CURRICULUM VITAE Name : HO Wing Wah Vera Contact : Cell Phone: +852-98483944 Email: [email protected] Education : The Southern California Institute of Architecture, Master of Architecture SCI-Arc, Vico Morcote, Switzerland, Master of Architecture Chu Hai College, B. of Sc. in Architecture Professional Qualifications: : Graduate Membership of Hong Kong Institute of Architects - 1996 Associate Membership of American Institute of Architects - 1994 Computer Knowledge : Drafting software including AutoCad / SketchUp Graphic Software including Photoshop / Illustrator / Acrobat and etc. Microsoft Office / iWorks Both Window and Mac Platform Key Experience : 2015 - Present PKNG Architects & Engineers Ltd. Associate / Design Architect City University (2013 - 2016) acted as team leader of a 3-year term consultancy services for the University. Responsible from preliminary design, documentation, site supervision and contract and administration for various renovation. Kings Road 1063 Lobby Renovation for Housing Society (2014 2015) - acted as team leader of the design and production team responsible from preliminary design to documentation. Construction was completed in October 2015. The Link-Signage & Facade Works Batch 1 Group A & B (2014 - 2016) acted as team leader of the design and production team responsible from preliminary design, statutory submission to documentation. The package includes signage and façade design for 8 shopping malls including Lok Fu Plaza with a total 50 million dollars estimated contract sum. Construction will be completed by end of 2016.

Upload: vera-ho

Post on 14-Apr-2017

42 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Vera Ho CV - 2016

CURRICULUM VITAE

Name : HO Wing Wah Vera

Contact : Cell Phone: +852-98483944

Email: [email protected]

Education : • The Southern California Institute of Architecture, Master of Architecture

• SCI-Arc, Vico Morcote, Switzerland, Master of Architecture

• Chu Hai College, B. of Sc. in Architecture

Professional

Qualifications: : • Graduate Membership of Hong Kong Institute of Architects - 1996

• Associate Membership of American Institute of Architects - 1994

Computer

Knowledge

: • Drafting software including AutoCad / SketchUp

Graphic Software including Photoshop / Illustrator / Acrobat and etc.

Microsoft Office / iWorks

Both Window and Mac Platform

Key

Experience

:

2015 - Present PKNG Architects & Engineers Ltd.

Associate / Design Architect

City University (2013 - 2016) – acted as team leader of a 3-year term

consultancy services for the University. Responsible from preliminary

design, documentation, site supervision and contract and administration

for various renovation.

King’s Road 1063 Lobby Renovation for Housing Society (2014 – 2015) -

acted as team leader of the design and production team responsible

from preliminary design to documentation. Construction was completed

in October 2015.

The Link-Signage & Facade Works Batch 1 Group A & B (2014 - 2016) –

acted as team leader of the design and production team responsible

from preliminary design, statutory submission to documentation. The

package includes signage and façade design for 8 shopping malls

including Lok Fu Plaza with a total 50 million dollars estimated contract

sum. Construction will be completed by end of 2016.

Page 2: Vera Ho CV - 2016

HKSKH Holy Carpenter Church (2015 - 2017) - acted as team leader of

the design and production team responsible from preliminary design,

statutory submission to documentation. The Church received 25 million

dollars HKJC funding for the improvement works including BFA upgrade /

face lifting and interior renovation.

Pok Hong Shopping Centre Improvement Works for Housing Authority

(2015 – 2017) - acted as team leader of the design and production team

responsible from preliminary design, statutory submission to

documentation. The works included façade design and LG/F interior

renovation.

Tin Yiu Market Improvement Works for Links (2015 – 2017) - acted as team

leader of the design and production team responsible from preliminary

design, statutory submission to documentation to convert the existing

wet market to a shopping mall with 2 open courtyards. The estimated

contract sum is 150 million dollars.

Lok Sing Centre Façade and 1/F Improvement Works at Causeway Bay

for China Resources Property Limited (2016 – 2017) - acted as team

leader of the design and production team responsible from preliminary

design, statutory submission to documentation.

Albania Residential Development (2015 – 2018) - acted as team leader

of the design and production team responsible from preliminary design,

statutory submission to documentation.

2008 - 2015 Samson Wong & Associates Property Consultancy Ltd.

Design Architect / Project Manager

The Humphrey at Tsim Sha Tsui for SINO Group (2015 – 2017) – acted as

project manager and design architect from concept design, statutory

submission to documentation.

