Cost of Project & Resources of Funds Rs. In Lakhs
Particular Amount
Cost of Projects
Cost of Land 100
Cost of Site Cleaning & Land Levelling 35
College Building annexture "A" 5,595
Residential & Hostel Building annexture "B" 4,530
Furniture & Fixtures annexture "C" 3,005
Computers, Science Appartus & Machinery annexture "D" 495
Roads / Compound Wall /Storms Water drains /Drainage & Sewage Plant 405
Library Books 100
Deposit with AICTE 35
Total funds Requirement 14,300
Resources
9,300
Term Loan from bank 5,000
Total funds 14,300
Own funds (including Donation through Indian & Foreign Contributions)
Page 17
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
2/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "A" - College BuildingBuilding No. of
Rooms
Area
Sq.mtr
Per room
Total
Sq.mtr
Area
Rate Rs
per.q.mtr
Rs. In
lakhs
a) Administrative Area1
1 sq.mtr
p.student3,000 16,000 480
b) Instructional Area
General Class room 10 175 1,750 16,000 280
Step Class room10 200 2,000
24,000480Tutorial room 13 100 1,300 16,000 208
Drawing Hall 5 200 1,000 16,000 160
Computer Centre 7 150 1,050 16,000 168
Library 7 400 2,800 16,000 448
Laboratories (diff.area for 10 500 5,000 16,000 800
Workshop 2 1,000 2,000 16,000 320
Sub Total 4,825 16,900 2,864c) Amenities Area ( 2 sq. mtr per students) 6,000 16,000 960
d) Circulation & Other area (30 % of above area) 8,070 16,000 1,291
Total 33,970 5,595
Total Cost of Building (Rounded) 33,970 33,970 5,595
Annexture "B" - Resiential & Hostel Building
Particular
No. of
Rooms
Area Sq.
Mtr. Per
room
Area Sq.
Mtr
Rate Rs
per sq.mtr
Rs. In
lakhs
c) Principal Quarter 1 140 140 15,000 21
b) Faculty & Staff Flat 123 50 6,150 15,000 923
c) Class IV Staff Room 129 30 3,870 15,000 581
d) Students Room 1,000 15 15,000 15,000 2,250e) Circulation & Other area ( 20 % of carpet area) 5,030 15,000 755
Total 30,190 4,529Total Cost of Building (Rounded) 4,530
Page 18
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
3/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "C" - Furniture & Fixtures
ParticularsNos of
Rooms
Area Sq.
Mtr. Per
room
Area Sq.
Mtr
Rate Rs
per sq.mtr
Rs. In
lakhs
A) College Building
a) Administrative Area1
1 sq.mtr
p.student 3,000 5,000 150b) Instructional Area
General Class room 10 175 1,750 5,000 88Step Class room 10 200 2,000 7,500 150
Tutorial room 13 100 1,300 5,000 65
Drawing Hall 5 200 1,000 5,000 50
Computer Centre 7 150 1,050 5,000 53
Library 7 400 2,800 5,000 140
Laboratories & Workshop 10 500 5,000 5,000 250
Workshop 2 1,000 2,000 5,000 100
Sub Total 16,900 895
c) Amenities Area (2 Sq.Mtr Per Students) 6,000 5,000 300d) Circulation & Other area (30 % of carpet area) 8,070 5,000 404
Total (A) Rouded off 33,970 1,748
B) Residential & Hostel Building
a) Principal Quarter 1 140 140 5,000 7
b) Faculty & Staff Room 123 50 6,150 5,000 308
c) Class IV Staff 129 30 3,870 5,000 194
d) Students Room 1,000 15 15,000 5,000 750e) Circulation& other area (20 % of carpet area) 5,030 - -
Total (B) 30,190 1,258
Total (A + B) 64,160 3,006Total Cost of Furniture & Fixture (Rounded) 3,005
Page 19
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
4/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "D" - Computer & Machinery
Particulars Quantity
Rate Rs
per
equipmt
Rs. In
lakhs
Computers terminal (P4 Processor)1:4 993 20,000 199
Printers 1:10 (3) & for admin office (2) 109 15,000 16
Laptop 50 50,000 25
Overhead Projectors 25 25,000 6Air Conditioners 39 20,000 8
LCD projectors 10 100,000 10
Science Appartus 110 100,000 110
Electric Generator 12 1,000,000 120
Total 494
Total Rounded 495
Page 20
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
5/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
6/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Graph showing College & Hostel Building construction Area Specification - Requirment (yearwise plan) Area Sq. Mtr
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
College Building 7,840 12,090 17,830 21,040 26,785 30,265 32,565 33,970 33,970 33,970
Hostel Building 2,840 5,705 9,495 13,115 17,290 21,135 24,560 27,960 29,320 30,190
7,840
17,830
21,040
26,785
32,565
2,840
9,495
13,115
17,290
21,135
24,560
27,96029,320
30,190
12,090
30,265
33,97033,97033,970
5,705
-
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Year
AreainS
q.Mtr
CollegeBuilding
HostelBuilding
Page 22
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
7/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "A2 " - College Building Rooms Requirement in Nos (yearwise plan) Qty in Nos.
