Page 1: Vendor Development System

KIRLOSKAR TOYODA TEXTILE MACHINERY PVT. LTD.Plot No. 10~13, Phase-II, Jigani Indl. Area, Anekal Taluk, Bangalore – 562 106

ISO 14001 Company

Page 2: Vendor Development System

Water flowFLOW OF WATER

(1)

Flow through Canal - normally smooth flow ,No turbulenceWhen gates are opened, possibility of overflow exists

(2)

Flow through river : never quite smmoth. Will encounter obstacles.Will change path.

Page 3: Vendor Development System

together we learn, work and contribute ….

KTTM Company ProfileKTTM Company Profile

Mr. Laxman Rao Kirloskar Mr. Sakichi Toyoda“Human Intellect and Individual ability gives us our means to direct our talents towards production work”

“Open your mind and look at the

great world outside”

The Spirit of Entrepreneurship and Innovation of

two great visionaries of different era and countries

resulted in the formation of

KTTM

The first Company of TOYOTA Group in Bangalore

Page 4: Vendor Development System

together we learn, work and contribute ….

Basic PolicyBasic Policy

“ “ Touch the Heart, People First ”Touch the Heart, People First ”

KTTM Company ProfileKTTM Company Profile

Operational PolicyOperational Policy

“ “ Speed up ! Speed up !

Change & Challenge !Change & Challenge !

Zero defect ! ”Zero defect ! ”

Page 5: Vendor Development System

together we learn, work and contribute ….

KTTM Company ProfileKTTM Company Profile1. Establishment 19951. Establishment 1995    14th August 1995

2. 2. Starting Operation 1997 6th June 1997

3. 3. Share Capital Ratio Toyota Industries Corporation : 95.1%

Kirloskar Oil Engines : 3.8%

Kirloskar Brothers : 1.1%

4. 4. Range of Business Domestic sales of Ring Frame

Export of Ring Frame Parts

Painting Job Work

Auto Parts Manufacturing

Toyota Fork Lifts Sales and Service

Page 6: Vendor Development System

together we learn, work and contribute ….

KTTM Company ProfileKTTM Company Profile5

.Location   Jigani Industrial Area, Bangalore

district,

Karnataka State, India

6.

Land 132,054 m2

7.

Building 22,838 m2

8.

Numbers of Employees

(as of Dec 2005)

      

Consolidated Manpower --- 815Division Super

visoryOP WT Total

Non Supervisory

Textile 84 52 81 217

SPM 50 29 129 208

LPM 22 12 47 81

DC 18 13 41 72

Production support Transmission 10 10

Corporate 29 29

Fork Lift Servicing 2 3 5

Average Age 27 years, including 4 Japanese staff

Apart from the above 173 Apprentices (Govt.Trainees) are undergoing training in different areas.

Page 7: Vendor Development System

together we learn, work and contribute ….

KTTM Company ProfileKTTM Company Profile

10.Turnover Growth & Plan

535 650987

1248 1375341

792

900900

0

500

1000

1500

2000

2500

'03-04 '04-05 '05-06 '06-07 '07-08

Textiles Transmission

In M

illi

on R

s

535

991

1779

2148 2275

Page 8: Vendor Development System

together we learn, work and contribute ….

Plant Layout

Total Built Area– 22838m2

Additional 18Acres of Land on West side available for Expansion

Page 9: Vendor Development System

KTTM’S BUSINESS ACTIVITIES

RING SPINNING MACHINES &

COMPONENTS

CAPITAL GOODSTEXTILE MACHINERY

TRANSMISSION COMPONENTS FOR TOYOTA’S “IMV”

SURFACE TREATMENT FOR VOLVO, GE

AUTO PARTS

JOB WORK

FORK LIFT SERVICES

AFTER SALE SERVICE & GENUINE SPARE PARTS

FOR TOYOTA FORKLIFTS

NEW BUSINESS

together we learn, work and contribute ….

Page 10: Vendor Development System

together we learn, work and contribute ….

Development of SystemWith

Vendors

Case Study: Transmission Project

Page 11: Vendor Development System

together we learn, work and contribute ….

TYPICAL MACHINED ALUMINUM DIE CAST PARTS

TYPICAL MACHINED CAST IRON PARTS

MACHINED FORGED STEEL & BAR PARTS

TOTAL OF 31 TYPE OF PARTS :161500 SETS / YEAR

Page 12: Vendor Development System

together we learn, work and contribute ….

Internal Auto Parts Manufacturing Facility

SMALL PARTS

MACHINING

DIE CASTING

ALUMINUM CASTING

MACHINING

Page 13: Vendor Development System

Methodology of Vendor Development

together we learn, work and contribute ….

Page 14: Vendor Development System

together we learn, work and contribute ….

Grand Schedule for Auto Parts Project

Vendor Control

This is a Master Schedule which integratesCustomer Schedule--- n+2 monthsKTTM Schedule--- nth monthVendor Schedule--- n-2 monthThis ensures “ON TIME PROJECT EXECUTION”

Page 15: Vendor Development System

together we learn, work and contribute ….

Support to the Vendors

We believe in “Mutually Beneficial Supplier Relationships”

We work with all our suppliers for

1. System Development2. Process Stabilization3. Problem Solving4. Reducing rejections

Page 16: Vendor Development System

together we learn, work and contribute ….

Sumimetal Malaysia

Page 17: Vendor Development System

together we learn, work and contribute ….