Installation of a Transferred Lift and Covered Walkway at Jat Ming

Chuen, Shatin for Housing Society (2014 - 2015) — acted as design

architect from preliminary design, statutory submission to documentation

of a total contract sum of 10 million Hong Kong.

Page 3: Vera Ho CV - 2016

ASD Minor Works Contract (2012 - 2015) - acted as design architect and

team leader of architectural design team for over 20 projects of a total

contract sum of 32 million Hong Kong.

ASD Barrier Free Contract (2012 - 2015) - acted as design architect and

team leader of architectural design team for over 20 projects of a total

contract sum of 13 million Hong Kong.

Post Occupancy Evaluation Study for Siu Sai Wan Complex for ASD (2013

-2014) - responsible for architectural section of the Post Occupancy

Evaluation Study Report and overall coordination with the consultancy

team.

ASD Minor Works Contract (2009 - 2012) - acted as design architect and

team leader of architectural design team for over 50 projects of a total

contract sum of 110 million Hong Kong.

Hong Kong’s Urban Best Practices Area Exhibition, Expo 2010, Shanghai -

acted as design architect from preliminary design to documentation.

Renovation Works for Choi Yuen Shopping Arcade, Sheung Shui for Links

(2008-2009) - acted as design architect and project manager;

responsible from preliminary design, statutory submission, documentation

to site supervision of a total contract sum of 35 million Hong Kong.

2005 - 2008 SL HO & Associates Limited

Design Architect / Project Manager

Fashionwalk at Causeway Bay for Hang Lung Properties Ltd. (2006-2008) -

acted as design architect and project manager; responsible from

preliminary design, statutory submission, documentation, site supervision

and contract and administration of a total contract sum of 35 million

Hong Kong.

Upgrade Drainage System for Yuen Yuen Institute in Tsuen Wan (2005-

2007) - acted as project manager, responsible of statutory submission,

coordination with other consultants and Government Departments, site

supervision and contract & administration.

2002 - 2005 Kenneth Mak & Associates

Design Architect / Project Manager

Shunde Fortuna Hotel, China for Fortuna Hotel (2004 - 2005) - acted as

team leader of the architectural team responsible from preliminary

design to documentation.

Park Island Development Phase 1 for Sun Hung Kai Properties (2002 -

2004) - acted as team leader of the architectural team and project

manager; responsible from preliminary design, documentation, site

supervision and contract & administration for 2 club houses, bus station

and ferry terminal of a total contract sum of 300 million Hong Kong.

Page 4: Vera Ho CV - 2016

1998 - 2002 Samson Wong & Associates Property Consultancy Ltd.

Design Architect / Project Manager

IBM-GKI, Beijing (2000 - 2002) - acted as team leader of the architectural

team responsible from preliminary design, documentation, site

supervision and contract & administration of a total contract sum of 100

million RMB.

Smartone Teleport at Chung Hom Kok for Sun Hung Kai Properties (1999 -

2001) - acted as team leader of the architectural team and project

manager; responsible from preliminary design, documentation, site

supervision and contract & administration for 2 club houses, bus station

and ferry terminal of a total contract sum of 200 million Hong Kong.

Nokia Factory, Beijing (1998 - 2000) - acted as team leader of the

architectural team responsible from preliminary design, statutory

submission, documentation, site supervision and contract and

administration of a total contract sum of 100 million Hong Kong.

Hong Kong Buddhist Hospital (1999 – 2002) – acted as team leader of a

3-year term consultancy services for the Hospital. Responsible from

preliminary design, documentation, site supervision and contract and

administration for various renovation including G/F renovation.

The Duchess of Kent Children’s Hospital (1998 – 2001) - acted as team

leader of a 3-year term consultancy services for the Hospital. Responsible

from preliminary design, documentation, site supervision and contract

and administration for various renovation including wards.

1996 - 1998 Richards Basmajian Ltd

Design Architect

Li & Fung Distribution and Industrial Centre at Panyu, China (1996 - 1998) -

acted as design architect and project manager; responsible from

preliminary design, documentation, site supervision and contract and

administration of a total contract sum of 100 million RMB.

Li & Fung Centre Headquarters Building, Hong Kong (1996 - 1997) - acted

as design architect; responsible from preliminary design to

documentation of a total contract sum of 30 million Hong Kong.

Landmark Basement Shopping Centre, Hong Kong (1996) - acted as

project manager to supervise the whole project of a total contract sum

of 20 million Hong Kong.