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
a) Administrative Area 1 1 2 2 2 3 3 3 3 3b) Instructional Area
General Class room - - 3 7 9 10 10 10 10 10
Step Class room 3 8 10 10 10 10 10 10 10 10
Tutorial room 2 5 9 12 13 13 13 13 13 13
Drawing Hall 1 2 3 4 5 5 5 5 5 5
Computer Centre 1 2 3 4 5 6 7 7 7 7
Library 1 2 3 4 5 6 7 7 7 7
Laboratories (diff. area for diff. labs) 4 5 6 6 9 9 10 10 10 10
Workshop 1 1 1 1 2 2 2 2 2 2
Sub Total
c)Amenities Area (2Sq.Mtr Per Stud) 2 2 4 4 4 6 6 6 6 6d)Circulation & Other area (30%) 30% of a, b& c
Total
Total Area of Building (Rounded) Total of a, b,c& d - - - - - - - -
Page 23
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
8/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "D 1" - Computer & Machinery in Nos (yearwise breakup of purchase plan) Qty in Nos.
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Computers terminal (P4 Processor )1:4 70 160 265 355 445 580 715 858 933 993
Printers 1:10 & for Admin office 12 21 32 41 55 68 82 96 103 109
Laptop ( 1 per batch ) 4 10 17 23 29 35 41 47 49 50
Overhead Projectors ( 1 per batch ) 2 5 9 12 15 18 21 24 25 25Air Conditioners (Residential) 4 9 14 19 23 28 32 37 38 39
LCD projectors (Lab+workshopl) 10 10 10 10 10 10 10 10 10 10
Science Appartus 20 30 40 50 60 70 80 90 100 110
Electric Generators 3 5 7 9 11 12 12 12 12 12
Page 24
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
9/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Annexture "E" Cost of Projected capital Expenditure (year wise break up) Rs. In Lakhs
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year Total
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Cost of Land 100 100
Land Levelling 35 35
Roads & Compound wall 200 50 50 50 55 - - - - - - - 405
College Building 295 884 884 951 513 919 557 368 225 5,595Hostel Building 428 428 568 544 626 577 514 510 204 131 4,530
Furnirure&Fixtures -College Bldg 645 297 161 287 174 115 68 - - - - 1,746 3,005
Furnirure & Fixtures -Hostel Bldg 237 237 181 65 160 143 142 56 38 - - 1,259
Computers, Science Appartus & Machinery 80 55 58 54 55 54 44 45 28 24 - 495
Library Books 30 10 10 10 10 5 5 5 5 5 5 100
Deposit with AICTE 35 35 630
Total funds Requirement 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5 14,300
Resources 430 1,942 4,330 6,496 8,013 10,029 11,563 12,761 13,755 14,065 14,267 14,295 14,300 28,600
Own funds (including Donation 430 1,012 1,388 1,166 517 1,016 1,032 1,065 593 - - - - 8,219
Term Loan from financial - 500 1,000 1,000 1,000 1,000 500 - - - - - - 5,000
Cash Surplus of educational - - - - - - - 134 401 310 202 29 5 1,081
Total generation of funds 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5 14,300
Page 25
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
10/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Graph showing Cost of Projected capital Expenditure & Sources of Funds (year wise break up) Rs. In Lakhs Lakhs
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Capital Expenditures 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Own funds 430 1,012 1,388 1,166 517 1,016 1,032 1,065 593 - - - -
Term Loan from financial institution - 500 1,000 1,000 1,000 1,000 500 - - - - - -
Cash Surplus of educational activities - - - - - - - 134 401 310 202 29 5
Availability of funds 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5
430
1,012
1,38
8
1,166
517
1,01
6
1,03
2
1,065
593
- - - -
-
500
1,00
0
1,00
0
1,00
0
500
-
-
- - - -
-
-
-
-
-
-
-
134
202
29
5
1,000
310
401
-
500
1,00
0
1,50
0
2,00
0
2,50
0
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Year
SourcesofFunds
Rs.InLakhs
CashSurplus ofeducational
activities
Term Loanfromfinancialinstitution
Own funds
Page 26
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
11/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Schedule of Term Loan Rs. In Lakhs
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Opening balance - - 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815
Loan : Received - 500 1,000 1,000 1,000 1,000 500
Total - 500 1,500 2,500 3,500 4,444 4,764 4,440 3,950 3,260 2,445 1,630 815
Less : Loan Repayment - - - - 56 181 323 490 690 815 815 815 815Closing Balance - 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815 -
Average balance - 500 1,500 2,500 3,472 4,354 4,602 4,195 3,605 2,853 2,038 1,223 408
