    Verification, Testing and

    Inspection Design Concept of

    Electrical and Machinery onVessels/ Mobile Offshore Units

  • 8/20/2019 Verification, Testing and Inspection Design

    2/96

     

    Safety First

      !"ilding e#its

      E$ergency plans

      %estroo$s

      &ar'ing

      !rea'fast (((

  • 8/20/2019 Verification, Testing and Inspection Design

    3/96

     

    Introd"ction

    ) Spea'er Introd"ction

    ) *eneral Introd"ction of each participant

       +a$e(

      Co$pany and area of responsibility(

      E#perience(

      E#pectation(

  • 8/20/2019 Verification, Testing and Inspection Design

    4/96

     

    Obecti-es) Introd"ction of electrical installation on -essel /

    Mobile Offshore Units .MOU

    ) O-er-ie0 of re1"ire$ent of electrical and

    $achinery on -essel / MOU) Testing and -erification concept on electrical and

    $achinery installation on -essel / MOU

    ) *eneral o-er-ie0 of

       Offshore "nits s"ch as Floating &rod"ction and StorageOffshore .F&SO, 2ac'3"ps and se$i3s"b$ersibles

  • 8/20/2019 Verification, Testing and Inspection Design

    5/96

     

    Mobile Offshore Units

  • 8/20/2019 Verification, Testing and Inspection Design

    6/96

     

    Mobile Offshore Units

  • 8/20/2019 Verification, Testing and Inspection Design

    7/96

     

    Electrical Installation

    ) &oints to Consider

      O-erall re-ie0 on electrical syste$s4

      !atteries and their -entilation4

      Fire and *as Detection4

      The ha5ardo"s areas4

  • 8/20/2019 Verification, Testing and Inspection Design

    8/96

     

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    9/96

     

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    10/96

     

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    11/96

  • 8/20/2019 Verification, Testing and Inspection Design

    12/96

     

    %e-ie0 Electrical Syste$

    6600V SF6 Circuit

    Breaker and

    Protection Relay

  • 8/20/2019 Verification, Testing and Inspection Design

    13/96

     

    %e-ie0 Electrical Syste$Load Test

  • 8/20/2019 Verification, Testing and Inspection Design

    14/96

     

    %e-ie0 Electrical Syste$Power Manageent Syste

  • 8/20/2019 Verification, Testing and Inspection Design

    15/96

     

    %e-ie0 Electrical Syste$!nterlock syste

  • 8/20/2019 Verification, Testing and Inspection Design

    16/96

     

    %e-ie0 Electrical Syste$Main "lternators

  • 8/20/2019 Verification, Testing and Inspection Design

    17/96

     

    %e-ie0 Electrical Syste$#ergency "lternators

  • 8/20/2019 Verification, Testing and Inspection Design

    18/96

     

    %e-ie0 Electrical Syste$One Line Diagram

    One line diagram of main and emergency power distribution systems to show:

      Generators

      Motors

      Motor controllers   Transformers

      Circuits

      Batteries

  • 8/20/2019 Verification, Testing and Inspection Design

    19/96

     

    Switchboards, Motor Controllers, etc.

    %e-ie0 Electrical Syste$

    #nclosures

    ) steel or other s"itable inco$b"stible,

    ) $oist"re3resistant $aterials

    ) reinforced as necessary to 0ithstand the

    $echanical, electro$agnetic and ther$al stresses

    ) Enclos"res are to be of the closed type4) The degree of the protection

    ) 6ll 0earing parts are to be accessible for

    inspection and be readily rene0able4

  • 8/20/2019 Verification, Testing and Inspection Design

    20/96

     

    %e-ie0 Electrical Syste$

    Bus Bars) Copper 

    ) si5ed and arranged, te$perat"re rise 0ill not affect the

    operation of co$ponent

    ) $a#i$"$ a$bient te$perat"re is to be in accordance 0ithspec

    )  bracing of b"s bars4

       0ithstand ther$al effects and $agnetic forces res"lting fro$ the

    $a#i$"$ prospecti-e short3circ"it c"rrent4

    ) S"itable bolted b"s bar connections to a-oid deterioration

    of electrical cond"cti-ity

    )  pre-ent loosening of n"ts

  • 8/20/2019 Verification, Testing and Inspection Design

    21/96

     

