value stream mapping for office
TRANSCRIPT
-
8/10/2019 Value Stream Mapping for Office
1/51
G
Karen MartinPresidentThe Karen Martin Group, Inc.
Kim ScottiGrafx Senior Consultant,Lean Six Sigma Black Belt
-
8/10/2019 Value Stream Mapping for Office
2/51
?
.
D .
-
8/10/2019 Value Stream Mapping for Office
3/51
: , . (1993)
C / C : & ,
.
: C , D .
A :
2013
-
8/10/2019 Value Stream Mapping for Office
4/51
www.ksmartin.com/subscribe
-
8/10/2019 Value Stream Mapping for Office
5/51
Value Stream Mappings Roots
5
& , 1999 B & D , 2004
, .
.
& ,
-
8/10/2019 Value Stream Mapping for Office
6/51
D
: A , (
).
Customer
6
C C
-
8/10/2019 Value Stream Mapping for Office
7/51
The Work We Do:Degrees of Granularity
7
ValueStream
Process Process Process
Step Step Step
Value Stream
Map
Micro ViewTactical; heavy
frontlineinvolvement
Macro ViewStrategic;
heavy leadershipinvolvement
Metrics-BasedProcess Map
-
8/10/2019 Value Stream Mapping for Office
8/51
-
8/10/2019 Value Stream Mapping for Office
9/51
Support (Value-enabling) Value Streams
Estimating / RFQ response Hiring Recruitment to 1 st (or 90 th) day New product development Business plan development
Annual sales meeting planning & execution Contract development & execution And more
9
-
8/10/2019 Value Stream Mapping for Office
10/51
Value Stream Mapping Benefit:Seeing the Whole
10
60,000 ;
-
8/10/2019 Value Stream Mapping for Office
11/51
11
E =
E =
-
8/10/2019 Value Stream Mapping for Office
12/51
CLARITY
12
?
H ?
-
8/10/2019 Value Stream Mapping for Office
13/51
13
:A A
-
8/10/2019 Value Stream Mapping for Office
14/51
Create a Value Stream Storyboard withPaper & Post-Its (Team-Based)
14
-
8/10/2019 Value Stream Mapping for Office
15/51
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State Value Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
B
F
&D F
-
8/10/2019 Value Stream Mapping for Office
16/51
16
Interim
Briefing(s)
1 Contact Information
2 1
3 2
4 3
5 45
1 6
2 7
3 8
4 95 10
1 Contact Information
2 1
3 2
4 3
5 4
1
2
3
4 Date: Date:Signature:Date:
Potential Obstacles ApprovalsExecutive Sponsorto the team's success with the mapping activity.
Implementation Plan
Current state VSM Function
Future state VSM SMEs that may not be needed full time
Always a nice touch; keepsthe team from wandering.
Need ample wall space
Planned Deliverables On-Call Support
Aim for objectives w/ measurable targets (from X to X). Goals & Measureable Objectives
Why are you doing this? What are the current state issues? Function
Leadership-heavy
Event Drivers Mapping Team
List required attendees; othersare optional
BriefingAttendees
Boundaries &
LimitationsFS Implementation
Timeframe
What is the team NOT authorized to change?
Typically 90-120 days
Last Step Task on last process block
Value Stream Mapping CharterEvent Scope Leadership / Coordination Schedule
Start/EndTimes
VP or C-level
If needed - often Director orManager level
SpecificConditions
What circumstances you're including andexcluding? (type of cust, time of year, etc.)
Value StreamChampion
Contract processing, rebate processing, etc.Executive
SponsorValue Stream Event Date(s)
Team Lead Not always needed
Skilled person leading the activity
MealsProvided?
Location
CoordinatorThe person arranging logistics(reserving the room, ordering food,sending meeting notices, etc.)
Facilitator
First Step Task on first process block
Customer Demand
Trigger
How many times is this done per wk, qtr, mo, or yr.?
What need does t he value stream address?
Signature: Signature:
3 days typically; sequential is
best
6 hrs minimum; 7 or 8 is best
FacilitatorValue Stream Champion
Aid in consensus building and
organizational learning.
Name
Name
-
8/10/2019 Value Stream Mapping for Office
17/51
D
F
DF
DC
3 DE
C
-
8/10/2019 Value Stream Mapping for Office
18/51
F
F
D
C
C
-
8/10/2019 Value Stream Mapping for Office
19/51
D
F
DF
DC
3 DE
C
-
8/10/2019 Value Stream Mapping for Office
20/51
Step 1 Define Process Blocks
Identify all process blocks in the value stream(target 5-15 blocks) Each process block (post-it) contains an activity or
group of activities that occurs before a significantbreak in the timeline occurs (typically build up of WIPor handoff to another function)
Activity format is verb/noun what happens to what WALK THE VALUE STREAM!
