viseo intro prive public cloud vs hosting
DESCRIPTION
Viseo introduction Prive Public Cloud vs hostingTRANSCRIPT
INTRODUCTION AU CLOUD
DIFFÉRENCES ENTRE LE CLOUDET UN HÉBERGEMENT DIT « STANDARD »
V2.1
VINCENT THAVONEKHAMPRACTICE MANAGERViseo Business Technologies
NIVEAU 100 DÉCOUVERTE
70M€ de CA
AU SEIN D’UN
GROUPECOMPLÉMENTAIRE
IntégrateurERP& CRM
IntégrateurBusinessIntelligence
GénieLogiciel / Agile
650Collaborateurs
12Agences& Filiales
Microsoft
Productivité web
Cloud / Big Data
Mobilité
web
Recu
eil,
anal
yse
et c
once
ption
Arch
itect
ure
Pilo
tage
de
proj
et
Dev
Ops
Form
ation
Mai
nten
ance
, sup
port
DEVOPS
Java J2EE
Etudes Build Run
INTRODUCTION AU CLOUD COMPUTING
• RÉVOLUTION DANS LE DOMAINE IT• PROPOSER SOUS FORME EXTERNALISÉE:
– PAIEMENT À L’USAGE – QUANTITÉ INFINIE– ENSEMBLE DE SERVICES TECHNIQUES INFORMATIQUES
• CES SERVICES SONT – SOIT DE TYPE IAAS : BRIQUES D’INFRASTRUCTURE DE BAS
NIVEAU– SOIT DE TYPE PAAS : DES MIDDLEWARES APPLICATIFS– SOIT DE TYPE SAAS : OFFRES MÉTIERS CLÉS EN MAIN, LÀ
AUSSI EXTERNALISÉES• OFFRES MAJEURES : AMAZON, GOOGLE, WINDOWS
AZURE, SALESFORCE.COM, OVH (CLOUD OU PRIVATE CLOUD)
PROBLEMATIQUES DU CLOUD COMPUTING
• OFFRE UN TRÈS GRAND NOMBRE DE NOUVELLES POSSIBILITÉS
• MAIS POSE DE QUESTIONS NOUVELLES, NOTAMMENT :– LA SÉCURITÉ– LA CONFIDENTIALITÉ– LE COÛT TOTAL RÉEL DE POSSESSION– LES CONTRAINTES LÉGALES ET LOCALISATION DES
DONNÉES– LA RÉORGANISATION DES DSI– ET DES RÔLES AU SEIN DE L’ENTREPRISE
PROBLEMATIQUES DU CLOUD COMPUTING : Cloud privé, Cloud public, Hébergement externalisé, Hébergement On-premise…
• TERME LARGEMENT ABUSÉ PAR LE MARKETING– IMPRESSION DE PEU DE NOUVEAUTÉS– SÈME LA CONFUSION
• POURTANT DE NOMBREUX CONCEPTS NOVATEURS – À APPRÉCIER – À APPRÉHENDER
VOCABULAIRE DES GRANDES CATEGORIES DE CLOUD: SAAS, PAAS, IAAS
• SOFTWARE AS A SERVICE (SAAS)– UTILISATION EN LIGNE D’UN LOGICIEL– EXEMPLES : CRM, EMAIL, GED, PAYE
• SOFTWARE AS A PLATFORM (PAAS)– SOLUTION DE DÉPLOIEMENT D’UN LOGICIEL QUE VOUS
FOURNISSEZ– MONTÉE EN CHARGE (AUTOMATIQUEMENT EN GÉNÉRAL)– EXEMPLES : WINDOWS AZURE, GOOGLE APP ENGINE,
HEROKU, …• INFRASTRUCTURE AS A SERVICE (IAAS)
– LOCATION DE RESSOURCES (SERVEURS, DISQUES, BACKUPS, …)
– AJOUT DE RESSOURCES À LA DEMANDE ET EN QUELQUES MINUTES
– LA GESTION DES RESSOURCES PEUT ÊTRE AUTOMATISÉE (API FOURNIES)
– EXEMPLES : AMAZON EC2, IBM, OVH, …
VM VM VM VM VM
VM
Élasticité horizontale
VM
VM
VM
Élasticité verticale
CPU
, R
AM
, H
DD
Limitations!