    %e-ie0 Electrical Syste$

    Circuit Breakers) Co$pliance 0ith a standard4

    ) Designed, constr"cted and tested to IEC &"blication 789:;3<

    or other recogni5ed standard4

    ) S"fficient brea'ing and $a'ing capacities,

    ) Mo"nting or 6rrange$ent

       the brea'ers $ay be re$o-ed fro$ the front of the s0itchboard 0itho"t

    de3energi5ing the b"s bars to 0hich the brea'ers connect4

       Use of dra03o"t or pl"g3in type circ"it brea'ers

       6lternati-ely, an isolation s0itch $ay be fitted "pstrea$ .line or s"pplyside of the brea'er4

       6rrange$ents 0here portions $ay be isolated to allo0 circ"it brea'er

    re$o-al acceptable  not interr"pt ser-ices for prop"lsion and safety

    of the -essel4

  • 8/20/2019 Verification, Testing and Inspection Design

    22/96

     

    %e-ie0 Electrical Syste$

    Fuses) Designed, constr"cted and tested in

    accordance 0ith IEC &"blication 78

  • 8/20/2019 Verification, Testing and Inspection Design

    23/96

     

    %e-ie0 Electrical Syste$

    !nternal $iring) Standard internal instr"$entation and control

    0iring 0ith fla$e3retarding ins"lation4

    ) Internal instr"$entation and control 0iring isto be protected by f"se or circ"it brea'er

    E#ception=

      *enerator -oltage reg"lator circ"its>  *enerator circ"it brea'er tripping control circ"its>

    and

      Secondary circ"it of c"rrent transfor$er4

  • 8/20/2019 Verification, Testing and Inspection Design

    24/96

     

    %e-ie0 Electrical Syste$

    Bus Bars %or Main and #ergency Switchboards

    ) Designed to $eet the $a#i$"$ generator rating based on

    a$bient te$perat"re of :?@C .A AB@F4

    ) si5ed to the co$bined rated generator c"rrent that can flo0thro"gh4

    ) Distrib"tion b"s bars and b"s3bar connections are to be

    designed for at least ;? of the co$bined f"ll3load rated

    c"rrents, or the co$bined c"rrent of the generators that cans"pply to that part of the b"s, 0hiche-er is less4

    ) hen a distrib"tion b"s bar s"pplies to one "nit or one gro"p

    of "nits in si$"ltaneo"s operation, it is to be designed for f"ll

    load4

  • 8/20/2019 Verification, Testing and Inspection Design

    25/96

     

    Bus Bars %or Main and #ergency Switchboards

    S"bdi-ision of !"s !ars

    ) for prop"lsion, the $ain b"s bars are to be s"bdi-ided into

    at least t0o parts

    ) nor$ally to be connected by circ"it brea'ers or other

    appro-ed $eans4

    ) 6s far as practicable, the connection of generating sets and

    any other d"plicated e1"ip$ent is to be e1"ally di-ided

     bet0een the parts4

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    26/96

  • 8/20/2019 Verification, Testing and Inspection Design

    27/96

     

    %e-ie0 Electrical Syste$

    Schematic Diagrams

    • type and size of cable• trip setting

    • rating of circuit (protective device)• rated capacity (connected load).

    Schematic of Electrical System to be checed• !eneral lighting" normal and emergency• #avigation lights• $nterior communications• !eneral emergency alarm• $ntrinsically safe systems• Emergency generator starting• Steering gear system• %ire detection and alarm system

  • 8/20/2019 Verification, Testing and Inspection Design

    28/96

     

    %e-ie0 Electrical Syste$

    Other &esting 'elated #ecessary ata

    ower *anagement System 

    e+uipment fitted

    preferential trips"

    schedule of se+uential start of motors etc.

    ,oltage rop re+uirements

    longest running of cable each size.