20
-
8/10/2019 Value Stream Mapping for Office
21/51
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State V alue Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
C
-
8/10/2019 Value Stream Mapping for Office
22/51
Step 2 Define I.T. Systems
Identify all I.T. systems used in the process
and information flow Note any scheduling that occurs (calendar,system, etc.)
Who tells whom to do what? How do they tellthem?
22
-
8/10/2019 Value Stream Mapping for Office
23/51
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State Value Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
C
-
8/10/2019 Value Stream Mapping for Office
24/51
Step 3 Add Data
Key metrics for all process blocks Process Time (PT)
Lead Time (LT) Percent Complete & Accurate (%C&A)
Work-in-process (WIP) at every step.
Significant barriers to flow (e.g. batching,shared resources, system downtime, etc.)
24
-
8/10/2019 Value Stream Mapping for Office
25/51
C
# ()
B F
( / )
F
%C&A
B #
-
8/10/2019 Value Stream Mapping for Office
26/51
C
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State Value Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
-
8/10/2019 Value Stream Mapping for Office
27/51
Key Metrics: Time
Scenario 1
27
( )
( )
= + / D
-
8/10/2019 Value Stream Mapping for Office
28/51
Key Metrics: Time
Scenario 2
28
= + / D
( )
-
8/10/2019 Value Stream Mapping for Office
29/51
Key Metrics: Quality
%Complete and Accurate (%C&A) % of incoming work thats usable as is: the
downstream customer can perform taskwithout having to do rework:
Correct information or material that was supplied
Add information that should have been supplied Clarify information that should have or could have
been clearer
Determined by the person receiving the input;metric goes on the output block.
29
-
8/10/2019 Value Stream Mapping for Office
30/51
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State V alue Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
C
-
8/10/2019 Value Stream Mapping for Office
31/51
Step 4 Create Timeline
Create timeline Calculate summary metrics
Timeline PT Sum Timeline LT Sum
Activity Ratio (AR) Rolled %C&A
31
-
8/10/2019 Value Stream Mapping for Office
32/51
Summary Metrics: Time
Activity Ratio The percentage of time anything is being done
to the work passing through the system (whethervalue-adding or non-value-adding)
( PT LT) 100 Common current state finding in office/service =1-10% (across entire value stream)
32
-
8/10/2019 Value Stream Mapping for Office
33/51
Summary Metrics: Quality
Rolled % C&A The percent of value stream output that passes
through the process clean, with no hiccups,no rework required.
(%C&A x %C&A x %C&A) x 100 Common current state finding in office/service
= 0-15%
33
-
8/10/2019 Value Stream Mapping for Office
34/51
C
Customer
Process 5
Dept E
LT = 1 daysPT = 15 mins.%C&A = 95%
4
5
10 mins.
480 mins.
5 mins.
240 mins.
3 mins.
2 days
5 mins.
240 mins.
15 mins.
480 mins. Total LT = 5 days
Total PT = 38 mins.Activity Ratio = 1.6%Rolled %C&A = 69.1%
Process 3
Dept C
LT = 2 daysPT = 3 mins.%C&A = 99%
3
3Process 4
Dept D
LT = 0.5 daysPT = 5 mins.%C&A = 99%
2
4
ABC Technology, Inc.Current State V alue Stream Map
Softw are Upgrade Order FulfillmentCustomer Demand = 500/year
IT-1 IT-2
45 pcs 10 pcs
Process 2
Dept B
LT = 0.5 daysPT = 5 mins.%C&A = 75%
2
2
`
Process 1
Dept A
LT = 1 daysPT = 10 mins.%C&A = 99%
5
1
-
8/10/2019 Value Stream Mapping for Office
35/51
C
D = 15
Customer Demand:15 patients per Day
(Takt Time 1920 seconds)8 hours per day
ReferringPhysician
% C&A = 65 %
Check-inPatient
(Admitting)
Cycle Time = 2 mins.
% C&A = 90 %
5
SendReports
(Imaging)
Cycle Time = 3 mins.
% C&A = 90 %
6
Hospital
5 mins.
ScheduleAppointment
Cycle Time = 11 mins.Lead Time = 12 mins.% C&A = 98 %
6
Pre-registerPatient
Cycle Time = 30 mins.Lead Time = 990 mins.% C&A = 100 %
5
CT=Cycle TimeLT=Lead Time
%C&A=% Complete & Accurate
Lead Time = 12 mins.Lead Time = 990 mins.
PrepPatient(Tech)
Cycle Time = 10 mins.
