    PROVISION OF LIMITED USE SUBWAY-COMPARISON OF CUT & COVER METHOD

    Vs BOX PUSHING TECHNIQUE

    1. Introduction: Many level crossing are planned to be closed bydiverting to either existing level crossing, existing bridge or byconstruction of new RUB. Earlier work for new RUB are proposed tobe constructed by using push through technique. Then it is proposedto carry out work by cut & cover method which has greatly enhanced

    the economy. This paper deals with the comparison of these bothtechnique.

    2.RBs policy of closing LC gate : As per latest RB policyvide letter no 2006/CE-I/MISC-2(RUB) dated 25/2/2008 , the closingof existing level crossing gate may be planned by provision of limiteduse subway having dimension not more than 4m X 3.6 m in planhead 30. ME also directed there will be no constraint for fund in thisplan head.

    3. Work Planned : Accordingly different work proposed the

    details of them are as follows:Diversion through existing LC- 14 NosDiversion through existing bridge- 7 NosDiversion through newly constructed limited use sub way 8 Nos

    On single line section 3 nosOn double line section 5 nos

    Diversion through newly constructed normal height sub way- 1 Noson double line

    4.Box Pushing technique : Three work for closing of levelcrossing no. AP22, AP26 and AP34 are sanctioned in PH 30 in lawbook each having sanctioned value of Rs 43 LakhsThe Scope in this work was as follows:

    Construction of thrust bed.Casting of box segment along with cutting edge.Pushing of box segment by using hydraulic jacks.

  • 7/31/2019 vkbhangale

    2/5

    Item proposed in this work are as follows:

    NS-1

    Casting jacking precast RCC Boxminimum M-45 grade concrete mix,below Railway track under running trafficconditions by box pushing techniqueincluding providing thrustbed and casting arrangements withcontractors design, providing drag sheeton top of box, providing intermediate

    jacking points if required, dewateringincluding alltemporary works making joint of boxwatertight with all contractors men,machinery, and material required forcarrying out work in all respect for RCCBox thrust bed. (Rate Rs. 21312.50 forone meter 2 / permeter length. Size of box 4.00m X3.50m) (inside dimensions)

    M 298375.00 10 2983750.00

    The percentage received are 95.786% Above the basic cost

    Cost per meter for pushing the segmental box other than wing wall,return wall etc = Rs 5,81,831/-

    Payment schedule for Box Pushing item proposed are asfollows:

    After approval of all Relevant Drawings by H.Qrs : 2%After completion of Thrust Bed & anchors : 10%After Casting of Box segment : 40%After pushing full length of RCC Box (Box pushing length asprescribed in schedule or as per site requirement) : 43%After completion of all work : 5%

    After considering the lowest offer value the offer comes out tobe Rs. 73.5 Lakhs per level crossing. There are guidelines from thecost of RUB should not exceed Rs 50 Lakhs

    So alternative method for execution are studied and it is noticedthat similar type of closing 11 unmanned level crossing by using cutand cover method on Guna-Maksi was carried out recently on Bhopal

  • 7/31/2019 vkbhangale

    3/5

    division. The method studied and same is applied for provision oflimited use subway.

    5. Cut and cover method : The various activities involved are:a)Casting of box segment each of 2 m length- 5 Nos

    Size of box 3.5 X 4.0 clear dimensionThick ness of box 400 mm

    Weight of one segment 13.28 m3 X 2.5 t/ m3 = 33.2tones

    b)Placement of segmental boxes in traffic blockCrane of 120 t capacity required

    Capacity of crane required at 8 m radius will at least be

    50 tQuantum of earth work = 118 m3 before block + 200 m3during block

    2 Hitachi pocklain of 225 capacity will be required forthis v olume of earth work to be execute in 1.30 Hrs

    Item proposed in the work are as follows:NS-10

    Placement of precast RCC segmental Box

    with the help of road crane at desiredlocation,carefully by lifting and pack ing method,

    during traffic and power block with all

    contractor labour tools and material, crane,machinery, preparation of surface as directed

    by Engineer, including filling of joints byepoxy mortar and laying of required sand

    including cost of epoxy and sand, includingall material and labour, tools, plants,machinery etc. with all lead and lift.

    MT 2200.00Rs.TwoThousandTw o

    Hundred

    And PaiseNil Only

    190 418000.00

    Prov iding RCC M-40 controlled concrete insegmental box with 20 mm crushed stone

    agreegate including form w ork, shuttering,

    staging, mixing placing vibrat ing etc.complete as directed by Engineer in-charge.

    M3 5000.00Rs.Five

    Thousand

    And PaiseNil Only

    78 390000.00

    Supplying MS plain / Tor steel barsconforming to IS specification andtransporting to site including loading andunloading w ith all contractors labour, tools

    and plant complete. Note- 1) Provision forwastage / rolling margin/overlaps is includedin basic rate. 2) Payment against w ork done

    will be made in accordance w ith the specialconditions for contract with contractors steel.

    3) Specification of the above item as perspecial condition w ith contractors steel are

    MT 30220.59 12 362647.08

  • 7/31/2019 vkbhangale

    4/5

    attached.

    Sanctioned value per bridge 43 Lakhs Offer value for per bridge- 35.78 Lakhs

    Cost of barrel length per meterCost of concrete = 6.14 m3 X 5000 X 1.30 = Rs

    39910Cost of steel = 36264 X 1.30 = Rs 47,143Cost ofplacement = 6.14 X 2.5 X 2200 X 1.3 =Rs 43,901Cost of earthwork, epoxy & misc item = 15,000Total

    = Rs 1,45,954 per meter

    6. Box pushing Vs Cut & cover method : By adopting Cut& cover method there will be saving in cost per Level crossingof by Rs. 23.5 lakhs

    Supervision required for box pushing will not be required.Hence more work can be planned with existing staff

    There will be joint at every 2m which is not desirable There will be requirement of traffic block of 4 Hrs and also

    possibility of disruption to traffic in event of crane failure There is saving of Rs 4,35,877 per meter barrel length (Rs

    5,81,831 - 1,45,954 )

    In big yards having of number of lines the same technique maynot be utilized

    7. Conclusion : Cut & cover method is more economical for singleline work. The same may be used in double line section in electictraction which will cost Rs. 75 lakhs for closing existing level crossing

    as against sanction upto 1.5 Cr for which proposal are beingsanctioned in RB level. Box pushing technique gives less joints in

    imbakment and do not require traffic blocks. but may cost more. Iflonger barrel length cost of box pushing gets lesser and may becomecomparable with cut & cover method which may be worked out.

  • 7/31/2019 vkbhangale

    5/5

    PROJECT REPORT

    PROVISION OF LIMITED USE

    SUBWAY- COMPARISON OFCUT & COVER METHOD

    Vs BOX PUSHING TECHNIQUE

    PRESENTED BY

    Sh. Vinod M. BhangaleSr.DEN/N/NGP

    Kind Guidance By

    Sh. A.K.Goyal

    Sr.Prof/Br-I