Audit Check Sheet

Quality

Production

Delivery

Pre Production

Maintenance

Systems

Self Assessm

ent

KT

TM

A’sm

ent

C’m

easure reply

Confirm

C’m

easureOverall Criteria for Selection162~180– Excellent & Accepted131~161—Accepted100~130—Conditional Accepted99 or less – Not Accepted(Combined score of all individual element)

Page 18: Vendor Development System

together we learn, work and contribute ….

Quality

Production

Pre Production

Delivery

Maintenance

Guidelines for Self assessment and KTTM assessment for Vendor Selection

This is done on1~4 Scale forindividual elementsWhere 1~ Least4~Excellent

Check points

4 3 2 1

Page 19: Vendor Development System

Quality Development Plan

together we learn, work and contribute ….

Method

Man

Facility

Inspection Standard

Inspection Parameters

ReleaseConfirm Insp.

StdRecord

Work Sequence Sheet

Skill Level

Manpower

Necessary facility

InspectionArea

Page 20: Vendor Development System

together we learn, work and contribute ….

Confirmation of Logistics

Method

Man

Facility

Page 21: Vendor Development System

together we learn, work and contribute ….

Traceability

Production records

Logisticsrecords

Click for Example

Page 22: Vendor Development System

Manual TransmissionExported to 8 countries161500 units/annum

together we learn, work and contribute ….

Page 23: Vendor Development System

together we learn, work and contribute ….

Page 24: Vendor Development System

together we learn, work and contribute ….

Audit System

Vendor Audits

Page 25: Vendor Development System

together we learn, work and contribute ….

Audit Report

VENDOR AUDIT REPORT

Page 26: Vendor Development System

Vendors Performance Monitoring Quality Mallya

0.006

0.650.59

0 0 0 0 0

0.10.04

0.1

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rej

ecti

on

%

Rejection

TargetEmbars

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rej

ecti

on

%

Rejection

Target

Dimo

2.03

0.82

1.94

2.52.51

1.32

2.231.8

2.2

1.72

0.0

0.5

1.0

1.5

2.0

2.5

3.0

Rej

ecti

on

%

RejectionTarget

Hightemp

2.80

2.31

3.323.00

2.08

3.053.30 3.10

2.40

0.360.27

0.00.5

1.01.5

2.02.5

3.03.5

Rej

ecti

on

%

Rejection

Target

Machine components

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rej

ecti

on

%

Rejection

Target

Megamiles

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Rej

ecti

on

%

Rejection

Target

Drawing,Cutting

AluminumDie Casting

Machining

Plating

Heat Treatment

Machining

Page 27: Vendor Development System

Vendors Performance Monitoring

Delivery

Since we work on KANBAN ,Delivery failures are NEGLIGIBLE

99.9 99.0 99.9 99.4 99.2100100100100

0

20

40

60

80

100

120

Au

g'0

5

Sep

'05

Oct

'05

No

v'05

Dec

'05

W1-

Jan

'06

W2-

Jan

'06

W3-

Jan

'06

W4-

Jan

'06

% A

dh

eren

ce

Page 28: Vendor Development System

together we learn, work and contribute ….

Risk Management1. KTTM will manage its supply chain to ensure supply to customer without failure at all time.2. Develop alternate backup plan.3. Test and keep the backup option ready in case of emergency.

Forecast incidence

Estimated risk

Transport

Counter measure

Truck strike 1. Pickup information in advance & deliver

2. Pickup through alternate mode.

Inter state strike 1. Ships to be diverted to nearest state

2. Transport through undisturbed state.

Port strike 1. Ships to be diverted to other port

Ship strike 1. Alternate shipping liner

Cyclone 1. Ships to be diverted to other ports.

Production

Dispatch

Machine failure 1. Keep Maximum 5 days stock to manage machine breakdown up to 5 days

Quality problem 1. Frequent Quality audits on quality system, and implementation of countermeasure

Once/yr<1wk

Once/3yr>1wk

Once/10yr

Page 29: Vendor Development System

together we learn, work and contribute ….

Risk Management

Raw material supplier

Shipping linerChennai port &

transport

KTTMRaw material

stock FG stock

Castings-China

Forgings-Japan

53

38

868

15 days stock 15 days stock 30 days stock 8 days stock

Problem location

Stock (days) Backup plan Judgment

Casting68 Backup by Japanese supplier

Forgings

Ship 53 Alternate shipping liner

Chennai port 15 Alternate port

Transport 30 Alternate route / transport

KTTM 8 Backup by Japanese supplier

Page 30: Vendor Development System

1095

137

26 30 12 5 0 10 10 0 5 17 0 4

3067507055

51

00

8 73

36

6

11

85

27

99

51

9 11

94

08

13

25

48

15

30

90

16

69

62

16

60

26

20

90

60

21

67

74

20

63

25

23

34

84

20

09

57

20

09

16

17

25

19 20

26

62

22

78

49

63

95

3

200

2030100

0

200

400

600

800

1000

1200

04-Jul

Aug Sep Oct Nov Dec 05-Jan

Feb Mar Apr May June Jul Aug Sep Oct Nov Dec Jan

0

50000

100000

150000

200000

250000PPM

Parts Supplied

CustomerTargetInternal Target

Performance Measurement at Customer

Thanks to Our Partners

Page 31: Vendor Development System

AWARDS AND ACHIEVEMENTS

Q

C

D

Page 32: Vendor Development System

ZERO PPMZERO PPM

BEST FOUNDRYBEST FOUNDRY

TKML

ALUCAST

Page 33: Vendor Development System