    Cost of Project & Resources of Funds Rs. In Lakhs

    Particular Amount

    Cost of Projects

    Cost of Land 100

    Cost of Site Cleaning & Land Levelling 35

    College Building annexture "A" 5,595

    Residential & Hostel Building annexture "B" 4,530

    Furniture & Fixtures annexture "C" 3,005

    Computers, Science Appartus & Machinery annexture "D" 495

    Roads / Compound Wall /Storms Water drains /Drainage & Sewage Plant 405

    Library Books 100

    Deposit with AICTE 35

    Total funds Requirement 14,300

    Resources

    9,300

    Term Loan from bank 5,000

    Total funds 14,300

    Own funds (including Donation through Indian & Foreign Contributions)

    Page 17

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    2/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "A" - College BuildingBuilding No. of

    Rooms

    Area

    Sq.mtr

    Per room

    Total

    Sq.mtr

    Area

    Rate Rs

    per.q.mtr

    Rs. In

    lakhs

    a) Administrative Area1

    1 sq.mtr

    p.student3,000 16,000 480

    b) Instructional Area

    General Class room 10 175 1,750 16,000 280

    Step Class room10 200 2,000

    24,000480Tutorial room 13 100 1,300 16,000 208

    Drawing Hall 5 200 1,000 16,000 160

    Computer Centre 7 150 1,050 16,000 168

    Library 7 400 2,800 16,000 448

    Laboratories (diff.area for 10 500 5,000 16,000 800

    Workshop 2 1,000 2,000 16,000 320

    Sub Total 4,825 16,900 2,864c) Amenities Area ( 2 sq. mtr per students) 6,000 16,000 960

    d) Circulation & Other area (30 % of above area) 8,070 16,000 1,291

    Total 33,970 5,595

    Total Cost of Building (Rounded) 33,970 33,970 5,595

    Annexture "B" - Resiential & Hostel Building

    Particular

    No. of

    Rooms

    Area Sq.

    Mtr. Per

    room

    Area Sq.

    Mtr

    Rate Rs

    per sq.mtr

    Rs. In

    lakhs

    c) Principal Quarter 1 140 140 15,000 21

    b) Faculty & Staff Flat 123 50 6,150 15,000 923

    c) Class IV Staff Room 129 30 3,870 15,000 581

    d) Students Room 1,000 15 15,000 15,000 2,250e) Circulation & Other area ( 20 % of carpet area) 5,030 15,000 755

    Total 30,190 4,529Total Cost of Building (Rounded) 4,530

    Page 18

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    3/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "C" - Furniture & Fixtures

    ParticularsNos of

    Rooms

    Area Sq.

    Mtr. Per

    room

    Area Sq.

    Mtr

    Rate Rs

    per sq.mtr

    Rs. In

    lakhs

    A) College Building

    a) Administrative Area1

    1 sq.mtr

    p.student 3,000 5,000 150b) Instructional Area

    General Class room 10 175 1,750 5,000 88Step Class room 10 200 2,000 7,500 150

    Tutorial room 13 100 1,300 5,000 65

    Drawing Hall 5 200 1,000 5,000 50

    Computer Centre 7 150 1,050 5,000 53

    Library 7 400 2,800 5,000 140

    Laboratories & Workshop 10 500 5,000 5,000 250

    Workshop 2 1,000 2,000 5,000 100

    Sub Total 16,900 895

    c) Amenities Area (2 Sq.Mtr Per Students) 6,000 5,000 300d) Circulation & Other area (30 % of carpet area) 8,070 5,000 404

    Total (A) Rouded off 33,970 1,748

    B) Residential & Hostel Building

    a) Principal Quarter 1 140 140 5,000 7

    b) Faculty & Staff Room 123 50 6,150 5,000 308

    c) Class IV Staff 129 30 3,870 5,000 194

    d) Students Room 1,000 15 15,000 5,000 750e) Circulation& other area (20 % of carpet area) 5,030 - -

    Total (B) 30,190 1,258

    Total (A + B) 64,160 3,006Total Cost of Furniture & Fixture (Rounded) 3,005

    Page 19

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    4/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "D" - Computer & Machinery