    *ain engine

    Oil *ist detection-monitoring

    alarm arrangements

     larms and Safeguards / emergency iesel Engines

  • 8/20/2019 Verification, Testing and Inspection Design

    29/96

     

    %e-ie0 Electrical Syste$

    Other &esting 'elated #ecessary ata

    ) Short circ"it analysis

       Ma#i$"$ calc"lated short circ"it c"rrents

    ) $ain and e$ergency s0itchboards

    ) do0n strea$ distrib"tion boards4

       %ated brea'ing and $a'ing capacities 3 protecti-e de-ices4

    )  &rotecti-e de-ice coordination st"dy

       St"dy

       ta'en in series,

       load e1"ip$ent to the so"rce

       -ario"s conditions of short circ"it4

    )  ar$onics st"dy .electrical po0er distrib"tion syste$

    )  E1"ip$ent

       S0itchboards, MCCS, generators, transfor$ers,

  • 8/20/2019 Verification, Testing and Inspection Design

    30/96

     

    %e-ie0 Electrical Syste$

    ) Installation &lansStandard iring &ractice

    a5ardo"s 6rea &lan and E1"ip$ent DataSpecial "ll &enetrations

    6rrange$ents of Electrical E1"ip$ent

    ) E1"ip$ent &lansCo-er Electrical rotating $achines, S0itchboards

    and controllers4

  • 8/20/2019 Verification, Testing and Inspection Design

    31/96

     

    %e-ie0 Electrical Syste$

    ) Electrical e1"ip$ent is to be designed,

    constr"cted and tested to a national,

    international or other Grecogni5edstandardH4

  • 8/20/2019 Verification, Testing and Inspection Design

    32/96

     

    %e-ie0 Electrical Syste$

    ) Differentiate bet0een &ri$ary Essential, SecondaryEssential and E$ergency Ser-ices4

    ) Differentiate bet0een high and lo0 -oltage syste$s4

    ) Ens"ring proper installation and 0or'$anship4

    ) Installing Co$ponents of Main Electrical &o0er*eneration and Ser-ices4

    ) Installing Co$ponents of E$ergency &o0er So"rces andSer-ices4

    )&rotection and Contin"ity of s"pply in e-ent of fa"lt oro-erload4

    ) Installing Electrical E1"ip$ent in a5ardo"s areas4

    ) Speciali5ed Syste$s

    ) Shipboard Testing

  • 8/20/2019 Verification, Testing and Inspection Design

    33/96

     

    %e-ie0 Electrical Syste$

    ) Priary #ssential Ser&ices  &ro-ide contin"o"s operation 3 prop"lsion steering   disconnected 3 disr"ption to prop"lsion and $ane"-ering4

    ) Secondary #ssential Ser&ices    &ro-ide non3contin"o"s operation 3 prop"lsion steering

       $ini$"$ le-el of safety 3 na-igation syste$s .I4e safety

    for dangero"s cargoes4

       disconnected 3 disr"ption to syste$s re1"ired for safety and

    na-igation4

    ) #ergency Ser&ices

       essential for safety in an e$ergency sit"ation

  • 8/20/2019 Verification, Testing and Inspection Design

    34/96

     

    %e-ie0 Electrical Syste$

    ) Low Voltage  8 to A'V 6C

      8 to A4

  • 8/20/2019 Verification, Testing and Inspection Design

    35/96

     

    %e-ie0 Electrical Syste$

    $orkanshi() Cable Si)ing) !nstallation including cable su((ort trays and

    organi)ation o% cables

    ) Cable (enetrations through water tight bulkheadsre*uire a((ro&ed %ittings

    ) Segregation o% Power + Counication Circuits

  • 8/20/2019 Verification, Testing and Inspection Design

    36/96

     

    %e-ie0 Electrical Syste$

    ) Cable Si)ing

    Standards of Co$pliance M"st be=

      Stranded copper cond"ctors 0ith ther$oplastic,

    elasto$eric or other ins"lation, $oist"re

    resistant ac'ets and ar$ored/sheathed inaccording 0ith recogni5ed standard4 K

    A 3 Fle#ible copper < 3 elasto$eric co$po"nd

    B 3 ther$oplastic co$po"nd

  • 8/20/2019 Verification, Testing and Inspection Design

    37/96

     

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    38/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, -eneral