CONCEPTES D’ELASTICITE
INTERETS
Computing
2013
2016+44%
INTERETS
DIFFERENCE ENTRE CLOUD ET HEBERGEMENT
HÉBERGEMENTCLOUD
EX. 1 DATA CENTER = 11 STADES DE FOOT EX. 1 DATA CENTER = 1 GRANDE SALLE
GOOGLE / AMAZON / AZURE: ~ MILLION DE SERVEUR PAR OPÉRATEUR
OVH ACTEUR MAJEUR EN FRANCE : 150 000 SERVEURS DANS 5 DATACENTER
AUCUNE INTERVENTION EN SALLE INTERVENTION HUMAINE EN SALLE
COMPRENDRE LES ENJEUX EN UNE DIPOSITIVE
Cloud Hébergement
Ajout de nouvelles VMs (souvent à la demande)
Achat / location de seveurs et VMs
Haute Sécurité: coût élevé et manuel
Opérateur pour monitorer et déployer
Flexibilité des processus
Elasticité infinie pilotée par l’application (donc le
développeur)
Paiement à la consommation
Haute Sécurité: coût faible car économie d’échelle
Quasi aucun humainProcessus standard pour
tous
EXEMPLE D’OFFRE D’UN HEBERGEUR
• ACHAT OU LOCATION D’UNE NOUVEAU SERVEUR / VM
• DÉPLOIEMENT ET MONITORING 24/7 PAR L’ÉQUIPE D’HÉBERGEMENT, AVEC PROCESSUS PERSONNALISÉ
• BACKUP-RESTORE PAR LES ÉQUIPES D’HÉBERGEMENT
• MISE À JOUR DES OS ET DES ANTI-VIRUS PAR L’HÉBERGEUR MANUELLEMENT VIA SCRIPTS
• OPTION: EXPERTISE EN TESTS D’INTRUSION (NIVEAU APPLICATION ET INFRASTRUCTURE)
EXEMPLE D’OFFRE D’UN CLOUD
• AUCUNE INTERVENTION HUMAINE DE LA PART DE L’HÉBERGEUR– MISE À JOUR DES OS (EX. PASSAGE DE WINDOWS SERVEUR 2008 À
WINDOWS SERVEUR 2012 AUTOMATIQUE)– ELASTICITÉ: ALLUMAGE ET EXTINCTION DES VMS AUTOMATIQUE,
L’APPLICATIF WEB SAIT CORRECTEMENT SE COMPORTER– FAIBLE COÛT: ÉCONOMIE D’ÉCHELLE ET PAS D’OPÉRATEURS
• COMMENT FAIRE SANS INTERVENTION HUMAINE? RICHESSE DES SERVICES ‘AUTOMATISÉS’– AUTOSCALING– TOUT EST SCRIPTABLE PAR LE CLIENT– … (VOIR DIAPORAMA SUIVANT)
Public Cloud: richesse de l’offre Amazon AWS (non exhaustif!)
Public Cloud: richesse du Cloud Windows Azure (non exhaustif!)
caching identity service bus media CDN big data commerce integration analytics HPC Scheduler mobile
compute storage networking
virtual machines web sites cloud services SQL database noSQL database blob storage connect virtual network traffic manager
...
Fram
ewor
ksSe
rvic
esFa
bric
Infr
astr
uctu
re
N Central US, S Central US, N Europe, W Europe, E Asia, SE Asia + 24 Edge CDN Locations
......
......
...