    Particulars Quantity

    Rate Rs

    per

    equipmt

    Rs. In

    lakhs

    Computers terminal (P4 Processor)1:4 993 20,000 199

    Printers 1:10 (3) & for admin office (2) 109 15,000 16

    Laptop 50 50,000 25

    Overhead Projectors 25 25,000 6Air Conditioners 39 20,000 8

    LCD projectors 10 100,000 10

    Science Appartus 110 100,000 110

    Electric Generator 12 1,000,000 120

    Total 494

    Total Rounded 495

    Page 20

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    5/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    6/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Graph showing College & Hostel Building construction Area Specification - Requirment (yearwise plan) Area Sq. Mtr

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    College Building 7,840 12,090 17,830 21,040 26,785 30,265 32,565 33,970 33,970 33,970

    Hostel Building 2,840 5,705 9,495 13,115 17,290 21,135 24,560 27,960 29,320 30,190

    7,840

    17,830

    21,040

    26,785

    32,565

    2,840

    9,495

    13,115

    17,290

    21,135

    24,560

    27,96029,320

    30,190

    12,090

    30,265

    33,97033,97033,970

    5,705

    -

    5,000

    10,000

    15,000

    20,000

    25,000

    30,000

    35,000

    40,000

    2009

    -10

    2010

    -11

    2011

    -12

    2012

    -13

    2013

    -14

    2014

    -15

    2015

    -16

    2016

    -17

    2017

    -18

    2018

    -19

    2019

    -20

    2020

    -21

    2021

    -22

    Year

    AreainS

    q.Mtr

    CollegeBuilding

    HostelBuilding

    Page 22

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    7/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "A2 " - College Building Rooms Requirement in Nos (yearwise plan) Qty in Nos.

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    a) Administrative Area 1 1 2 2 2 3 3 3 3 3b) Instructional Area

    General Class room - - 3 7 9 10 10 10 10 10

    Step Class room 3 8 10 10 10 10 10 10 10 10

    Tutorial room 2 5 9 12 13 13 13 13 13 13

    Drawing Hall 1 2 3 4 5 5 5 5 5 5

    Computer Centre 1 2 3 4 5 6 7 7 7 7

    Library 1 2 3 4 5 6 7 7 7 7

    Laboratories (diff. area for diff. labs) 4 5 6 6 9 9 10 10 10 10

    Workshop 1 1 1 1 2 2 2 2 2 2

    Sub Total

    c)Amenities Area (2Sq.Mtr Per Stud) 2 2 4 4 4 6 6 6 6 6d)Circulation & Other area (30%) 30% of a, b& c

    Total

    Total Area of Building (Rounded) Total of a, b,c& d - - - - - - - -

    Page 23

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    8/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "D 1" - Computer & Machinery in Nos (yearwise breakup of purchase plan) Qty in Nos.

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Computers terminal (P4 Processor )1:4 70 160 265 355 445 580 715 858 933 993

    Printers 1:10 & for Admin office 12 21 32 41 55 68 82 96 103 109

    Laptop ( 1 per batch ) 4 10 17 23 29 35 41 47 49 50

    Overhead Projectors ( 1 per batch ) 2 5 9 12 15 18 21 24 25 25Air Conditioners (Residential) 4 9 14 19 23 28 32 37 38 39

    LCD projectors (Lab+workshopl) 10 10 10 10 10 10 10 10 10 10

    Science Appartus 20 30 40 50 60 70 80 90 100 110

    Electric Generators 3 5 7 9 11 12 12 12 12 12

    Page 24

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    9/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Annexture "E" Cost of Projected capital Expenditure (year wise break up) Rs. In Lakhs

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year Total

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Cost of Land 100 100

    Land Levelling 35 35

    Roads & Compound wall 200 50 50 50 55 - - - - - - - 405

    College Building 295 884 884 951 513 919 557 368 225 5,595Hostel Building 428 428 568 544 626 577 514 510 204 131 4,530

    Furnirure&Fixtures -College Bldg 645 297 161 287 174 115 68 - - - - 1,746 3,005

    Furnirure & Fixtures -Hostel Bldg 237 237 181 65 160 143 142 56 38 - - 1,259

    Computers, Science Appartus & Machinery 80 55 58 54 55 54 44 45 28 24 - 495

    Library Books 30 10 10 10 10 5 5 5 5 5 5 100

    Deposit with AICTE 35 35 630

    Total funds Requirement 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5 14,300