Stanley Court Town House Refurbishment for Hong Kong Land, Hong

Kong (1996 - 1997) - acted as design architect and project manager;

responsible from preliminary design, documentation, supervision and

contract administration of a total contract sum of 20 million Hong Kong.

Hong Kong Jockey Club Members‘ Grandstand and Betting Hall at

Shatin (1996 - 1997) - acted as design architect; responsible from

preliminary design, statutory submission and documentation of a total

Page 5: Vera Ho CV - 2016

contract sum of 250 million Hong Kong.

1995 - 1996 David Au & Associates

Design Architect

BMW Depot II at Yuen Long for Sime Darby (1995) - acted as design

architect and assistant project manager; responsible from preliminary

design, documentation, site supervision and contract and administration

of a total contract sum of 30 million Hong Kong.

South China Morning Post Printing Factory at Tai Po Industrial Park (1995) -

acted as assistant project manager; responsible from site supervision,

contract and administration of a total contract sum of 200 million Hong

Kong.

115 How Ming Street at Kwun Tong, Hong Kong (1995 - 1996) - acted as

design architect and assistant project manager; responsible from

preliminary design, statutory submission, documentation, site supervision

and contract and administration of a total contract sum of 30 million

Hong Kong.

BMW Motor Services Center at Shenzhen for Sime Dardy (1995) - acted

as design architect and assistant project manager; responsible from

preliminary design, statutory submission, documentation, site supervision

and contract and administration of a total contract sum of 10 million

RMB.

Competition : Chocolate Factory : Redeveloped Abandoned Chocolate Factory,

Switzerland (1989)

Chantermerle : Hotel and Multi-Storey Carpark to the Ski Resort, France

(1999)

Science School: Science School from Grade 1 to Grade 12, Los Angeles,

U.S.A (1994)

Jyeonggi-do Jeongok Prehistory Museum Competition (2005)

• The Harbourview Hotel for YMCA (2006)

Page 6: Vera Ho CV - 2016

the book

fromthewib

Page 7: Vera Ho CV - 2016

Walt Disney Roadshow1995 - Appointed by Walt Disney Greater China to design 2 road shows in Taipei and Kaohsiung respectively.

Cablex Computer Store1995 - Appointed by the owner of a computer shop to renovate the store. The design concept was inspired by the new Macbook and iPod to have the glowing white look.

Exit Bar1995 - Appointed by the owner of a new cafe at Star Street. The design concept is to provide a warm and cozy environment by using sand ston and beech wood.

South China Morning Post Printing FactoryDavid Au & Associates 1995 - Acted as assistant project manager; responsible from site supervi-sion, statutory submission, contract and adminis-tration of a total contract sum of 200 million Hong Kong.

115 How Ming Street RedevelopmentDavid Au & Associates 1995 to 1996 - Acted as architectural designer and assistant project man-ager; responsible from preliminary design, statu-tory submission, documentation, site supervision and contract and administration of a total con-tract sum of 30 million Hong Kong.

BMW Service CentreDavid Au & Associates 1996 - Acted as architec-tural designer and assistant project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 30 million Hong Kong.

Page 8: Vera Ho CV - 2016

Li Fung Centre RefurbishmentRichards Basmajian Ltd 1996 to 1997 - Acted as architectural designer; responsible from prelimi-nary design to documentation of a total contract sum of 30 million Hong Kong.

Stanley Court RefurbishmentRichards Basmajian Ltd 1996 to 1997 - Acted as architectural designer and project manager; responsible from preliminary design, documen-tation, supervision and contract administration of a total contract sum of 20 million Hong Kong.

HKJC Shatin Membership Grandstand RefurbishmentRichards Basmajian Ltd 1997 to 1998 - Acted as architectural designer; responsible from prelimi-nary design, statutory submission and documen-tation of a total contract sum of 250 million Hong Kong.

Nokia Beijing FactorySamson Wong & Associates Property Consultan-cy Ltd. 1998 to 2000 - Acted as team leader of the architectural team responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 150 million Hong Kong.

Smartone TeleportSamson Wong & Associates Property Consultan-cy Ltd. 1999 to 2001 - Acted as team leader of the architectural team responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 100 million Hong Kong.

IBM-GKI Chips FactorySamson Wong & Associates Property Consultan-cy Ltd. 2000 to 2002 - Acted as team leader of the architectural team responsible from preliminary design, documentation, site supervision and contract & administration of a total contract sum of 100 million RMB.

Page 9: Vera Ho CV - 2016

World Wide House Multi-media DisplaySamson Wong & Associates Property Consultan-cy Ltd. 2002 - Acted as architectural designer; responsible from design, statutory submission and documentation of a total contract sum of 200 million Hong Kong.