Interest on term loan @ 11 % - 55 165 275 382 479 506 461 397 314 224 134 45
Total of interest plus pricipal payment 55 165 275 438 660 830 952 1,087 1,129 1,039 950 860
Graph Showing Term Loan from Financial Institution Rs. In Lakhs
-
500
1,500
2,500
3,500
4,4444,764
4,440
3,950
3,260
2,445
1,630
815
-
1,000
2,000
3,000
4,000
5,000
6,000
2009
-10
2010
-11
2011
-12
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Year
Loan
LiabilityinRs.Lakhs
Page 27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
12/27
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Statement Projected Sanctioned Intake Capacity (yearwise plan)
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
1. Mechanical/Civil Engineering 60 120 180 240 300 360 420 480 480 480
2. Electrical Engineering 60 120 180 240 300 360 420 480 480 480
3. Electronics & Telcommunication 60 120 180 240 300 360 420 480 480 4804. Computer/IT Engineering 60 120 180 240 300 360 420 480 480 480
5. Food Technology 60 120 180 240 300 360 420 480 480
6. BioTechnology 60 120 180 240 300 360 420 480
240 540 900 1,260 1,620 1,980 2,340 2,700 2,820 2,880
7. MMS 60 120 120 120 120 120 120 120 120
Total Students Strength 240 600 1,020 1,380 1,740 2,100 2,460 2,820 2,940 3,000
Nos of Batches 4 10 17 23 25 26 26 26 26 26
Nos of Class Room Required 3 8 13 17 19 20 20 20 20 20
Nos of Tutorial Room Required 2 5 9 12 13 13 13 13 13 13
Total Intake Capacity 240 360 420 420 420 660 720 780 780 780
Increase in Intake Capacity 240 120 60 - - 240 60 60 - -
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Page 28
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
13/27
Statement Projected Nos of Admitted Students (yearwise plan)
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
1. Mechanical/Civil Engineering 30 75 135 195 285 360 420 480 480 4802. Electrical Engineering 30 75 135 195 285 360 420 480 480 4803. Electronics & Telcommunication 30 75 135 195 285 360 420 480 480 4804. Computer/IT Engineering 30 75 135 195 285 360 420 480 480 4805. Food Technology - 45 105 165 225 300 360 420 480 480
6. BioTechnology - 45 105 165 225 300 360 420 480- 120 345 690 1,050 1,530 1,965 2,340 2,700 2,820 2,880
7. MMS 30 75 105 120 120 120 120 120 120
Total Students Strength 120 375 765 1,155 1,650 2,085 2,460 2,820 2,940 3,000
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Page 29
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
14/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
15/27
Graph showing Nos. of Students, Teaching & Non teaching Staff (yearwise plan)
Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Total Students Strength - - - 240 600 1,020 1,380 1,740 2,100 2,460 2,820 2,940 3,000
Total Teaching & Non Teaching staff - - - 44 71 100 126 151 176 200 225 240 253
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
- - -
240
600
1,020
1,380
1,740
2,100
2,460
2,8202,940
3,000
- - -44
71
126
151
176
200 24
0253
225
100
-
500
1,00
0
1,500
2,00
0
2,50
0
3,00
0
3,50
0
2009-1
0
2010-1
1
2011-1
2
2012-1
3
2013-1
4
2014-1
5
2015-1
6
2016-1
7
2017-1
8
2018-1
9
2019-2
0
2020-2
1
2021-2
2
Year
No.s
ofStudents&Staff
TotalStudentsStrength
TotalTeaching &NonTeachingstaff
Page 31
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
16/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
17/27
Graph Showing Projected Income & Expenditure Account For the year 2009 - 2010 to 2021-2022 Rs. In Lakhs
Particular Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th YearYear 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Total Income - - - 46 382 775 1,169 1,669 2,109 2,487 2,851 2,972 3,033Cash Expenses (Excluding Depreciation) - 55 165 524 837 1,162 1,368 1,535 1,708 1,800 1,884 1,881 1,872Total Expenses - 55 165 927 1,309 1,724 1,989 2,190 2,381 2,448 2,501 2,458 2,410
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Projected Fees from students Rs. In Lakhs
- - - 46
382
1,169
1,669
2,109
2,851
2,972 3,033
-55
165
524
837
1,162
1,368
1,535
1,7081,800
1,884 1,881 1,872
- 55165
927
1,309
1,724
1,989
2,190
2,3812,448
2,487
775
2,4102,4582,501
-
500
1,000
1,500
2,000
2,500
3,000
3,500
2009
-10
2010-11
2011-12
2012-13
2013-14
2014-15
2015-16
2016-17
2017-18
2018-19
2019-20
2020-21
2021-22
Year
Am
ountinLakhs
Total Income
Cash Expenses
(ExcludingDepreciation)
Total Expenses
Page 33
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
18/27
Particulars
fee per
student
p.a.
