UNDERSTANDING THE VALUE OF RELIABILITY FOR THE FREIGHT INDUSTRY
FTAC MeetingAugust 12th, 2015
Xia JinLCTR, FIU
Outline
Background Purpose Objectives Challenges Stated Preference Survey
Recruitment Experiment Design
Background
Growing demand for
freight transportation
Better understanding
of freight behavior
Increasing role of reliability
in freight transportation
Purpose
Value of Reliability (VOR) refers to the monetary value users place on reliability, or how much the users are willing to pay to reduce the variability of travel time.
It is a critical parameter in benefit-cost analysis, and transportation planning to measure the monetary equivalency of improvements in reliability.
This study aims to understand how the freight community value travel time reliability in their transportation decisions.
Benefits to the Community
Support investment decisions that reflect the needs of freight stakeholders better understanding of how the users (shippers and
carriers) respond to changes in reliability tools to evaluate alternative freight management and
operational strategies.
Project Objectives
Review existing studies on VOR and identify knowledge and data gap;
Conduct stated preference survey to understand user decision-making;
Develop models to estimate VOR by stratification, such as, commodity type, trip length, and business type, etc.
Incorporate VOR in freight analysis and project evaluation.
Stated Preference (SP) Survey
SP surveys are designed to collect preference information from the users through hypothetical scenarios.
Recruitment Stage Background information One recent shipment information
SP Scenarios Eight to nine scenarios, each consists of 2 or 3
alternatives
Proposed Market Segment - Shippers
Light Medium Heavy
Yes X X X X X X
Delivery Window Pressure
X X
Truck
Non
-pe
rish
able No X X X X
Yes X X X X X XPeri
shab
le No X X X X X X
Shippers
RailWaterways
Air
Proposed Market Segment - Carriers
Carriers Truck Rail
Water-ways Air Shipping
Distance Light Medium Heavy Shipping Distance
Con
tain
eriz
ed
<50 Miles X X X <300 Miles X
X X
50-300 Miles X X X
300+ Miles X X X 300-
1000 Miles
X
Non
-C
onta
iner
ized
<50 Miles X X X 50-300 Miles X X X
> 1000 Miles X 300+
Miles X X X
Experimental Design
C1 –within-mode trade-offs among travel time, cost and reliability;
C2 –within-mode trade-offs among travel time, cost, reliability, and departure time;
C3 –cross-mode trade-offs between roadway and railway shipment based on travel time, cost, travel time reliability, service flexibility and probability of shipment damage.
C4 –cross-mode trade-offs between roadway and railway based on travel time, cost, travel time reliability, departure time, service flexibility and probability of shipment damage.
DesignFlow
Recruitment Instrument –Shipment Information
Recruitment Instrument –Background Information
Experiment Design
Alternative 1
Alternative 2
Alternative 3
Mean Transit Time : 10 hrs Mean Transit Time: 15 hrs Mean Transit Time: 12.5 hrs
The shipment has an equal chance of arriving at any of
the following time :
4.5 hours early 2 hours early
On time 5 hours late
10 hours late ( Hints : very high reliability)
The shipment has an equal chance of arriving at any of
the following time :
6 hour early 3 hour early
On-time 4.5 hours late
9 hour late ( Hints : low reliability)
The shipment has an equal chance of arriving at any of
the following time :
3.5 hour early On-time On-time
3 hour late 3 hour late
( Hints : medium reliability )
Cost : $875 Cost : $250 Cost : $400
I prefer this option
I prefer this option
I prefer this option
C1
Alternative 1
Alternative 2
Alternative 3
Departure time : Morning : Before 6:00 AM or
after 10:00 AM, Or Afternoon : Before 3:00 PM
or after 7:00 PM
Departure time : Between 6:00 AM and 10:00 AM
(morning) or Between 3:00 Pm and 7:00 PM (noon)
Departure time : Morning : Before 6:00 AM or
after 10:00 AM, Or Afternoon : : Before 3:00 PM
or after 7:00 PM
Mean Transit Time : 8 hrs Mean Transit Time: 12.5 hrs Mean Transit Time: 10 hrs
The shipment has an equal chance of arriving at any of
the following time :
1 hour early 1 hour early
On time On time
1 hour late ( Hints : high reliability)
The shipment has an equal chance of arriving at any of
the following time :
6 hour early 4 hour early
On-time 5.5 hours late 12.5 hour late
( Hints : very low reliability)
The shipment has an equal chance of arriving at any of
the following time :
0.5 hour early On-time On-time On-time
1 hour late ( Hints : medium reliability )
Cost : $500 Cost : $400 Cost : $750
I prefer this option
I prefer this option
I prefer this option
C2
Road
Rail
Mean Transit Time : 10 hrs Mean Transit Time: 20 hrs
The shipment has an equal chance of arriving at any of the following time :
3 hour early On time On time
2 hour late 2 hour late
( Hints : high reliability)
The shipment has an equal chance of arriving at any of the following time :
3 hour early 3 hour early
On-time On-time
2 hour late ( Hints : medium reliability )
Cost : $500 Cost : $280
Service Flexibility : Medium Service Flexibility : High
Probability of Shipment Damage : Medium Probability of Shipment Damage : Low
I prefer this option
I prefer this option
C3
C4Road
Rail
Road
Departure time : Between 6:00 AM and 10:00 AM
(morning) or Between 3:00 Pm and 7:00 PM (noon)
Departure time : Morning : Before 6:00 AM or
after 10:00 AM, Or Afternoon : Before 3:00 PM
or after 7:00 PM
Departure time : Morning : Before 6:00 AM or
after 10:00 AM, Or Afternoon : Before 3:00 PM
or after 7:00 PM
Mean Transit Time : 12.5 hrs Mean Transit Time: 15 hrs Mean Transit Time: 8 hrs
The shipment has an equal chance of arriving at any of
the following time : 3.5 hour early
On time On time 3 hours late
3 hours late ( Hints : high reliability)
The shipment has an equal chance of arriving at any of
the following time : 1 hour early
On-time On-time On-time
2 hours late ( Hints : very low reliability)
The shipment has an equal chance of arriving at any of
the following time : 1 hour early 1 hour early
On-time On-time
1 hour late ( Hints : Medium reliability )
Cost : $500 Cost : $625 Cost : $750
Service flexibility : Medium Service flexibility : Medium Service flexibility : Low
Probability of Shipment damage : Medium Probability of Shipment
damage : Medium Probability of Shipment damage : Medium
I prefer this option
I prefer this option
I prefer this option