v-node s equipment

32
F5361_A06 SpectralWave™ V-Node S STM-16/STM-4/STM-1 Multiplexer RELEASE 1.00 EQUIPMENT INSTALLATION NEC Corporation • 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan • TEL +81-3-3454-1111 • TELEX NECTOK J22686 • FAX +81-3-3798-1510/9

Upload: mohamed-ali

Post on 10-Dec-2015

6 views

Category:

Documents


1 download

DESCRIPTION

NEC V-NODE product

TRANSCRIPT

Page 1: V-Node S Equipment

F5361_A06

SpectralWave™ V-Node S

STM-16/STM-4/STM-1 Multiplexer

RELEASE 1.00

EQUIPMENT INSTALLATION

NEC Corporation • 7-1, Shiba 5-chome, Minato-ku, Tokyo 108-8001, Japan • TEL +81-3-3454-1111

• TELEX NECTOK J22686 • FAX +81-3-3798-1510/9

Page 2: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLTION

SpectralWave is a registered trademark of NEC Corporation.

Copyright © 2006-2007 by NEC Corporation.

All rights reserved.

The information of this manual was approved by product manager of CND.

This manual is subject to change without notice.

1st Issue Mar 2006

Printed in China

Page 3: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

CONTENTS

Contents – i –

E

1. SUMMARY 1-1

2. EQUIPMENT DESCRIPTION 2-1

2.1 Description........................................................................................ 2-1

2.2 V-Node S Subrack View.................................................................... 2-1

2.3 V-Node S Subrack Dimensions ....................................................... 2-2

3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT 3-1

3.1 Environment and Performance ....................................................... 3-1

3.2 Safety Items ...................................................................................... 3-2

3.3 Admonishment ................................................................................. 3-2

4. OVERVIEW OF INSTALLATION TASKS 4-1

4.1 Installation Flow................................................................................ 4-1

4.2 Reference .......................................................................................... 4-1

5. INVENTORY TOOLS 5-1

5.1 Crew Tool Box................................................................................... 5-1

5.2 Personal Tool Box ............................................................................ 5-3

6. SITE PREPARATION 6-1

7. UNPACK EQUIPMENT 7-1

7.1 Unpack and Verify Contents ............................................................ 7-1

8. INSTALL V-NODE S SUBRACK 8-1

8.1 To 19inch RACK................................................................................ 8-1

8.2 To NEC ETS V-RACK ........................................................................ 8-2

9. GROUNDING SYSTEM 9-1

Page 4: V-Node S Equipment

This page is intentionally left blank.

Page 5: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Summary 1-1

E

1. SUMMARY

This manual provides the equipment descriptions for the system, rack layouts and Subracks used for the V-Node S, and their procedures.

Detailed descriptions on boards and modules, and their installation procedures are provided in the Unit Installation manual.

Descriptions and procedures for cable connections are provided in the Cable Installation manual.

NOTE: The components that make up a V-Node S system are follows:

Boards (Interface) are installed into the Subrack.

Include one MCP, two P_INF, two CS, one FAN, one CLK board and seven interface boards.

Modules are mounted on the board for additional function.

A Subrack with the boards composes network element (NE).

Page 6: V-Node S Equipment

This page is intentionally left blank.

Page 7: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Equipment Description 2-1

2. EQUIPMENT DESCRIPTION

2.1 Description V-Node S subracks can be installed into the ETSI rack and maximum 8 subracks can be installed into the NEC’s ETSI subrack (V-RACK).

2.2 V-Node S Subrack View V-Node S subrack view shows as follows. If you want to see the board view, please see the B07_UNIT INSTALLATION manual.

Figure 2-1. V-Node S subrack view

Page 8: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Equipment Description 2-2

E

2.3 V-Node S Subrack Dimensions Figure 2-2 shows the dimension of the V-Node S equipment.

Figure 2-2. V-Node S subrack dimension

Page 9: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Equipment Installation Safety Requirement 3-1

3. EQUIPMENT INSTALLATION SAFETY REQUIREMENT

Follow the safety requirements below when installing the V-Node S equipment.

3.1 Environment and Performance When performing hazardous work or entering potentially hazardous areas, wear

protective equipment, such as head or eye protection.

Smoking or open flames are prohibited in the operation area.

Properly remove and dispose of all unused hazardous materials.

Comply with hazardous material documentation and reporting requirements

After using any power tools or other equipment, they must be cleaned up and put in storage on a daily basis.

Keep all tools within the designated work area.

When cutting any kind of material, safety glasses are required.

When handling conducting cables, the cable ends must be taped or insulated at all times.

Do not wear any jewelry or any other kinds of accessories, such as ID around the neck, while working.