Apec Plaza RenovationSamson Wong & Associates Property Consultan-cy Ltd. 2002 - Acted as architectural designer; responsible from design, documentation and contract and administration of a total contract sum of 10 million Hong Kong.

Verbena Heights - New Covered WalkwaySamson Wong & Associates Property Consultan-cy Ltd. 2002 - Acted as architectural designer; responsible from design, documentation and contract and administration of a total contract sum of 10 million Hong Kong.

Vikings & Ellison Factory RenovationSamson Wong & Associates Property Consultan-cy Ltd. 2000 - Acted as architectural designer; responsible from design, and documentation of a total contract sum of 10 million Hong Kong.

Shunde Fortuna Hotel,Kenneth Mak & Associates 2004 to 2005 - acted as team leader of the architectural team responsible from preliminary design to documentation.

Park Island Development Phase 1 - Blue Blue ClubKenneth Mak & Associates 2002 to 2004 - acted as team leader of the architectural team and project manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 200 mil-lion Hong Kong.

Page 10: Vera Ho CV - 2016

Park Island Development Phase 1 - Green Green ClubKenneth Mak & Associates 2002 to 2004 - Acted as team leader of the architectural team and pro-ject manager; responsible from preliminary design, documentation, site supervision and contract & administration for 2 club houses, bus station and ferry terminal of a total contract sum of 200 million Hong Kong.

Park Island Development Phase 1 - Angsana SpaKenneth Mak & Associates 2002 to 2004 - Acted as team leader of the architectural team and pro-ject manager; responsible from preliminary design, documentation, site supervision and contract & administration for Angsana Spa at Park Island of a total contract sum of 10 million

Fashionwalk at Causeway BaySL HO & Associates Limited 2006 to 2008 - Acted as architectural designer and project manager; responsible from preliminary design, statutory submission, documentation, site supervision and contract and administration of a total contract sum of 35 million Hong Kong.

Renovation Works for Choi Yuen Shopping ArcadeSamson Wong & Associates Property Consultan-cy Ltd. 2008 t0 2009 - Acted as architectural designer and AP representative; responsible from preliminary design, statutory submission, docu-mentation to site supervision of a total contract

Hong Kong’s Urban Best Practices Area Exhibi-tion, Expo 2010, ShanghaiSamson Wong & Associates Property Consultan-cy Ltd. 2009 to 2010 - Acted as architectural designer from preliminary design to documenta-

Tai Po Waterfront Park - Covered WalkwaySamson Wong & Associates Property Consultan-cy Ltd. 2009 to 2011 - Acted as architectural designer and team leader of architectural design team for over 50 projects of a total contract sum of 10 million Hong Kong.

Page 11: Vera Ho CV - 2016

Luen Cheong Street Public ToiletSamson Wong & Associates Property Consultan-cy Ltd. 2009 to 2012 - Acted as architectural designer and team leader of architectural design team for over 50 projects of a total contract sum of 10 million Hong Kong.

POE for Siu Sai Wan ComplexSamson Wong & Associates Property Consultan-cy Ltd. 2013 to 2014 - Responsible for architectur-al part of the POE study report and overall coordi-nation with the consultancy team.

Proposed Transferred Lift and Covered Walkway at Jat Ming ChuenSamson Wong & Associates Property Consultan-cy Ltd. 2014 to 2015 - Acted as architectural designer from preliminary design, statutory sub-mission to documentation of a total contract sum of 10 million Hong Kong.

Jeongok Prehistory Museum Competition in South Korea (2005)

The Harbourview Hotel for YMCA (2006)

The Humphreys: To convert a 50-year-old build-ing in Tsim Sha Tsui to a service apartment for Sino Group. Construction will start in July 2016.

Page 12: Vera Ho CV - 2016

Renovation to 1063 King’s Road Lobby for Hous-ing Authority. The project was completed in October 2015.

New residential development in Albania for join developers from Albania and Hong Kong. Con-struction was started in March 2016.

Proposed Facade, G/F & 1/F Renovation for Lok Sing Centre at Causeway Bay for China Resources Enterprise. Construction will start in July 2016.

Proposed Facade & shopping arcade renovation for Housing Authority. Construction will start in July 2016.

Proposed renovation for students inactive space at Acedemic 1, Cuty-U. Construction will be com-pleted in July 2016.

To transform existing Tin Yiu Market to shopping arcade for Link. Construction will be completed in January 2017.