    Resources 430 1,942 4,330 6,496 8,013 10,029 11,563 12,761 13,755 14,065 14,267 14,295 14,300 28,600

    Own funds (including Donation 430 1,012 1,388 1,166 517 1,016 1,032 1,065 593 - - - - 8,219

    Term Loan from financial - 500 1,000 1,000 1,000 1,000 500 - - - - - - 5,000

    Cash Surplus of educational - - - - - - - 134 401 310 202 29 5 1,081

    Total generation of funds 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5 14,300

    Page 25

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    10/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Graph showing Cost of Projected capital Expenditure & Sources of Funds (year wise break up) Rs. In Lakhs Lakhs

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Capital Expenditures 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Own funds 430 1,012 1,388 1,166 517 1,016 1,032 1,065 593 - - - -

    Term Loan from financial institution - 500 1,000 1,000 1,000 1,000 500 - - - - - -

    Cash Surplus of educational activities - - - - - - - 134 401 310 202 29 5

    Availability of funds 430 1,512 2,388 2,166 1,517 2,016 1,532 1,198 994 310 202 29 5

    430

    1,012

    1,38

    8

    1,166

    517

    1,01

    6

    1,03

    2

    1,065

    593

    - - - -

    -

    500

    1,00

    0

    1,00

    0

    1,00

    0

    500

    -

    -

    - - - -

    -

    -

    -

    -

    -

    -

    -

    134

    202

    29

    5

    1,000

    310

    401

    -

    500

    1,00

    0

    1,50

    0

    2,00

    0

    2,50

    0

    2009

    -10

    2010

    -11

    2011

    -12

    2012

    -13

    2013

    -14

    2014

    -15

    2015

    -16

    2016

    -17

    2017

    -18

    2018

    -19

    2019

    -20

    2020

    -21

    2021

    -22

    Year

    SourcesofFunds

    Rs.InLakhs

    CashSurplus ofeducational

    activities

    Term Loanfromfinancialinstitution

    Own funds

    Page 26

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    11/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Schedule of Term Loan Rs. In Lakhs

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Opening balance - - 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815

    Loan : Received - 500 1,000 1,000 1,000 1,000 500

    Total - 500 1,500 2,500 3,500 4,444 4,764 4,440 3,950 3,260 2,445 1,630 815

    Less : Loan Repayment - - - - 56 181 323 490 690 815 815 815 815Closing Balance - 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815 -

    Average balance - 500 1,500 2,500 3,472 4,354 4,602 4,195 3,605 2,853 2,038 1,223 408

    Interest on term loan @ 11 % - 55 165 275 382 479 506 461 397 314 224 134 45

    Total of interest plus pricipal payment 55 165 275 438 660 830 952 1,087 1,129 1,039 950 860

    Graph Showing Term Loan from Financial Institution Rs. In Lakhs

    -

    500

    1,500

    2,500

    3,500

    4,4444,764

    4,440

    3,950

    3,260

    2,445

    1,630

    815

    -

    1,000

    2,000

    3,000

    4,000

    5,000

    6,000

    2009

    -10

    2010

    -11

    2011

    -12

    2012

    -13

    2013

    -14

    2014

    -15

    2015

    -16

    2016

    -17

    2017

    -18

    2018

    -19

    2019

    -20

    2020

    -21

    2021

    -22

    Year

    Loan

    LiabilityinRs.Lakhs

    Page 27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    12/27

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Statement Projected Sanctioned Intake Capacity (yearwise plan)

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    1. Mechanical/Civil Engineering 60 120 180 240 300 360 420 480 480 480

    2. Electrical Engineering 60 120 180 240 300 360 420 480 480 480

    3. Electronics & Telcommunication 60 120 180 240 300 360 420 480 480 4804. Computer/IT Engineering 60 120 180 240 300 360 420 480 480 480

    5. Food Technology 60 120 180 240 300 360 420 480 480

    6. BioTechnology 60 120 180 240 300 360 420 480

    240 540 900 1,260 1,620 1,980 2,340 2,700 2,820 2,880

    7. MMS 60 120 120 120 120 120 120 120 120

    Total Students Strength 240 600 1,020 1,380 1,740 2,100 2,460 2,820 2,940 3,000

    Nos of Batches 4 10 17 23 25 26 26 26 26 26

    Nos of Class Room Required 3 8 13 17 19 20 20 20 20 20

    Nos of Tutorial Room Required 2 5 9 12 13 13 13 13 13 13

    Total Intake Capacity 240 360 420 420 420 660 720 780 780 780

    Increase in Intake Capacity 240 120 60 - - 240 60 60 - -

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Page 28

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    13/27

    Statement Projected Nos of Admitted Students (yearwise plan)