    ) Continuity   Install in contin"o"s lengths

       Li$it installation of cable bo#es and splicing repair/ connecting$od"le

    ) Restricted Locations=   6-oid =e#cessi-e heat, fla$$able gases, e#pos"re to $echanical

    da$age4   If can not be a-oided, special $eas"res for effecti-e protection4

    )Rated o(erating te(    6t least A8oC higher than $a# a$bient te$p of the location   Segregate igh -oltage and Lo0 -oltage4

        +on3Shielded signal are not to be b"nched 0ith po0er andlighting cables

  • 8/20/2019 Verification, Testing and Inspection Design

    39/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, -eneral) If coatings are applied to electric cables 

    $echanical and fire perfor$ance properties sho"ldnot be affected4

    ) Cable syste$s are to be protected 0hen painting

     begins4) Voltage drop at any point in the syste$ is not to

    e#ceed 7 of no$inal -oltage4 For battery syste$less than ?8 V increase to A84

    ) Single cond"ctor cables= 0hen necessary to "seand circuits greater than .0" are s"bect tospecial installation re1s4

  • 8/20/2019 Verification, Testing and Inspection Design

    40/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, -eneral

    ) Cables installed in trays are not to e/ceed

    double banking

    ) S"fficient air space for heat dissipation4   &o0er cables in sa$e b"nch intended for si$"ltaneo"s

    operation = $a# 7 b"nches

       If J 7 cables= apply red"ction po0er factor .i4e 84?

     po0er factor for ; A< b"nches4 More than this are to

     be specially considered4

  • 8/20/2019 Verification, Testing and Inspection Design

    41/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, Su((ort

    ) 6-oid Chaffing and Stress) Trays to be rob"st and corrosion resistant

    ) Spacing inter-al .not to e#ceed :88 $$ .A7 in4N ) Clips Saddles Straps s"rface area 0ide eno"gh

    shaped   Clips sho"ld be $etallic protected4    +on $etallic clips allo0ed pro-ided fla$e retardant ia0 IEC &"b4

    7889

  • 8/20/2019 Verification, Testing and Inspection Design

    42/96

     

    ) &lastic Cable Trays and &rotecti-eCasings $"st be fla$e retardant

    s"pple$ented by $etallic fi#t"res andstraps for added protection in case offire4  Trays are to be loaded ia0 $an"fact"rers SL  *enerally not spaced greater than < $eters4

      Cables installed in protecti-e casings less thanhalf of the internal cross sectional area of thecasing4 Casings to be fit 0ith Drainage$echanis$s4

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    43/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, Su((ort

    ) Should adhere to anu%acturers

    recoendations or cable construction

    standard !1e bending radius

    re*uireent2

  • 8/20/2019 Verification, Testing and Inspection Design

    44/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, Bulkhead

    + 3eck PenetrationsPenetrations ust be ade with a((ro&ed stu%%ing tubes4transit de&ices or (our able aterials which will aintainthe %ire%ighting and watertight integrity o% the Penetrationwithout daaging cables1

       Structural !nsulation) Cables not to be installed behind or ibedded in !nsulation) Must (ass through at Right "ngles iniu transit reduces heat

    buildu(2

       5on,$atertight Penetrations) Must ha&e a bearing sur%ace o% at least 61 1.7 in2 "ll burrs and shar(

    edges to be reo&ed1 Protecti&e groets should be %itted1

       Collision Bulkhead) 5o Cable is to Penetrate the collision bulkhead

       Re%rigerated S(aces) Cables to be installed in Phenolic (i(es or siilar heat insulating aterial1

  • 8/20/2019 Verification, Testing and Inspection Design

    45/96

     

    %e-ie0 Electrical Syste$Shi(board #lectrical Cables , Mechanical

    Protection

    ) Cables e/(osed to risk o% echanical daage during

    noral o(eration are to be o% arored ty(e4

    ) Cables should be %itted with (rotecti&e co&er wheree/(osed to contact (rone to cha%%ing and abrasion1

    ) #arthed and #lectrically continuous Metal Shields or

    e*ui&alents o% su%%icient strength are to be (ro&ided inareas such as cargo hatches4 decks sub8ect to seas etc to(ro&ide additional (rotection1