Automated
Managed Resources
Elastic
Usage Based
Global Physical Infrastructureservers / network / datacenters
Ruby …
34 Add-Ons
Nouvelles fonctionnalités toutes les 2 semaines
TsdfsdfdfsdPRIVATE CLOUD VS. PUBLIC CLOUD VS. HEBERGEMENT
CLOUD PRIVÉ VS. PUBLICTCO: TOTAL COST OF OWNERSHIP
HÉBERGEMENT VS. CLOUD ZONE ROUGE: SURCHARGEZONE JAUNE: SOUS-UTILISATION = GASPILLAGE
ANALOGIE
• Avez-vous, à votre domicile, une centrale électrique ?• A partir de quelle taille de bâtiment est-il intéressant d’avoir sa
propre centrale électrique ?• Une application Web est comparable à l’électricité
TÉMOIGNAGE: VÉRITABLE DÉPLOIEMENT « PUBLIC CLOUD » POUR UN PROSPECT
Déploiement semi-manuel réussi pour un nouveau prospect par téléphone-Chat lors d’un « After-work ». Prospect transformé en client !
CONFIGURATION EN QUELQUES ÉTAPES (1/3)CRÉER UN ENVIRONNEMENT CLOUD AZURE, PUIS LIAISON AU REPOSITORY
CONFIGURATION EN QUELQUES ÉTAPES (2/3)UTILISATION: CONNEXION À JAVA / ECLIPSE
CONFIGURATION EN QUELQUES ÉTAPES (3/3)UTILISATION: CONNEXION À VISUAL STUDIO
CONCLUSION: DEBUTER SUR LE CLOUD = ATTENTION A LA MARCHE !
SIMPLE à chaque étapes !– Ne pas oublier les prochaines marches– Cela porte un nom: Modèle de maturité du « Cloud Computing »– Assimiler les problématiques DevOps et ITIL limite l’effet tunnel– « Think big, act small, fail fast, lear rapidly » (cf. Lean)
1. Initiation / PoC / apprentissageBusiness Model
2. - 1ier SaaS à la main- tâtonnement avec l’outillage
3. Conception de processus PROD- arrive aux limites des outils de dév- début d’automatisation en pré-prod / prod
4. Intégrer de plus en plus de fonctionnalités, consolidation
5. Commercialisation robuste
ITIL (**)
Prêt
ARM (*)
(*) ARM: Application Release Management(**) ITIL: IT Infrastructure Library
PREUVE DE NOTRE EXPERTISE CLOUD:QUELQUES REFERENCES
PÉRIODIQUE PROGRAMMEZ!JAN 2014: N°170 SPÉCIAL CLOUD CONTRIBUTEUR EN TANT QU’EXPERT N°1
NOMBREUX PROJETS CLOUDS– VISEO IDENTIFIÉ PAR MICROSOFT COMME PARTENAIRE CLOUD– VISEO PARTENAIRE AVEC DES CLOUD FRANÇAIS– PROJET CLOUD: MULTINATIONALE LEADER EN COSMÉTIQUE– CLOUD AVEC SAP– PROJET VISEO DE RECHERCHE: ‘RECHERCHE & INNOVATION’
PROJET MONDIAL AVEC SCHNEIDER ELECTRICPROJET CONFIDENTIEL SUR LE CLOUD WINDOWS AZURE
EXPERTISE RECONNUE PAS MICROSOFTEN 2013, VISEO SE VOIT ATTRIBUER LE LABEL AZURE CIRCLE
PARTENAIRES VISEO D’HEBERGEMENT FRANCO-FRANCAIS
INTRINSECHTTP://WWW.INTRINSEC.COMSERVEURS DÉDIÉS
OVHSERVEURS DÉDIÉS
BUSINESS GEOGRAPHICHTTP://WWW.BUSINESS-GEOGRAFIC.COMSERVEURS DÉDIÉS
CLOUD WINDOWS AZURE SUR OVH (EN COURS)
NOMBREUSES FORMATIONS JAVA, CLOUD, .NET, UML, AGILITÉ…
CATALOGUE 2014 EN COURS D’IMPRESSION !!
• 4 centres de formation certifiées
• 12 années d’expertise dans l’animation de formations en région Rhône-Alpes
• 47 formations sur les nouvelles technologies et les méthodes agiles