All accidents on-site must be reported to appropriate personnel and to your supervisor as soon as possible.

Page 10: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Equipment Installation Safety Requirement 3-2

E

3.2 Safety Items

Have all safety items available on-site:

• “Caution” Tape

• Safety Cones

• Safety Glasses/Goggles

• First Aid Kit

3.3 Admonishment

Installers must also be familiar with and able to employ the following Safety Requirements:

CAUTION

ESD

ESD Sensitive Equipment The V-Node S equipment is ESD sensitive. Every precaution should be observed while working around this equipment. Personnel should always wear ESD grounding straps while handling any boards and modules. Place them in an ESD proof bag when they are not actually installed in the system.

Page 11: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Overview of Installation Tasks 4-1

E

4. OVERVIEW OF INSTALLATION TASKS

Tasks to install the SpectralWave V-Node S equipment are listed below:

4.1 Installation Flow

ORDER TASKS (Sections Containing Procedures) DESCRIPTION

1 Site Preparation Prepare the installation site. Define floor layout.

2 Unpack Equipment Receive equipment, uncrate and inspect received equipment.

3 Install Rack See appropriate instruction manual.

4 Install V-Node S Subrack Install Subrack into the rack.

4.2 Reference

Procedures for the following tasks are provided in a separate manual:

ORDER TASKS (Sections Containing Procedures) REFERENCE

5 Verify strap settings on boards before installing them into the Subrack. Unit Installation manual.

6 Install boards into the Subrack. Unit Installation manual.

7 Power and Grounding Cable Installation manual.

8 Route and connect cables. Cable Installation manual.

Page 12: V-Node S Equipment

This page is intentionally left blank..

Page 13: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Inventory Tools 5-1

5. INVENTORY TOOLS

Before starting the equipment installation, confirm that the following tools are available:

5.1 Crew Tool Box

# TOOLS CHECKS / YOUR NOTES

1 Hammer Drill

2 Cordless Electric Drill & Bit Index

3 Electric Drill

4 Torque Wrench

5 Large Pry Bar

6 Torque Screw Driver

7 3/8-inch Masonry Bit

8 5/8-inch Masonry Bit

9 TBM-14 Hydraulic Crimper (with assorted dies)

10 TBM-25S Hand Crimper

11 Jig Saw

12 Hacksaw

13 Portable Band Saw

14 3-inch Hole Saw

15 1-inch Hole Saw

16 Heat Gun

17 Wire-Wrap Gun

18 Optical Light Source / Optical Power Meter

19 Ratchet & Socket Set

20 Cable Cutters

21 Cable Jacks; for reels

22 Extension Cords

23 Plumb Bob (Line)

24 4-foot Steel Level

25 Chalk Line

26 Antistatic Wrist Strap (3M 2224 Charge-Guard or equivalent)

Page 14: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Inventory Tools 5-2

# TOOLS CHECKS / YOUR NOTES

27 Canvas Tarpaulin (fireproof & ESD resistant)

28 Safety Cones & Safety Tapes

29 P-Touch Label Maker & Various Cartridges

30 Brady Label & Labels

31 Working Lamp / Drop Light

32 Heavy Duty Flashlight

33 Two 6-feet Ladders (Fiberglass)

34 Vacuum Cleaner and Canister

35 Broom and Dust Pan

Page 15: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Inventory Tools 5-3

E

5.2 Personal Tool Box

# TOOLS CHECKS / YOUR NOTES

36 Cable Scissors

37 Cable Butting Knife

38 Cable Lacing Needles

39 Cable Stripper

40 Hand Wire / Cable Cutters

41 Cable-Side Cutter

42 Wire Wrap/Unwrap Tool

43 Sockets

44 Crimping Tool (AMP 59500-0, 45066-3)

45 Claw Hammer

46 Ball Peen Hammer

47 Adjusted Wrenches

48 Pry Bar

49 Screw Drivers (assorted)

50 Nut Drivers (assorted)

51 Digital millimeters

52 Speed Square

53 Drill Bits

54 Pliers

55 Needle-Nose File / Rat Tail File

56 Flat or Bastard File

57 Torpedo Level

58 Center Punch

59 Sponge

60 Flashlight

61 Marking Pens

62 Measuring Tapes

Page 16: V-Node S Equipment

This page is intentionally left blank.

Page 17: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Site Preparation 6-1

E

6. SITE PREPARATION

Verify the location for the V-Node S Subrack to be installed.

Determine the availability and location of the following terminals:

• Station power

• Fiber distribution panel (FDP) or enhanced interface panel (EIP)

• Alarm distribution panel

Determine the position and direction of all cable runs.