    6r$ored Cable

  • 8/20/2019 Verification, Testing and Inspection Design

    46/96

     

    "rored cable= !ron5e, tinned copper or al"$in"$ braid, so$eti$es bet0een the inner

     ac'et and the o"ter sheath4

    (((

    6r$ored Cable

    rotection against mechanical and physical damage

    Armored Cable Required in Zone 1

    (((rotection against any failure in the cable

    6r$ored Cable

  • 8/20/2019 Verification, Testing and Inspection Design

    47/96

     

    6r$ored Cable

    Armored and

    Sheathed Cable

    Armored Cable

    raa 0ables 1. 2OS&'$! series.&hree 0onductor ower.

     rmor 

    Sheath

    6r$ored Cable

  • 8/20/2019 Verification, Testing and Inspection Design

    48/96

     

    %e1"ire$ent= 6r$ored cable is to be gro"nded at each end4

    6r$ored Cable

    6r$ored Cable

  • 8/20/2019 Verification, Testing and Inspection Design

    49/96

     

    6r$ored Cable

    3hat happens if the armor is damaged4

    rmored 0able

  • 8/20/2019 Verification, Testing and Inspection Design

    50/96

     

     rmored 0able

    $f armor on the cable is damaged" no need to be

    replaced if it installed in #O# 56'O7S 'E

    with condition as follow:

    the remaining armor has been grounded O'the armor is made electrically continuous.

    $f installed in hazardous areas" the damaged armor is

    to be replaced.

    i l i l S

  • 8/20/2019 Verification, Testing and Inspection Design

    51/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, #ergency

    + #ssential Ser&ices

    ) Cables + $iring %or these systes should be routed clear o% e/ternal Boundaries o%

    Category " achinery s(aces and other high %ire risk areas other than those

    ser&ed2 Cable running should consider cables being rendered unser&iceable1

    ) Cables and #*ui(ent are to be arranged so that a %ire in any o% these areasdoesn9t a%%ect the o(eration o% the ser&ice in any other area1 Can be achie&ed by   Fire Resistant Cables   3ual Routing   Sel% Monitoring Systes

    % i El i l S

  • 8/20/2019 Verification, Testing and Inspection Design

    52/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, S(ecial

    Considerations 

    ) Mineral !nsulated Cables) Fiber :(tic Cables

    ) Cable S(lices

    % i El t i l S t

  • 8/20/2019 Verification, Testing and Inspection Design

    53/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, S(ecial

    Considerations

    ) !nstallation o% ;unction Bo/es<   arine a((lications a((ro&ed   not %or Pro(ulsion Cables   where (eritted4 ensure that<

    ) suitable %or installation location) "ccessible) Low Voltage systes are to be segregated or (ro&ided with (hysical

    barriers) Segregate #ergency and 5on,#ergency Circuits) "rored Cables are to ha&e "roring ade electrically continuous) Connecting Cables are to be well,su((orted and %astened

  • 8/20/2019 Verification, Testing and Inspection Design

    54/96

     

    Shi(board #lectrical Cables, S(ecialConsiderations

    ) Cable Terinations<

       Stri((ed cables are to be sealed   Cable conductors %or terinal connection to be %itted with

    ade*uately si)ed cri( lugs1 Soldered lugs (eritted with

    liitation2   Secured to Terinal bo/ or other sturdy structure   Moisture resistant 8acket is to e/tend through the outerost

    cable cla( o% the terinal bo/1 

    %e-ie0 Electrical Syste$

    % i El t i l S t

  • 8/20/2019 Verification, Testing and Inspection Design

    55/96

     

    %e-ie0 Electrical Syste$Shi(board #lectrical Cables, #arthing Re*uireents

    #*ui(ent #arthing) E1"ip$ent=

        protect against electric shoc'   non li-e e#posed $etal parts if fa"lt beco$e li-e   E#ception

    ) Voltage less than ?8 V.dc or ac) Voltage not e#ceeding

  • 8/20/2019 Verification, Testing and Inspection Design

    56/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, #arthing Re*uireents

    #*ui(ent #arthing) Earthing Methods

       Metal fra$es or enclos"re earthed thro"gh $etallic contact0ith the -esselQs str"ct"re .pro-ided installation $ethod andarrange$ent ass"re positi-e earthing4