1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
BE
1. Mechanical/Civil Engineering 100,000 2012-13@36000 p.s.p.a 11 75 135 195 285 360 420 480 480 480
2. Electrical Engineering 100,000 11 75 135 195 285 360 420 480 480 480
3. Electronics & Telcommunication 100,000 11 75 135 195 285 360 420 480 480 480
4. Computer/IT Engineering 100,000 11 75 135 195 285 360 420 480 480 480
5. Food Technology 100,000 - 45 105 165 225 300 360 420 480 4806. BioTechnology 100,000 - - 45 105 165 225 300 360 420 480
- 43 345 690 1,050 1,530 1,965 2,340 2,700 2,820 2,8807. MMS 100,000 - 30 75 105 120 120 120 120 120 120
Total 43 375 765 1,155 1,650 2,085 2,460 2,820 2,940 3,000
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Projected Salaries & Allowances Rs. In Lakhs
Pre Academic year
Page 34
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
19/27
Name of the PostSalary
p.m1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
Director / Principal 100,000 - - 12 12 12 12 12 12 12 12 12 12
Professors 50,000 - - 6 18 24 36 42 54 60 72 72 78
Asst. Prof./Readers 40,000 - - 10 24 43 58 72 86 101 115 120 120
Lecturers 30,000 - - 22 54 94 126 158 191 223 256 266 270
Registrar 30,000 - - 4 4 4 4 4 4 4 4 4 4
Accountant cum cashier 15,000 - - 2 2 2 2 2 2 2 2 2 2
Junior Clerks 12,000 - - 7 9 10 10 10 10 10 10 10 10
Librarian 30,000 - - 22 29 36 43 50 58 65 72 79 86
Library Assistant 12,000 - - 3 6 9 12 14 16 17 19 20 22
Lab Incharge 30,000 - - 7 14 22 29 36 43 50 58 65 72
Lab Assistants 12,000 - - 7 9 10 12 13 14 16 17 19 20
Lab Attedents 10,000 - - 6 8 11 13 16 18 20 23 25 28
Peons 10,000 - - 7 11 14 18 22 25 29 32 36 40
- - 114 199 290 373 451 533 609 691 730 763
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
Projected Depreciation on Immovable & Movable Properties Rs. In Lakhs
Pre Academic year
Page 35
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
20/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
21/27
Particular 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year
2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22
L I A B I L I T I E S
Own fund of VPM 430 1,502 3,055 4,705 5,734 7,321 8,878 10,441 11,726 12,167 12,219 11,974 11,636
Loan liability 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815 -
Income & Expenditure Surplus - - - - - - - - - - - -
Total Liabilities 430 2,002 4,555 7,205 9,179 11,584 13,318 14,391 14,987 14,613 13,850 12,789 11,636
A S S E T S
Land at Velneshwar 135 135 135 135 135 135 135 135 135 135 135 135 135
Buildings 295 1,807 3,169 4,500 5,326 6,580 7,328 7,800 8,108 7,896 7,626 7,245 6,882
Furniture & fixture - 882 1,274 1,454 1,625 1,763 1,819 1,826 1,694 1,559 1,403 1,263
Computer & Machinery - 80 114 146 170 191 208 214 221 211 199 169
Library books - 30 36 41 46 51 50 50 49 49 48 48
Deposit with AICTE - 35 35 35 35 35 35 35 35 35 35 35
Accrued interest on FD - - - 3 6 8 11 14 17 20 22 25Income & Expenditure Deficit 55 220 1,100 2,028 2,976 3,796 4,317 4,589 4,550 4,200 3,686 3,063
Cash & bank balances 5 5 10 10 10 10 15 15 15 15 15 15
Total Assets 430 2,002 4,555 7,205 9,179 11,584 13,318 14,391 14,987 14,613 13,850 12,789 11,636
VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra
` Rs. In Lakhs
Pre Academic Period
Page 37
