various security projects
TRANSCRIPT
![Page 1: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/1.jpg)
Various Security Projects
Pre-Proposal Conference
![Page 2: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/2.jpg)
Agenda
• Introduction – Scott Rasplicka
• GPA Welcome – Kevin Doyle
• LINC – Page Siplon
• Request for Proposal - Scott Rasplicka
– Scope of Work
– Requirements
– Appendices
![Page 3: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/3.jpg)
Agenda (cont)
• RFP (cont)
– Commissioning
– Bid Process
– Schedule
– Contracts
• Questions
• Bus Tour – Port Police
• Conclusion – Scott Rasplicka
![Page 4: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/4.jpg)
Staff Introduction
• Kevin Doyle – GM of Protective Services
• Bill Sutton – Assistant Director of MIS
• Mill Lawson – Port Security Systems Administrator
• Adam Lutz – Manager of Terminal Automations
• Mike Bray – Purchasing Manager
• Cathy Willis - Administrative Manager for Grants
• Capt. Frank Manson – Chief of Port Police
![Page 5: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/5.jpg)
Staff Introduction (cont)
• Guy Buck – Port Police
• Sgt. David Eller – Port Police
• Artis Morrison – Facility Security MGR, Brunswick
• Maj. Thomas Thompson – Port Police
• Lisa Lansford – Purchasing Coordinator
• Randy Murray – Manager IT
• Randy Hutcheson – Manager, Systems Admin
![Page 6: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/6.jpg)
• Brad Goodman – City of Savannah Network Manager
• Lewis Leonard – Chatham County ICS Director
• Scott Rasplicka – CEO Home Port Solutions, Consultant to GPA
![Page 7: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/7.jpg)
Welcome
• Kevin Doyle
– General Manager of Protective Services
– Project Owner
![Page 8: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/8.jpg)
LINC
• Page Siplon – Executive Director
• Accelerating Growth & Competitiveness
– The Center of Innovation for Logistics is Georgia's leading resource for accelerating logistics growth and competitiveness in the state. Our approach is simple: we bring together a wide range of stakeholders to address logistics issues. We call this our problem holder–problem solver model.
• http://logistics.georgiainnovation.org
![Page 9: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/9.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 10: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/10.jpg)
SOW General Comments
• One System
– Multiple Grants (new subsystems)
– Legacy Systems
• Access Control
• Fence Detection
• Security Cameras
• Operational Cameras
– Multiple Terminals
![Page 11: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/11.jpg)
General Comments (cont)
• Big Picture
– Where we are now
– Where we will be after these grant projects are implemented
– Where we want to go
• Choosing the Team is as Important as Choosing the Technology
– Who can get us where we want to go?
![Page 12: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/12.jpg)
General Comments (cont)
• Administratively Difficult– While project should be executed as one project,
administratively these are separate projects
• Reasonable Man Approach– Not a Fortress
• Must Improve Operations – Not Impede!