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    1. Mechanical/Civil Engineering 30 75 135 195 285 360 420 480 480 4802. Electrical Engineering 30 75 135 195 285 360 420 480 480 4803. Electronics & Telcommunication 30 75 135 195 285 360 420 480 480 4804. Computer/IT Engineering 30 75 135 195 285 360 420 480 480 4805. Food Technology - 45 105 165 225 300 360 420 480 480

    6. BioTechnology - 45 105 165 225 300 360 420 480- 120 345 690 1,050 1,530 1,965 2,340 2,700 2,820 2,880

    7. MMS 30 75 105 120 120 120 120 120 120

    Total Students Strength 120 375 765 1,155 1,650 2,085 2,460 2,820 2,940 3,000

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Page 29

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    14/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    15/27

    Graph showing Nos. of Students, Teaching & Non teaching Staff (yearwise plan)

    Particulars Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Total Students Strength - - - 240 600 1,020 1,380 1,740 2,100 2,460 2,820 2,940 3,000

    Total Teaching & Non Teaching staff - - - 44 71 100 126 151 176 200 225 240 253

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    - - -

    240

    600

    1,020

    1,380

    1,740

    2,100

    2,460

    2,8202,940

    3,000

    - - -44

    71

    126

    151

    176

    200 24

    0253

    225

    100

    -

    500

    1,00

    0

    1,500

    2,00

    0

    2,50

    0

    3,00

    0

    3,50

    0

    2009-1

    0

    2010-1

    1

    2011-1

    2

    2012-1

    3

    2013-1

    4

    2014-1

    5

    2015-1

    6

    2016-1

    7

    2017-1

    8

    2018-1

    9

    2019-2

    0

    2020-2

    1

    2021-2

    2

    Year

    No.s

    ofStudents&Staff

    TotalStudentsStrength

    TotalTeaching &NonTeachingstaff

    Page 31

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    16/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    17/27

    Graph Showing Projected Income & Expenditure Account For the year 2009 - 2010 to 2021-2022 Rs. In Lakhs

    Particular Pre Academic Period 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th YearYear 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Total Income - - - 46 382 775 1,169 1,669 2,109 2,487 2,851 2,972 3,033Cash Expenses (Excluding Depreciation) - 55 165 524 837 1,162 1,368 1,535 1,708 1,800 1,884 1,881 1,872Total Expenses - 55 165 927 1,309 1,724 1,989 2,190 2,381 2,448 2,501 2,458 2,410

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Projected Fees from students Rs. In Lakhs

    - - - 46

    382

    1,169

    1,669

    2,109

    2,851

    2,972 3,033

    -55

    165

    524

    837

    1,162

    1,368

    1,535

    1,7081,800

    1,884 1,881 1,872

    - 55165

    927

    1,309

    1,724

    1,989

    2,190

    2,3812,448

    2,487

    775

    2,4102,4582,501

    -

    500

    1,000

    1,500

    2,000

    2,500

    3,000

    3,500

    2009

    -10

    2010-11

    2011-12

    2012-13

    2013-14

    2014-15

    2015-16

    2016-17

    2017-18

    2018-19

    2019-20

    2020-21

    2021-22

    Year

    Am

    ountinLakhs

    Total Income

    Cash Expenses

    (ExcludingDepreciation)

    Total Expenses

    Page 33

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    18/27

    Particulars

    fee per

    student

    p.a.

