazed 2814
Floor 61131
Wall 6669
Column 2001
Steel 551
Formwork 4520
Floodgate 7350
Total 177,833
Comparison
$177,833 USD
• 8 rooms , 4 floors apartment
$25,000 USD
• 2 rooms apartment in India
177833-25000x4= $77833 USD
Cost proportions
Floor38%
Windows38%
Exterior - Brick on Mt.I. Stud
6%
Floodgate4%
Wall3%
Generic - 9" 3%
formwork2%
Others6%
Type cost
Total cost is $200,005 USD
Cost proportions
Sash36%
Metal deck28%
Cast-in-Place Concrete
15%
Masonry - Brick5%
Floodgate4%
Roof3%
formwork2%
Others7%
Material cost
Total cost is $200,005 USD
RESULT ANALYSIS
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
Time Spent (Ben)
• Ben (10 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)
40%
60%
Time Spent (Ben)
Communication Individual work
Time Spent (Ken)
• Ken (7 hours per week)(including 1 hour for regular meeting and 2 hours for regular course)
57%
43%
Time Spent (Ken)
Communication Individual work
Result analysis
Result analysis
Time spent
Problems
Solved Unsolved
Problems
Solved
• Icebreaking We wrote and shared a
document about ourselves.
• Not clear job assignment– Take over the cost estimation.
Unsolved
• Agenda preparing before regular meeting
CONCLUSION
Conclusion
Conclusion
ContributionLesson learned
Contribution
• Design a flood safe renovation of an existing building
• Scheduling a construction
• A rough cost estimation
Lesson Learned
Common views
• Different background makes some difficulties, but we think on the same line to finish the project.
• Hard to participate because of being in the virtual team.
• Work responsibility is not clear.
Different views
• UW: lack of specific information about the project and knowledge
• IIT: understand the India English problems and thank Will for his help
• IIT: 7:00 AM is too early
• IIT: hardware and Internet problems are challenges but it is getting better
THANK YOU
Global Team Project
VLAB 1