% C&A = 100 %
2
Check-inPatient
(Imaging)
Cycle Time = 1 mins.
% C&A = 98 %
3
CompleteExam(Tech)
Cycle Time = 15 mins.
%C&A = 90 %
2
TransmitImages(Tech)
Cycle Time = 3 mins.
%C&A = 100 %
2
Read/DictateExam
(Radiologist)
Cycle Time = 15 mins.
% C&A = 95 %
2
TranscribeReport(MDI)
Cycle Time = 5 mins.
% C&A = 75 %
6
ReviewDraft/Sign
(Radiologist)
Cycle Time = 1 mins.
%C&A = 95 %
2
PrintReports
(Imaging)
Cycle Time = 1 mins.
% C&A = 99 %
230 mins. 5 mins. 248 mins. 365 mins. 960 mins. 110 mins. 120 mins.45 mins.
E Pay
Excel
ADS
Symposium
Internet
Waiting RoomManagement
System
Fax OrderSolutions
PACS
5 mins.
Lead Time = 24 days
Meditech
1234
5 6 7 8 9 10 11 12 13 14
Auto Fax 50%Us Mail 25%
MD Mailbox 25%
Rework Loopvia Fax 25% ofthe time
Rolled First Passyield = 29%
5 minutes
2 minutes 11520 minutes
1 minutes
45 minutes
10 minutes
30 minutes
15 minutes
5 minutes
3 minutes
248 minutes
15 minutes
365 minutes
5 minutes
960 minutes
1 minutes
110 minutes
1 minutes
120 minutes
3 minutes
L/T = 13464 minutes
VA/T = 11576 minutes
-
8/10/2019 Value Stream Mapping for Office
36/51
Outpatient Imaging Value Stream
Current State Findings
36
Metric Current
State
Projected
Future State
%
ImprovementLead Time 32.5 hrs
Process Time 56 mins
Activity Ratio 2.9%Rolled %C&A 29%
-
8/10/2019 Value Stream Mapping for Office
37/51
Step 5 Determine VA & N Steps
Identify all value-adding (VA) andnecessary non-value-adding (N) steps
Add VA or N smaller post-it to relevantprocess blocks
All unnecessary non-value-adding blocks
remain unlabelled
37
-
8/10/2019 Value Stream Mapping for Office
38/51
Customer-Defined Value
Value-Adding (VA) - any operation or activityyour external customers value, are (or would
be) willing to pay for, or its a requirement ofdoing business with them. Non-Value-Adding (NVA) - any operation or
activity that consumes time and/or resources butdoes not add value to the product (good orservice) the customer receives. Necessary support processes, regulatory
requirements, etc.; also referred to as essential orvalue-enabling.
Unnecessary everything else - WASTE
38
-
8/10/2019 Value Stream Mapping for Office
39/51
E ( )
E
( )
( / )
39
-
8/10/2019 Value Stream Mapping for Office
40/51
C F
( ) .
40
A
A
D
A
-
8/10/2019 Value Stream Mapping for Office
41/51
D
F
D
F
DC
3 DE
C
-
8/10/2019 Value Stream Mapping for Office
42/51
Future State Design
Goal: Eliminate all redundancies andbarriers to flow (the work should never
stop) Batches Rework
Bottlenecks & WIP Handoffs Setup / changeover
Physical layout Motion & transportation
42
F D = 15
-
8/10/2019 Value Stream Mapping for Office
43/51
ReferringPhysician
% C&A = 85 %
SendReports
(Imaging)
Cycle Time = 3 mins.% C&A = 90 %
6
Hospital
Schedule apptPre-register
Cycle Time = 11 mins.Lead Time = 45 mins.% C&A = 98 %
6
CT=Cycle TimeLT=Lead Time
%C&A=% Complete & Accurate
0.0833 hrs.1 mins.
0.583 hrs.10 mins.
0.333 hrs.10 mins.
0.0833 hrs.2 mins.
2 hrs.15 mins.
7 hrs.1 mins.
0.0333 hrs.1 mins.
0.5 hrs.3 mins.
LT = 11.3 hrs.CT = 43 mins.CT/LT Ratio = 6.32%
Lead Time = 45 mins.Lead Time = 15 days
PrepPatient(Tech)
Cycle Time = 10 mins.% C&A = 100 %
2
Check-inPatient
(Imaging)
Cycle Time = 1 mins.% C&A = 98 %
3
CompleteExam(Tech)
Cycle Time = 10 mins.% C&A = 90 %
2
TransmitImages(Tech)
Cycle Time = 2 mins.% C&A = 100 %
2
Read/DictateExam
(Radiologist)
Cycle Time = 15 mins.% C&A = 95 %
2
ReviewDraft/Sign
(Radiologist)
Cycle Time = 1 mins.% C&A = 95 %
2
PrintReports
(Imaging)
Cycle Time = 1 mins.% C&A = 99 %
220 mins. 5 mins. 120 mins. 420 mins. 2 mins. 30 mins.35 mins.