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
22/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
23/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
24/27
Particular31st March
2002
31st March
2003
31st March
2004
31st March
2005
31st March
2006
31st March
2007
31st March
2008
31st March
2009
31st March
2010
L I A B I L I T I E STrust Fund or Corpus 1 1 1 1 1 1 1 1 1
Other Earmarked Funds 1,007 1,160 1,234 1,375 1,599 1,752 1,857 2,023 2,351
Loans (secured & Unsecured) - - - 80 247 206 103 - -
Liabilities 39 37 63 64 67 72 181 187 150
Income & Expenditure Account 103 57 55 60 46 139 398 617 599
Total Liabilities 1,149 1,256 1,352 1,580 1,959 2,170 2,539 2,828 3,101
A S S E T S
Immovable Properties 529 568 610 744 926 1,060 1,075 1,149 1,297
Investments 230 239 273 275 308 315 475 596 597
Furniture & fixture 256 277 311 327 439 490 670 738 743
Loans (Secured or unsecured) - - - - - - - - -
Advances 10 9 9 40 59 59 63 66 68
Income outstanding 13 11 16 12 11 15 25 28 50
Cash & Bank Balances 111 152 134 183 215 232 231 250 346
Total Assets 1,149 1,256 1,352 1,580 1,959 2,170 2,539 2,828 3,101
VIDYA PRASARAK MANDAL, THANE
Actual Cash flow For the year 2002 - 03 to 2008 - 09 Rs. In Lakhs
Page 40
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
25/27
Particular 2002-03 2003-04 2004-05 2005- 06 2006-07 2007-08 2008-09 2009-10
SOURCES OF FUNDS
Revenue Income 1,313 1,288 1,382 1,607 2,021 2,344 2,747 3,016
Increase in Trust Fund or Corpus - - - - - - - -
Increase in Other Earmarked Funds 154 173 195 224 3 5 14 4
Increase in Loans (secured & Unsecured) - - 80 167 - - - -
Increase in Liabilities - 26 1 3 6 109 6 -
Decrease in Advances 1 0 - - 1 - - -
Decrease in Income Outstanding 3 - 4 1 - - - -
Decrease in Cash & Bank Balances - 18 - - - 1 - -
Increase in Surplus for asdjustment in I & E A/c for Prev. Year 48
Total Liabilities 1,471 1,505 1,662 2,001 2,031 2,506 2,767 3,020
APPLICATION OF FUNDS
Revenue Expenditure 1,304 1,329 1,368 1,538 1,677 1,907 2,226 2,562
Increase in Immovable Properties 59 63 154 202 162 47 114 188Increase in Investments 10 34 2 33 7 160 121 1
Increase in Furniture & fixture 56 74 58 176 123 274 178 113
Increase in Advances - - 31 20 - 4 3 2
Increase in Income outstanding - 5 - - 4 10 4 22
Increase in Cash & Bank Balances 41 - 48 33 17 - 19 96
Decrease in Loans (Secured & Unsecured) - - - - 41 104 103 -
Decrease in Liabilities 2 - - - - - - 37
Total Assets 1,471 1,505 1,662 2,001 2,031 2,506 2,767 3,020
VIDYA PRASARAK MANDAL, THANERs. In Lakhs
Actual Income & Expenditure For the year 2002 - 03 to 2008 - 09
Page 41
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
26/27
-
7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls
27/27
As at Financial year end 1,965 1,970 1,975 1,980 1,985 1,990 1,995 2,000 2,005 2,006 2,007 2,008 2,009 2,010
Total Assets & Liabilities of the VPM 4 11 33 67 146 338 625 1,052 1,580 1,959 2,170 2,320 2,720 3,101
Total Assets & Liabilities
of the VPM
11 3367
146
338
625
1,052
1,580
1,959
2,170
2,320
2,720
3,101
-
200
400
600
800
1,00
01,200
1,40
01,600
1,80
02,000
2,20
02,400
2,60
02,80
03,000
3,20
03,400
1
,960
1
,965
1
,970
1
,975
1
,980
1
,985
1
,990
1
,995
2
,000
2
,005
2
,010
Year Ending
Rs.inLakhs
Page 43