• KISS – Keep It Simple Stupid
• Projects Presented Here Are Concepts– You are the experts
![Page 13: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/13.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 14: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/14.jpg)
Savannah River Intrusion Network
• Visual Coverage of the Savannah River
– Elba Island to Houlihan Bridge
• Four Lines of Demarcation (Gates) – increasing scrutiny
– Houlihan Bridge
– Elba Island
– West of GCT
– East of OT – near Talmadge Bridge
![Page 15: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/15.jpg)
SRIN (cont)
![Page 16: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/16.jpg)
SRIN (cont)
• 24 hour coverage
• Semi-automated
– Detection by
• Size
• Speed
• Location
• Other considerations– Length of time in an area
– regular
![Page 17: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/17.jpg)
SRIN (cont)
• Ad hoc exclusion zones
• Areas of Particular Interest
– Rousakis Square / River Street
– Trade Center / Ferry Docks
– Back side of Elba Island
• Cameras
– Number, type and location determined by bidders
– Mixture of 24 fixed and PTZ in original concept
![Page 18: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/18.jpg)
SRIN Concept
![Page 19: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/19.jpg)
SRIN (cont)
• Network
– Near Terminals may tie directly into existing network
– Off Terminal may use wireless, internet or other means
• Some areas may not have power or transmission sources available
– May use existing equipment as available
![Page 20: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/20.jpg)
SRIN (cont)
• SCMPD Connection to GCT Admin building
– Server room to corner of HWY 25 and Dean Forrest Rd
• Pass data to SCMPD monitoring room and allow control of certain cameras
• Other Connections
– Any terminal may connect at their expense to the SRIN and pass data to GPA/SCMPD
– USCG and other government entities
![Page 21: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/21.jpg)
SRIN (cont)
• New Monitoring Center
– Designed for 3 people
• Minimum of 1 person on duty at all times in SOC
• 2 people on duty in SOC when needed
• 3rd person is supervisory position to be used in higher MARSEC levels, emergencies or training
– 2nd monitoring station at GCT front desk – full time
– 3rd monitoring station at credentialing center
• Distributed Monitoring and Analytics - shall allow increased coverage without increased labor
![Page 22: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/22.jpg)
SRIN
• Video / Data Recording
– Data recording devices may be located in the server room
• Must provide heat/power requirements for all equipment
• Redundancy is required to minimize risk of loss
– Distributed Recording may also be used to reduce network congestion
• Redundancy still required
![Page 23: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/23.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 24: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/24.jpg)
Colonel’s Island Intrusion Network
• Visual Coverage of the Brunswick River– Docks on Colonel’s Island
– Southern tip of Blythe Island
• Lines of Demarcation (Gates) – East and West of Colonel’s Island
• Ad hoc exclusion zones
• Cameras– Number, type and location determined by bidders
– Mixture of 6 fixed and PTZ in original concept
![Page 25: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/25.jpg)
![Page 26: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/26.jpg)
CIIN (cont)
• 24 hour coverage
• Semi-automated
– Detection by
• Size
• Speed
• Location
• Other considerations– Length of time in an area
– regular
![Page 27: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/27.jpg)
CIIN (cont)
• Network
– Dockside Cameras may tie directly into existing network
– Blythe Island may need wireless data connection and solar power / batteries
• Current Network between GCT and CI / MP is a T-1
• Future Network shall provide up to 600 Mbs
![Page 28: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/28.jpg)
CIIN (cont)
• Distributed Monitoring and Analytics - shall allow increased coverage without increased labor
– Primary Monitor - GCT’s New Monitoring Center
– Secondary Monitor - Locally in Guard Shack
• Data Recording Most Likely On site
– Must be redundant
![Page 29: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/29.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 30: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/30.jpg)
LL / Thermal
• Provide Thermal Detection
– See beyond fence into trees and water
• Mostly fixed cameras in most vulnerable spots (4)
• At least one mobile asset (mounted on patrol car)
• Vehicle-mounted (rugged) laptops (2)
– TWIC readers attached
– Wireless connection
– Ability to receive and display video feeds and control cameras
![Page 31: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/31.jpg)
LL/Thermal (cont)
• Analytics
• Recorder
• Monitor
– Guard Shack
– Capability to distribute to roving patrols
• Primary Monitor at GCT
• Must provide power and video to camera locations
![Page 32: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/32.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 33: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/33.jpg)
TWIC Access System Integration
• Fixed TWIC biometric readers at MP and CI gates
– Integrate into Access Control System
• Build New Pedestal at CI
• TWIC Enrollment Stations
– Two may be fixed
– At least two should be mobile
![Page 34: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/34.jpg)
TWIC ASI (cont)
• Wireless Access Points
– MP
• Complete coverage of MP including inside the warehouse