E Pay
Excel
Symposium
Internet
Waiting RoomManagement
System
Fax OrderSolutions
PACS
5 mins.
Set-upReduction
RemoveCheck in
and ReduceSystem Access
WorkBalancing
StandardWork
Pull System(SuppliesKanban)
VisualWorkplace
VoiceRecognition
BatchReductions
5S
Co-locate
StandardWork
WorkBalance
ContinuousFlow
Value StreamAlignment
Auto Fax 80%Us Mail 15%MD Mailbox 5%
Rolled First Passyield = 40%
Rework Loopvia Fax 10% ofthe time
Customer Demand:15 patients per Day
(Takt Time 1920 seconds)8 hours per day
123
4 5 6 7 8 9 10 11
RiskReduction
(JointCommision)
Meditech
: ( )
C (C )
-
8/10/2019 Value Stream Mapping for Office
44/51
Outpatient Imaging Value Stream
Projected Future State Results
44
Metric CurrentStateProjected
Future State%
Improvement
Lead Time 32.5 hrs 11.3 hrs 65%
Process Time 56 mins 43 mins 23%
Activity Ratio 2.9% 6.3% 117%
Rolled %C&A 29% 40% 38%
-
8/10/2019 Value Stream Mapping for Office
45/51
D
F
D
F
DC
3 DE
C
Future State Implementation Plan
-
8/10/2019 Value Stream Mapping for Office
46/51
Value Stream
1 2 3 4 5 6 7 8 9 10 11 12
2 Improve quality of referral KE Sean O'Ryan
3, 4 Reduce lead time beween schedulingandpreregistration steps PROJDianne
Prichard
5, 6 Eliminate the need for two patient check-ins KEMichaelO'Shea
6 Eliminate bottleneck in waiting area KE DiannePrichard
9 Eliminate lead time associated withtranscription step PROJ Sam Parks
10 Eliminate batched reading KE Sam Parks
7 Reduce inventory costs, regulatory riskand storage needs KEMichaelO'Shea
12 Reduce delay in report delivery PROJ Martha Allen
12 Reduce delay in report delivery KE Martha Allen
Implement voice recognition technology
Reduce setup required
Cross-train and colocate work teams
Implement additional fax ports
Collect copays in Imaging
Balance work / level demand
5S CT supplies area; implement kanban
Value Stream Mapping Facilitator
Increase percentage of physiciansreceiving electronic delivery (rather thanhard copy)
Approvals
Executive Sponsor Value Stream Champion
Signature:
Date: Date: Date:
Signature: Signature:
Block#
Goal / Objective Improvement Activity
Implement standard work for referralprocess
Type OwnerImplementation Schedule (weeks) Date
Complete
Date Created
11/21/2007
Allen Ward
Sally McKinsey
Dave Parks 12/13/200710/18/2007 1/10/2008
Future State Implementation Plan
Executive Sponsor
Value Stream Champion
Value Stream Mapping Facilitator
Implementation Plan Review Dates
11/1/2007
Outpatient Imaging
-
8/10/2019 Value Stream Mapping for Office
47/51
D
F
D
F
DC
3 DE
C
E E A
C D .
-
8/10/2019 Value Stream Mapping for Office
48/51
Manufacturing Office
Customer icon Upper right Center
Supplier icon Upper left None
The thing were following Raw material, sub-assemblies,finished goodsPaper, verbal, and electronic
Information
Information Flow More structured / formalized I.T.systems Multiple I.T. systems andwork-arounds
Schedule notification Multiple points across VSM Work not scheduled
Material flow (via hollowarrow) Yes Sometimes
WIP icon Inventory triangle In-bin (if preferred)
LT determination for eachblock
Based on the time to process all ofthe accumulated WIP between
process blocks
Based on a single item passingthrough the value stream
Hands-on time to do thework Cycle Time Process Time
Quality Metric First Pass Yield (FPY) Percent Complete & Accurate(%C&A)
Takt Time Typically can be applied Applicable in areas with dedicatedresources
?
-
8/10/2019 Value Stream Mapping for Office
49/51
?
, 7770 #635
D , CA 92122858.677.6799
@ .: @
B & : . . /
?
-
8/10/2019 Value Stream Mapping for Office
50/51
. . / C D A
. . /503 404 6050
?
-
8/10/2019 Value Stream Mapping for Office
51/51
!