    1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    Year 2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    BE

    1. Mechanical/Civil Engineering 100,000 2012-13@36000 p.s.p.a 11 75 135 195 285 360 420 480 480 480

    2. Electrical Engineering 100,000 11 75 135 195 285 360 420 480 480 480

    3. Electronics & Telcommunication 100,000 11 75 135 195 285 360 420 480 480 480

    4. Computer/IT Engineering 100,000 11 75 135 195 285 360 420 480 480 480

    5. Food Technology 100,000 - 45 105 165 225 300 360 420 480 4806. BioTechnology 100,000 - - 45 105 165 225 300 360 420 480

    - 43 345 690 1,050 1,530 1,965 2,340 2,700 2,820 2,8807. MMS 100,000 - 30 75 105 120 120 120 120 120 120

    Total 43 375 765 1,155 1,650 2,085 2,460 2,820 2,940 3,000

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Projected Salaries & Allowances Rs. In Lakhs

    Pre Academic year

    Page 34

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    19/27

    Name of the PostSalary

    p.m1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    Director / Principal 100,000 - - 12 12 12 12 12 12 12 12 12 12

    Professors 50,000 - - 6 18 24 36 42 54 60 72 72 78

    Asst. Prof./Readers 40,000 - - 10 24 43 58 72 86 101 115 120 120

    Lecturers 30,000 - - 22 54 94 126 158 191 223 256 266 270

    Registrar 30,000 - - 4 4 4 4 4 4 4 4 4 4

    Accountant cum cashier 15,000 - - 2 2 2 2 2 2 2 2 2 2

    Junior Clerks 12,000 - - 7 9 10 10 10 10 10 10 10 10

    Librarian 30,000 - - 22 29 36 43 50 58 65 72 79 86

    Library Assistant 12,000 - - 3 6 9 12 14 16 17 19 20 22

    Lab Incharge 30,000 - - 7 14 22 29 36 43 50 58 65 72

    Lab Assistants 12,000 - - 7 9 10 12 13 14 16 17 19 20

    Lab Attedents 10,000 - - 6 8 11 13 16 18 20 23 25 28

    Peons 10,000 - - 7 11 14 18 22 25 29 32 36 40

    - - 114 199 290 373 451 533 609 691 730 763

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    Projected Depreciation on Immovable & Movable Properties Rs. In Lakhs

    Pre Academic year

    Page 35

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    20/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    21/27

    Particular 1st Year 2nd Year 3rd Year 4th Year 5th Year 6th Year 7th Year 8th Year 9th Year 10th Year

    2009 -10 2010-11 2011-12 2012-13 2013-14 2014-15 2015-16 2016-17 2017-18 2018-19 2019-20 2020-21 2021-22

    L I A B I L I T I E S

    Own fund of VPM 430 1,502 3,055 4,705 5,734 7,321 8,878 10,441 11,726 12,167 12,219 11,974 11,636

    Loan liability 500 1,500 2,500 3,444 4,264 4,440 3,950 3,260 2,445 1,630 815 -

    Income & Expenditure Surplus - - - - - - - - - - - -

    Total Liabilities 430 2,002 4,555 7,205 9,179 11,584 13,318 14,391 14,987 14,613 13,850 12,789 11,636

    A S S E T S

    Land at Velneshwar 135 135 135 135 135 135 135 135 135 135 135 135 135

    Buildings 295 1,807 3,169 4,500 5,326 6,580 7,328 7,800 8,108 7,896 7,626 7,245 6,882

    Furniture & fixture - 882 1,274 1,454 1,625 1,763 1,819 1,826 1,694 1,559 1,403 1,263

    Computer & Machinery - 80 114 146 170 191 208 214 221 211 199 169

    Library books - 30 36 41 46 51 50 50 49 49 48 48

    Deposit with AICTE - 35 35 35 35 35 35 35 35 35 35 35

    Accrued interest on FD - - - 3 6 8 11 14 17 20 22 25Income & Expenditure Deficit 55 220 1,100 2,028 2,976 3,796 4,317 4,589 4,550 4,200 3,686 3,063

    Cash & bank balances 5 5 10 10 10 10 15 15 15 15 15 15

    Total Assets 430 2,002 4,555 7,205 9,179 11,584 13,318 14,391 14,987 14,613 13,850 12,789 11,636

    VPM's Maharshi Parshuram College of Engineering, Velneshwar (Guhagar) : State Maharashtra

    ` Rs. In Lakhs

    Pre Academic Period

    Page 37

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    22/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    23/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    24/27