       Other0ise= they are to be connected by separate cond"ctoras follo0s=

    ) copper cond"ctor or other corrosion resistant $aterial) Specific +o$inal Cross Section area) Connection of earthing cond"ctor in a protected accessible location

    and sec"red by si5ed scre0 of corrosion resistant $aterial4

    ) For cri$ped connector $"st be -ery sec"re .not to be loose4

     

    #*ui(ent grounding

  • 8/20/2019 Verification, Testing and Inspection Design

    57/96

     

    ) -rounding ethods<

       Thro"gh gro"nding

    cond"ctor4

       Thro"gh foolproof

    $etallic contact 0ith the

    h"ll4

    ) To pro-ide ade1"ate c"rrent

    carrying capability to accept

    the per$itted gro"nd3fa"lts

    c"rrents without creating a

    %ire=e/(losion ha)ard

    ) !ns(ection of E1"ip$ent

    *ro"nding sho"ld be

     perfor$ed periodically, for

    si5ing so"ndness

    #*ui(ent grounding

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    58/96

     

    %e-ie0 Electrical Syste$Shi(board #lectrical Cables, #arthing Re*uireents

    ) Systes #arthing u( to > k&2 ? #arthed "C 3istributionSyste   *eneral Earthing 6rrange$ent

    ) For earthed distrib"tion syste$s, the ne"tral of each po0er so"rce is to be connected in parallel and earthed at a single point .if applicable4

       Syste$s Earthing Cond"ctor) Separate earthing cond"ctors for earthing of non3c"rrent carrying parts of electrical

    e1"ip$ent4

       :3ire B &hase 6C Syste$s = no protecti-e de-ices fitted in the ne"tral cond"ctors4   M"ltipole s0itches or circ"it brea'ers 0hich si$"ltaneo"sly open all cond"ctors are

    allo0ed4   M"ltiple generator installations 3 each generatorQs ne"tral connection to earth

     pro-ided 0ith a disconnecting lin'4

     

    %e-ie0 Electrical Syste$

  • 8/20/2019 Verification, Testing and Inspection Design

    59/96

     

    %e-ie0 Electrical Syste$

    Shi(board #lectrical Cables, #arthing Re*uireents

    Systes #arthing e/ceeding > k& but less than >7k&2#arthed "C 3istribution Syste

       #arthed 5eutral Systes,

    ) ! earth @ ! o% the largest generator on switchboard) ! earth A / ! %ault iniu %or o(eration o% any de&ice

       #lectrical e*ui(ent in directly earthed neutral orother neutral earthed systes

    ) withstand current due single (hase %ault

    ) tri( the (rotection de&ice1

       Pro&ide disconnection link %or #ach -enerator5eutral

    #*ui(ent grounding

  • 8/20/2019 Verification, Testing and Inspection Design

    60/96

     

    &roper gro"nding = -essel

     properly 0ired to A

  • 8/20/2019 Verification, Testing and Inspection Design

    61/96

     

  • 8/20/2019 Verification, Testing and Inspection Design

    62/96

     

    !atteries

  • 8/20/2019 Verification, Testing and Inspection Design

    63/96

     

    SM6LL= battery charger belo0 84

  • 8/20/2019 Verification, Testing and Inspection Design

    64/96

     

    L6%*E= battery charger abo-e

  • 8/20/2019 Verification, Testing and Inspection Design

    65/96

     

    )Special case=

    Low hydrogen eission batteries are "sed to red"ce

    the rated ha5ardo"s area4

    !atteries

      warning notice is to be furnished at the room"

    indicating that the batteries are to be only

    replaced by other batteries with the same

    hydrogen emission rate.

    !atteries

  • 8/20/2019 Verification, Testing and Inspection Design

    66/96

     

    Criteria %or Low hydrogen eission batteries<

    ) +F&6 B

  • 8/20/2019 Verification, Testing and Inspection Design

    67/96

     

    S'ecial attention to %(S )%ninterru'ted

    (ower S*stem+ installed in Air ConditionedControl Room.