– CI
• As much coverage as possible
• Gates and dock areas at a minimum
• May be used to transmit video to network
![Page 35: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/35.jpg)
TWIC ASI (cont)
• Hand-held TWIC Readers (8)
– Communicate over wireless system
– Read and capture data from TWIC
– Communicate with access control system
• Compare existing data to current read
• Check TWIC TSA Hot List
• Record data from TWIC
![Page 36: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/36.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 37: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/37.jpg)
Option 1: Access Control System
• Existing AMAG ACS is Not TWIC Compatible
– AMAG requires an upgrade
– All biometric readers must be replaced
– Visitor Control system is home grown
– Enrollment System is home grown
• System Selection Will Be Made in conjunction with TWIC ASI
– Funding is imminent
![Page 38: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/38.jpg)
ACS (cont)
• Existing System includes:
– Magal Senstar fence detection system
– Perimeter cameras
• Passes Data to Navis TOS
– Allows mission tickets to be printed at gate if valid ID presented by trucker
– Link Trucker / Passenger to Truck
![Page 39: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/39.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 40: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/40.jpg)
Options 4 & 5: SRIN & CIIN
• Concepts and Budgeting were developed two years ago for SRIN and CIIN
– Budget may be inadequate
– Full system design should be developed regardless
• Make recommendation regarding what to buy first
• Options will be used to seek future funding
![Page 41: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/41.jpg)
Option 3: Command and Control System
• GPA has Multiple Systems in Place
– Magal Senstar Fence Detection
– Perimeter Cameras
– Operational Cameras
– AMAG ACS
– Navis TOS / ATAMS
– Trouble Kiosks
![Page 42: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/42.jpg)
Option 3 (cont)
• New Systems to be Fielded
– SRIN
– CIIN
– Lowlight / Thermal
– TWIC
– Remote TWIC Monitoring
![Page 43: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/43.jpg)
Option 3 (cont)
• 1 System
– All systems shall be brought into 1 system for command, control, dispatch, dissemination, analysis, recording
– SRIN, CIIN and LL/Thermal should all be installed as a single system
– Provide a plan to connect existing systems
![Page 44: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/44.jpg)
Option 3 (cont)
• Command and Control Can Be Deployed in Multiple Ways
– As part of an access control system
– As part of an analytics system
– As a standalone system
• No Funding Available
– Fund through SRIN, CIIN or LL/Thermal
– Make request for future grants
![Page 45: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/45.jpg)
Option 6: Connect Existing Systems
• Depending on How the Command and Control System is Fielded, Option 6 May Be needed to:
– Provide a plan for connecting existing systems
– Determine funding necessary
– Identify additional equipment or changes that must take place to bring everything into one system
![Page 46: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/46.jpg)
Scope of Work
– Savannah River Intrusion Network
– Colonel’s Island Intrusion Network
– Lowlight / Thermal Detection and Response
– TWIC Access System Integration
• Option 1: Access Control System
– Options 3-6
– Option 7: Unsolicited
![Page 47: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/47.jpg)
Option 7: Unsolicited
• This is an opportunity to recommend systems or changes to improve the overall security of the Ports that have not been requested in the RFP
– May be used to obtain future grants
![Page 48: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/48.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 49: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/49.jpg)
Requirements
• 3 Types of Requirements
– Shall – indicates mandatory
– Should – indicates reasonably required
– May – indicates a “nice-to-have”
• No One is Expected to Meet All Requirements
– Must indicate levels guaranteed for each requirement
![Page 50: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/50.jpg)
Requirements (cont)
• General Requirements
– Improve Security
– Use Automation to reduce/maintain personnel
– Life Cycle Costs estimates
• Initial Cost
• Replacements
• Maintenance
– Reliability – No Single Point Failures
– Grounding – 5 ohms – no chemicals
![Page 51: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/51.jpg)
Requirements (cont)
• Backup Power
– 1 hour general requirement
– 3 Days if supplied by solar power
– None if tied to a source with generator backup
• OFF THE SHELF – Open Architecture
• Operations and Maintenance Manuals
• Warranties
![Page 52: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/52.jpg)
Requirements (cont)
• Weather
– All conditions – no exceptions
• Winds – 3 Stages
– Low Winds – operational
– Medium Winds – Not operational but returns automatically when winds die down
– Cat 5 Hurricane – Not operational without assistance
![Page 53: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/53.jpg)
Requirements (cont)
• Network Latency – Camera Control and Response Times
• Automation – no excuses
– Camera Angles
– Sun Spots
• Recording – 30 Days
• GPA Prefers Oracle Databases but also uses SQL
![Page 54: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/54.jpg)
Requirements (cont)
• TWIC Biometric Readers– Fast Enrollment
– Fast Reads
– Few Failures – No Exceptions• Greasy Hands
• Cut Fingers
• Poor Ridges
• Command Center– Situational Awareness!!!