    Particular31st March

    2002

    31st March

    2003

    31st March

    2004

    31st March

    2005

    31st March

    2006

    31st March

    2007

    31st March

    2008

    31st March

    2009

    31st March

    2010

    L I A B I L I T I E STrust Fund or Corpus 1 1 1 1 1 1 1 1 1

    Other Earmarked Funds 1,007 1,160 1,234 1,375 1,599 1,752 1,857 2,023 2,351

    Loans (secured & Unsecured) - - - 80 247 206 103 - -

    Liabilities 39 37 63 64 67 72 181 187 150

    Income & Expenditure Account 103 57 55 60 46 139 398 617 599

    Total Liabilities 1,149 1,256 1,352 1,580 1,959 2,170 2,539 2,828 3,101

    A S S E T S

    Immovable Properties 529 568 610 744 926 1,060 1,075 1,149 1,297

    Investments 230 239 273 275 308 315 475 596 597

    Furniture & fixture 256 277 311 327 439 490 670 738 743

    Loans (Secured or unsecured) - - - - - - - - -

    Advances 10 9 9 40 59 59 63 66 68

    Income outstanding 13 11 16 12 11 15 25 28 50

    Cash & Bank Balances 111 152 134 183 215 232 231 250 346

    Total Assets 1,149 1,256 1,352 1,580 1,959 2,170 2,539 2,828 3,101

    VIDYA PRASARAK MANDAL, THANE

    Actual Cash flow For the year 2002 - 03 to 2008 - 09 Rs. In Lakhs

    Page 40

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    25/27

    Particular 2002-03 2003-04 2004-05 2005- 06 2006-07 2007-08 2008-09 2009-10

    SOURCES OF FUNDS

    Revenue Income 1,313 1,288 1,382 1,607 2,021 2,344 2,747 3,016

    Increase in Trust Fund or Corpus - - - - - - - -

    Increase in Other Earmarked Funds 154 173 195 224 3 5 14 4

    Increase in Loans (secured & Unsecured) - - 80 167 - - - -

    Increase in Liabilities - 26 1 3 6 109 6 -

    Decrease in Advances 1 0 - - 1 - - -

    Decrease in Income Outstanding 3 - 4 1 - - - -

    Decrease in Cash & Bank Balances - 18 - - - 1 - -

    Increase in Surplus for asdjustment in I & E A/c for Prev. Year 48

    Total Liabilities 1,471 1,505 1,662 2,001 2,031 2,506 2,767 3,020

    APPLICATION OF FUNDS

    Revenue Expenditure 1,304 1,329 1,368 1,538 1,677 1,907 2,226 2,562

    Increase in Immovable Properties 59 63 154 202 162 47 114 188Increase in Investments 10 34 2 33 7 160 121 1

    Increase in Furniture & fixture 56 74 58 176 123 274 178 113

    Increase in Advances - - 31 20 - 4 3 2

    Increase in Income outstanding - 5 - - 4 10 4 22

    Increase in Cash & Bank Balances 41 - 48 33 17 - 19 96

    Decrease in Loans (Secured & Unsecured) - - - - 41 104 103 -

    Decrease in Liabilities 2 - - - - - - 37

    Total Assets 1,471 1,505 1,662 2,001 2,031 2,506 2,767 3,020

    VIDYA PRASARAK MANDAL, THANERs. In Lakhs

    Actual Income & Expenditure For the year 2002 - 03 to 2008 - 09

    Page 41

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    26/27

  • 7/29/2019 Velaneshwar Project 2009 - (840 Intake)_cost.xls

    27/27

    As at Financial year end 1,965 1,970 1,975 1,980 1,985 1,990 1,995 2,000 2,005 2,006 2,007 2,008 2,009 2,010

    Total Assets & Liabilities of the VPM 4 11 33 67 146 338 625 1,052 1,580 1,959 2,170 2,320 2,720 3,101

    Total Assets & Liabilities

    of the VPM

    11 3367

    146

    338

    625

    1,052

    1,580

    1,959

    2,170

    2,320

    2,720

    3,101

    -

    200

    400

    600

    800

    1,00

    01,200

    1,40

    01,600

    1,80

    02,000

    2,20

    02,400

    2,60

    02,80

    03,000

    3,20

    03,400

    1

    ,960

    1

    ,965

    1

    ,970

    1

    ,975

    1

    ,980

    1

    ,985

    1

    ,990

    1

    ,995

    2

    ,000

    2

    ,005

    2

    ,010

    Year Ending

    Rs.inLakhs

    Page 43