    •7S need to be certified for use in a controlroom.

    •5ydrogen emission can add to be considered

    5azardous rea.

  • 8/20/2019 Verification, Testing and Inspection Design

    68/96

     

    Fire 3etection and "lar Systes

    ) Mainly on the prop"lsion $achinery space

    ) Co$bined 0ith other fire detection and alar$syste$s re1"ired onboard the -essel4

    ) The fire control panel is to be located on thena-igation bridge or in the fire fighting station4

    ) If located in the fire fighting station, a repeater

     panel is to be fitted on the na-igation bridge4) &rop"lsion $achinery space fire is to be alar$ed

    in the centrali5ed control station4

  • 8/20/2019 Verification, Testing and Inspection Design

    69/96

     

    Fire "lar Call Points

    ) Man"ally operated fire alar$ call points are

    to be pro-ided at the follo0ing locations=   Centrali5ed control station

       &assage0ays leading to the prop"lsion

    $achinery spaces   +a-igation bridge

    Fire 3etection and "lar Systes

    Fire Detection

  • 8/20/2019 Verification, Testing and Inspection Design

    70/96

     

    7nmanned *achinery Space

    Service Spaces

     ccommodation Spaces

      (Sleeping +uarters)

    Smoe

    etectors

    "R& detectors in a *O74

    %lame detectors

    are to be used inaddition of other

    fire detectors.

    %lame detectors even

    though are fast detectors"

    they may give false alarms.

    'ational

    *as Detection

  • 8/20/2019 Verification, Testing and Inspection Design

    71/96

     

    -AS detectors in a *O74

    0ellar ec

    rill %loor 

    *ud it rea

    Shale Shaer reaOther enclosed spaces containing open

    components of the mud circulation system

    !as indication panels areto be located at the drill #loor  

    > emerc* control stations

    / udible > visual alarm/ ;ocation > concentration

    of gas (/0 > 23 of ;E;)

    %ire etection 0ase Study

  • 8/20/2019 Verification, Testing and Inspection Design

    72/96

     

    )Only s$o'e detectors installed in MachinerySpaces4

    )

  • 8/20/2019 Verification, Testing and Inspection Design

    73/96

     

    e e ec o C se S "dy

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    74/96

     

    a5ardo"s 6reas

    #lectrical #*ui(ent in 'a)ardous "reas) a5ardo"s areas =

      Spaces .0here

      fla$$able or e#plosi-e gases, -apors or d"st

      .are nor$ally present, or li'ely to be present4

    ) Classified based

      li'elihood of presence

      concentration and type of fla$$able at$osphere,

    as 0ell as in ter$s of the e#tent of the space4

  • 8/20/2019 Verification, Testing and Inspection Design

    75/96

     

    ) Electrical e1"ip$ent is +OT to be installed

    in ha5ardo"s areas

    Unless =

      For safety or for operational p"rposes4

      Installation of electrical e1"ip$ent is necessary,.$"st be s"itable for the ha5ardo"s area

    classification

    a5ardo"s 6reas

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    76/96

     

    Different Standards=

    )International Electrotechnical Co$$ission .IEC Series

    ;9=  Zone 0, 1, 2

    ) +ational Electric Code .+EC 6rt ?88=

    Class I Div1, Div 2

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    77/96

     

    ) one 0

  • 8/20/2019 Verification, Testing and Inspection Design

    78/96

     

    ) Class ! 3i& >

  • 8/20/2019 Verification, Testing and Inspection Design

    79/96

     

    '""R3:DS "R#"S in a MODU(

    rill %loor 

    Shale Shaer" egasser" esander" esilter 

    *ud &ans or *ud its

    E+uipment nameplate shows

    suitability for use in hazardous area.

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    80/96

     

    ) hat to loo' for in a na$eplate 0hen e1"ip$ent

    installed in ha5ardo"s area(

    3The Testing LabQs na$e= CS6, UL or others

    3The Certificate +o4

    3The a5ardo"s 6rea Mar'ing

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    81/96

     

    4

    Cert o.!esting Labs ame

    $a4ardous

     Area

    Mar5ing

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    82/96

     

    $a4ardous Area

    Mar5ing!esting Labs ame Cert o.