![Page 55: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/55.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 56: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/56.jpg)
Appendices
• AMAG Inventory
– AMAG Symmetry S813 – 48
• Biometric + Smartcard
– AMAG Symmetry S635 – 54
• Magnetic Swipe
– Keypad Only - 1
![Page 57: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/57.jpg)
Appendices
• Appendices are being Re-evaluated– As described in RFP – too sensitive
• Appendix 14: Fiber Loop– Dark fiber is unreliable
• Bidders shall select camera locations
• Bidders shall seek closest network node and price accordingly
• Top proposals shall verify locations and network before final pricing
– Network Nodes will be published
![Page 58: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/58.jpg)
Appendices (cont)
• Appendix 16: Existing Fence Detection System– No benefit to providing it to bidders
– If you need specific information, submit a formal question in writing
– Will not be published
• Appendix 17: List of Existing Camera Locations– Will not be published
– Bidders shall assume no cameras are present in locations sought with these grants
![Page 59: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/59.jpg)
Appendix 18: Camera Fields of View
• Too Sensitive – Will Not be Published
– Specific questions can be asked in writing
![Page 60: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/60.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 61: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/61.jpg)
Commissioning
• Provide Draft Test Plan
– What tests at component level?
– What tests at system level?
– How will you accomplish tests – set up scenarios?
![Page 62: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/62.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 63: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/63.jpg)
Bid Process
• Bid Team Will Review Proposals
– Finance Team (40%)
– Technical Team (60%)
• 20 Copies of Technical Proposal with Disks
• 1 Copy of Financial Proposal
• GPA Will Invite 2-5 Teams for Orals
– May be followed by demonstrations or proof of concept
![Page 64: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/64.jpg)
Proposal
• 10% Bid Bond
• Bid Forms
– Appendices
• Several forms will be turned in with proposal
– Addendums
• Must indicate that proposals take into account addendums
![Page 65: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/65.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 66: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/66.jpg)
Schedule
• Written Questions Due – 24 April
• GPA Responses – 8 May
• Proposals Due – 21 May
• Expect 3 months minimum before evaluations completed
• Letter of Intent
– Contract negotiations
• Start Work – Estimate 1 Nov
![Page 67: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/67.jpg)
Request for Proposal
• Scope of Work
• Requirements
• Appendices
• Commissioning
• Bid Process
• Schedule
• Contracts
![Page 68: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/68.jpg)
Contract
• Selected Team will be required to supply a contract
– Acknowledge Forms
• Multiple Contracts – One Per System
• Proposal and RFP will remain a Part of the Contract
– Requirements
– Accepted Levels of Performance
![Page 69: Various Security Projects](https://reader035.vdocuments.site/reader035/viewer/2022071602/613d5492736caf36b75c0cfc/html5/thumbnails/69.jpg)
Questions and Answers
• Questions and Responses will be Published
– Exception: Questions that are sensitive to bidder
– Must be indicated
– May be overruled by GPA