Page 18: V-Node S Equipment

This page is intentionally left blank.

Page 19: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Unpack Equipment 7-1 E

7. UNPACK EQUIPMENT

7.1 Unpack and Verify Contents

PROCEDURE

1. Verify that all crates and cartons have been received.

2. Verify that crates and cartons are not damaged.

3. Locate markings on the box, and position the box with the correct side up according to the markings.

4. Open the carton with the carton knife or a razor blade.

5. Remove the contents from the carton, and place them on a flat patch.

6. Check the contents of the carton against the packing list.

7. Check the contents (Subracks, modules, cables, etc.) for visible damages.

NOTE: Contact NEC or your project contractor if any damage is found.

Page 20: V-Node S Equipment

This page is intentionally left blank.

Page 21: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-1

8. INSTALL V-NODE S SUBRACK

8.1 To 19inch RACK

This section describes the mounting method of the V-Node S subrack for 19 inch standard rack.

Attention!

Since the Subrack is heavy (11 kg), two or more people are required for the installation. Subrack should be installed according to following procedure.

(1) Mount the subrack slowly into the rack.

(2) Fasten the subrack to the rack with appropriate screw.

Figure 8-1 Fasten Subrack to Standard Rack

Page 22: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-2

8.2 To NEC ETS V-RACK

This section describes the mounting method of the V-Node S subrack for the NEC ETS V-RACK (ETS V-Rack). For information about the ETS V-Rack, refer to ETS V-Rack manual. Subrack mounting components are necessary to mount the V-Node S subrack in the NEC ETS V-Rack. Before starting the installation work, check supplied components shown in Table 8-1.

Table 8-1 Components List

ITEM NEC CODE NUMBER Q’TY

Cable Support 128-B05323-02 2

RAC Nut 125-B03310-07 6

Screw (M6) PL-CPIMSX6X10X3GF 6

Screw (M4) PL-CPIMSX4X X3GF 2

Figure 8-2 Components for Subrack Mounting

The following flowchart shows a series of procedures necessary for installing the subrack. The subrack should be mounted according to these procedures.

Page 23: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-3

Figure 8-3. The Procedures for Installing the Subrack

Page 24: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-4

Figure 8-4 and Figure 8-5 shows one sample about the standard mounting positions for the V-Node S subrack. If you install the cable from the upper side of the subrack, please make a space 100mm or more between the subrack. (Figure 8-4) And if you install the cable from left or right side of the subrack, you can install as Figure 8-5.

Figure 8-4 Subrack Mounting Positions

(The Case of Cabling from upper side)

Page 25: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-5

Figure 8-5 Subrack Mounting Positions

(The Case of Cabling from left or right side)

Page 26: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-6

Procedure 8-1: Attach the RAC Nut

Attach the RAC nuts at both sides to the mounting positions shown in Figure 8-4 and Figure 8-5.

Figure 8-6 Attach RAC Nut

Page 27: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-7

Procedure 8-2: Mounting Cable support

(1) Insert the cable supports into the square holes on the V-Rack rear panel.

Figure 8-7 Insert cable supports into the square holes

(2) Fasten the M4 screws to fix the cable supports. Keep in mind that the fastened positions of the cable support is differed with the cable install location.

Figure 8-8 Fasten screws to fix cable support.

Page 28: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-8

Procedure 8-3: Mounting the Optical Tray of Subrack

(1) Loosen the hex-head screw on the subrack.

NOTE: Do not take off the hex-head screws from the subrack.

(2) Hang the optical tray slowly on the hex-head screws.

(2) Fasten the optical tray to the V-Rack with hex-head screws.

NOTE: When you use the hex-head screw to fix the tray to the subrack, please use

the supplied hex-head wrench.

Figure 8-9. Mounting the Optical Tray

Page 29: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 8-9

E

Procedure 8-4: Mounting Subrack

(1) Mount the subrack slowly on the subrack supports. (2) Fasten the subrack to the V-Rack with M6 screws.

Figure 8-10 Fasten Subrack to V-Rack

Attention!

1. The Subrack is heavy, two or more person are required for the installation.

2. When you install the subrack, please un-installed the board from the subrack.

Page 30: V-Node S Equipment

This page is intentionally left blank.

Page 31: V-Node S Equipment

F5361_A06 EQUIPMENT INSTALLATION

Install V-Node S Subrack 9-1

E

9. GROUNDING SYSTEM

There are 3 types of grounding: frame ground (FG); battery ground (BG); signal ground (SG). Every type of grounding insulates from other groundings.

If need use shield to prevent the internal circuit from electromagnetic radiation, connect with the frame ground (FG).

Page 32: V-Node S Equipment

This page is intentionally left blank.