Vincent Keller, Ralf Gruber, EPFL
Intelligent GRID Scheduling Service (ISS)
Intelligent GRID Scheduling Service (ISS)
Managed by
K. Cristiano, A. Drotz, R.Gruber, V. Keller, P. Kunszt, P. Kuonen, S. Maffioletti, P. Manneback, M.-C. Sawley, U. Schwiegelshohn,
M. Thiémard, A. Tolou, T.-M. Tran, O. Wäldrich, P. Wieder, C. Witzig, R. Yahyapour, W. Ziegler,
“Application-oriented scheduling for HPC Grids”,CoreGRID TR-0070 (2007) available on http://www.coregrid.net
Managed by
Outline
• ISS Goals• Applications & Resources characterization• ISS architecture• Decision model : CFM• ISS Modules/Services Implementation Status• Testbeds (HW & SW)
Managed by
Goals of ISS
1. Find most suited computational resources in a HPC Grid for a given component2. Use best an existing HPC Grid3. Predict best evolution of an HPC Grid
Managed by
Γ model : Characteristic parameters of an application task*
O: Number of operations per node [Flops]W: Number of main memory accesses per node [Words]Z: Number of messages to be sent per nodeS: Number of words sent by one node [Words]
Va=O/W:Number of operations per memory access [Flops/Word]
a = O/S: Number of operations per word sent [Flops/Word]
*suppose the parallel subtasks are well equilibrated
Managed by
Γ model : Characteristic parameters of a parallel machine
P: Number of nodes in a machineR: Peak performance of a node [Flops/s]M: Peak main memory bandwidth of a node [Words/s]
VM=R / M: Number of operations per memory access [Flops/Word]ra= min (R , M * Va): Peak task performance on a node [Flops/s]tc= O/ra: Minimum computation time [s]
Note: ra= R min (1, Va/VM)
Managed by
Γ model : Characteristic parameters of the internode network
C: Total network bandwidth of a machine [Words/s]L: Latency of the network [s]<d>: Average distance (= number of links passed)
Vc=P R/ C: Number of operations per sent word [Flops/Word]b=C/(P*<d>): Inter-node communication bandwidth per node [Words/s]tb=S/b: Time needed to send S words through the network [s]tL=LZ: Latency time [s]T=tc+ tb+ tL: Minimum turn around time of a task*
M=(ra/b)(1+tL/tb): Number of operations per word sent [Flops/Word]B=b L: Message size taking L to be transfered
*I/O is not considered and communication cannot be hidden behind computation
Managed by
model (One value per application and machine)
> 1
5012
1
/11
1/11
>E>Γ
P>A>Γ
Γ+=
P
A=E
Γ+
P=A
Speedup
= a / M
Task/application: a = O / S [flops/64bit word] Machine (if LZ/S<<1): M = ra / b [flops/64bit word]
Efficiency
Managed byParameters of some Swiss HPC machines
1’8006030682 3.182.7211021.399Pleiades 2+
128
160**
100*
62
30
3
0.3
bMwords/s
128
2’650
1’065
14
3.75
0.4
0.003
C
Gwords/s
18128816SX-5***
6.8
2.5
10
60
60
60
L
s
20019’2007.50.860610NoW
3.3
22
154
179
1’792
VC
f/w
5255’836121.648Terrane
5.2
5.6
9.6
5.6
5.6
R
Gflops/s
1’0806.50.88’6501’664Horizon
25080.722’9374’096BlueGene
62061.62’150224Mizar
1’80070.8672120Pleiades2
18070.8739132Pleiades1
BWords
VM
f/w
M
Gwords/s
P R
Gflops/s
PCluster
*<d>32 for half of C
**<d>10*** decommissioned
Managed byExample: Speculoos
Pleiades 2GbE=3.8
Pleiades 1FE
=1.4
Pleiades 2+GbE=1.6
Managed byISS/VIOLA environment
Managed by
ISS : Job Execution Process
Goal: Find most suited machines in a Grid to run application components
Managed by
Cost Function Model
Managed by
Cost Function Model
• CPU Costs Ke
• licence fees Kl
• Results waiting time Kw
• Energy Costs K eco
• Data Transfer Costs Kd
• All the costs are expressed in Electronic Cost Unit (ECU)
Managed by
Cost Function Model : CPU costs
with investment cost, maintenance fees, bank interest, etc..
Managed by
Cost Function Model : Broker
• The broker computes a list of machines with their relative costs for a given application component
• This ordered list is sent to the MSS for final decision and submission
Managed by
Other important goal of ISS
Simulation to evolve cluster resources in a Grid(uses the same simulator as to determine , ,
using statistical application execution data over a long period in time (same data as to determine , ,
Support tool to decide on how to choose new Grid resource
Managed by
Side products
VAMOS monitoring service (measurement of Ra, )Application optimization (increase Va, Ra)
Processor frequency adaptation (reduce energy consumption)
Managed by
What exists?
Simulator to determine , , VAMOS monitoring service to determine
Cost Function Model
Managed by
What is in implementation phase?
Interface between ISS and MSS (first version ready by end of June 07)Ra monitoring (ready by end of Mai 07)
Cost Function Model (beta version ready by end of 07)Simulator to predict new cluster acquisition (by the end of 07)
Managed by
Application testbed
CFD, MPI: SpecuLOOS (3D spectral element method)CFD, OpenMP: Helmholtz (3D solver with spectral elements)
Plasma physics, single proc: VMEC (3D MHD equilibrium solver)Plasma physics, single proc: TERPSICHORE (3D ideal linear MHD stability analysis)
Climate, POP-C++: Alpine3D (multiphysics, components)Chemistry : GAMESS (ab-initio molecular quantum chemistry)
Managed by
First hardware testbed
UNICORE/MSS/ISS GRID
Pleiades 1 (132 single proc nodes, FE switch, OpenPBS/Maui)Pleiades 2 (120 single proc nodes, GbE switch, Torque/Maui)
Pleiades 2+ (99 dual proc/dual core nodes, GbE switch, Torque/Maui)CONDOR pool EPFL (300 single & multi proc nodes, no interconnect network)
Managed by
CSCS:SMP/vector
Low m cluster
EPFL:SMP/NUMA
High m cluster
ETHZ:SMP/NUMA
High m cluster
EIF:NoW
CERN:egee Grid
SWING
Switch
I
S
S
ISS as a SwissGrid metascheduler
Managed by
Conclusions
Automatic:Find best suited machines for a given application
Monitor application behaviours on single node and network
Guide towards:Better usage of overall GRID
Extend existing GRID by best suited machines for an application setSingle node optimization and better parallelization
http://web.cscs.ch/ISS/