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    83/96

     

    6hats wrong with this name'late7

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    84/96

     

     +a$eplate IEC

    4

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    85/96

     

    $a4ardous Area

    Mar5ing

    !esting Labs ame

    Cert o.

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    86/96

     

    o0e-er=

    one < e1"ip$ent Class I Di- <one A e1"ip$ent

    one 8 e1"ip$ent Class I Di- A

    &here is #O e+uivalency between

    6one and ivision???

  • 8/20/2019 Verification, Testing and Inspection Design

    87/96

     

    ) The general r"le for installing electrical e1"ip$ent

    in fla$$able at$osphere is

    3: 5:T<) !oth +F&6 ;8 and IEC 788;93A: State that by

    caref"l design it is possible to locate $ost

    electrical e1"ip$ent a0ay fro$ fla$$ableat$ospheres

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    88/96

     

    a5ardo"s 6reas

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    89/96

     

    If an enclos"re or roo$ installed in ha5ardo"sareas, b"t e1"ip$ent not been certified4

    urged System.

    'ositi8e 'ressure in relation to the surroundedatmosphere. (# @AB or $E0 CA/9).e.g: drillersconsole.

    Solutio

    n

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    90/96

     

    Typical e1"ip$ent in one A4

    ) E#plosion proof= the enclos"re 0ithstands ande#plosion inside and pre-ents propagation4

    ) Intrinsically safe GiaH GibH= an intrinsically safe

     barrier is installed in a safe area to a-oid spar's by

    li$iting the energy to the circ"it in the ha5ardo"sarea4

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    91/96

     

    Special Considerations4

    ) Electrical e1"ip$ent in e#terior locations and operableafter total sh"tdo0n need CE%TIFIC6TIO+ .one

  • 8/20/2019 Verification, Testing and Inspection Design

    92/96

     

    Special Considerations

    ) !%USLESS $otors .and other si$ilar e1"ip$ent can

     be installed in Class I Di-< .+EC ?8A4! 0ith no

    ha5ardo"s area certification, i4e4 s1"irrel cage $otors4

     

    Rational:

     br"shes and s0itches prod"ce arc3spar's andconse1"ently, they can be a so"rce of ignition4

    Requirement: #ameplate is to show the ma= surface &

    (D0) for the space heater. &he e=posed surface of the

    space heater is not to be above 8 F of the ignition &

    (D0) of the gas involved

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    93/96

     

    The follo0ing spaces are, in general, to be

    regarded as ha5ardo"s areas=

    ) Tan's containing fla$$able li1"ids ha-ing a

    flash point of 78C .A:8F or belo04

    ) olds containing solid b"l' cargoes liable to

    release fla$$able gases or d"st4

    ) olds or enclosed cargo spaces containing

    cargoes that are li'ely to e$it fla$$able gases

    or -apors, e4g4, dangero"s goods, -ehicles 0ith

    f"el in their tan's, etc4

  • 8/20/2019 Verification, Testing and Inspection Design

    94/96

     

    ) Ventilation in a5ardo"s 6reasVentilation inlets and o"tlets 3 Ventilation inlets be located in nonha)ardous

    areas1 and co(letely se(arate %ro that %or nonha)ardous areas1

    More critical less press"re flo0 fro$ less to $ore

     +"$ber of air changes re1"ired for enclosed $"d pits 3 #&ery two inutes1

    ) D"cts passing tho"gh ha5ardo"s 5ones 3 Dnder (ressure in to less ha)ardousareas and at o&er(ressure to ore ha)ardous areas

      are to be rigidly constructed to a&oid air leaks1

    ) Ventilation of non ar5ardo"s 5ones 3 to be located in nonha)ardous areaand o&er(ressure in relation to the ha)ardous area1

    ) Self closing doors are re*uired between nonha)ardous and ha)ardous)ones

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    95/96

     

    ) Case St"dy I

    ) Case St"dy II

    a5ardo"s 6reas

  • 8/20/2019 Verification, Testing and Inspection Design

    96/96